ML16154A270: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 | |||
June 1, 2016 | |||
Richard Michael Glover Site Vice President | |||
H.B. Robinson Steam Electric Plant | H.B. Robinson Steam Electric Plant | ||
Duke Energy Corporation | Duke Energy Corporation | ||
3581 West Entrance, RNPA01 | 3581 West Entrance, RNPA01 | ||
Hartsville, SC 29550 SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED | |||
OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302 Dear R. Glover: In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and | Hartsville, SC 29550 | ||
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED | |||
OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302 | |||
Dear R. Glover: | |||
In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and | |||
Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations | Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations | ||
Engineer, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to be administered during the week of July 25, 2016. The on-site preparatory week is scheduled for the week of July 25, 2016. | Engineer, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to be administered during the week of July 25, | ||
2016. The on-site preparatory week is scheduled for the week of July 25, 2016. | |||
As agreed during the telephone conversation, your staff will prepare the examinations based on | As agreed during the telephone conversation, your staff will prepare the examinations based on | ||
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for | the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for | ||
Power Reactors." The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are administered. | Power Reactors." The NRC's regional office will | ||
discuss with your staff any changes that might be necessary before the examinations are administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the operating test | To meet the above schedule, it will be necessary for your staff to furnish the operating test | ||
outline by June 2, 2016. The operating tests and supporting reference materials identified in | outline by June 2, 2016. The operating tests and supporting reference materials identified in | ||
Line 34: | Line 45: | ||
Commission for review and approval. All materials shall be complete and ready-to-use. We | Commission for review and approval. All materials shall be complete and ready-to-use. We | ||
request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in | request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in | ||
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. | receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. | ||
To conduct the requested operating tests, it will be necessary for your staff to provide adequate | To conduct the requested operating tests, it will be necessary for your staff to provide adequate | ||
space and accommodations in accordance with ES-402, and to make the simulation facility | space and accommodations in accordance with ES-402, and to make the simulation facility | ||
available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final. | available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) | ||
R. Glover 2 | generated during the dynamic operating tests until the examination results are final. | ||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered. | R. Glover 2 | ||
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered. | |||
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget | To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget | ||
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the applications are not received at least 15 days before the examination date, a postponement may be necessary. Signed application certifying that all remedial training has been completed | (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the applications are not received at least 15 days before the examination date, a postponement may be necessary. Signed application certifying that all remedial training has been completed | ||
should be submitted at least by July 14, 2016. | should be submitted at least by July 14, 2016. | ||
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | This letter contains information collections that are subject to the | ||
Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | |||
this collection of information is estimated to average 2500 hours per response, including the | this collection of information is estimated to average 2500 hours per response, including the | ||
time for reviewing instructions, gathering and maintaining the data needed, writing the | time for reviewing instructions, gathering and maintaining the data needed, writing the | ||
Line 50: | Line 69: | ||
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov; | Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov; | ||
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150- | ||
0018), Office of Management and Budget, Washington, DC 20503. | 0018), Office of Management and Budget, Washington, DC 20503. | ||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. | The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number. | ||
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," | In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding," | ||
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and | of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and | ||
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html. Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: | Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html | ||
Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). Sincerely, /RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety | . Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail: | ||
Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). Sincerely, | |||
/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety | |||
Docket No.: 50-261 | Docket No.: 50-261 | ||
License No.: DPR-23 | License No.: DPR-23 | ||
cc: Distribution via Listserv | cc: Distribution via Listserv | ||
_ _______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RSB2 EFG | _ _______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RSB2 EFG | ||
NAME BALDWIN GUTHRIE DATE 6/ 1/2016 6/1/2016 E-MAIL COPY? YES NO YES NO YES NO | |||
}} | }} |
Revision as of 07:54, 30 June 2018
ML16154A270 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 06/01/2016 |
From: | Guthrie E F Division of Reactor Safety II |
To: | Glover R M Duke Energy Corp |
References | |
50-261/16-302 | |
Download: ML16154A270 (3) | |
See also: IR 05000261/2016302
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
June 1, 2016
Richard Michael Glover Site Vice President
H.B. Robinson Steam Electric Plant
Duke Energy Corporation
3581 West Entrance, RNPA01
Hartsville, SC 29550
SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF LICENSED
OPERATOR RE-TAKE INITIAL EXAMINATION 05000261/2016302
Dear R. Glover:
In a meeting on May 24, 2016, between Mr. Christopher McComber, Training Instructor and
Mr. Joseph Rackley, Training Supervisor, and Mr. Richard S. Baldwin, Senior Operations
Engineer, arrangements were made for the administration of licensing examinations at H. B. Robinson Steam Electric Plant. The simulator portion of an operating test is scheduled to be administered during the week of July 25,
2016. The on-site preparatory week is scheduled for the week of July 25, 2016.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in Revision 10, of NUREG-1021, "Operator Licensing Examination Standards for
Power Reactors." The NRC's regional office will
discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by June 2, 2016. The operating tests and supporting reference materials identified in
Attachment 3 to ES-201 will be due by July 7, 2016. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the examinations, and tests before they are submitted to the
Commission for review and approval. All materials shall be complete and ready-to-use. We
request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
To conduct the requested operating tests, it will be necessary for your staff to provide adequate
space and accommodations in accordance with ES-402, and to make the simulation facility
available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels)
generated during the dynamic operating tests until the examination results are final.
R. Glover 2
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least by July 5, 2016. If the applications are not received at least 15 days before the examination date, a postponement may be necessary. Signed application certifying that all remedial training has been completed
should be submitted at least by July 14, 2016.
This letter contains information collections that are subject to the
Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 2500 hours0.0289 days <br />0.694 hours <br />0.00413 weeks <br />9.5125e-4 months <br /> per response, including the
time for reviewing instructions, gathering and maintaining the data needed, writing the
examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to infocollectsresource@nrc.gov;
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding,"
of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and
Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html
. Thank you for your cooperation in this matter. Mr. Rackely has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Baldwin at (404) 997-4642, (Internet E-mail:
Richard.Baldwin@nrc.gov), or me at (404) 997-4662, (Internet E-mail: Eugene.Guthrie@nrc.gov). Sincerely,
/RA/ Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety
Docket No.: 50-261
License No.: DPR-23
cc: Distribution via Listserv
_ _______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RSB2 EFG
NAME BALDWIN GUTHRIE DATE 6/ 1/2016 6/1/2016 E-MAIL COPY? YES NO YES NO YES NO