- ML20203C577 (← links)
- ML20202E857 (← links)
- ML20202D487 (← links)
- ML20207F285 (← links)
- ML20206U885 (← links)
- ML20206J991 (← links)
- ML20214Q011 (← links)
- ML20214N328 (← links)
- ML20214J028 (← links)
- ML20212R226 (← links)
- ML20212Q041 (← links)
- ML20212E645 (← links)
- ML20212B530 (← links)
- ML20244C885 (← links)
- ML20238C381 (← links)
- ML20237K332 (← links)
- ML20248E452 (← links)
- ML20248B793 (← links)
- ML20248B287 (← links)
- ML20246K064 (← links)
- ML20245E830 (← links)
- ML20245D212 (← links)
- ML20236N024 (← links)
- ML20236H088 (← links)
- ML20236G688 (← links)
- ML20236D553 (← links)
- ML20235C306 (← links)
- ML20234D244 (← links)
- ML20215D368 (← links)
- B13364, Forwards Rev 19 to Modified Amended Security Plan.Rev Withheld (Ref 10CFR2.790(a)) (← links)
- B13375, Responds to Request for Addl Info Re Electrical Distribution Sys Design Associated W/New Switchgear Bldg.New Switchgear Bldg Provides Opportunity to Minimize Dependence on Motor Control Ctr 5 & Further Reduce Level of Risk (← links)
- B13374, Forwards Bimonthly Progress Rept 18 Re New Switchgear Bldg Const (← links)
- B13321, Informs of Inability to Submit plant-specific Analyses for Util as Planned,Due to Delays Encountered in Completing Sensitivity & Break Spectrum Analysis.Meeting Between NRC & Util Representatives Arranged for 890810 (← links)
- B13251, Forwards Bimonthly Progress Rept 16 for New Switchgear Bldg Const.Const on New Switchgear Continued to Progress,Per Revised Milestone Schedule Provided to NRC in Sept 1988.No Delay in Meeting Any Milestone Expected (← links)
- A07433, Proposed Tech Specs Re Leakage Detection Sys (← links)
- B13265, Requests That NRC Process 890331 Amend to License DPR-61 Re Containment Integrity During Containment Air Recirculation Fan Motor HX Cleaning Activities as Exigent Change (← links)
- A07040, Submits Results of long-term Analysis Per Commitment in 880324 Response to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes (← links)
- B13186, Provides Addl Info Re Dedication of commerical-grade Items, 10CFR21 Requirements & Westinghouse Technical Bulletin NSD-TB-83-02,in Response to Insp Rept 50-213/89-200 (← links)
- A07780, Comments on NRC 890123 SER Approving Inservice Insp Program, Third 10-yr Interval,Rev 1.Util Will Upgrade Classification of Svc Water Supply & Return Lines to Containment Air Recirculation Fan Coolers to ASME Class 2 (← links)
- B13225, Reiterates Util Position on 10CFR50.44(c)(3)(ii) & Provides Addl Info & Clarification Re Combustible Gas Control Issue. Calculations of Combustible Gas Generation Updated Following LOCA to Address Plans for Conversion to Zircaloy Cladding (← links)
- B13236, Draft Ltr Forwarding Comparison Between Util 880829 Proposed Tech Specs & Westinghouse STS & Justification for Any Deviations,Per 890330 Meeting W/Nrc (← links)
- B13188, Lists Amounts of Property Insurance Currently in Force for Facility (← links)
- B13352, Requests Exemption from Certain Requirements of 10CFR50,App J to Assure That Containment Leakage During Design Basis Event Will Not Exceed Applicable Leakage Limits. Justification Encl (← links)
- B13184, Documents Util Intention to Address Open Item Re Draft Emergency Exercise Scenario Package,In Response to NRC Questions Raised in Insp Rept 50-213/88-20 (← links)
- B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A (← links)
- B13351, Provides Clarifications of Util & NRC 890525 Insp Rept 50-213/89-200.Util Proposes to Extend Schedule for Completion of Sampling and Evaluation Program to 900930 & Valves That Fail Systematic Testing Will Be Replaced (← links)
- B13235, Forwards Addl Info to Support Completion of NRC Review of Reactor Protection Sys Upgrade Project.Rev 0 to IC-CALC-88-001, Connecticut Yankee Instrument & Controls Calculations:Dynamic Response of Low Pressurizer... Encl (← links)
- B13282, Forwards Response to 890501 Request for Addl Info Re Util Const of New Switchgear Bldg at Plant (← links)
- B13341, Forwards WCAP-12196, Svc Water Sys Design Basis Temp Increase to 95 F for Connecticut Yankee & Haddam Neck Plant, Per Request in Amend 112 to License DPR-61.Northeast Utils Svc Co Suppl to Rept Also Encl (← links)
- B13340, Submits Results of Svc Water & Primary Auxiliary Bldg Equipment Operability Analyses Not Provided in 890428 Submittal of Results of ECCS Single Failure Analysis (← links)