| {{#Wiki_filter:*'"":PEntergyGNRO-2016/00060November15,2016U.S.NuclearRegulatoryCommissionAttn:DocumentControlDeskWashington,DC20555-0001EntergyOperations,Inc.P.o.Box756PortGibson,Mississippi39150JamesJ.NadeauManager,RegulatoryAssuranceGrandGulfNuclearStation601-437-2103 | | {{#Wiki_filter:*'"":PEntergyGNRO-2016/00060 November15,2016U.S.NuclearRegulatory Commission Attn:DocumentControlDesk Washington,DC20555-0001 EntergyOperations, Inc.P.o.Box756PortGibson,Mississippi 39150JamesJ.NadeauManager,Regulatory Assurance GrandGulfNuclearStation601-437-2103 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
| SupplementalReportof10CFR50.59Evaluations-July1,2012throughJune30,2014GrandGulfNuclearStation,UnitNo.1DocketNo.50-416LicenseNo.NPF-29 | | SupplementalReportof10CFR50.59 Evaluations-July1,2012 throughJune30,2014 GrandGulfNuclearStation,UnitNo.1 DocketNo.50-416LicenseNo. |
| | NPF-29 |
|
| |
|
| ==REFERENCE:== | | ==REFERENCE:== |
| 1.LettertoNRC,GNRO-2014/00065,"Reportof10CFR50.59EvaluationsandCommitmentChangesJuly1,2012throughJune30,2014,"datedSeptember30,2014. | | |
| | 1.LettertoNRC,GNRO-2014/00065, "Reportof10CFR50.59 Evaluations andCommitment ChangesJuly1,2012 throughJune30,2014,"dated September30,2014. |
|
| |
|
| ==DearSirorMadam:== | | ==DearSirorMadam:== |
| InreviewofReference1,itwasidentifiedthatcertain50.59EvaluationswerenotincludedintheReference1,Attachment1,1OCFR50.59SummaryReport.Inresponse,EntergyOperations,Inc.(Entergy)issubmittingasupplementtoReference1,Attachment1.TheAttachmenttothisletter,Supplemental1OCFR50.59SummaryReport,willreplaceAttachment1,1OCFR50.59SummaryReport,ofReference1.Pursuantto10CFR50.59(d)(2),EntergyOperations,Inc.herebysubmitsasupplementalsummaryof50.59EvaluationsfortheperiodofJuly1,2012throughJune30,2014inthisletter.TheAttachmenttothislettercontainstheSupplemental1OCFR50.59SummaryReport.Thisletterdoesnotcontainanynewcommitments.Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactJamesNadeauat601-437-2103.JJN/tmm GNRO2016-00060Page2of2
| | Inreviewof Reference1,itwasidentifiedthatcertain50.59 Evaluationswerenotincludedinthe Reference 1,Attachment1,1OCFR50.59 SummaryReport.In |
| | : response, EntergyOperations, Inc.(Entergy) issubmitting asupplement toReference 1,Attachment1.TheAttachmenttothisletter, Supplemental1OCFR50.59 SummaryReport,willreplace Attachment1,1OCFR50.59 SummaryReport,of Reference 1.Pursuantto10CFR50.59(d)(2), |
| | EntergyOperations, Inc.herebysubmitsasupplemental summaryof50.59EvaluationsfortheperiodofJuly1,2012 throughJune30,2014inthisletter.The AttachmenttothislettercontainstheSupplemental1OCFR50.59 SummaryReport.Thisletterdoesnotcontainanynew commitments.Ifyouhaveany questions orrequireadditional information, pleasecontactJamesNadeauat601-437-2103. |
| | JJN/tmm GNRO2016-00060Page2of2 |
|
| |
|
| ==Attachment:== | | ==Attachment:== |
| Supplemental1OCFR50.59SummaryReportcc:NRCSeniorResidentInspectorGrandGulfNuclearStationPortGibson,MS39150U.S.NuclearRegulatoryCommissionATTN:KrissM.Kennedy(w/2)RegionAdministrator,RegionIV1600EastLamarBoulevardArlington,TX76011-4511U.S.NuclearRegulatoryCommissionATTN:JimKim,NRR/DORL(w/2)MailStopOWFN8B1Rockville,MD20852-2738 AttachmenttoGNRO2016-00060Supplemental1OCFR50.59SummaryReport GNRO-2016/00060Page1of1GrandGulfNuclearStationSupplemental10CFR50.59SummaryReportInitiatingDocument50.59SummaryEC38371,LBDCR2012-0034EngineeringChangeEC-38371,"Cycle19EPUCOLR."EC38230EngineeringChangeEC-38230,"EC38230asmodifiedbyEC38798."EC38885EngineeringChangeEC-38885,"TheLossofCoolantAccident,MainSteamLineBreakOutsideContainment,andControlRodDropAccidentdoseanalysesapplythealternativesourcetermfrom10CFR50.67todeterminetheoffsiteandcontrolroomdosesassociatedwiththesedesignbasisaccidents.ThesedoseanalysesarerevisedtoreflectimplementationoftheExtendedPowerUprate."EC41518EngineeringChangeEC-41518,"NewStrategyforProtectingPMPExternalDoors1X701D308,1X701D312,1X701D309,1X701D310,1Y401M110,2Y402M110,2Y402M111andSZ100C313FromPMPHazard."EC43421EngineeringChangeEC-43421,"EvaluationofESFSwitchgearRoom1A309Temperaturewithroomcooler1T46B003Aoutofservice."EC43958EngineeringChangeEC-43958,"EvaluationofESFSwitchgearRoom1A308Temperaturewithroomcooler1T46B003Boutofservice."EC44293EngineeringChangeEC-44293,"EvaluationtoallowESFRoomCoolers1T46B001Band1T46B002Btobeoutofservice(atdifferenttimes)perTRM6.7.1."EC48003EngineeringChangeEC-48003,"EvaluationtoallowESFRoomCooler1T46B003AtobeoutofserviceperTRMLCO6.7.1ActionC3."EC48407EngineeringChangeEC-48407,"EvaluationtoallowESFRoomCooler1T46B002AtobeoutofserviceperTRMLCO6.7.1ActionC3."EC49291,LBDCR2014-004EngineeringChangeEC-49291,"Cycle20COLR."EC49891EngineeringChangeEC-49891,"ThischangeistosubstituteBetacalibrationunitstomanuallyperformtheautomaticfunctionoftheturbinefirststagepressuretransmitters."EC42886EngineeringChangeEC-42886,"EvaluationofESFSwitchgearRoom1A219Temperaturewithroomcooler1T46B002Aoutofservice."}} | | |
| | Supplemental1OCFR50.59 SummaryReportcc:NRCSeniorResident InspectorGrandGulf NuclearStationPortGibson,MS39150 U.S.NuclearRegulatory CommissionATTN:KrissM.Kennedy(w/2) |
| | RegionAdministrator,RegionIV1600EastLamar BoulevardArlington,TX76011-4511U.S.NuclearRegulatory CommissionATTN:JimKim, NRR/DORL(w/2)MailStopOWFN8B1Rockville,MD 20852-2738 Attachment toGNRO2016-00060 Supplemental1OCFR50.59 SummaryReport GNRO-2016/00060Page1of1GrandGulf NuclearStationSupplemental 10CFR50.59 SummaryReportInitiating Document50.59SummaryEC38371,LBDCR2012-0034 EngineeringChangeEC-38371,"Cycle19 EPUCOLR."EC38230EngineeringChangeEC-38230,"EC38230as modifiedbyEC38798."EC38885EngineeringChangeEC-38885,"The LossofCoolantAccident, MainSteamLineBreak OutsideContainment, andControlRodDropAccidentdoseanalysesapplythealternative sourcetermfrom10CFR50.67todetermine theoffsiteandcontrolroomdosesassociated withthesedesignbasis accidents.Thesedoseanalysesarerevisedto reflectimplementation oftheExtendedPower Uprate."EC41518EngineeringChangeEC-41518, "NewStrategyforProtectingPMPExternalDoors1X701D308, 1X701D312,1X701D309,1X701D310,1Y401M110, 2Y402M110, 2Y402M111andSZ100C313From PMPHazard."EC43421EngineeringChangeEC-43421, "Evaluation ofESFSwitchgearRoom1A309 Temperature withroomcooler1T46B003A outofservice." |
| | EC43958EngineeringChangeEC-43958, "Evaluation ofESFSwitchgearRoom1A308 Temperature withroomcooler1T46B003B outofservice." |
| | EC44293EngineeringChangeEC-44293, "Evaluation toallowESFRoomCoolers1T46B001Band1T46B002Btobe outofservice(at different times)perTRM6.7.1."EC48003EngineeringChangeEC-48003, "Evaluation toallowESFRoomCooler1T46B003Atobe outofserviceperTRM LCO6.7.1ActionC3."EC48407EngineeringChangeEC-48407, "Evaluation toallowESFRoomCooler1 T46B002AtobeoutofserviceperTRM LCO6.7.1ActionC3."EC49291,LBDCR2014-004 EngineeringChangeEC-49291,"Cycle20 COLR."EC49891EngineeringChangeEC-49891,"Thischangeisto substitute Betacalibration unitstomanuallyperformtheautomatic functionoftheturbinefirststagepressure transmitters." |
| | EC42886EngineeringChangeEC-42886, "Evaluation ofESFSwitchgearRoom1A219 Temperature withroomcooler1T46B002A outofservice."}} |
|
---|
Category:Letter
MONTHYEARML24012A1422024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0051 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000416/20230042024-01-25025 January 2024 Integrated Inspection Report 5000416/2023004 ML24018A0222024-01-18018 January 2024 Core Operating Limits Report (COLR) Cycle 24, Revision 2 IR 05000416/20243012024-01-16016 January 2024 NRC Initial Operator Licensing Examination Approval 05000416/2024301 ML24012A1962024-01-12012 January 2024 Response to 2nd Round Request for Additional Information Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23348A3712023-12-14014 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report (05000416/2024011) and Request for Information ML23340A2222023-12-13013 December 2023 Project Manager Assignment ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23325A1422023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000416/20234032023-11-13013 