ML120620082: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Letter | | document type = Letter | ||
| page count = 4 | | page count = 4 | ||
| project = TAC:ME8073 | |||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 5, 2012 Mr. Barry Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1-CORRECTION OF TYPOGRAPHICAL ERROR RE: AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE CHANGE TRAVELER 513, REVISION TO TECHNICAL SPECIFICATION 3.4.14, "[REACTOR COOLANT SYSTEM] LEAKAGE DETECTION INSTRUMENTATION" (TAC NO. ME8073) | |||
==Dear Mr. Allen:== | |||
The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the enclosed Amendment No. 284 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) on December 9, 2011 (Agencywide Documents Access and Management System Accession No. ML 112590431), in response to FirstEnergy Nuclear Operating Company's (FENOC's) application dated April 29, 2011. The amendment revised the DBNPS Technical Specifications (TS) to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable. The amendment also made TS Bases changes which reflect the proposed TS changes and more accurately reflect the contents of the facility design basis related to operability of the RCS leakage detection instrumentation. FENOC's staff subsequently identified that in a retyped TS page provided to the NRC, there was a typographical error and subsequently the amendment was issued with that error. FENOC when sending in the retyped page inadvertently inserted the word "required" at the beginning of Condition C, which should read "Containment sump monitor inoperable." The NRC staff determined that this typographical error was inadvertently introduced. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions. please call me at 301-415-3867 Michael Mahoney. Project anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346 | |||
===Enclosures:=== | |||
As Stated cc w/encls: Distribution via Listserv | |||
-------------------------------------3.4.15 RCS Leakage Detection Instrumentation ACTIONS (continued) COMPLETION TIME REQUIRED ACTION CONDITION ---------------NO Not required until 12 hours after establishment of steady state operation. B. (continued) Perform SR 3.4.13.1. Once per 24 hours AND Restore required 30 days containment atmosphere radioactivity monitor to OPERABLE status. ---_....... -NOTE-Only applicable when the containment atmosphere gaseous radiation monitor is the only OPERABLE monitor. ---------...--_... _--....C.1 Analyze grab samples of Once per 12 hours monitor inoperable. C. Containment sump the containment atmosphere. AND C.2 Restore containment sump 7 days monitor to OPERABLE status. D.1 Be in MODE 3. 6 associated Time of Condition A, D. Required Action and or C not Be in MODE 5. 36 hours E. Both required monitors E.1 Enter LCO 3.0.3. 3.4.15-2 Amendment 284 Corrected TS page 3.4.15-2 is enclosed. me at 301-415-3867 Docket No. 50-346 | |||
===Enclosures:=== | |||
As Stated cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL3-2 RlF RidsNrrPMDavis-Besse Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsRgn3MaiiCenter Resource RidsNrrLAKGoldstein Resource RidsNrrDorllpl3-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource Accession No ML120620082 If you or your staff have any questions, please call | |||
Sincerely,IRAJ Michael Mahoney, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor NRR-058 OFFICE LPL3-2/PM LPL3-2/LA LPL3*21BC LPL3*2/PM NAME MMahoney KGoldstein JZimmerman MMahoney DATE 03/05/12 03/05/12 03/05/12 03/05/12 OFFICIAL RECORD}} |
Revision as of 10:20, 16 March 2018
ML120620082 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 03/05/2012 |
From: | Michael Mahoney Plant Licensing Branch III |
To: | Allen B S FirstEnergy Nuclear Operating Co |
Mahoney, M NRR/DORL/LPLIII- 2 415-3867 | |
References | |
TAC ME8073 | |
Download: ML120620082 (4) | |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 March 5, 2012 Mr. Barry Site Vice President FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station Mail Stop A-DB-3080 5501 North State Route 2 Oak Harbor, OH 43449-9760 DAVIS-BESSE NUCLEAR POWER STATION, UNIT NO.1-CORRECTION OF TYPOGRAPHICAL ERROR RE: AMENDMENT RE: ADOPTION OF TECHNICAL SPECIFICATIONS TASK FORCE CHANGE TRAVELER 513, REVISION TO TECHNICAL SPECIFICATION 3.4.14, "[REACTOR COOLANT SYSTEM] LEAKAGE DETECTION INSTRUMENTATION" (TAC NO. ME8073)
Dear Mr. Allen:
The U.S. Nuclear Regulatory Commission (NRC, the Commission) issued the enclosed Amendment No. 284 to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station, Unit No.1 (DBNPS) on December 9, 2011 (Agencywide Documents Access and Management System Accession No. ML 112590431), in response to FirstEnergy Nuclear Operating Company's (FENOC's) application dated April 29, 2011. The amendment revised the DBNPS Technical Specifications (TS) to define a new time limit for restoring inoperable Reactor Coolant System (RCS) leakage detection instrumentation to operable status and establish alternate methods of monitoring RCS leakage when one or more required monitors are inoperable. The amendment also made TS Bases changes which reflect the proposed TS changes and more accurately reflect the contents of the facility design basis related to operability of the RCS leakage detection instrumentation. FENOC's staff subsequently identified that in a retyped TS page provided to the NRC, there was a typographical error and subsequently the amendment was issued with that error. FENOC when sending in the retyped page inadvertently inserted the word "required" at the beginning of Condition C, which should read "Containment sump monitor inoperable." The NRC staff determined that this typographical error was inadvertently introduced. The proposed correction does not change any of the conclusions in the safety evaluation associated with the amendment and does not affect the associated notice to the public. Corrected TS page 3.4.15-2 is enclosed. If you or your staff have any questions. please call me at 301-415-3867 Michael Mahoney. Project anager Plant Licensing Branch 111-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-346
Enclosures:
As Stated cc w/encls: Distribution via Listserv
3.4.15 RCS Leakage Detection Instrumentation ACTIONS (continued) COMPLETION TIME REQUIRED ACTION CONDITION ---------------NO Not required until 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after establishment of steady state operation. B. (continued) Perform SR 3.4.13.1. Once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> AND Restore required 30 days containment atmosphere radioactivity monitor to OPERABLE status. ---_....... -NOTE-Only applicable when the containment atmosphere gaseous radiation monitor is the only OPERABLE monitor. ---------...--_... _--....C.1 Analyze grab samples of Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> monitor inoperable. C. Containment sump the containment atmosphere. AND C.2 Restore containment sump 7 days monitor to OPERABLE status. D.1 Be in MODE 3. 6 associated Time of Condition A, D. Required Action and or C not Be in MODE 5. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> E. Both required monitors E.1 Enter LCO 3.0.3. 3.4.15-2 Amendment 284 Corrected TS page 3.4.15-2 is enclosed. me at 301-415-3867 Docket No. 50-346
Enclosures:
As Stated cc w/encls: Distribution via Listserv DISTRIBUTION: PUBLIC LPL3-2 RlF RidsNrrPMDavis-Besse Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsRgn3MaiiCenter Resource RidsNrrLAKGoldstein Resource RidsNrrDorllpl3-2 Resource RidsNrrDoriDpr Resource RidsAcrsAcnw_MaiiCTR Resource Accession No ML120620082 If you or your staff have any questions, please call
Sincerely,IRAJ Michael Mahoney, Project Plant Licensing Branch Division of Operating Reactor Office of Nuclear Reactor NRR-058 OFFICE LPL3-2/PM LPL3-2/LA LPL3*21BC LPL3*2/PM NAME MMahoney KGoldstein JZimmerman MMahoney DATE 03/05/12 03/05/12 03/05/12 03/05/12 OFFICIAL RECORD