| {{#Wiki_filter:Calvert Cliffs Nuclear Power Plant1650 Calvert Cliffs ParkwayLusby, Maryland 20657CENGa joint venture offlCorotellation | | {{#Wiki_filter:Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of flCorotellation |
| *#,DSEnergy* | | *#,D SEnergy* 0 CALVERT CLIFFS NUCLEAR POWER PLANT July 12, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: |
| 0CALVERT CLIFFSNUCLEAR POWER PLANTJuly 12, 2013U. S. Nuclear Regulatory Commission Washington, DC 20555ATTENTION:
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| Document Control DeskCalvert Cliffs Nuclear Power PlantUnit Nos. 1 & 2; Docket Nos. 50-317 & 50-318Response to NRC Regulatory Issue Summary 2013-06, Preparation andScheduling of Operator Licensing Examinations (a) NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling ofOperator Licensing Examinations, dated June 7, 2013 | | Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Response to NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations (a) NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations, dated June 7, 2013 |
|
| |
|
| ==REFERENCE:== | | ==REFERENCE:== |
|
| |
|
| Attached is Calvert Cliffs Nuclear Power Plant's response to Reference (a). The attached NRC Form 536contains the proposed schedules of examinations intended for preparation and the estimated number ofapplicants to be tested in site examinations in calendar years 2015 through 2018 and generic fundamentals examinations in calendar years 2015 and 2016.There are no regulatory commitments contained in this letter.Should you have questions regarding this matter, please contact me at (410) 495-5214 orMr. Douglas E. Lauver at (410) 495-5219. | | Attached is Calvert Cliffs Nuclear Power Plant's response to Reference (a). The attached NRC Form 536 contains the proposed schedules of examinations intended for preparation and the estimated number of applicants to be tested in site examinations in calendar years 2015 through 2018 and generic fundamentals examinations in calendar years 2015 and 2016.There are no regulatory commitments contained in this letter.Should you have questions regarding this matter, please contact me at (410) 495-5214 or Mr. Douglas E. Lauver at (410) 495-5219.Very truly yours, R. Mark Moore Manager -Training RMM/PSF/bjd |
| Very truly yours,R. Mark MooreManager -TrainingRMM/PSF/bjd | |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
|
| |
|
| (1) Response.to Regulatory Issue Summary 2013-06, NRC Form 536cc: N. S. Morgan, NRCW. M. Dean, NRCResident Inspector, NRCS. Gray, DNRb D ATTACHMENT (1)RESPONSE TO REGULATORY ISSUE SUMMARY 2013-06,NRC FORM 536Calvert Cliffs Nuclear Power Plant, LLCJuly 12, 2013 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: | | (1) Response.to Regulatory Issue Summary 2013-06, NRC Form 536 cc: N. S. Morgan, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR b D ATTACHMENT (1)RESPONSE TO REGULATORY ISSUE |
| 9/30/2014 (9-2011)Estimated burden per response to comply with this voluntary information collection request: | | |
| 1 hour. This information collection is used to planbudgets and resources for operator examinations. | | ==SUMMARY== |
| Send commentsregarding burden estimate to the Information Services Branch (T-5 F53),OPERATOR LICENSING U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or byinternet e-mail to infocollects.Resource@nrc.gov, and to the Desk Officer,EXAMINATION DATA Office of Information and Regulatory | | 2013-06, NRC FORM 536 Calvert Cliffs Nuclear Power Plant, LLC July 12, 2013 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 9/30/2014 (9-2011)Estimated burden per response to comply with this voluntary information collection request: 1 hour. This information collection is used to plan budgets and resources for operator examinations. |
| : Affairs, NEOB-10202, (3150-0131),
| | Send comments regarding burden estimate to the Information Services Branch (T-5 F53), OPERATOR LICENSING U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects.Resource@nrc.gov, and to the Desk Officer, EXAMINATION DATA Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is I not required to respond to, the information collection. |
| Office of Management and Budget, Washington, DC 20503. If a meansused to impose an information collection does not display a currently validOMB control number, the NRC may not conduct or sponsor, and a person isI not required to respond to, the information collection. | | FACILITY NRC REGION Calvert Cliffs Nuclear Power Plant, LLC Unit Nos. 1 & 2, Docket Nos. 50-317 & 50-318 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 0 5 0 5 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS |
| FACILITY NRC REGIONCalvert Cliffs Nuclear Power Plant, LLCUnit Nos. 1 & 2, Docket Nos. 50-317 & 50-318 1A. PROPOSED EXAMINATION PREPARATION SCHEDULEPROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018ESTIMATED NUMBER OFLICENSEE-PREPARED 0 1 0 1EXAMINATIONS ESTIMATED NUMBER OFNRC-PREPARED 0 0 0 0EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018NUMBER OF REACTOR 0 5 0 5OPERATORS NUMBER OF SENIORREACTOR OPERATORS | | -0 6 0 6 INSTANT NUMBER OF SENIOR REACTOR OPERATORS |
| -0 6 0 6INSTANTNUMBER OF SENIORREACTOR OPERATORS | | -0 3 0 3 UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-0 0 0 0 LIMITED PROPOSED DATES PRIMARY DATE August 8 August 6 ALTERNATE DATE September 12 September 10 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2015 .CY 2016 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 11 CANDIDATES NRC FORM 536 (9-2011)}} |
| -0 3 0 3UPGRADENUMBER OF SENIORREACTOR OPERATORS-0 0 0 0LIMITEDPROPOSED DATESPRIMARY DATE August 8 August 6ALTERNATE DATE September 12 September 10C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULEPROPOSED CY 2015 .CY 2016NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBERESTIMATED NUMBER OF 0 0 0 0 0 0 0 11CANDIDATES NRC FORM 536 (9-2011)}} | |
