|
|
Line 25: |
Line 25: |
| ==Dear Mr. Rausch:== | | ==Dear Mr. Rausch:== |
| By letter dated September 18, 2012, 1 as supplemented by letter dated, May 10, 2013,2 PPL Susquehanna, LLC (PPL, the licensee) submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2, to the Nuclear Regulatory Commission (NRC) for review. The proposed amendment would make changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. A notice of the NRC's consideration of the proposed amendment was published in the Federal Register on November 27, 2012 (77 FR 70843). Subsequently, by letter dated December 22, 2014,3 PPL requested to withdrawal the amendment request. In this letter, PPL stated that the reason for withdrawing the license amendment request was related to plans for new design analysis that will impact the original proposal. PPL further stated that it intends to request a pre-submittal meeting with the NRC staff to discuss submitting an amendment to change the above stated TS SRs based on this new design analysis. The NRC staff has ceased all work on this licensing action and closed Technical Assignment Control (TAC) Nos. ME9609 and ME9610. The NRC has filed the enclosed Notice of Withdrawal of Application to Amend the Facility Operating Licenses with the Office of the Federal Register for publication. 1 Agencywide Documents Access and Management System Accession No. ML 12262A321. 2 ADAMS Accession No. ML 13130A127. 3 ADAMS Accession No. ML 15022A013. | | By letter dated September 18, 2012, 1 as supplemented by letter dated, May 10, 2013,2 PPL Susquehanna, LLC (PPL, the licensee) submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2, to the Nuclear Regulatory Commission (NRC) for review. The proposed amendment would make changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. A notice of the NRC's consideration of the proposed amendment was published in the Federal Register on November 27, 2012 (77 FR 70843). Subsequently, by letter dated December 22, 2014,3 PPL requested to withdrawal the amendment request. In this letter, PPL stated that the reason for withdrawing the license amendment request was related to plans for new design analysis that will impact the original proposal. PPL further stated that it intends to request a pre-submittal meeting with the NRC staff to discuss submitting an amendment to change the above stated TS SRs based on this new design analysis. The NRC staff has ceased all work on this licensing action and closed Technical Assignment Control (TAC) Nos. ME9609 and ME9610. The NRC has filed the enclosed Notice of Withdrawal of Application to Amend the Facility Operating Licenses with the Office of the Federal Register for publication. 1 Agencywide Documents Access and Management System Accession No. ML 12262A321. 2 ADAMS Accession No. ML 13130A127. 3 ADAMS Accession No. ML 15022A013. |
| T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388 | | T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
Line 31: |
Line 31: |
| * Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0283. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. | | * Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0283. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document. |
| * NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. | | * NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced. |
| * NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Jeffrey A. Whited, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-4090, e-mail: jeffrey.whited@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of PPL Susquehanna, LLC (the licensee) to withdraw its application dated September 18, 2012 (ADAMS Accession No. ML 12262A321), as supplemented by letter dated May 10, 2013 (ADAMS Accession No. ML 13130A127), for a proposed amendment to the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania. The proposed amendment would have made changes to TS SR 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. The NRC published a Biweekly Notice in the Federal Register on November 27, 2012 (77 FR 70843), that gave notice that this proposed amendment was under consideration by the NRC. However, by letter dated December 22, 2014 (ADAMS Accession No ML 15022A013), the licensee requested to withdraw the proposed amendment. Dated at Rockville, Maryland, this C:/ day of February 2015. For the Nuclear Regulatory Commission. Je!?f{.:f Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. | | * NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Jeffrey A. Whited, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-4090, e-mail: jeffrey.whited@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of PPL Susquehanna, LLC (the licensee) to withdraw its application dated September 18, 2012 (ADAMS Accession No. ML 12262A321), as supplemented by letter dated May 10, 2013 (ADAMS Accession No. ML 13130A127), for a proposed amendment to the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania. The proposed amendment would have made changes to TS SR 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. The NRC published a Biweekly Notice in the Federal Register on November 27, 2012 (77 FR 70843), that gave notice that this proposed amendment was under consideration by the NRC. However, by letter dated December 22, 2014 (ADAMS Accession No ML 15022A013), the licensee requested to withdraw the proposed amendment. Dated at Rockville, Maryland, this C:/ day of February 2015. For the Nuclear Regulatory Commission. Je!?f{.:f Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. |
| T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388 | | T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388 |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSusquehanna Resource RidsRgnlMailCenter Resource Sincerely, IRA/ Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS Accession Nos.: L TR (NRR-106) ML 15027A605 FRN (ADM-012) ML 15027 A603 *via e-mail OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME JWhited ABaxter | | Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSusquehanna Resource RidsRgnlMailCenter Resource Sincerely, IRA/ Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS Accession Nos.: L TR (NRR-106) ML 15027A605 FRN (ADM-012) ML 15027 A603 *via e-mail OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME JWhited ABaxter |
| * MKhanna JWhited DATE 02/06/2015 02/05/2015 02/06/2015 02/09/2015 OFFICIAL AGENCY RECORD | | * MKhanna JWhited DATE 02/06/2015 02/05/2015 02/06/2015 02/09/2015 OFFICIAL AGENCY RECORD}} |
| }} | |
Letter Sequence Withdrawal |
---|
|
|
|
|
---|
Category:Federal Register Notice
MONTHYEARML24114A3102024-05-0303 May 2024 Monthly (28-Day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 14, 2024 ML24102A2572024-04-25025 April 2024 Federal Register Notice - Issuance of Multiple Exemptions Regarding 10 CFR Part 73 - March 2024 ML24087A0702024-04-25025 April 2024 FRN - Exemption Decision for Susquehanna ML24087A0712024-04-16016 April 2024 FRN - Notice of Availability of EA-FONSI for Susquehanna Exemption ML23073A1192023-03-31031 March 2023 Associated Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Licenses & Draft Conforming License Amendments EPID L-2022-LLM-0003 - FRN - Enclosure 5 ML22299A1122022-11-0303 November 2022 Notice of Consideration of Approval of Indirect Transfer of Licenses & Conforming Amendments & Opportunity to Request Hearing - Susquehanna Steam Station, Units 1 & 2 & Associated Independent Spent Fuel Storage Installation (EPID L-2022-LLM ML22299A1132022-11-0303 November 2022 Notice of Consideration of Approval of Indirect Transfer of Licenses and Conforming Amendments & Opportunity to Request Hearing - Susquehanna Steam Station, Units 1 & 2 & Associated Independent Spent Fuel Storage Installation (EPID L-2022-L ML20335A0902020-12-21021 December 2020 Federal Register Notice - November 2020 COVID-19 Exemptions ML20271A0002020-10-13013 October 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for September 2020 ML20035C4082020-02-18018 February 2020 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/25/2020 ML19042A3062019-02-15015 February 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 2/26/2019 ML18278A2802018-10-10010 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 10/23/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML16243A3882016-09-28028 September 2016 Federal Register Notice Susquehanna Steam Electric Station, Units 1 and 2, Consideration of Approval of Application Regarding License Transfer of Renewed Facility Operating License Nos. NPF-14 and NPF-22 ML16239A4242016-09-16016 September 2016 Letter with Notice of Consideration of Approval of Transfer of Licenses and Opportunity for a Hearing ML16131A7952016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 NRC-2016-0100, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 20162016-05-13013 May 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 24, 2016 ML15218A6252015-08-14014 August 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 14, 2015 ML15202A2252015-07-23023 July 2015 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing ML15202A2292015-07-23023 July 2015 