{{#Wiki_filter:As of: December 24, 2014Received:
{{#Wiki_filter:As of: December 24, 2014 Received:
December 22, 2014PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20Submission Type: WebDocket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating  
December 22, 2014 PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,, 14 Document:
: Station, Units 2 and 3Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating  
: Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,,14Document:
NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356
NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356
/ U// y ('97- 0 1 -179 F-Ile 4 4 4 rSubmitter Information Name: Ace Hoffman -]Address:P.O. Box 1936Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com  
/ U// y ('97- 0 1 -1 79 F-Ile 4 4 4 r Submitter Information Name: Ace Hoffman -]Address: P.O. Box 1936 Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com  
[2-TiC-)-An-iU)-°General CommentTo The NRC:You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology  
[2-Ti C-)-A n-i U)-°General Comment To The NRC: You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology  
--just as we see it -- if notbetter.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threatsof terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, isthe best you can do (and the final decision for which casks Southern California Edison (SCE) will use will notlast forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In PlaneFluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given baddata, but really, they should have red-flagged that data and alerted operators.
--just as we see it -- if not better.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threats of terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, is the best you can do (and the final decision for which casks Southern California Edison (SCE) will use will not last forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In Plane Fluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given bad data, but really, they should have red-flagged that data and alerted operators.
Furthermore, it's now believed bysome experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.
Furthermore, it's now believed by some experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.The point is, that this failure of the system is systemic in the nuclear industry.
The point is, that this failure of the system is systemic in the nuclear industry.
San Onofre was operating on "fix-SUNSI Review Complete Template = ADM -013 E-RIDS= ADM -03 Add= T- týTS&6# i&_
San Onofre was operating on "fix-SUNSI Review CompleteTemplate
on-fail" schedule, letting known problems wait until they became big problems before they would shut down and fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, and rust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires that had worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way to cost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would have continued if the cost of a third set of steam generators was absolutely prohibitive.
= ADM -013E-RIDS= ADM -03Add= T- týTS&6# i&_
So maybe you should run some tests, and see what sorts of bounds the software programs the computer industry uses would have identified the problem that actually occurred.
on-fail"  
Don't tear down San Onofre at all. Run it into the ground (without radioactive fuel; use alternate heating sources).These tests should be paid for by the nuclear industry's insurance company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem. You're not seriously planning to leave it on site for even 10 years, are you?!?! Seriously?
: schedule, letting known problems wait until they became big problems before they would shut downand fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, andrust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires thathad worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way tocost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would havecontinued if the cost of a third set of steam generators was absolutely prohibitive.
Why? The cost to America of an accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in the middle of Southern California?
So maybe you should run some tests, and see what sorts of bounds the software programs the computer industryuses would have identified the problem that actually occurred.
Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or your predecessors, the Atomic Energy Commission) promised a technological solution to the waste problem: Mitigation, containment, isolation, reduction, reprocessing, recycling, breeding, rocketing it to the sun, subsea burial, vitrification (for low-level transuranics and fission products), big tanks at Hanford...
Don't tear down San Onofre at all. Run it into theground (without radioactive fuel; use alternate heating sources).
the list goes on and nothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRC whenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, and technologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:
These tests should be paid for by the nuclear industry's insurance  
each a potehtial show-stopper, Yucca Mountain suffers from all these problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.
: company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem.
Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin compared to the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned by SCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate any worker who complains about these problems).
You'renot seriously planning to leave it on site for even 10 years, are you?!?! Seriously?
YOU have to protect America. YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).
Why? The cost to America ofan accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in themiddle of Southern California?
Require Edison to remove the waste long before Stress Corrosion Cracking of the containers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 years the NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite for many centuries:
Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or yourpredecessors, the Atomic Energy Commission) promised a technological solution to the waste problem:Mitigation, containment, isolation, reduction, reprocessing, recycling,  
Far beyond the 300 years you've already guessed is possible.One last request: Stop pulling numbers out of your hat.Ace Hoffman Carlsbad, CA Please make the comment boxes bigger. No space left.
: breeding, rocketing it to the sun, subseaburial, vitrification (for low-level transuranics and fission products),
As of: December 24, 2014 Received:
big tanks at Hanford...
December 22, 2014 PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,, 14 Document:
the list goes on andnothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRCwhenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, andtechnologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:
each a potehtial show-stopper, Yucca Mountain suffers from allthese problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.
Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin comparedto the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned bySCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate anyworker who complains about these problems).
YOU have to protect America.
YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).
Require Edison to remove the waste long before Stress Corrosion Cracking of thecontainers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 yearsthe NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite formany centuries:
Far beyond the 300 years you've already guessed is possible.
