ML22032A143: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:[7590-01-P]
{{#Wiki_filter:[7590-01-P]
NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION
[NRC-2022-0043]
[NRC-2022-0043]
Monthly Notice Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations AGENCY: Nuclear Regulatory Commission.
 
Monthly Notice
 
Applications and Amendments to Facility Operating Licenses and Combined
 
Licenses Involving No Significant Hazards Considerations
 
AGENCY: Nuclear Regulatory Commission.
 
ACTION: Monthly notice.
ACTION: Monthly notice.


==SUMMARY==
==SUMMARY==
: Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this regular monthly notice. The Act requires the Commission to publish notice of any amendments issued, or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration (NSHC), notwithstanding the pendency before the Commission of a request for a hearing from any person. This monthly notice includes all amendments issued, or proposed to be issued, from January 7, 2022, to February 3, 2022. The last monthly notice was published on January 25, 2022.
: Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as
DATES: Comments must be filed by March 24, 2022. A request for a hearing or petitions for leave to intervene must be filed by April 25, 2022.
 
ADDRESSES: You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website:
amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this
 
regular monthly notice. The Act requires the Commission to pub lish notice of any
 
amendments issued, or proposed to be issued, and grants the Com mission the authority
 
to issue and make immediately effective any amendment to an ope rating license or
 
combined license, as applicable, upon a determination by the Co mmission that such
 
amendment involves no significant hazards consideration (NSHC), notwithstanding the
 
pendency before the Commission of a request for a hearing from any person. This
 
monthly notice includes all amendments issued, or proposed to b e issued, from
 
January 7, 2022, to February 3, 2022. The last monthly notice was published on
 
January 25, 2022.
 
DATES: Comments must be filed by March 24, 2022. A request for a hearing or
 
petitions for leave to intervene must be filed by April 25, 2022.
 
ADDRESSES: You may submit comments by any of the following methods; howe ver,
 
the NRC encourages electronic comment submission through the Federal rulemaking
 
website:
Federal rulemaking website: Go to https://www.regulations.gov and search
 
for Docket ID NRC-2022-0043. Address questions about Docket IDs in Regulations.gov
 
to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schu mann@nrc.gov. For
 
technical questions, contact the individual listed in the For Further Information Contact
 
section of this document.
 
Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M,
 
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program
 
Management, Announcements and Editing Staff.
 
For additional direction on obtaining information and submittin g comments, see
 
Obtaining Information and Submitting Comments in the SUPPLEME NTARY
 
INFORMATION section of this document.
 
FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear Reactor
 
Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,
 
telephone: 301-415-1506, email: Kay.Goldstein@nrc.gov.


Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0043. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the For Further Information Contact section of this document.
Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see Obtaining Information and Submitting Comments in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-1506, email: Kay.Goldstein@nrc.gov.
SUPPLEMENTARY INFORMATION:
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments A. Obtaining Information Please refer to Docket ID NRC-2022-0043, facility name, unit number(s), docket number(s), application date, and subject when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2022-0043.
NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public 2


Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to PDR.Resource@nrc.gov. For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the Availability of Documents section.
I. Obtaining Information and Submitting Comments
NRCs PDR: You may examine and purchase copies of public documents, by appointment, at the NRCs PDR, Room P1 B35, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Friday, except Federal holidays.
 
B. Submitting Comments The NRC encourages electronic comment submission through the Federal rulemaking website (https://www.regulations.gov). Please include Docket ID NRC-2022-0043, facility name, unit number(s), docket number(s), application date, and subject, in your comment submission.
A. Obtaining Information
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
 
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment 3
Please refer to Docket ID NRC-2022-0043, facility name, unit number(s), docket
 
number(s), application date, and subject when contacting the NR C about the availability
 
of information for this action. You may obtain publicly availa ble information related to
 
this action by any of the following methods:
 
Federal Rulemaking Website: Go to https://www.regulations.gov and
 
search for Docket ID NRC-2022-0043.
 
NRCs Agencywide Documents Access and Management System
 
(ADAMS): You may obtain publicly available documents online in the ADA MS Public
 
2 Documents collection at https ://www.nrc.gov/reading-rm/adams.html. To begin the
 
search, select Begin Web-based ADAMS Search. For problems wi th ADAMS, please
 
contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209,
 
301-415-4737, or by email to PDR.Resource@nrc.gov. For the con venience of the
 
reader, instructions about obtaining materials referenced in th is document are provided
 
in the Availability of Documents section.
 
NRCs PDR: You may examine and purchase copies of public documents,
 
by appointment, at the NRCs PDR, Room P1 B35, One White Flint North, 11555
 
Rockville Pike, Rockville, Maryland 20852. To make an appointm ent to visit the PDR,
 
please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-
 
4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Frid ay, except Federal
 
holidays.
 
B. Submitting Comments
 
The NRC encourages electronic comment submission through the Federal
 
rulemaking website (https://www.regulations.gov). Please include Docket ID NRC-
 
2022-0043, facility name, unit number(s), docket number(s), application date, and
 
subject, in your comment submission.
 
The NRC cautions you not to include identifying or contact info rmation that you
 
do not want to be publicly disclosed in your comment submission. The NRC will post all
 
comment submissions at https://www.regulations.gov as well as e nter the comment
 
submissions into ADAMS. The NRC does not routinely edit commen t submissions to
 
remove identifying or contact information.
 
If you are requesting or aggregating comments from other person s for
 
submission to the NRC, then you should inform those persons not to include identifying
 
or contact information that they do not want to be publicly dis closed in their comment
 
3 submission. Your request should state that the NRC does not routinely edit comment
 
submissions to remove such information before making the commen t submissions
 
available to the public or entering the comment into ADAMS.
 
II. Notice of Consideration of Issuance of Amendments to Facili ty Operating
 
Licenses and Combined Licenses and Proposed No Significant Haza rds
 
Consideration Determination
 
For the facility-specific amendment requests shown in this not ice, the
 
Commission finds that the licensees analyses provided, consist ent with section 50.91 of
 
title 10 of the Code of Federal Regulations (10 CFR), are sufficient to support the
 
proposed determinations that these amendment requests involve N SHC. Under the
 
Commissions regulations in 10 CFR 50.92, operation of the faci lities in accordance with
 
the proposed amendments would not (1) involve a significant inc rease in the probability
 
or consequences of an accident previously evaluated; or (2) cre ate the possibility of a
 
new or different kind of accident from any accident previously evaluated; or (3) involve a
 
significant reduction in a margin of safety.
 
The Commission is seeking public comments on these proposed de terminations.
 
Any comments received within 30 days after the date of publicat ion of this notice will be
 
considered in making any final determinations.
 
Normally, the Commission will not issue the amendments until t he expiration of
 
60 days after the date of publication of this notice. The Comm ission may issue any of
 
these license amendments before expiration of the 60-day period provided that its final
 
determination is that the amendment involves NSHC. In addition, the Commission may
 
issue any of these amendments prior to the expiration of the 30 -day comment period if
 
circumstances change during the 30-day comment period such that failure to act in a
 
timely way would result, for example in derating or shutdown of the facility. If the
 
4 Commission takes action on any of these amendments prior to the expiration of either
 
the comment period or the notice period, it will publish in the Federal Register a notice of
 
issuance. If the Commission makes a final NSHC determination f or any of these
 
amendments, any hearing will take place after issuance. The Co mmission expects that
 
the need to take action on any amendment before 60 days have el apsed will occur very


submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
infrequently.
II. Notice of Consideration of Issuance of Amendments to Facility Operating Licenses and Combined Licenses and Proposed No Significant Hazards Consideration Determination For the facility-specific amendment requests shown in this notice, the Commission finds that the licensees analyses provided, consistent with section 50.91 of title 10 of the Code of Federal Regulations (10 CFR), are sufficient to support the proposed determinations that these amendment requests involve NSHC. Under the Commissions regulations in 10 CFR 50.92, operation of the facilities in accordance with the proposed amendments would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or different kind of accident from any accident previously evaluated; or (3) involve a significant reduction in a margin of safety.
The Commission is seeking public comments on these proposed determinations.
Any comments received within 30 days after the date of publication of this notice will be considered in making any final determinations.
Normally, the Commission will not issue the amendments until the expiration of 60 days after the date of publication of this notice. The Commission may issue any of these license amendments before expiration of the 60-day period provided that its final determination is that the amendment involves NSHC. In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example in derating or shutdown of the facility. If the 4


Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance. If the Commission makes a final NSHC determination for any of these amendments, any hearing will take place after issuance. The Commission expects that the need to take action on any amendment before 60 days have elapsed will occur very infrequently.
A. Opportunity to Request a Hearing and Petition for Leave to I ntervene
A. Opportunity to Request a Hearing and Petition for Leave to Intervene Within 60 days after the date of publication of this notice, any persons (petitioner) whose interest may be affected by any of these actions may file a request for a hearing and petition for leave to intervene (petition) with respect to that action. Petitions shall be filed in accordance with the Commissions Agency Rules of Practice and Procedure in 10 CFR part 2. Interested persons should consult a current copy of 10 CFR 2.309. The NRCs regulations are accessible electronically from the NRC Library on the NRCs website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, the Commission or a presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued.
As required by 10 CFR 2.309(d) the petition should specifically explain the reasons why intervention should be permitted with particular reference to the following general requirements for standing: (1) the name, address, and telephone number of the petitioner; (2) the nature of the petitioners right to be made a party to the proceeding; (3) the nature and extent of the petitioners property, financial, or other interest in the proceeding; and (4) the possible effect of any decision or order which may be entered in the proceeding on the petitioners interest.
In accordance with 10 CFR 2.309(f), the petition must also set forth the specific contentions that the petitioner seeks to have litigated in the proceeding. Each contention 5


must consist of a specific statement of the issue of law or fact to be raised or controverted. In addition, the petitioner must provide a brief explanation of the bases for the contention and a concise statement of the alleged facts or expert opinion that support the contention and on which the petitioner intends to rely in proving the contention at the hearing. The petitioner must also provide references to the specific sources and documents on which the petitioner intends to rely to support its position on the issue. The petition must include sufficient information to show that a genuine dispute exists with the applicant or licensee on a material issue of law or fact. Contentions must be limited to matters within the scope of the proceeding. The contention must be one that, if proven, would entitle the petitioner to relief. A petitioner who fails to satisfy the requirements at 10 CFR 2.309(f) with respect to at least one contention will not be permitted to participate as a party.
Within 60 days after the date of publication of this notice, an y persons (petitioner)
Those permitted to intervene become parties to the proceeding, subject to any limitations in the order granting leave to intervene. Parties have the opportunity to participate fully in the conduct of the hearing with respect to resolution of that partys admitted contentions, including the opportunity to present evidence, consistent with the NRCs regulations, policies, and procedures.
Petitions must be filed no later than 60 days from the date of publication of this notice. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii). The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document.
If a hearing is requested, and the Commission has not made a final determination on the issue of NSHC, the Commission will make a final determination on 6


the issue of NSHC. The final determination will serve to establish when the hearing is held. If the final determination is that the amendment request involves NSHC, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.
whose interest may be affected by any of these actions may file a request for a hearing
A State, local governmental body, Federally recognized Indian Tribe, or agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h)(1). The petition should state the nature and extent of the petitioners interest in the proceeding. The petition should be submitted to the Commission no later than 60 days from the date of publication of this notice. The petition must be filed in accordance with the filing instructions in the Electronic Submissions (E-Filing) section of this document, and should meet the requirements for petitions set forth in this section, except that under 10 CFR 2.309(h)(2) a State, local governmental body, or Federally recognized Indian Tribe, or agency thereof does not need to address the standing requirements in 10 CFR 2.309(d) if the facility is located within its boundaries.
 
Alternatively, a State, local governmental body, Federally recognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c).
and petition for leave to intervene (petition) with respect to that action. Petitions shall be
If a petition is submitted, any person who is not a party to the proceeding and is not affiliated with or represented by a party may, at the discretion of the presiding officer, be permitted to make a limited appearance pursuant to the provisions of 10 CFR 2.315(a). A person making a limited appearance may make an oral or written 7
 
filed in accordance with the Commissions Agency Rules of Prac tice and Procedure in
 
10 CFR part 2. Interested persons should consult a current cop y of 10 CFR 2.309. The
 
NRCs regulations are accessible electronically from the NRC Li brary on the NRCs
 
website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, the
 
Commission or a presiding officer will rule on the petition and, if appropriate, a notice of
 
a hearing will be issued.
 
As required by 10 CFR 2.309(d) the petition should specifically explain the
 
reasons why intervention should be permitted with particular re ference to the following
 
general requirements for standing: (1) the name, address, and telephone number of the
 
petitioner; (2) the nature of the petitioners right to be made a party to the proceeding;
 
(3) the nature and extent of the petitioners property, financi al, or other interest in the
 
proceeding; and (4) the possible effect of any decision or orde r which may be entered in
 
the proceeding on the petitioners interest.
 
In accordance with 10 CFR 2.309(f), the petition must also set forth the specific
 
contentions that the petitioner seeks to have litigated in the proceeding. Each contention
 
5 must consist of a specific statement of the issue of law or fac t to be raised or
 
controverted. In addition, the petitioner must provide a brief explanation of the bases for
 
the contention and a concise statement of the alleged facts or expert opinion that
 
support the contention and on which the petitioner intends to r ely in proving the
 
contention at the hearing. The petitioner must also provide re ferences to the specific
 
sources and documents on which the petitioner intends to rely t o support its position on
 
the issue. The petition must include sufficient information to show that a genuine dispute
 
exists with the applicant or licensee on a material issue of la w or fact. Contentions must
 
be limited to matters within the scope of the proceeding. The contention must be one
 
that, if proven, would entitle the petitioner to relief. A pet itioner who fails to satisfy the
 
requirements at 10 CFR 2.309(f) with respect to at least one co ntention will not be
 
permitted to participate as a party.
 
Those permitted to intervene become parties to the proceeding, subject to any
 
limitations in the order granting leave to intervene. Parties have the opportunity to
 
participate fully in the conduct of the hearing with respect to resolution of that partys
 
admitted contentions, including the opportunity to present evid ence, consistent with the
 
NRCs regulations, policies, and procedures.
 
Petitions must be filed no later than 60 days from the date of publication of this
 
notice. Petitions and motions for leave to file new or amended contentions that are filed
 
after the deadline will not be entertained absent a determinati on by the presiding officer
 
that the filing demonstrates good cause by satisfying the three factors in
 
10 CFR 2.309(c)(1)(i) through (iii). The petition must be file d in accordance with the
 
filing instructions in the Electronic Submissions (E-Filing) section of this document.
 
If a hearing is requested, and the Commission has not made a fi nal
 
determination on the issue of NSHC, the Commission will make a final determination on
 
6 the issue of NSHC. The final determination will serve to estab lish when the hearing is
 
held. If the final determination is that the amendment request involves NSHC, the
 
Commission may issue the amendment and make it immediately effe ctive,
 
notwithstanding the request for a hearing. Any hearing would t ake place after issuance
 
of the amendment. If the final determination is that the amend ment request involves a
 
significant hazards consideration, then any hearing held would take place before the
 
issuance of the amendment unless the Commission finds an immine nt danger to the
 
health or safety of the public, in which case it will issue an appropriate order or rule
 
under 10 CFR part 2.
 
A State, local governmental body, Federally recognized Indian T ribe, or agency
 
thereof, may submit a petition to the Commission to participate as a party under
 
10 CFR 2.309(h)(1). The petition should state the nature and e xtent of the petitioners
 
interest in the proceeding. The petition should be submitted t o the Commission no later
 
than 60 days from the date of publication of this notice. The petition must be filed in
 
accordance with the filing instructions in the Electronic Subm issions (E-Filing) section
 
of this document, and should meet the requirements for petition s set forth in this section,
 
except that under 10 CFR 2.309(h)(2) a State, local governmenta l body, or Federally
 
recognized Indian Tribe, or agency thereof does not need to add ress the standing
 
requirements in 10 CFR 2.309(d) if the facility is located with in its boundaries.
 
Alternatively, a State, local governmental body, Federally reco gnized Indian Tribe, or
 
agency thereof may participate as a non-party under 10 CFR 2.31 5(c).
 