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Enclosure) ML15054A0582015-04-10010 April 2015 Letter Forwarding Order Approving Transfer of Licenses and Conforming Amendments Related to Susquehanna Steam Electric Station, Units 1 and 2 (TAC MF4426 and MF4427) NRC-2012-0283, PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit Nos. 1 and 2 EDG Amd Frequency Withdraw Federal Register Notice2015-02-0909 February 2015 PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit Nos. 1 and 2 EDG Amd Frequency Withdraw Federal Register Notice ML15027A6032015-02-0909 February 2015 PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit Nos. 1 and 2 EDG Amd Frequency Withdraw Federal Register Notice ML15027A6052015-02-0909 February 2015 Withdrawal of an Amendment Request ML15027A6112015-02-0909 February 2015 Withdrawal of an Amendment Request ML14149A3102014-05-30030 May 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: June 6, 2014 NRC-2014-0132, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: June 6, 20142014-05-30030 May 2014 FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: June 6, 2014 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0432012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12068A4222012-03-0909 March 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML12068A4192012-03-0909 March 2012 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing NRC-2012-0063, Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing2012-03-0909 March 2012 Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing NRC-2011-0230, FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations2011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1126504892011-09-22022 September 2011 FRN: General Notice. Biweekly Notice - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations ML1104103732011-02-10010 February 2011 Sholly Report for Fr Publication on February 22, 2011 NRC-2011-0040, Sholly Report for Fr Publication on February 22, 20112011-02-10010 February 2011 Sholly Report for Fr Publication on February 22, 2011 ML1008103102010-03-29029 March 2010 ME2839 & ME2840, Correction Letter Correction Fr Notice for EA-FR for Publication in Fr and Corrected Fr Notice for Exemption Prior to Publication in Fr ML1001102922010-03-19019 March 2010 ME2839 & ME2840, Transmittal Letter to Licensee for Exemption & Fr Request for Exemption from Part 73 Implementation Date ML1001102532010-03-15015 March 2010 Environmental Assessment and Finding of No Significant Impact Request for Exemption from Implementation Deadline for Physical Security Plans ML0931602812009-11-24024 November 2009 FRN: General Notice. Issuance of Renewed Facility Operating License Nos. NPF-14 and NPF-22 for the Susquehanna Steam Electric Station, Units 1 and 2 NRC-2009-0389, Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License2009-08-31031 August 2009 Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License ML0924300972009-08-31031 August 2009 Frn:General Notice, Notice of Withdrawal of Application for Amendment to Facility Operating License ML0922300552009-08-31031 August 2009 Letter Regarding Withdrawal of an Amendment Request and FRN 2024-05-03
[Table view] Category:Letter
MONTHYEARML24289A1252024-10-22022 October 2024 – Authorized Alternative to Requirements of the ASME OM Code PLA-8145, Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-81452024-10-21021 October 2024 Biennial 10 CFR 50.59 and 72.48 Summary Report and Changes to Regulatory Commitments - PLA-8145 ML24291A1562024-10-16016 October 2024 Missed Annual Inventory Required by 40 CFR 266, Subpart in PLE 0026645 PLA-8148, Registration for the Use of Spent Fuel Storage Casks 311, 308, and 3102024-10-15015 October 2024 Registration for the Use of Spent Fuel Storage Casks 311, 308, and 310 PLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 ML24260A2312024-09-17017 September 2024 Senior Reactor and Reactor Operator Initial License Examinations 05000387/LER-2024-002, B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor2024-09-16016 September 2024 B Diesel Generator Inoperable Due to Failed Excitation System Linear Reactor ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24233A2192024-09-0303 September 2024 – Authorized Alternative to Requirements of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code IR 05000387/20240052024-08-29029 August 2024 Updated Inspection Plan for Susquehanna Steam Electric Station, Units 1 and 2 (Report 05000387/2024005 and 05000388/2024005) 05000387/LER-2023-004-01, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-08-26026 August 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum 