Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019
ML21237A550
Person / Time
Site: Grand Gulf, River Bend  Entergy icon.png
Issue date: 08/25/2021
From: Couture P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CNRO2021-00022, GNRO2021-00028
Download: ML21237A550 (2)


Text

Entergy Operations, Inc.

1340 Echelon Parkway Jackson, MS 39213 Tel 601-368-5102 Phil Couture Senior Manager, Fleet Regulatory Assurance 10 CFR 50.55a(z)(1)

CNRO2021-00022 GNRO2021-00028 August 25, 2021 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Supplemental Information to Relief Requests GG-ISI-020 and RBS-ISI-019 Grand Gulf Nuclear Station, Unit 1 NRC Docket No. 50-416 Renewed Facility Operating License No. NPF-29 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47

References:

1. Entergy Operations, Inc. (Entergy) letter to U.S. Nuclear Regulatory Commission (NRC) Request to Delay Review of Relief Request GG-ISI-020 and RBS-ISI-019, (ADAMS Accession No. ML21106A216) dated April 16, 2021 In Reference 1, Entergy Operations, Inc. (Entergy) stated it would perform fuel sampling to verify that the catalyst loading at Grand Gulf Nuclear Station, Unit 1 (GGNS) was greater than 0.1 g/cm2. Further, Entergy stated it would document the results of this verification in a supplemental letter to the NRC. The purpose of this letter is to document the results of that verification. Entergys analysis of the GGNS fuel samples determined the average catalyst loading was 0.65 g/cm2.

There are no regulatory commitments contained in this letter.

CNRO2021-00022 GNRO2021-00028 Page 2 of 2 Should you have any questions or require additional information, please contact me at (601) 368-5102.

Respectfully, Phil Couture PC/ram/gpn cc:

NRC Region IV Regional Administrator NRC Senior Resident Inspector - Grand Gulf Nuclear Station, Unit 1 NRC Senior Resident Inspector - River Bend Station, Unit 1 NRC Project Manager - Entergy Fleet NRC Project Manager - Grand Gulf Nuclear Station, Unit 1 NRC Project Manager - River Bend Station, Unit 1 Philip Couture Digitally signed by Philip Couture Date: 2021.08.25 16:34:22