If a petition is submitted, any person who is not a party to th e proceeding and is
 
not affiliated with or represented by a party may, at the discr etion of the presiding officer,
 
be permitted to make a limited appearance pursuant to the provi sions of
 
10 CFR 2.315(a). A person making a limited appearance may make an oral or written
 
7 statement of his or her position on the issues but may not othe rwise participate in the
 
proceeding. A limited appearance may be made at any session of the hearing or at any
 
prehearing conference, subject to the limits and conditions as may be imposed by the
 
presiding officer. Details regarding the opportunity to make a limited appearance will be
 
provided by the presiding officer if such sessions are schedule d.


statement of his or her position on the issues but may not otherwise participate in the proceeding. A limited appearance may be made at any session of the hearing or at any prehearing conference, subject to the limits and conditions as may be imposed by the presiding officer. Details regarding the opportunity to make a limited appearance will be provided by the presiding officer if such sessions are scheduled.
B. Electronic Submissions (E-Filing)
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings including documents filed by an interested State, local governmental body, Federally recognized Indian Tribe, or designated agency thereof that requests to participate under 10 CFR 2.315(c), must be filed in accordance with 10 CFR 2.302. The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases, to mail copies on electronic storage media, unless an exemption permitting an alternative filing method, as discussed in this notice, is granted. Detailed guidance on electronic submissions is located in the Guidance for Electronic Submissions to the NRC (ADAMS Accession No. ML13031A056) and on the NRC website at https://www.nrc.gov/site-help/e-submittals.html.
To comply with the procedural requirements of E-Filing, at least 10 days prior to the filing deadline, the participant should contact the Office of the Secretary by email at Hearing.Docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital identification (ID) certificate, which allows the participant (or its counsel or representative) to digitally sign submissions and access the E-Filing system for any proceeding in which it is participating; and (2) advise the Secretary that the participant will be submitting a petition or other adjudicatory document (even in instances in which the participant, or its counsel or representative, already holds an NRC-issued digital ID certificate). Based upon this information, the Secretary will establish an electronic 8


docket for the proceeding if the Secretary has not already established an electronic docket.
All documents filed in NRC adjudicatory proceedings including d ocuments filed
Information about applying for a digital ID certificate is available on the NRCs public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html. After a digital ID certificate is obtained and a docket created, the participant must submit adjudicatory documents in Portable Document Format. Guidance on submissions is available on the NRCs public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html. A filing is considered complete at the time the document is submitted through the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a transmission, the E-Filing system timestamps the document and sends the submitter an e-mail confirming receipt of the document. The E-Filing system also distributes an e-mail that provides access to the document to the NRCs Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed to obtain access to the documents via the E-Filing system.
A person filing electronically using the NRCs adjudicatory E-Filing system may seek assistance by contacting the NRCs Electronic Filing Help Desk through the Contact Us link located on the NRCs public website at https://www.nrc.gov/site-help/e-submittals.html, by email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m.,
Eastern Time, Monday through Friday, excluding government holidays.
9


Participants who believe that they have good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted in accordance with 10 CFR 2.302(b)-(d). Participants filing adjudicatory documents in this manner are responsible for serving their documents on all other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must still meet the electronic formatting requirement in 10 CFR 2.302(g)(1), unless the participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1).
by an interested State, local governmental body, Federally reco gnized Indian Tribe, or
Documents submitted in adjudicatory proceedings will appear in the NRCs electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the presiding officer. If you do not have an NRC-issued digital ID certificate as previously described, click cancel when the link requests certificates and you will be automatically directed to the NRCs electronic hearing dockets where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information such as social security numbers, home addresses, or personal phone numbers in their filings unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants should not include copyrighted materials in their submission.
 
The following table provides the plant name, docket number, date of application, ADAMS accession number, and location in the application of the licensees proposed NSHC determinations. For further details with respect to these license amendment applications, see the applications for amendment, which are available for public 10
designated agency thereof that requests to participate under 10 CFR 2.315(c), must be
 
filed in accordance with 10 CFR 2.302. The E-Filing process re quires participants to
 
submit and serve all adjudicatory documents over the internet, or in some cases, to mail
 
copies on electronic storage media, unless an exemption permitt ing an alternative filing
 
method, as discussed in this notice, is granted. Detailed guid ance on electronic
 
submissions is located in the Guidance for Electronic Submissio ns to the NRC (ADAMS
 
Accession No. ML13031A056) and on t he NRC website at https://www.nrc.gov/site-
 
help/e-submittals.html.
 
To comply with the procedural requirements of E-Filing, at leas t 10 days prior to
 
the filing deadline, the participant should contact the Office of the Secretary by email at
 
Hearing.Docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital
 
identification (ID) certificate, which allows the participant ( or its counsel or
 
representative) to digitally sign submissions and access the E-Filing system for any
 
proceeding in which it is participating; and (2) advise the Sec retary that the participant
 
will be submitting a petition or other adjudicatory document (e ven in instances in which
 
the participant, or its counsel or representative, already hold s an NRC-issued digital ID
 
certificate). Based upon this information, the Secretary will establish an electronic
 
8 docket for the proceeding if the Secretary has not already esta blished an electronic
 
docket.
 
Information about applying for a digital ID certificate is avai lable on the NRCs
 
public website at https://www.nrc.gov/site-help/e-submittals/ge tting-started.html. After a
 
digital ID certificate is obtained and a docket created, the pa rticipant must submit
 
adjudicatory documents in Portable Document Format. Guidance o n submissions is
 
available on the NRCs public website at https://www.nrc.gov/si te-help/electronic-sub-ref-
 
mat.html. A filing is considered complete at the time the docu ment is submitted through
 
the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-
 
Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a
 
transmission, the E-Filing system timestamps the document and s ends the submitter an
 
e-mail confirming receipt of the document. The E-Filing system also distributes an e-
 
mail that provides access to the document to the NRCs Office o f the General Counsel
 
and any others who have advised the Office of the Secretary tha t they wish to participate
 
in the proceeding, so that the filer need not serve the documen t on those participants
 
separately. Therefore, applicants and other participants (or t heir counsel or
 
representative) must apply for and receive a digital ID certifi cate before adjudicatory
 
documents are filed to obtain access to the documents via the E -Filing system.
 
A person filing electronically u sing the NRCs adjudicatory E-Filing system may
 
seek assistance by contacting the NRCs Electronic Filing Help Desk through the
 
Contact Us link located on the NRCs public website at https: //www.nrc.gov/site-help/e-
 
submittals.html, by email to MSHD.Resource@nrc.gov, or by a tol l-free call at 1-866-
 
672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m.,
 
Eastern Time, Monday through Friday, excluding government holid ays.
 
9 Participants who believe that they have good cause for not subm itting documents
 
electronically must file an exemption request, in accordance wi th 10 CFR 2.302(g), with
 
their initial paper filing stating why there is good cause for not filing electronically and
 
requesting authorization to continue to submit documents in pap er format. Such filings
 
must be submitted in accordance with 10 CFR 2.302(b)-(d). Part icipants filing
 
adjudicatory documents in this manner are responsible for servi ng their documents on all
 
other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must
 
still meet the electronic formatting requirement in 10 CFR 2.30 2(g)(1), unless the
 
participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1).
 
Documents submitted in adjudicatory proceedings will appear in the NRCs
 
electronic hearing docket, which is publicly available at https ://adams.nrc.gov/ehd,
 
unless excluded pursuant to an order of the presiding officer. If you do not have an
 
NRC-issued digital ID certificate as previously described, click cancel when the link
 
requests certificates and you will be automatically directed to the NRCs electronic
 
hearing dockets where you will be able to access any publicly a vailable documents in a
 
particular hearing docket. Participants are requested not to i nclude personal privacy
 
information such as social security numbers, home addresses, or personal phone
 
numbers in their filings unless an NRC regulation or other law requires submission of
 
such information. With respect to copyrighted works, except fo r limited excerpts that
 
serve the purpose of the adjudicatory filings and would constit ute a Fair Use application,
 
participants should not include copyrighted materials in their submission.
 