05000387/LER-2024-001-01, Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear2024-08-21021 August 2024 Main Steam Isolation Valve Leakage Due to Valve Body Seat Wear IR 05000387/20240022024-08-12012 August 2024 Integrated Inspection Report 05000387/2024002 and 05000388/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) ML24197A0982024-07-15015 July 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000387/2024010 and 05000388/2024010 PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 ML24127A2262024-05-29029 May 2024 Issuance of Amendment Nos. 288 and 272 Adoption of TSTF-563 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) 05000387/LER-2024-001, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) IR 05000387/20240012024-05-13013 May 2024 Integrated Inspection Report 05000387/2024001 and 05000388/2024001 IR 05000387/20244042024-05-0707 May 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000387/2024404 and 05000388/2024404 PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) ML24082A1372024-04-22022 April 2024 Issuance of Amendment Nos. 287 and 271 Adoption of TSTF-568, Revision 2 and Associated Technical Specification Changes PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) ML24092A4022024-04-0101 April 2024 Annual Financial Report (PLA-8098) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) ML24067A2512024-03-19019 March 2024 Authorized Alternative to Requirements of the ASME Code PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance ML24044A2532024-03-14014 March 2024 Associated Independent Spent Fuel Storage Installation – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0077 (Security Notifications, Reports, and Recordkeeping & Suspicious Activity Reporting)) IR 05000387/20240112024-02-29029 February 2024 Commercial Grade Dedication Inspection Report 05000387/2024011 and 05000388/2024011 IR 05000387/20230062024-02-28028 February 2024 Annual Assessment Letter for Susquehanna Steam Electric Station, Units 1 and 2 (Reports 05000387/2023006 and 05000388/2023006) ML24039A1882024-02-27027 February 2024 Issuance of Amendment Nos. 286 and 270 Changes to Technical Specifications for Control Rods ML24037A3072024-02-22022 February 2024 Summary of Regulatory Audit in Support of Relief Request 5RR-02 PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) IR 05000387/20230042024-02-0707 February 2024 Integrated Inspection Report 05000387/2023004 and 05000388/2023004 05000387/LER-2023-004, Manual Reactor Scram Due to Degraded Main Condenser Vacuum2024-01-0909 January 2024 Manual Reactor Scram Due to Degraded Main Condenser Vacuum PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) IR 05000387/20230102023-12-11011 December 2023 Fire Protection Team Inspection Report 05000387/2023010 and 05000388/2023010 PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) 2024-09-06
[Table view] |
Text
Mr. Timothy S. Rausch UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 February 9, 2015 Senior Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603-0467
SUBJECT:
SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 -WITHDRAWAL OF AN AMENDMENT REQUEST (TAC NOS. ME9609 AND ME9610)
Dear Mr. Rausch:
By letter dated September 18, 2012, 1 as supplemented by letter dated, May 10, 2013,2 PPL Susquehanna, LLC (PPL, the licensee) submitted a license amendment request for Susquehanna Steam Electric Station, Units 1 and 2, to the Nuclear Regulatory Commission (NRC) for review. The proposed amendment would make changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. A notice of the NRC's consideration of the proposed amendment was published in the Federal Register on November 27, 2012 (77 FR 70843). Subsequently, by letter dated December 22, 2014,3 PPL requested to withdrawal the amendment request. In this letter, PPL stated that the reason for withdrawing the license amendment request was related to plans for new design analysis that will impact the original proposal. PPL further stated that it intends to request a pre-submittal meeting with the NRC staff to discuss submitting an amendment to change the above stated TS SRs based on this new design analysis. The NRC staff has ceased all work on this licensing action and closed Technical Assignment Control (TAC) Nos. ME9609 and ME9610. The NRC has filed the enclosed Notice of Withdrawal of Application to Amend the Facility Operating Licenses with the Office of the Federal Register for publication. 1 Agencywide Documents Access and Management System Accession No. ML 12262A321. 2 ADAMS Accession No. ML 13130A127. 3 ADAMS Accession No. ML 15022A013.