One last request:
Stop pulling numbers out of your hat.Ace Hoffman  
: Carlsbad, CAPlease make the comment boxes bigger. No space left.
As of: December 24, 2014Received:
December 22, 2014PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20Submission Type: WebDocket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating  
: Station, Units 2 and 3Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating  
: Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,,14Document:
NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356
NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356
/ U// y ('97- 0 1 -179 F-Ile 4 4 4 rSubmitter Information Name: Ace Hoffman -]Address:P.O. Box 1936Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com  
/ U// y ('97- 0 1 -1 79 F-Ile 4 4 4 r Submitter Information Name: Ace Hoffman -]Address: P.O. Box 1936 Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com  
[2-TiC-)-An-iU)-°General CommentTo The NRC:You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology  
[2-Ti C-)-A n-i U)-°General Comment To The NRC: You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology  
--just as we see it -- if notbetter.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threatsof terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, isthe best you can do (and the final decision for which casks Southern California Edison (SCE) will use will notlast forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In PlaneFluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given baddata, but really, they should have red-flagged that data and alerted operators.
--just as we see it -- if not better.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threats of terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, is the best you can do (and the final decision for which casks Southern California Edison (SCE) will use will not last forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In Plane Fluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given bad data, but really, they should have red-flagged that data and alerted operators.
Furthermore, it's now believed bysome experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.
Furthermore, it's now believed by some experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.The point is, that this failure of the system is systemic in the nuclear industry.
The point is, that this failure of the system is systemic in the nuclear industry.
San Onofre was operating on "fix-SUNSI Review Complete Template = ADM -013 E-RIDS= ADM -03 Add= T- týTS&6# i&_
San Onofre was operating on "fix-SUNSI Review CompleteTemplate
on-fail" schedule, letting known problems wait until they became big problems before they would shut down and fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, and rust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires that had worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way to cost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would have continued if the cost of a third set of steam generators was absolutely prohibitive.
= ADM -013E-RIDS= ADM -03Add= T- týTS&6# i&_
So maybe you should run some tests, and see what sorts of bounds the software programs the computer industry uses would have identified the problem that actually occurred.
on-fail"  
Don't tear down San Onofre at all. Run it into the ground (without radioactive fuel; use alternate heating sources).These tests should be paid for by the nuclear industry's insurance company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem. You're not seriously planning to leave it on site for even 10 years, are you?!?! Seriously?
: schedule, letting known problems wait until they became big problems before they would shut downand fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, andrust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires thathad worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way tocost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would havecontinued if the cost of a third set of steam generators was absolutely prohibitive.
Why? The cost to America of an accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in the middle of Southern California?
So maybe you should run some tests, and see what sorts of bounds the software programs the computer industryuses would have identified the problem that actually occurred.
Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or your predecessors, the Atomic Energy Commission) promised a technological solution to the waste problem: Mitigation, containment, isolation, reduction, reprocessing, recycling, breeding, rocketing it to the sun, subsea burial, vitrification (for low-level transuranics and fission products), big tanks at Hanford...
Don't tear down San Onofre at all. Run it into theground (without radioactive fuel; use alternate heating sources).
the list goes on and nothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRC whenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, and technologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:
These tests should be paid for by the nuclear industry's insurance  
each a potehtial show-stopper, Yucca Mountain suffers from all these problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.
: company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem.
Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin compared to the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned by SCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate any worker who complains about these problems).
You'renot seriously planning to leave it on site for even 10 years, are you?!?! Seriously?
YOU have to protect America. YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).
Why? The cost to America ofan accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in themiddle of Southern California?
Require Edison to remove the waste long before Stress Corrosion Cracking of the containers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 years the NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite for many centuries:
Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or yourpredecessors, the Atomic Energy Commission) promised a technological solution to the waste problem:Mitigation, containment, isolation, reduction, reprocessing, recycling,  
Far beyond the 300 years you've already guessed is possible.One last request: Stop pulling numbers out of your hat.Ace Hoffman Carlsbad, CA Please make the comment boxes bigger. No space left.}}
: breeding, rocketing it to the sun, subseaburial, vitrification (for low-level transuranics and fission products),
big tanks at Hanford...
the list goes on andnothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRCwhenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, andtechnologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:
each a potehtial show-stopper, Yucca Mountain suffers from allthese problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.
Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin comparedto the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned bySCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate anyworker who complains about these problems).
YOU have to protect America.
YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).
Require Edison to remove the waste long before Stress Corrosion Cracking of thecontainers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 yearsthe NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite formany centuries:
Far beyond the 300 years you've already guessed is possible.
One last request:
Stop pulling numbers out of your hat.Ace Hoffman  
: Carlsbad, CAPlease make the comment boxes bigger. No space left.}}