The following table provides the plant name, docket number, dat e of application,
 
ADAMS accession number, and location in the application of the licensees proposed
 
NSHC determinations. For further details with respect to these license amendment
 
applications, see the applications for amendment, which are ava ilable for public
 
10 inspection in ADAMS. For additional direction on accessing inf ormation related to this
 
document, see the Obtaining Information and Submitting Comment s section of this
 
document.


inspection in ADAMS. For additional direction on accessing information related to this document, see the Obtaining Information and Submitting Comments section of this document.
License Amendment Request(s)
License Amendment Request(s)
Constellation Energy Generation, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA Docket No(s).                          50-352, 50-353 March 11, 2021, as supplemented by letter(s)
Application date dated May 5, 2021, and December 15, 2021 ML21070A412, ML21125A215, and ADAMS Accession No. ML21349B364 Pages 18-20 of Attachment 1 to Letter dated Location in Application of NSHC December 15, 2021 The license amendment request was originally noticed in the Federal Register on August 10, 2021 (86 FR 43690). The notice is being reissued in its entirety to include the revised scope, description of the amendment request, and proposed no significant hazards consideration determination. The proposed amendments would modify the licensing basis Brief Description of Amendment(s)      by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic Tier 1 categorization process to allow the implementation of risk-informed categorization and treatment of structures, systems and components in accordance with 10 CFR 50.69.
Proposed Determination                  NSHC Tamra Domeyer, Associate General Counsel, Name of Attorney for Licensee, Mailing Constellation Energy Generation, LLC, 4300 Address Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone V. Sreenivas, 301-415-2597 Number Constellation Energy Generation, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA Docket No(s).                          50-352, 50-353 Application date                        December 15, 2021 ADAMS Accession No.                    ML21349B378 Location in Application of NSHC        Pages 27-29 of Attachment 1 11


The proposed amendments would revise technical specification (TS) surveillance requirements for emergency diesel generator (EDG) frequency and voltage tolerances and for emergency core cooling system pump flows. Specifically, the amendments would revise certain frequency and voltage acceptance criteria for steady-state EDG surveillance requirements under TS 3/4.8.1, Brief Description of Amendment(s)        "A.C. Sources - Operating. The proposed changes are consistent with WCAP-17308-NP-A .Rev 0, Treatment of Diesel Generator (DG) Technical Specification Frequency and Voltage Tolerances, dated July 2017. The proposed amendments would also revise the flow acceptance criteria of the emergency core cooling system (ECCS) pump surveillance requirements under TS3/ 4.5.1, ECCS-Operating.
Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA Docket No(s). 50-352, 50-353 Application date March 11, 2021, as supplemented by letter(s) dated May 5, 2021, and December 15, 2021
Proposed Determination                  NSHC Tamra Domeyer, Associate General Counsel, Name of Attorney for Licensee, Mailing Constellation Energy Generation, LLC, 4300 Address Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone V. Sreenivas, 301-415-2597 Number Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC; Duke Energy Carolinas, LLC; William States Lee III Nuclear Station, Units 1 and 2; Cherokee County, SC.
50-325, 50-324, 50-413, 50-414, 50-400, 50-Docket No(s).                           369, 50-370, 50-269, 50-270, 50-287, 50-261, 52-018, 52-019 Application date                         December 14, 2021 ADAMS Accession No.                      ML21348A003 Location in Application of NSHC          Pages 16-18 of Enclosure 1 The proposed amendments would relocate the Duke Energy Common Emergency Operations Facility (EOF) from 526 South Church Street, Charlotte, NC, to 9700 David Taylor Drive, Brief Description of Amendment(s)
Charlotte, NC. The new location is approximately nine air miles from the current location. Since the proposed change to the EOFs location results in the EOF being 12


greater than 25 miles from any of the Duke Energy nuclear sites, NRC approval is required per 10 CFR part 50 appendix E, IV.E.8.b.
ADAMS Accession No. ML21070A412, ML21125A215, and ML21349B364
Proposed Determination                NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address                                Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Andrew Hon, 301-415-8480 Number Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 and 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nuclear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC 50-325, 50-324, 50-413, 50-414, 50-400, 50-Docket No(s).
369, 50-370, 50-269, 50-270, 50-287, 50-261 Application date                      January 18, 2022 ADAMS Accession No.                    ML22018A236 Location in Application of NSHC        Pages 9-11 of Enclosure 1 The proposed amendments would modify certain technical specification (TS) surveillance requirements (SRs) by adding exceptions to consider the SR met when automatic valves or dampers are locked, sealed, or otherwise secured in the actuated position, in order to consider the SR met Brief Description of Amendment(s)      based on TS Task Force (TSTF) Traveler TSTF-541, Revision 2, "Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position" (ADAMS Accession No. ML19240A315), and the associated NRC safety evaluation for TSTF-541, Revision 2 (ADAMS Accession No. ML19323E926).
Proposed Determination                NSHC Kathryn B. Nolan, Deputy General Counsel, Name of Attorney for Licensee, Mailing Duke Energy Corporation, 550 South Tryon Address Street (DEC45A), Charlotte, NC 28202 NRC Project Manager, Telephone Luke Haeg, 301-415-0272 Number Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC 13


Docket No(s).                         50-369, 50-370 Application date                       December 20, 2021 ADAMS Accession No.                   ML21355A362 Location in Application of NSHC       Pages 9 and 10 of Enclosure The proposed amendments would revise McGuire's Unit 1 and 2 Technical Specification 3.4.3, "RCS Pressure and Temperature (P/T)
Location in Application of NSHC Pages 18-20 of Attachment 1 to Letter dated December 15, 2021
Brief Description of Amendment(s)     Limits," to reflect that Unit 1's P/T limit curves are applicable up to 54 effective full power years (EFPY) and that Unit 2's P/T limit curves are applicable up to 38.6 EFPY.
 
Proposed Determination                 NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address                               Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone John Klos, 301-415-5136 Number Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s).                         50-261 December 9, 2021, as supplemented by letter Application date dated January 6, 2022 ADAMS Accession No.                   ML21343A047, ML22006A240 Location in Application of NSHC       Pages 2-3 of the Enclosure The proposed amendment would adopt Technical Specifications Task Force (TSTF)
The license amendment request was originally noticed in the Federal Register on August 10, 2021 (86 FR 43690). The notice is being reissued in its entirety to include the revised scope, description of the amendment request, and proposed no significant hazards consideration determination. The proposed amendments would modify the licensing basis Brief Description of Amendment(s) by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic Tier 1 categorization process to allow the implementation of risk-informed categorization and treatment of structures, systems and components in accordance with 10 CFR 50.69.
Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections. Additionally, Duke Energy proposed a steam generator tube inspection period of 72 effective full power months for the Robinson inspection period that began Brief Description of Amendment(s)
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Tamra Domeyer, Associate General Counsel, Address Constellation Energy Generation, LLC, 4300 Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone Number V. Sreenivas, 301-415-2597 Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA Docket No(s). 50-352, 50-353 Application date December 15, 2021 ADAMS Accession No. ML21349B378 Location in Application of NSHC Pages 27-29 of Attachment 1
December 8, 2020. This is a variation from the TS changes described in TSTF-577 because the enhanced probe inspection method has not previously been used for steam generator tube inspections at Robinson.
 
