{{#Wiki_filter:" " November 22, 2016  
{{#Wiki_filter:" " November 22, 2016  


Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98  
 
Brownville, NE 68321


SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403
Line 29: Line 31:
The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.
The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.


If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC, 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station.
If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC, 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of  


If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station. A cross-cutting aspect was assigned to the finding in the area of human performance.
Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station.


Specifically, Cooper Nuclear Station failed to ensure individuals used a consistent, systematic approach to make decisions on equipment required to be considered target set components, and failed to ensure risk insights were incorporated as appropriate [H.13]. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station.
 
A cross-cutting aspect was assigned to the finding in the area of human performance.
 
Specifically, Cooper Nuclear Station failed to ensure individuals used a consistent, systematic approach to make decisions on equipment required to be considered target set components, and failed to ensure risk insights were incorporated as appropriate [H.13].
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,/RA/
Sincerely,/RA/
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-298 License No. DPR-46  
Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety  
 
Docket No. 50-298 License No. DPR-46  


Nonpublic  
Nonpublic  
Line 46: Line 55:


===w/Attachment:===
===w/Attachment:===
Supplemental Information cc w/o enclosure: Electronic Distribution  
Supplemental Information  
 
cc w/o enclosure: Electronic Distribution  


ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/ DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 Letter to Oscar from Mark S. Haire, dated November 22, 2016
ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:
MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/
DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Letter to Oscar from Mark S. Haire, dated November 22, 2016


SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure: Security Specialist/NSIR (Eric.Wharton@nrc.gov)
SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) Security Specialist/NSIR (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Line 58: Line 73:
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)  
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Senior Resident Inspector (Patricia.Voss@nrc.gov) Resident Inspector (Christopher.Henderson@nrc.gov)
 
Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Senior Resident Inspector (Patricia.Voss@nrc.gov)
Resident Inspector (Christopher.Henderson@nrc.gov)  
 
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Branch Chief, DRP/C (Greg.Warnick@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Senior Project Engineer (Cale.Young@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Project Engineer (Lindsay.Brandt@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov) Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)
Administrative Assistant (Amy.Elam@nrc.gov)
Project Manager (Thomas.Wengert@nrc.gov)
Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Thomas.Wengert@nrc.gov)  
 
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) ACES (R4Enforcement.Resource@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RSLO (Bill.Maier@nrc.gov)
SAIC (Gayle.Walker@nrc.gov)  
 
RSLO (Bill.Maier@nrc.gov)  
 
RidsOeMailCenter Resource
RidsOeMailCenter Resource
}}
}}

Revision as of 02:35, 30 June 2018

Cooper Nuclear Station - NRC Security Inspection Report 05000298/2016403 (Cover Letter Only)
ML16327A596
Person / Time
Site: Cooper Entergy icon.png
Issue date: 11/22/2016
From: Haire M S
Plant Support Branch-1
To: Limpias O A
Nebraska Public Power District (NPPD)
References
IR 2016403
Download: ML16327A596 (4)


Text

" " November 22, 2016

Mr. Oscar Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98

Brownville, NE 68321

SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403

Dear Mr. Limpias:

On October 14, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Cooper Nuclear Station and the NRC inspector discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.

The NRC inspectors documented one finding of very low security significance (Green) in this report. This finding involved a violation of NRC requirements. The NRC is treating this violation as a non-cited violation consistent with Section 2.3.2.a of the Enforcement Policy.

If you contest the violation or significance of the non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC, 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of

Enforcement; Office of Nuclear Security and Incident Response; and the NRC resident inspector at the Cooper Nuclear Station.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Washington, DC 20555-0001; with copies to the Regional Administrator, Region IV and the NRC Resident Inspector at Cooper Nuclear Station.

A cross-cutting aspect was assigned to the finding in the area of human performance.

Specifically, Cooper Nuclear Station failed to ensure individuals used a consistent, systematic approach to make decisions on equipment required to be considered target set components, and failed to ensure risk insights were incorporated as appropriate [H.13].

This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,/RA/

Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety

Docket No. 50-298 License No. DPR-46

Nonpublic

Enclosure:

Inspection Report 05000298/2016403

w/Attachment:

Supplemental Information

cc w/o enclosure: Electronic Distribution

ML16327A596 Entire Report SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword:

MD 3.4 A.3 Cover Letter Only SUNSI Review By: CJewett ADAMS Yes No Publicly Available Non-Publicly Available Non-Sensitive Sensitive Keyword: NRC-002 OFFICE PSI: PSB1 PSI: PSB1 C: PSB1 C:PBC C: PSB1 NAME CJewett AMeyen MHaire GWarnick MHaire SIGNATURE E-mail E-mail E-mail /RA/ /RA/

DATE 11/21/16 11/21/16 11/21/16 11/21/16 11/21/16 SEC URITY-RELATED INFORMATION SEC URITY-RELATED INFORMATION Letter to Oscar from Mark S. Haire, dated November 22, 2016

SUBJECT: COOPER NUCLEAR STATION - NRC SECURITY INSPECTION REPORT 05000298/2016403 Distribution w/enclosure:

Security Specialist/NSIR (Eric.Wharton@nrc.gov)

Security Specialist/NSIR (Niry.Simonian@nrc.gov)

Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)

Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Raymond.McKinley@nrc.gov)

Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)

Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)

Regional Administrator (Kriss.Kennedy@nrc.gov)

Deputy Regional Administrator (Scott.Morris@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRP Deputy Director (Ryan.Lantz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Branch Chief, DRS/PSB1 (Mark.Haire@nrc.gov) Senior Resident Inspector (Patricia.Voss@nrc.gov)

Resident Inspector (Christopher.Henderson@nrc.gov)

Branch Chief, DRP/C (Greg.Warnick@nrc.gov)

Senior Project Engineer (Cale.Young@nrc.gov)

Project Engineer (Lindsay.Brandt@nrc.gov)

Administrative Assistant (Amy.Elam@nrc.gov)

Distribution w/o enclosure: Public Affairs Officer (Victor.Dricks@nrc.gov)

Project Manager (Thomas.Wengert@nrc.gov)

Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)

Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)

Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

SAIC (Gayle.Walker@nrc.gov)

RSLO (Bill.Maier@nrc.gov)

RidsOeMailCenter Resource