Latest revision as of 09:24, 9 July 2018

Comment (13) of Ace Hoffman on Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report
ML14364A014
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/22/2014
From: Hoffman A
- No Known Affiliation
To:
Rules, Announcements, and Directives Branch
References
79FR61668 00013, NRC-2014-0223
Download: ML14364A014 (3)


Text

As of: December 24, 2014 Received:

December 22, 2014 PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,, 14 Document:

NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356

/ U// y ('97- 0 1 -1 79 F-Ile 4 4 4 r Submitter Information Name: Ace Hoffman -]Address: P.O. Box 1936 Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com

[2-Ti C-)-A n-i U)-°General Comment To The NRC: You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology

--just as we see it -- if not better.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threats of terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, is the best you can do (and the final decision for which casks Southern California Edison (SCE) will use will not last forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In Plane Fluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given bad data, but really, they should have red-flagged that data and alerted operators.

Furthermore, it's now believed by some experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.The point is, that this failure of the system is systemic in the nuclear industry.

San Onofre was operating on "fix-SUNSI Review Complete Template = ADM -013 E-RIDS= ADM -03 Add= T- týTS&6# i&_

on-fail" schedule, letting known problems wait until they became big problems before they would shut down and fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, and rust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires that had worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way to cost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would have continued if the cost of a third set of steam generators was absolutely prohibitive.

So maybe you should run some tests, and see what sorts of bounds the software programs the computer industry uses would have identified the problem that actually occurred.

Don't tear down San Onofre at all. Run it into the ground (without radioactive fuel; use alternate heating sources).These tests should be paid for by the nuclear industry's insurance company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem. You're not seriously planning to leave it on site for even 10 years, are you?!?! Seriously?

Why? The cost to America of an accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in the middle of Southern California?

Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or your predecessors, the Atomic Energy Commission) promised a technological solution to the waste problem: Mitigation, containment, isolation, reduction, reprocessing, recycling, breeding, rocketing it to the sun, subsea burial, vitrification (for low-level transuranics and fission products), big tanks at Hanford...

the list goes on and nothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRC whenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, and technologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:

each a potehtial show-stopper, Yucca Mountain suffers from all these problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.

Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin compared to the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned by SCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate any worker who complains about these problems).

YOU have to protect America. YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).

Require Edison to remove the waste long before Stress Corrosion Cracking of the containers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 years the NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite for many centuries:

Far beyond the 300 years you've already guessed is possible.One last request: Stop pulling numbers out of your hat.Ace Hoffman Carlsbad, CA Please make the comment boxes bigger. No space left.

As of: December 24, 2014 Received:

December 22, 2014 PUBLIC SUBMISSIONengost PU L C S B I S O Tracking No. ljy-8g7c-cydv Comments Due: December 22, 20 Submission Type: Web Docket: NRC-2014-0223 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3 Comment On: NRC-2014-0223-0001 Southern California Edison Company; San Onofre Nuclear Generating Station, Units 2 and 3; Post-Shutdown Decommissioning Activities Report ].,,, 14 Document:

NRC-2014-0223-DRAFT-0009 Comment on FR Doc # 2014-24356

/ U// y ('97- 0 1 -1 79 F-Ile 4 4 4 r Submitter Information Name: Ace Hoffman -]Address: P.O. Box 1936 Carlsbad, 92018-1936 Email: rhoffman@animatedsoftware.com

