ML20211P393

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Nov 1986 & Revised Operating Rept for Oct 1986.Gross Electrical Energy Generated for month,year-to-date & Cumulative Changed
ML20211P393
Person / Time
Site: Farley 
Issue date: 12/09/1986
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20211P397 List:
References
NUDOCS 8703020355
Download: ML20211P393 (1)


Text

.__

4 Alat ama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 AlabamaPower R. P. Mcdonald the southern electrc system Senior Vice President i

December 9, 1986 Docket No. 50-348 Director, Office of Resource Management U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Sir:

RE: Joseph M. Farley Nuclear Plant Unit 1 Monthly Operatino Data ReDort Attached are two (2) copies of the November 1986 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 1, required by Section 6.9.1.10 of the Technical Specifications. Also, attached is a revised copy of the October 1986 Operating Data Report in which the Gross Electrical Energy Generated (MWH) for the month, year-to-date and cumulative has been changed.

If you have any questions, please advise.

Yours very u y, V

R. P. Mcdonald

\\

RPM /BCE:pmm/F-2 Enclosures xc: Director, IE (10 copies)

Director, RII (1 copy) k

[k DO 5

8 4

.