|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 IR 05000318/20240072024-11-0606 November 2024 Assessment Follow-Up Letter for Calvert Cliffs Nuclear Power Plant, Unit 2 (Report 05000318/2024007) ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums IR 05000317/20240032024-10-22022 October 2024 Integrated Inspection Report 05000317/2024003, 05000318/2024003, and Independent Spent Fuel Storage Installation Report 07200008/2024001 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24283A0012024-10-0909 October 2024 Senior Reactor and Reactor Operator Initial License Examinations IR 05000317/20245012024-10-0707 October 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000317/2024501 and 05000318/2024501 ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000317/20240052024-08-29029 August 2024 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2024005 and 05000318/2024005) ML24240A1112024-08-27027 August 2024 Registration of Use of Casks to Store Spent Fuel ML24240A2462024-08-27027 August 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240022024-08-0606 August 2024 Integrated Inspection Report 05000317/2024002 and 05000318/2024002 IR 05000317/20240102024-07-31031 July 2024 Age-Related Degradation Inspection Report 05000317/2024010 and 05000318/2024010 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24198A0442024-07-16016 July 2024 Inservice Inspection Report IR 05000317/20244012024-07-0909 July 2024 Security Baseline Inspection Report 05000317/2024401 and 05000318/2024401 ML24177A1832024-06-25025 June 2024 Inservice Inspection Report RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24161A0012024-06-0909 June 2024 Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report ML24150A0522024-05-29029 May 2024 Operator Licensing Examination Approval ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24136A1962024-05-15015 May 2024 Independent Spent Fuel Storage Installation - Annual Radiological Environmental Operating Report IR 05000317/20240012024-05-0707 May 2024 Integrated Inspection Report 05000317/2024001 and 05000318/2024001 RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests 05000317/LER-2024-002, Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus2024-04-29029 April 2024 Emergency Diesel Generators Automatic Start Due to Loss of a 13kV Bus 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip2024-04-24024 April 2024 Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip ML24101A1942024-04-22022 April 2024 Closeout Letter for GL 2004-02 ML24114A0182024-04-18018 April 2024 Electronic Reporting of Occupational Exposure Reporting 05000318/LER-2023-004-01, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-04-12012 April 2024 Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000317/20240402024-04-11011 April 2024 95001 Supplemental Inspection Report 05000317/2024040 and Follow-Up Assessment Letter RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24082A0082024-03-22022 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 ML24078A1152024-03-18018 March 2024 10 CFR 50.46 Annual Report ML24059A0632024-03-15015 March 2024 Authorization and Safety Evaluation for Alternative Request ISI-05-021 (EPID L-2023-LLR-0006) - Non-Proprietary IR 05000317/20230062024-02-28028 February 2024 Annual Assessment Letter for Calvert Cliffs Nuclear Power Plant, Units 1 and 2, (Reports 05000317/2023006 and 05000318/2023006 ML24052A0072024-02-14014 February 2024 Core Operating Limits Report for Unit 1, Cycle 27, Revision 0 ML24040A0962024-02-0909 February 2024 Notification of Readiness for NRC 95001 Inspection ML24040A1492024-02-0909 February 2024 Response to NRC Request for Additional Information Regarding Final Response to Generic Letter 2004-02 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank 2024-09-06
[Table view] |
Text
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 CENG a joint venture of flCorotellation
- ,D SEnergy* 0 CALVERT CLIFFS NUCLEAR POWER PLANT July 12, 2013 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
SUBJECT:
Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Response to NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations (a) NRC Regulatory Issue Summary 2013-06, Preparation and Scheduling of Operator Licensing Examinations, dated June 7, 2013
REFERENCE:
Attached is Calvert Cliffs Nuclear Power Plant's response to Reference (a). The attached NRC Form 536 contains the proposed schedules of examinations intended for preparation and the estimated number of applicants to be tested in site examinations in calendar years 2015 through 2018 and generic fundamentals examinations in calendar years 2015 and 2016.There are no regulatory commitments contained in this letter.Should you have questions regarding this matter, please contact me at (410) 495-5214 or Mr. Douglas E. Lauver at (410) 495-5219.Very truly yours, R. Mark Moore Manager -Training RMM/PSF/bjd
Attachment:
(1) Response.to Regulatory Issue Summary 2013-06, NRC Form 536 cc: N. S. Morgan, NRC W. M. Dean, NRC Resident Inspector, NRC S. Gray, DNR b D ATTACHMENT (1)RESPONSE TO REGULATORY ISSUE
SUMMARY
2013-06, NRC FORM 536 Calvert Cliffs Nuclear Power Plant, LLC July 12, 2013 NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 9/30/2014 (9-2011)Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch (T-5 F53), OPERATOR LICENSING U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet e-mail to infocollects.Resource@nrc.gov, and to the Desk Officer, EXAMINATION DATA Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is I not required to respond to, the information collection.
FACILITY NRC REGION Calvert Cliffs Nuclear Power Plant, LLC Unit Nos. 1 & 2, Docket Nos. 50-317 & 50-318 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2015 CY 2016 CY 2017 CY 2018 NUMBER OF REACTOR 0 5 0 5 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS
-0 6 0 6 INSTANT NUMBER OF SENIOR REACTOR OPERATORS
-0 3 0 3 UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-0 0 0 0 LIMITED PROPOSED DATES PRIMARY DATE August 8 August 6 ALTERNATE DATE September 12 September 10 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2015 .CY 2016 NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 0 0 11 CANDIDATES NRC FORM 536 (9-2011)