[2-Ti C-)-A n-i U)-°General Comment To The NRC: You are in the midst of yet another leadership shuffle.But surely each of you can see plain as day, that nuclear power is a failed technology

--just as we see it -- if not better.The world has already gone made once, twice, and again (if not more so). Two World Wars and today's threats of terrorism add up to: Stop making more of this waste! If leaving it here, amidst tens of millions of people, is the best you can do (and the final decision for which casks Southern California Edison (SCE) will use will not last forever, but we know you'll keep it here until forever, because you have no place to put it.As to the rest of the reactor complex, perhaps some (nonnuclear) tests need to be run to establish why "In Plane Fluid Elastic Instability" (IPFEI) occurred in Unit 3 but not in Unit 2, whilst Flow Induced Vibration (FIV)occurred in both units. Also, the software programs were largely found innocent because they were given bad data, but really, they should have red-flagged that data and alerted operators.

Furthermore, it's now believed by some experts that the computers were in fact, unable to predict IPFE1 even if their input data had been accurate.The point is, that this failure of the system is systemic in the nuclear industry.

San Onofre was operating on "fix-SUNSI Review Complete Template = ADM -013 E-RIDS= ADM -03 Add= T- týTS&6# i&_

on-fail" schedule, letting known problems wait until they became big problems before they would shut down and fix them. That's why we saw plastic bags and mops directing secondary coolant into plastic buckets, and rust nearly all the way through major piping systems that run throughout the plant. Pinched electrical wires that had worked for 30 years finally shorted out in the last few years of life at the plant. Fix-on-fail is the only way to cost-effectively operate an aging nuclear power plant. San Onofre did that for many years, and would have continued if the cost of a third set of steam generators was absolutely prohibitive.

So maybe you should run some tests, and see what sorts of bounds the software programs the computer industry uses would have identified the problem that actually occurred.

Don't tear down San Onofre at all. Run it into the ground (without radioactive fuel; use alternate heating sources).These tests should be paid for by the nuclear industry's insurance company, of course.Meanwhile, it's about time the NRC and the nuclear industry takes a serious look at the waste problem. You're not seriously planning to leave it on site for even 10 years, are you?!?! Seriously?

Why? The cost to America of an accident which caused a fire at a spent fuel facility is astronomical no matter where it happens, but in the middle of Southern California?

Everyone ignored the waste problem nuclear power was creating when it was introduced because you (or your predecessors, the Atomic Energy Commission) promised a technological solution to the waste problem: Mitigation, containment, isolation, reduction, reprocessing, recycling, breeding, rocketing it to the sun, subsea burial, vitrification (for low-level transuranics and fission products), big tanks at Hanford...

the list goes on and nothing has worked."Yucca Mountain" was the knee-jerk response critics such as myself had to hear from SCE and from the NRC whenever the problem of waste disposal came up at hearings for the past 20 years. That project is stopped, and technologically it collapsed a long time ago: Water seepage, groundwater flow 50 times faster than expected, volcanoes, earthquakes, population increases:

each a potehtial show-stopper, Yucca Mountain suffers from all these problems and more.So there is no confidence in NRC's policy formerly known as Waste Confidence.

Starting with leaving the waste onsite in 5/8ths inch thick stainless steel canisters that are paper thin compared to the kinetic energy of a jet turbine shaft. And no: Burying them underground isn't good enough.You have to stop making more. YOU have to close down Diablo Canyon and Palo Verde (partly owned by SCE, who falsify records, skip fire watch patrols, fix things with paper mache and spit, and intimidate any worker who complains about these problems).

YOU have to protect America. YOU have to do your duty.Reject this PSDAR and require Edison to offer the facility for testing to the industry (globally, not just U.S.nuclear power companies).

Require Edison to remove the waste long before Stress Corrosion Cracking of the containers can possibly set in (uh, that appears to be about two years, not even 10, let alone the 60 to 300 years the NRC has already threatened to leave the waste on site for). Require Edison to use thicker cask materials, which are stronger and more durable, because there is a very strong possibility the waste will remain onsite for many centuries:

Far beyond the 300 years you've already guessed is possible.One last request: Stop pulling numbers out of your hat.Ace Hoffman Carlsbad, CA Please make the comment boxes bigger. No space left.