11 The proposed amendments would revise technical specification (TS) surveillance requirements for emergency diesel generator (EDG) frequency and voltage tolerances and for emergency core cooling system pump flows. Specifically, the amendments would revise certain frequency and voltage acceptance criteria for steady-state EDG surveillance requirements under TS 3/4.8.1, Brief Description of Amendment(s) "A.C. Sources - Operating. The proposed changes are consistent with WCAP-17308-NP-A.Rev 0, Treatment of Diesel Generator (DG) Technical Specification Frequency and Voltage Tolerances, dated July 2017. The proposed amendments would also revise the flow acceptance criteria of the emergency core cooling system (ECCS) pump surveillance requirements under TS3/ 4.5.1, ECCS-Operating.
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Tamra Domeyer, Associate General Counsel, Address Constellation Energy Generation, LLC, 4300 Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone Number V. Sreenivas, 301-415-2597 Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 an d 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nucl ear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC ; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear P ower Plant, Unit 1; Wake and Chatham Counties, NC; Duke Energy Carolinas, L LC; William States Lee III Nuclear Station, Units 1 and 2; Cherokee County, SC.
50-325, 50-324, 50-413, 50-414, 50-400, 50-Docket No(s). 369, 50-370, 50-269, 50-270, 50-287, 50-261, 52-018, 52-019 Application date December 14, 2021 ADAMS Accession No. ML21348A003 Location in Application of NSHC Pages 16-18 of Enclosure 1 The proposed amendments would relocate the Duke Energy Common Emergency Operations Facility (EOF) from 526 South Church Street, Brief Description of Amendment(s) Charlotte, NC, to 9700 David Taylor Drive, Charlotte, NC. The new location is approximately nine air miles from the current location. Since the proposed change to the EOFs location results in the EOF being 12 greater than 25 miles from any of the Duke Energy nuclear sites, NRC approval is required per 10 CFR part 50 appendix E, IV.E.8.b.
Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number Andrew Hon, 301-415-8480 Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 an d 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nucl ear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC ; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear P ower Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-325, 50-324, 50-413, 50-414, 50-400, 50-369, 50-370, 50-269, 50-270, 50-287, 50-261 Application date January 18, 2022 ADAMS Accession No. ML22018A236 Location in Application of NSHC Pages 9-11 of Enclosure 1 The proposed amendments would modify certain technical specification (TS) surveillance requirements (SRs) by adding exceptions to consider the SR met when automatic valves or dampers are locked, sealed, or otherwise secured in the actuated position, in order to consider the SR met Brief Description of Amendment(s) based on TS Task Force (TSTF) Traveler TSTF-541, Revision 2, "Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position" (ADAMS Accession No. ML19240A315), and the associated NRC safety evaluation for TSTF-541, Revision 2 (ADAMS Accession No. ML19323E926).
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Kathryn B. Nolan, Deputy General Counsel, Address Duke Energy Corporation, 550 South Tryon Street (DEC45A), Charlotte, NC 28202 NRC Project Manager, Telephone Number Luke Haeg, 301-415-0272 Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 an d 2; Mecklenburg County, NC
 
13 Docket No(s). 50-369, 50-370 Application date December 20, 2021 ADAMS Accession No. ML21355A362 Location in Application of NSHC Pages 9 and 10 of Enclosure The proposed amendments would revise McGuire's Unit 1 and 2 Technical Specification 3.4.3, "RCS Pressure and Temperature (P/T)
Brief Description of Amendment(s) Limits," to reflect that Unit 1's P/T limit curves are applicable up to 54 effective full power years (EFPY) and that Unit 2's P/T limit curves are applicable up to 38.6 EFPY.
Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number John Klos, 301-415-5136 Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s). 50-261 Application date December 9, 2021, as supplemented by {{letter dated|date=January 6, 2022|text=letter dated January 6, 2022}} ADAMS Accession No. ML21343A047, ML22006A240 Location in Application of NSHC Pages 2-3 of the Enclosure The proposed amendment would adopt Technical Specifications Task Force (TSTF)
Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections. Additionally, Duke Energy proposed a steam generator tube inspection period of 72 effective full power months for the Brief Description of Amendment(s) Robinson inspection period that began December 8, 2020. This is a variation from the TS changes described in TSTF-577 because the enhanced probe inspection method has not previously been used for steam generator tube inspections at Robinson.
For all future steam generator tube inspections, the enhanced probe inspection method will be utilized.
For all future steam generator tube inspections, the enhanced probe inspection method will be utilized.
Proposed Determination                 NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address                               Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 14
Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202


NRC Project Manager, Telephone Tanya Hood, 301-415-1387 Number Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s).                         50-261 Application date                       December 9, 2021 ADAMS Accession No.                   ML21343A087 Location in Application of NSHC       Pages 5-6 of the Enclosure 1 The proposed amendment would revise Technical Specification (TS) 3.4.3, RCS
14 NRC Project Manager, Telephone Number Tanya Hood, 301-415-1387 Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s). 50-261 Application date December 9, 2021 ADAMS Accession No. ML21343A087 Location in Application of NSHC Pages 5-6 of the Enclosure 1 The proposed amendment would revise Technical Specification (TS) 3.4.3, RCS
[Reactor Coolant System] Pressure and Temperature (P/T) Limits. Specifically, a Brief Description of Amendment(s) portion of TS Figure 3.4.3-2 (P/T limit cooldown curves) is being corrected because it does not reflect the data approved in Amendment No. 248.
[Reactor Coolant System] Pressure and Brief Description of Amendment(s) Temperature (P/T) Limits. Specifically, a portion of TS Figure 3.4.3-2 (P/T limit cooldown curves) is being corrected because it does not reflect the data approved in Amendment No. 248.
Proposed Determination                 NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address                               Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Tanya Hood, 301-415-1387 Number Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Beaver Valley Power Station, Units 1 and 2; Beaver County, PA Docket No(s).                         50-334, 50-412 Application date                       September 15, 2021 ADAMS Accession No.                   ML21258A319 Location in Application of NSHC       Pages 3-5 of Enclosure Energy Harbor Nuclear Corp. requests adoption of Technical Specifications Task Force (TSTF) Traveler, TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Brief Description of Amendment(s)
Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number Tanya Hood, 301-415-1387 Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Beaver Valley Power Station, Units 1 and 2; Beaver County, PA Docket No(s). 50-334, 50-412 Application date September 15, 2021 ADAMS Accession No. ML21258A319 Location in Application of NSHC Pages 3-5 of Enclosure Energy Harbor Nuclear Corp. requests adoption of Technical Specifications Task Force (TSTF) Traveler, TSTF-577-A, Revision Brief Description of Amendment(s) 1, Revised Frequencies for Steam Generator Tube Inspections. The technical specifications related to steam generator tube inspections and reporting would be revised based on operating history.
Tube Inspections. The technical specifications related to steam generator tube inspections and reporting would be revised based on operating history.
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Rick Giannantonio, General Counsel, Energy Address Harbor Nuclear Corp., Mail Stop A-GO-15, 76 South Main Street, Akron, OH 44308 NRC Project Manager, Telephone Number Sujata Goetz, 301-415-8004 Energy Northwest; Columbia Generating Station; Benton County, W A Docket No(s). 50-397 Application date November 9, 2021 15 ADAMS Accession No. ML21314A224 Location in Application of NSHC Pages 24-25 of the Enclosure The proposed amendment would modify the Columbia Generating Station licensing basis by the addition of a license condition to allow Brief Description of Amendment(s) for the implementation of the provisions of 10 CFR 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
Proposed Determination                 NSHC Rick Giannantonio, General Counsel, Energy Name of Attorney for Licensee, Mailing Harbor Nuclear Corp., Mail Stop A-GO-15, 76 Address South Main Street, Akron, OH 44308 NRC Project Manager, Telephone Sujata Goetz, 301-415-8004 Number Energy Northwest; Columbia Generating Station; Benton County, WA Docket No(s).                         50-397 Application date                       November 9, 2021 15
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Kathleen Galioto, Assistant General Counsel, Address Energy Northwest, MD 1020, P.O. Box 968, Richland, WA 99352 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Entergy Operations, Inc.; Arkansas Nuclear One, Unit 1; Pope Co unty, AR Docket No(s). 50-313