T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388
Enclosure:
Notice of Withdrawal cc w/encl: Distribution via Listserv Sincerely, Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ENCLOSURE FEDERAL REGISTER NOTICE NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-387 and 50-388; NRC-2012-0283] [7590-01-P] PPL Susquehanna, LLC; Susquehanna Steam Electric Station, Unit Nos. 1 and 2 AGENCY: Nuclear Regulatory Commission. ACTION: License amendment application; withdrawal by applicant. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) has granted the request of PPL Susquehanna, LLC to withdraw its application dated September 18, 2012, as supplemented by letter dated May 10, 2013, for a proposed amendment to Renewed Facility Operating License Nos. NPF-14 and NPF-22, for the Susquehanna Steam Electric Station, Units 1 and 2. The proposed amendment would have made changes to Technical Specification (TS) Surveillance Requirement (SR) 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. DATES: Notice of withdrawal of license amendment application given on [INSERT DATE OF PUBLICATION IN THE FEDERAi:.REGISTER] ADDRESSES: Please refer to Docket ID NRC-2012-0283 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:
- Federal Rulemaking Web Site: Go to http://www.regulations.gov and search for Docket ID NRC-2012-0283. Address questions about NRC dockets to Carol Gallagher; telephone: 301-287-3422; e-mail: Carol.Gallagher@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
- NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at http://www.nrc.gov/reading-rm/adams.html. To begin the search, select "ADAMS Public Documents" and then select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced in this document (if that document is available in ADAMS) is provided the first time that a document is referenced.
- NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room 01-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. FOR FURTHER INFORMATION CONTACT: Jeffrey A. Whited, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; telephone: 301-415-4090, e-mail: jeffrey.whited@nrc.gov. SUPPLEMENTARY INFORMATION: The NRC has granted the request of PPL Susquehanna, LLC (the licensee) to withdraw its application dated September 18, 2012 (ADAMS Accession No. ML 12262A321), as supplemented by letter dated May 10, 2013 (ADAMS Accession No. ML 13130A127), for a proposed amendment to the Susquehanna Steam Electric Station, Units 1 and 2, located in Luzerne County, Pennsylvania. The proposed amendment would have made changes to TS SR 3.8.1.19 in TS 3.8.1 "AC Source -Operating." Specifically, the proposed amendment would increase the minimum steady state frequency for Diesel Generator E during the loss of offsite power and emergency core cooling system surveillance. The NRC published a Biweekly Notice in the Federal Register on November 27, 2012 (77 FR 70843), that gave notice that this proposed amendment was under consideration by the NRC. However, by letter dated December 22, 2014 (ADAMS Accession No ML 15022A013), the licensee requested to withdraw the proposed amendment. Dated at Rockville, Maryland, this C:/ day of February 2015. For the Nuclear Regulatory Commission. Je!?f{.:f Plant Licensing Branch 1-2, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
T. Rausch If you have any questions regarding this matter, please contact me at 301-415-4090. Docket Nos. 50-387 and 50-388
Enclosure:
Notice of Withdrawal cc w/encl: Distribution via Listserv DISTRIBUTION: PUBLIC Branch Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDorlDpr Resource RidsNrrDorlLpll-2 Resource RidsNrrLAABaxter Resource RidsNrrPMSusquehanna Resource RidsRgnlMailCenter Resource Sincerely, IRA/ Jeffrey A. Whited, Project Manager Plant Licensing Branch 1-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation ADAMS Accession Nos.: L TR (NRR-106) ML 15027A605 FRN (ADM-012) ML 15027 A603 *via e-mail OFFICE NRR/DORL/LPLl-2/PM NRR/DORL/LPLl-2/LA NRR/DORL/LPLl-2/BC NRR/DORL/LPLl-2/PM NAME JWhited ABaxter
- MKhanna JWhited DATE 02/06/2015 02/05/2015 02/06/2015 02/09/2015 OFFICIAL AGENCY RECORD