IR 05000443/2011403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:EFFICIAT USE ONtY SECURITY-REIATED INFORMATIONJuly 29,2011Mr. Paul FreemanSite Vice President, North RegionSeabrook Nuclear Power PlantNextEra Energy Seabrook, LLCc/o Mr. Michael O'KeefeP.O. Box 300Seabrook, NH 03874
{{#Wiki_filter:EFFICIAT USE ONtY SECURITY-REIATED INFORMATION July 29,2011 Mr. Paul Freeman Site Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. Michael O'Keefe P.O. Box 300 Seabrook, NH 03874


SUBJECT: SEABROOK STATION, UNIT NO. 1 - NRC SECURITY INSPECTIONREPORT 05000443/201 1 403
SUBJECT: SEABROOK STATION, UNIT NO. 1 - NRC SECURITY INSPECTION REPORT 05000443/201 1 403


==Dear Mr. Freeman:==
==Dear Mr. Freeman:==
On July 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a securitybaseline inspection at Seabrook Station. The inspection covered one or more of the keyattributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosedinspection report documents the inspection results, which were discussed on July 1 4,2011, withyou, and other members of your staff.The inspection examined activities conducted under your license as they relate to security andcompliance with the Commission's rules and regulations and with the conditions of your license'The inspectors reviewed selected procedures and records, observed activities, and interviewedpersonnel.Based on the results of this inspection, no findings were identified.ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from thePublicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMSis accessible from the NRC Website at http://www.nrc.qov/readinq-rm/adams.html (the PublicElectronic Reading Room). However, because of the security-related information contained inthe enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not beavailable for public inspection.Enclosure contains Sensitive UnclassifiedNon-Safeguards Information. When separatedfrom its enclosure, the transmittal document isdecontrolled.OFFIElAT USE ENtY SEEUruTY RETATED INFERMATION OFFIGIAT USE ONtY SEEURITY.RETATED INFORMATION ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements foryour response, if any. This practice will ensure that your response will not be made availableelectronically for public inspection in the NRC Public Document Room or from the NRC'sdocument system, ADAMS. lf Safeguards Information is necessary to provide an acceptableresponse, please provide the level of protection described in 10 CFR 73.22. Otherwise, markyour entire response "security-Related Information - Withhold Under 10 CFR 2.390'and followthe instructions for withholding in 10 CFR 2.390(bX1).
On July 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Seabrook Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 1 4,2011, with you, and other members of your staff.The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license'The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Sincerely,/RNJames M. Trapp, ChiefPlant Support Branch 1Division of Reactor SafetyDocket No. 50-443License No. NPF-86
Based on the results of this inspection, no findings were identified.
 
ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
 
Enclosure contains Sensitive Unclassified Non-Safeguards Information.
 
When separated from its enclosure, the transmittal document is decontrolled.
 
OFFIElAT USE ENtY SEEUruTY RETATED INFERMATION OFFIGIAT USE ONtY SEEURITY.RETATED INFORMATION ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "security-Related Information - Withhold Under 10 CFR 2.390'and follow the instructions for withholding in 10 CFR 2.390(bX1).
 
Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-443 License No. NPF-86  


===Enclosure:===
===Enclosure:===
Line 31: Line 41:


===Attachment:===
===Attachment:===
Supplemental Information(coNTAtNS OFFlClAL USE ONLY - SECURTTY RELATED INFORMATION (OUO-SRl))cc w/encl: w/OUO-SRlJ. Tucker, Security ManagerJ. Giarrusso, SLO, MassachusettsC. Pope, Director, State of NH Homeland Securitycc w/o encl: w/o OUO-SRI: Distribution via ListServOFFIElAT USE gNtY SECUHTY RETATED INFORMATION OFFICIAT USE ONtY SEEURITY-REIATEP INFORMATION
Supplemental Information (coNTAtNS OFFlClAL USE ONLY - SECURTTY RELATED INFORMATION (OUO-SRl))
cc w/encl: w/OUO-SRlJ. Tucker, Security Manager J. Giarrusso, SLO, Massachusetts C. Pope, Director, State of NH Homeland Security cc w/o encl: w/o OUO-SRI: Distribution via ListServ OFFIElAT USE gNtY SECUHTY RETATED INFORMATION OFFICIAT USE ONtY SEEURITY-REIATEP INFORMATION
}}
}}

Revision as of 14:41, 4 August 2018

IR 05000443-11-403, 07/11/2011 - 07/14/2011, Seabrook Station, Security. (Letter Only)
ML112101478
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/29/2011
From: Trapp J M
Plant Support Branch 1
To: Freeman P
NextEra Energy Seabrook
References
IR-11-403
Download: ML112101478 (4)


Text

EFFICIAT USE ONtY SECURITY-REIATED INFORMATION July 29,2011 Mr. Paul Freeman Site Vice President, North Region Seabrook Nuclear Power Plant NextEra Energy Seabrook, LLC c/o Mr. Michael O'Keefe P.O. Box 300 Seabrook, NH 03874

SUBJECT: SEABROOK STATION, UNIT NO. 1 - NRC SECURITY INSPECTION REPORT 05000443/201 1 403

Dear Mr. Freeman:

On July 14,2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at Seabrook Station. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on July 1 4,2011, with you, and other members of your staff.The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license'The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

ln accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.qov/readinq-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from its enclosure, the transmittal document is decontrolled.

OFFIElAT USE ENtY SEEUruTY RETATED INFERMATION OFFIGIAT USE ONtY SEEURITY.RETATED INFORMATION ln accordance with 10 CFR 2.390(bX1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. lf Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.22. Otherwise, mark your entire response "security-Related Information - Withhold Under 10 CFR 2.390'and follow the instructions for withholding in 10 CFR 2.390(bX1).

Sincerely,/RN James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-443 License No. NPF-86

Enclosure:

NRC lnspection Report No. 05000443i2011403 M

Attachment:

Supplemental Information (coNTAtNS OFFlClAL USE ONLY - SECURTTY RELATED INFORMATION (OUO-SRl))

cc w/encl: w/OUO-SRlJ. Tucker, Security Manager J. Giarrusso, SLO, Massachusetts C. Pope, Director, State of NH Homeland Security cc w/o encl: w/o OUO-SRI: Distribution via ListServ OFFIElAT USE gNtY SECUHTY RETATED INFORMATION OFFICIAT USE ONtY SEEURITY-REIATEP INFORMATION