{{#Wiki_filter:Entergy Operations, Inc.
{{#Wiki_filter:Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5102 Phil Couture Senior Manager, Fleet Regulatory Assurance 10 CFR 50.55a(z)(1)
1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5102 Phil Couture Senior Manager, Fleet Regulatory Assurance
CNRO2021-00022 GNRO2021-00028 August 25, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
10 CFR 50.55a(z)(1)
CNRO2021-00022 GNRO2021-00028
 
August 25, 2021
 
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Subject:==
==Subject:==
Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019 Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47
Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019
 
Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29
 
River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47


==References:==
==References:==
: 1. Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC) Request to Delay Review of Relief Request GG-ISI-020 and RBS-ISI-019, (ADAMS Accession No. ML21106A216) dated April 16, 2021 In Reference 1, Entergy Operations, Inc. (Entergy) stated it would perform fuel sampling to verify that the catalyst loading at Grand Gulf Nuclear Station, Unit 1 (GGNS) was greater than 0.1 g/cm2. Further, Entergy stated it would document the results of this verification in a supplemental letter to the NRC. The purpose of this letter is to document the results of that verification. Entergys analysis of the GGNS fuel samples determined the average catalyst loading was 0.65 g/cm2.
: 1. Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC) Request to Delay Review of Relief Request GG-ISI-020 and RBS-ISI-019, (ADAMS Accession No. ML21106A216) dated April 16, 2021
 
In Reference 1, Entergy Operations, Inc. (Entergy) stated it would perform fuel sampling to verify that the catalyst loading at Grand Gulf Nuclear Station, Unit 1 (GGNS) was greater than 0.1 g/cm2. Further, Entergy stated it would document the results of this verification in a supplemental letter to the NRC. The purpose of this letter is to document the results of that verification. Entergys analysis of the GGNS fuel samples determined the average catalyst loading was 0.65 g/cm2.
 
There are no regulatory commitments contained in this letter.
There are no regulatory commitments contained in this letter.


CNRO2021-00022 GNRO2021-00028 Page 2 of 2 Should you have any questions or require additional information, please contact me at (601) 368-5102.
CNRO2021-00022 GNRO2021-00028 Page 2 of 2
Respectfully, Philip            Digitally signed by Philip Couture Couture            Date: 2021.08.25 16:34:22
 
                  -05'00' Phil Couture PC/ram/gpn cc:   NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet NRC Project Manager - Grand Gulf Nuclear Station, Unit 1 NRC Project Manager - River Bend Station, Unit 1}}
Should you have any questions or require additional information, please contact me at (601) 368-5102.
 
Respectfully,
 
Phil Couture
 
PC/ram/gpn
 
cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet NRC Project Manager - Grand Gulf Nuclear Station, Unit 1 NRC Project Manager - River Bend Station, Unit 1}}

Latest revision as of 23:38, 19 November 2024

Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019
ML21237A550
Person / Time
Site: Grand Gulf, River Bend  Entergy icon.png
Issue date: 08/25/2021
From: Couture P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO2021-00022, GNRO2021-00028
Download: ML21237A550 (2)


Text

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5102 Phil Couture Senior Manager, Fleet Regulatory Assurance

10 CFR 50.55a(z)(1)

CNRO2021-00022 GNRO2021-00028

August 25, 2021

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019

Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29

River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47

References:

1. Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC) Request to Delay Review of Relief Request GG-ISI-020 and RBS-ISI-019, (ADAMS Accession No. ML21106A216) dated April 16, 2021

In Reference 1, Entergy Operations, Inc. (Entergy) stated it would perform fuel sampling to verify that the catalyst loading at Grand Gulf Nuclear Station, Unit 1 (GGNS) was greater than 0.1 g/cm2. Further, Entergy stated it would document the results of this verification in a supplemental letter to the NRC. The purpose of this letter is to document the results of that verification. Entergys analysis of the GGNS fuel samples determined the average catalyst loading was 0.65 g/cm2.

There are no regulatory commitments contained in this letter.

CNRO2021-00022 GNRO2021-00028 Page 2 of 2

Should you have any questions or require additional information, please contact me at (601) 368-5102.

Respectfully,

Phil Couture

PC/ram/gpn

cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet NRC Project Manager - Grand Gulf Nuclear Station, Unit 1 NRC Project Manager - River Bend Station, Unit 1