November 2023 Security Baseline Inspection Report 05000416/2023403 Cover Letter ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000416/20230032023-11-0808 November 2023 Integrated Inspection Report 05000416/2023003 ML23270B9932023-09-29029 September 2023 Request to Update ASME Boiler & Pressure Vessel Code Relief Request SE with NRC-Approved Revision of Bwrip Guidelines (GG-ISI-020 & RBS-ISI-019) (EPID L-2022-LLR-0090) - Non-Proprietary ML23270B1892023-09-27027 September 2023 Evacuation Time Estimate Study ML23269A1242023-09-27027 September 2023 Request for Withholding Information from Public Disclosure ML23240A3952023-08-28028 August 2023 Reply to a Notice of Violation; EA-23-019 IR 05000416/20230052023-08-21021 August 2023 Updated Inspection Plan for Grand Gulf Nuclear Station (Report 05000416/2023005) ML23226A1002023-08-18018 August 2023 Regulatory Audit in Support of License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000416/20234042023-08-0707 August 2023 Material Control and Accounting Program Inspection Report 05000416/2023404 IR 05000416/20230912023-07-28028 July 2023 Final Significance Determination of a Green Finding and Notice of Violation; NRC Inspection Report 05000416/2023091 ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23166B0712023-06-15015 June 2023 Reply to Notice of Violation EA-22-104 and EA-22-115 ML23166B0662023-06-15015 June 2023 Response to NRC Integrated Inspection Report 05000416/2023001 ML23159A2302023-06-0808 June 2023 Response to Request for Additional Information Concerning Request to Update ASME Code Relief Request Safety Evaluations with NRC-Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) GNRO-2023/00014, License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-06-0606 June 2023 License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GNRO-2023/00015, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-06-0606 June 2023 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML23122A1632023-05-18018 May 2023 NRC Inspection Report 05000416/2023090 and Preliminary White Finding IR 05000416/20234022023-05-17017 May 2023 Security Baseline Inspection Report 05000416/2023402 ML23110A8002023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000416/20230012023-05-10010 May 2023 Notice of Violation; Integrated Inspection Report 05000416/2023001 and NRC Investigation Report 4-2022-004 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23117A0422023-04-27027 April 2023 Annual Radioactive Effluent Release Report (ARERR) ML23111A2132023-04-21021 April 2023 Responses to RAI Concerning Relief Request Number EN-RR-22-001 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G ML23110A0552023-04-20020 April 2023 Annual Radiological Environmental Operating Report (AREOR) ML23103A1022023-04-13013 April 2023 Annual Report of Individual Monitoring - NRC Form 5 for 2022 Per 10 CFR 20.2206 ML23102A1482023-04-12012 April 2023 Notification of NRC Initial Operator Licensing Examination 05000416/2024301 ML23089A0602023-03-30030 March 2023 Entergy Operations, Inc. - Fleet Project Manager Assignment ML23088A3922023-03-29029 March 2023 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML23079A2772023-03-21021 March 2023 U.S. Nuclear Regulatory Commission Presentation at the May 1, 2023, Port Gibson City Council Meeting ML23080A2882023-03-21021 March 2023 Decommissioning Funding Status Report Per 10 CFR 50.75(f)(1) Entergy Operations, Inc IR 05000416/20230112023-03-0808 March 2023 Design Basis Assurance Inspection Report 05000416/2023011 2024-01-31
[Table view] |
Text
- '"":PEntergyGNRO-2016/00060 November15,2016U.S.NuclearRegulatory Commission Attn:DocumentControlDesk Washington,DC20555-0001 EntergyOperations, Inc.P.o.Box756PortGibson,Mississippi 39150JamesJ.NadeauManager,Regulatory Assurance GrandGulfNuclearStation601-437-2103
SUBJECT:
SupplementalReportof10CFR50.59 Evaluations-July1,2012 throughJune30,2014 GrandGulfNuclearStation,UnitNo.1 DocketNo.50-416LicenseNo.