ADAMS Accession No.                    ML21314A224 Location in Application of NSHC        Pages 24-25 of the Enclosure The proposed amendment would modify the Columbia Generating Station licensing basis by the addition of a license condition to allow Brief Description of Amendment(s)      for the implementation of the provisions of 10 CFR 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
Application date September 30, 2021, as supplemented by {{letter dated|date=December 2, 2021|text=letter dated December 2, 2021}} ADAMS Accession No. ML21274A874, ML21337A245 Location in Application of NSHC Pages 28 - 29 of the Enclosure The proposed amendment would revise the Dose Equivalent I-131 and the reactor coolant system (RCS) primary activity limits required by Technical Specification (TS) 3.4.12, RCS Specific Activity, for Arkansas Nuclear One, Unit 1. In addition, the primary-to-secondary Brief Description of Amendment(s) leak rate limit provided in TS 3.4.13, RCS Operational Leakage, would be revised.
Proposed Determination                NSHC Kathleen Galioto, Assistant General Counsel, Name of Attorney for Licensee, Mailing Energy Northwest, MD 1020, P.O. Box 968, Address Richland, WA 99352 NRC Project Manager, Telephone Mahesh Chawla, 301-415-8371 Number Entergy Operations, Inc.; Arkansas Nuclear One, Unit 1; Pope County, AR Docket No(s).                          50-313 September 30, 2021, as supplemented by Application date {{letter dated|date=December 2, 2021|text=letter dated December 2, 2021}} ADAMS Accession No.                   ML21274A874, ML21337A245 Location in Application of NSHC       Pages 28 - 29 of the Enclosure The proposed amendment would revise the Dose Equivalent I-131 and the reactor coolant system (RCS) primary activity limits required by Technical Specification (TS) 3.4.12, RCS Specific Activity, for Arkansas Nuclear One, Unit 1. In addition, the primary-to-secondary leak rate limit provided in TS 3.4.13, RCS Brief Description of Amendment(s)
Operational Leakage, would be revised.
These proposed changes are proposed to address non-conservative inputs used in the steam generator tube rupture accident, the main steam line break accident, and the control rod ejection accident dose consequence calculations.
These proposed changes are proposed to address non-conservative inputs used in the steam generator tube rupture accident, the main steam line break accident, and the control rod ejection accident dose consequence calculations.
Proposed Determination                 NSHC Anna Vinson Jones, Assistant General Name of Attorney for Licensee, Mailing Counsel, Entergy Services, Inc.,101 Address                               Constitution Avenue, NW, Suite 200 East, Washington, DC 20001 NRC Project Manager, Telephone Thomas Wengert, 301-415-4037 Number Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, Units 1 and 2; Berrien County, MI Docket No(s).                         50-315, 50-316 Application date                       November 8, 2021 16
Proposed Determination NSHC Anna Vinson Jones, Assistant General Name of Attorney for Licensee, Mailing Counsel, Entergy Services, Inc.,101 Address Constitution Avenue, NW, Suite 200 East, Washington, DC 20001 NRC Project Manager, Telephone Number Thomas Wengert, 301-415-4037 Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, U nits 1 and 2; Berrien County, MI Docket No(s). 50-315, 50-316 Application date November 8, 2021
 
ADAMS Accession No.                    ML21312A518 Location in Application of NSHC        Pages 2-3 of Enclosure 2 The proposed amendments would revise the technical specifications to adopt Technical Brief Description of Amendment(s)      Specifications Task Force (TSTF) Traveler, TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections.
Proposed Determination                NSHC Robert B. Haemer, Senior Nuclear Counsel, Name of Attorney for Licensee, Mailing Indiana Michigan Power Company, One Cook Address Place, Bridgman, MI 49106 NRC Project Manager, Telephone Scott Wall, 301-415-2855 Number National Institute of Standards and Technology (NIST), National Bureau of Standards test reactor, Montgomery County, Maryland Docket No(s).                          50-184 December 23, 2021, as supplemented by Application date                      NSHC Supplement Rev.1 {{letter dated|date=January 11, 2022|text=letter dated January 11, 2022}} ADAMS Accession No.                    ML21361A246 (Package), ML22012A090 Location in Application of NSHC        Pages 2-4 of supplement The proposed amendment would revise Technical Specification (TS) 3.9.2.1, removing permission to use height checks to verify latching of fuel elements and requiring that both a rotational check and visual verification be performed to verify latching of fuel elements. The proposed TS revisions would provide additional confidence that a fuel element is properly latched and will remain in position during reactor operation. Proper latching of the fuel element during operation Brief Description of Amendment(s) ensures adequate cooling flow to the fuel element preventing overheating of the element during normal reactor operations. Specifically, the proposed amendment would revise TS 3.9.2.1 by changing the specification statement from shall be accomplished by one of the following methods, to shall be accomplished by both of the following methods. Additionally, TS 3.9.2.1.1 Elevation check of the fuel element with main pump flow, is deleted entirely.
Proposed Determination                NSHC Name of Attorney for Licensee, Mailing Henry N. Wixon, Chief of Counsel, National Address                                Institute of Standards and Technology, 100 17


Bureau Drive, Stop 1052, Room A534, Gaithersburg, MD 20899-1052 NRC Project Manager, Telephone Patrick G. Boyle, 301-415-3936 Number Northern States Power Company; Monticello Nuclear Generating Plant; Wright County, MN Docket No(s).                          50-263 Application date                      December 13, 2021 ADAMS Accession No.                   ML21348A718 Location in Application of NSHC       Pages 19 and 20 of Enclosure The proposed amendment would revise the Monticello Nuclear Generating Plant Technical Specifications (TSs). Specifically, the amendment would revise TS 3.8.3, "Diesel Brief Description of Amendment(s)     Fuel Oil, Lube Oil, and Starting Air," and TS 3.8.2 "AC Sources - Shutdown," to allow the common fuel oil storage tank to be out of service for up to 14 days to perform inspection required by license renewal.
16 ADAMS Accession No. ML21312A518 Location in Application of NSHC Pages 2-3 of Enclosure 2 The proposed amendments would revise the technical specifications to adopt Technical Brief Description of Amendment(s) Specifications Task Force (TSTF) Traveler, TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections.
Proposed Determination                 NSHC Peter M. Glass, Assistant General Counsel, Name of Attorney for Licensee, Mailing Xcel Energy, 414 Nicollet Mall - 401-8, Address Minneapolis, MN 55401 NRC Project Manager, Telephone Robert Kuntz, 301-415-3733 Number Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL Docket No(s).                         50-348, 50-364 Application date                       December 13, 2021 ADAMS Accession No.                   ML21348A733 Location in Application of NSHC       Pages E-14 and E-15 of Enclosure The proposed amendment would revise the peak calculated containment internal pressure for the design basis loss-of-coolant accident Brief Description of Amendment(s)     (LOCA) described in the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications 5.5.17, Containment Leakage Rate Testing Program.
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Robert B. Haemer, Senior Nuclear Counsel, Address Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106 NRC Project Manager, Telephone Number Scott Wall, 301-415-2855 National Institute of Standards and Technology (NIST), National Bureau of Standards test reactor, Montgomery County, Maryland Docket No(s). 50-184 December 23, 2021, as supplemented by Application date NSHC Supplement Rev.1 {{letter dated|date=January 11, 2022|text=letter dated January 11, 2022}} ADAMS Accession No. ML21361A246 (Package), ML22012A090 Location in Application of NSHC Pages 2-4 of supplement The proposed amendment would revise Technical Specification (TS) 3.9.2.1, removing permission to use height checks to verify latching of fuel elements and requiring that both a rotational check and visual verification be performed to verify latching of fuel elements. The proposed TS revisions would provide additional confidence that a fuel element is properly latched and will remain in position during reactor operation. Proper Brief Description of Amendment(s) latching of the fuel element during operation ensures adequate cooling flow to the fuel element preventing overheating of the element during normal reactor operations. Specifically, the proposed amendment would revise TS 3.9.2.1 by changing the specification statement from shall be accomplished by one of the following methods, to shall be accomplished by both of the following methods. Additionally, TS 3.9.2.1.1 Elevation check of the fuel element with main pump flow, is deleted entirely.
Proposed Determination                 NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address                               Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Stephanie Devlin-Gill, 301-415-5301 Number 18
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Henry N. Wixon, Chief of Counsel, National Address Institute of Standards and Technology, 100


Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s).                         50-348, 50-364, 50-424, 50-425 Application date                       December 21, 2021 ADAMS Accession No.                   ML21356B499 Location in Application of NSHC       Pages E-2 and E-3 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves. The Brief Description of Amendment(s)     proposed amendment would modify Technical Specification 3.6.3, Containment Isolation Valves. Consistent with TSTF-269-A, Notes would be added to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.
17 Bureau Drive, Stop 1052, Room A534, Gaithersburg, MD 20899-1052 NRC Project Manager, Telephone Number Patrick G. Boyle, 301-415-3936 Northern States Power Company; Monticello Nuclear Generating Pl ant; Wright County, MN Docket No(s). 50-263 Application date December 13, 2021 ADAMS Accession No. ML21348A718 Location in Application of NSHC Pages 19 and 20 of Enclosure The proposed amendment would revise the Monticello Nuclear Generating Plant Technical Specifications (TSs). Specifically, the amendment would revise TS 3.8.3, "Diesel Brief Description of Amendment(s) Fuel Oil, Lube Oil, and Starting Air," and TS 3.8.2 "AC Sources - Shutdown," to allow the common fuel oil storage tank to be out of service for up to 14 days to perform inspection required by license renewal.
Proposed Determination                 NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address                               Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone John Lamb, 301-415-3100 Number Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s).                         50-348, 50-364, 50-424, 50-425 Application date                       December 22, 2021 ADAMS Accession No.                   ML21356B484 Location in Application of NSHC       Pages E-8 and E-9 of Enclosure The proposed amendment would revise the Farley Technical Specifications (TS) by relocating some detailed information from TS 5.5.16, "Main Steamline Inspection Program,"
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Peter M. Glass, Assistant General Counsel, Address Xcel Energy, 414 Nicollet Mall - 401-8, Minneapolis, MN 55401 NRC Project Manager, Telephone Number Robert Kuntz, 301-415-3733 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL Docket No(s). 50-348, 50-364 Application date December 13, 2021 ADAMS Accession No. ML21348A733 Location in Application of NSHC Pages E-14 and E-15 of Enclosu re The proposed amendment would revise the peak calculated containment internal pressure for the design basis loss-of-coolant accident Brief Description of Amendment(s) (LOCA) described in the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications 5.5.17, Containment Leakage Rate Testing Program.
to the Farley Updated Final Safety Analysis Brief Description of Amendment(s)
Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number Stephanie Devlin-Gill, 301-415-5301
Report (UFSAR). The proposed amendment would also revise the Vogtle TS by relocating some detailed information from TS 5.5.16, "MS [Main Steam] and FW [Feedwater] Piping Inspection Program," to the Vogtle UFSAR.
Proposed Determination                 NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address                               Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 19


NRC Project Manager, Telephone John Lamb, 301-415-3100 Number Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s).                         50-424, 50-425 Application date                       December 22, 2021 ADAMS Accession No.                   ML21356B485 Location in Application of NSHC       Pages E-6 and E-8 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF)-283-A, Revision 3, "Modify Section 3.8 Mode Restriction Notes." The proposed amendment would modify Technical Brief Description of Amendment(s)     Specifications (TS) 3.8.1, "AC Sources -
18 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Application date December 21, 2021 ADAMS Accession No. ML21356B499 Location in Application of NSHC Pages E-2 and E-3 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves. The Brief Description of Amendment(s) proposed amendment would modify Technical Specification 3.6.3, Containment Isolation Valves. Consistent with TSTF-269-A, Notes would be added to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.
Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Application date December 22, 2021 ADAMS Accession No. ML21356B484 Location in Application of NSHC Pages E-8 and E-9 of Enclosure The proposed amendment would revise the Farley Technical Specifications (TS) by relocating some detailed information from TS 5.5.16, "Main Steamline Inspection Program,"
Brief Description of Amendment(s) to the Farley Updated Final Safety Analysis Report (UFSAR). The proposed amendment would also revise the Vogtle TS by relocating some detailed information from TS 5.5.16, "MS [Main Steam] and FW [Feedwater] Piping Inspection Program," to the Vogtle UFSAR.
Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 19 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Southern Nuclear Operating Company, Inc.; Vogtle Electric Gener ating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-424, 50-425 Application date December 22, 2021 ADAMS Accession No. ML21356B485 Location in Application of NSHC Pages E-6 and E-8 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF)-283-A, Revision 3, "Modify Section 3.8 Mode Restriction Notes." The proposed amendment would modify Technical Brief Description of Amendment(s) Specifications (TS) 3.8.1, "AC Sources -
Operating", and TS 3.8.4, "DC Sources -
Operating", and TS 3.8.4, "DC Sources -
Operating." Consistent with TSTF-283-A, Notes would be added to allow greater flexibility in performing Surveillance Requirements in Modes 1, 2, 3, or 4.
Operating." Consistent with TSTF-283-A, Notes would be added to allow greater flexibility in performing Surveillance Requirements in Modes 1, 2, 3, or 4.
Proposed Determination                 NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address                               Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone John Lamb, 301-415-3100 Number Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, Inc.;
Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, In c.;
Susquehanna Steam Electric Station, Units 1 and 2; Luzerne County, PA Docket No(s).                         50-387, 50-388 October 5, 2021, as supplemented by letter Application date dated December 16, 2021 ADAMS Accession No.                   ML21279A026, ML21350A265 Pages 9-11 of Enclosure 1 of October 5, 2021 Location in Application of NSHC       submittal, and Page 2 of supplement dated December 16, 2021 The proposed amendments would revise the instrumentation allowable values for the core spray and the low pressure cooling injection systems reactor steam dome pressure low initiation and injection permissive Brief Description of Amendment(s)     instrumentation functions in Table 3.3.5.1-1 in Technical Specification 3.3.5.1, Emergency Core Cooling System (ECCS)
Susquehanna Steam Electric Station, Units 1 and 2; Luzerne Coun ty, PA Docket No(s). 50-387, 50-388 Application date October 5, 2021, as supplemented by {{letter dated|date=December 16, 2021|text=letter dated December 16, 2021}}
 
ADAMS Accession No. ML21279A026, ML21350A265 Pages 9-11 of Enclosure 1 of October 5, 2021 Location in Application of NSHC submittal, and Page 2 of supplement dated December 16, 2021 The proposed amendments would revise the instrumentation allowable values for the core spray and the low pressure cooling injection systems reactor steam dome pressure low initiation and injection permissive Brief Description of Amendment(s) instrumentation functions in Table 3.3.5.1-1 in Technical Specification 3.3.5.1, Emergency Core Cooling System (ECCS)
Instrumentation. The proposed amendments would also modify the associated analytical limits and setpoint values for these functions.
Instrumentation. The proposed amendments would also modify the associated analytical limits and setpoint values for these functions.
Proposed Determination                 NSHC 20
Proposed Determination NSHC 20 Name of Attorney for Licensee, Mailing Damon D. Obie, Esq, 835 Hamilton St., Suite Address 150, Allentown, PA 18101 NRC Project Manager, Telephone Number Audrey Klett, 301-415-0489 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s). 50-259, 50-260, 50-296 Application date November 5, 2021 ADAMS Accession No. ML21309A038 Location in Application of NSHC Pages E E-12 of the Enclos ure The proposed amendments would allow the use of a manually operated chilled water cross-tie line between the Browns Ferry Nuclear Plant (Browns Ferry), Unit 3, control bay chilled water system and the Browns Ferry, Unit 1/2 control bay chilled water system to be used in the event of an abnormal Brief Description of Amendment(s) condition when both trains of the Unit 1/2 chilled water system are inoperable. The proposed amendments also would revise Browns Ferry, Units 1, 2, and 3, Technical Specification 3.8.7, "Distribution Systems -
Operating," to provide a one-time use exception to the Required Actions during the installation and testing of the cross-tie.
Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s). 50-259, 50-260, 50-296 Application date December 3, 2021 ADAMS Accession No. ML21337A227 Location in Application of NSHC Pages E-4 and E-5 of the Enclo sure The proposed amendments would revise a few of the instrument testing and calibration definitions in the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3 technical Brief Description of Amendment(s) specifications (TSs), as well as incorporate the surveillance frequency control program in a couple of the same definitions. The proposed amendments are based on Technical Specification Task Force (TSTF) Traveler 21 TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.
Additionally, the proposed amendments would rescind the consolidation of several previously approved surveillance requirements approved in Amendment Nos. 315, 338, and 298 for Browns Ferry, Units 1, 2, and 3, respectively, and restore the surveillance requirements to their prior status with the frequencies as "In accordance with the Surveillance Frequency Control Program."
Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 an d 2; Rhea County, TN Docket No(s). 50-390, 50-391 Application date December 9, 2021 ADAMS Accession No. ML21344A027 Location in Application of NSHC Pages E-3 and E-4 of the Enclo sure The proposed amendments would revise several instrumentation testing and calibration definitions in the Watts Bar Nuclear Plant, Units 1 and 2, technical specifications, as well as incorporate the surveillance frequency control program in a few of the same Brief Description of Amendment(s) definitions. The proposed amendments are based on Technical Specification Task Force (TSTF) Traveler TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.
Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902
 
22 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Union Electric Company; Callaway Plant, Unit No. 1; Callaway Co unty, MO Docket No(s). 50-483 Application date September 28, 2021, as supplemented by {{letter dated|date=December 1, 2021|text=letter dated December 1, 2021}}