NPF-29
REFERENCE:
1.LettertoNRC,GNRO-2014/00065, "Reportof10CFR50.59 Evaluations andCommitment ChangesJuly1,2012 throughJune30,2014,"dated September30,2014.
DearSirorMadam:
Inreviewof Reference1,itwasidentifiedthatcertain50.59 Evaluationswerenotincludedinthe Reference 1,Attachment1,1OCFR50.59 SummaryReport.In
- response, EntergyOperations, Inc.(Entergy) issubmitting asupplement toReference 1,Attachment1.TheAttachmenttothisletter, Supplemental1OCFR50.59 SummaryReport,willreplace Attachment1,1OCFR50.59 SummaryReport,of Reference 1.Pursuantto10CFR50.59(d)(2),
EntergyOperations, Inc.herebysubmitsasupplemental summaryof50.59EvaluationsfortheperiodofJuly1,2012 throughJune30,2014inthisletter.The AttachmenttothislettercontainstheSupplemental1OCFR50.59 SummaryReport.Thisletterdoesnotcontainanynew commitments.Ifyouhaveany questions orrequireadditional information, pleasecontactJamesNadeauat601-437-2103.
JJN/tmm GNRO2016-00060Page2of2
Attachment:
Supplemental1OCFR50.59 SummaryReportcc:NRCSeniorResident InspectorGrandGulf NuclearStationPortGibson,MS39150 U.S.NuclearRegulatory CommissionATTN:KrissM.Kennedy(w/2)
RegionAdministrator,RegionIV1600EastLamar BoulevardArlington,TX76011-4511U.S.NuclearRegulatory CommissionATTN:JimKim, NRR/DORL(w/2)MailStopOWFN8B1Rockville,MD 20852-2738 Attachment toGNRO2016-00060 Supplemental1OCFR50.59 SummaryReport GNRO-2016/00060Page1of1GrandGulf NuclearStationSupplemental 10CFR50.59 SummaryReportInitiating Document50.59SummaryEC38371,LBDCR2012-0034 EngineeringChangeEC-38371,"Cycle19 EPUCOLR."EC38230EngineeringChangeEC-38230,"EC38230as modifiedbyEC38798."EC38885EngineeringChangeEC-38885,"The LossofCoolantAccident, MainSteamLineBreak OutsideContainment, andControlRodDropAccidentdoseanalysesapplythealternative sourcetermfrom10CFR50.67todetermine theoffsiteandcontrolroomdosesassociated withthesedesignbasis accidents.Thesedoseanalysesarerevisedto reflectimplementation oftheExtendedPower Uprate."EC41518EngineeringChangeEC-41518, "NewStrategyforProtectingPMPExternalDoors1X701D308, 1X701D312,1X701D309,1X701D310,1Y401M110, 2Y402M110, 2Y402M111andSZ100C313From PMPHazard."EC43421EngineeringChangeEC-43421, "Evaluation ofESFSwitchgearRoom1A309 Temperature withroomcooler1T46B003A outofservice."
EC43958EngineeringChangeEC-43958, "Evaluation ofESFSwitchgearRoom1A308 Temperature withroomcooler1T46B003B outofservice."
EC44293EngineeringChangeEC-44293, "Evaluation toallowESFRoomCoolers1T46B001Band1T46B002Btobe outofservice(at different times)perTRM6.7.1."EC48003EngineeringChangeEC-48003, "Evaluation toallowESFRoomCooler1T46B003Atobe outofserviceperTRM LCO6.7.1ActionC3."EC48407EngineeringChangeEC-48407, "Evaluation toallowESFRoomCooler1 T46B002AtobeoutofserviceperTRM LCO6.7.1ActionC3."EC49291,LBDCR2014-004 EngineeringChangeEC-49291,"Cycle20 COLR."EC49891EngineeringChangeEC-49891,"Thischangeisto substitute Betacalibration unitstomanuallyperformtheautomatic functionoftheturbinefirststagepressure transmitters."
EC42886EngineeringChangeEC-42886, "Evaluation ofESFSwitchgearRoom1A219 Temperature withroomcooler1T46B002A outofservice."