Name of Attorney for Licensee, Mailing Damon D. Obie, Esq, 835 Hamilton St., Suite Address                                150, Allentown, PA 18101 NRC Project Manager, Telephone Audrey Klett, 301-415-0489 Number Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s).                          50-259, 50-260, 50-296 Application date                      November 5, 2021 ADAMS Accession No.                    ML21309A038 Location in Application of NSHC        Pages E E-12 of the Enclosure The proposed amendments would allow the use of a manually operated chilled water cross-tie line between the Browns Ferry Nuclear Plant (Browns Ferry), Unit 3, control bay chilled water system and the Browns Ferry, Unit 1/2 control bay chilled water system to be used in the event of an abnormal Brief Description of Amendment(s)      condition when both trains of the Unit 1/2 chilled water system are inoperable. The proposed amendments also would revise Browns Ferry, Units 1, 2, and 3, Technical Specification 3.8.7, "Distribution Systems -
ADAMS Accession No. ML21272A167 (Package), ML21335A451 (Package)
Operating," to provide a one-time use exception to the Required Actions during the installation and testing of the cross-tie.
Proposed Determination                NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address                                West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Kimberly Green, 301-415-1627 Number Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s).                          50-259, 50-260, 50-296 Application date                      December 3, 2021 ADAMS Accession No.                   ML21337A227 Location in Application of NSHC        Pages E-4 and E-5 of the Enclosure The proposed amendments would revise a few of the instrument testing and calibration definitions in the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3 technical Brief Description of Amendment(s)      specifications (TSs), as well as incorporate the surveillance frequency control program in a couple of the same definitions. The proposed amendments are based on Technical Specification Task Force (TSTF) Traveler 21


TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.
Location in Application of NSHC Pages 158-160 of Enclosure 1 of the Supplement The proposed amendments would revise the technical specifications and authorize changes to the final safety analysis report to support a full-scope application of the regulations in 10 CFR 50.67, Alternative Source Term, and described in NRC Regulatory Guide 1.183, Revision 0, Alternative Radiological Source Brief Description of Amendment(s) Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. Specifically, the amendments would revise technical specification (TS) 3.7.10, Control Room Emergency Ventilation System (CREVS), TS 5.5.11, Ventilation Filter Testing Program, and TS 5.5.17, Control Room Envelope Habitability Program.
Additionally, the proposed amendments would rescind the consolidation of several previously approved surveillance requirements approved in Amendment Nos. 315, 338, and 298 for Browns Ferry, Units 1, 2, and 3, respectively, and restore the surveillance requirements to their prior status with the frequencies as "In accordance with the Surveillance Frequency Control Program."
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Jay E. Silberg, Pillsbury Winthrop Shaw Address Pittman LLP, 1200 17th St., NW, Washington, DC 20036 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Union Electric Company; Callaway Plant, Unit No. 1; Callaway Co unty, MO Docket No(s). 50-483 Application date October 21, 2021, as supplemented by {{letter dated|date=November 24, 2021|text=letter dated November 24, 2021}}
Proposed Determination                 NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address                                West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Kimberly Green, 301-415-1627 Number Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 and 2; Rhea County, TN Docket No(s).                         50-390, 50-391 Application date                       December 9, 2021 ADAMS Accession No.                    ML21344A027 Location in Application of NSHC        Pages E-3 and E-4 of the Enclosure The proposed amendments would revise several instrumentation testing and calibration definitions in the Watts Bar Nuclear Plant, Units 1 and 2, technical specifications, as well as incorporate the surveillance frequency control program in a few of the same definitions. The proposed amendments are Brief Description of Amendment(s) based on Technical Specification Task Force (TSTF) Traveler TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.
Proposed Determination                NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address                                West Summit Hill Drive, WT 6A, Knoxville, TN 37902 22


NRC Project Manager, Telephone Kimberly Green, 301-415-1627 Number Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO Docket No(s).                          50-483 September 28, 2021, as supplemented by Application date {{letter dated|date=December 1, 2021|text=letter dated December 1, 2021}} ML21272A167 (Package), ML21335A451 ADAMS Accession No.
ADAMS Accession No. ML21294A393 (Package), ML21328A182 (Package)
(Package)
Location in Application of NSHC Pages 6-8 of Attachment 1 The proposed amendment would adopt Technical Specifications Task Force (TSTF)
Pages 158-160 of Enclosure 1 of the Location in Application of NSHC Supplement The proposed amendments would revise the technical specifications and authorize changes to the final safety analysis report to support a full-scope application of the regulations in 10 CFR 50.67, Alternative Source Term, and described in NRC Regulatory Guide 1.183, Revision 0, Alternative Radiological Source Brief Description of Amendment(s)      Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. Specifically, the amendments would revise technical specification (TS) 3.7.10, Control Room Emergency Ventilation System (CREVS), TS 5.5.11, Ventilation Filter Testing Program, and TS 5.5.17, Control Room Envelope Habitability Program.
Proposed Determination                NSHC Jay E. Silberg, Pillsbury Winthrop Shaw Name of Attorney for Licensee, Mailing Pittman LLP, 1200 17th St., NW, Washington, Address DC 20036 NRC Project Manager, Telephone Mahesh Chawla, 301-415-8371 Number Union Electric Company; Callaway Plant, Unit No. 1; Callaway County, MO Docket No(s).                          50-483 October 21, 2021, as supplemented by letter Application date dated November 24, 2021 ML21294A393 (Package), ML21328A182 ADAMS Accession No.
(Package)
Location in Application of NSHC       Pages 6-8 of Attachment 1 The proposed amendment would adopt Technical Specifications Task Force (TSTF)
Traveler TSTF-505, Revision 2, "Provide Risk-Informed Extended Completion Times -
Traveler TSTF-505, Revision 2, "Provide Risk-Informed Extended Completion Times -
Brief Description of Amendment(s)     RITSTF [Risk-Informed TSTF] Initiative 4b,"
Brief Description of Amendment(s) RITSTF [Risk-Informed TSTF] Initiative 4b,"
and TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation] and would time 23
and TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation] and would time 23 completion times contained in the applicable technical specifications (TSs). The amendment would modify the TS requirements to add a new TS 5.5.19, Risk Informed Completion Time Program, to 5.0, "Administrative Controls."
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Jay E. Silberg, Pillsbury Winthrop Shaw Address Pittman LLP, 1200 17th St., NW, Washington, DC 20036 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS Docket No(s). 50-482 Application date January 12, 2022 ADAMS Accession No. ML22012A217 Location in Application of NSHC Pages 3-4 of Attachment I The proposed amendment would remove the Table of Contents from the Wolf Creek Brief Description of Amendment(s) Generating Station, Unit 1, Technical Specifications and place it under the licensee control.
Proposed Determination NSHC Name of Attorney for Licensee, Mailing Thomas C. Poindexter, Morgan, Lewis and Address Bockius LLP, 1111 Pennsylvania Avenue, NW, Washington, DC 20004-2541 NRC Project Manager, Telephone Number Samson Lee, 301-415-3168
 
III. Notice of Issuance of Amendments to Facility Operating Lic enses and
 
Combined Licenses
 
During the period since publication of the last monthly notice, the Commission
 
has issued the following amendments. The Commission has determ ined for each of
 
these amendments that the application complies with the standar ds and requirements of
 
the Atomic Energy Act of 1954, as amended (the Act), and the Co mmissions rules and
 
regulations. The Commission has made appropriate findings as r equired by the Act and
 
24 the Commissions rules and regulations in 10 CFR chapter I, whi ch are set forth in the
 
license amendment.


completion times contained in the applicable technical specifications (TSs). The amendment would modify the TS requirements to add a new TS 5.5.19, Risk Informed Completion Time Program, to 5.0, "Administrative Controls."
A notice of consideration of issuance of amendment to facility operating license
Proposed Determination                      NSHC Jay E. Silberg, Pillsbury Winthrop Shaw Name of Attorney for Licensee, Mailing Pittman LLP, 1200 17th St., NW, Washington, Address DC 20036 NRC Project Manager, Telephone Mahesh Chawla, 301-415-8371 Number Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS Docket No(s).                              50-482 Application date                            January 12, 2022 ADAMS Accession No.                        ML22012A217 Location in Application of NSHC            Pages 3-4 of Attachment I The proposed amendment would remove the Table of Contents from the Wolf Creek Brief Description of Amendment(s)          Generating Station, Unit 1, Technical Specifications and place it under the licensee control.
Proposed Determination                      NSHC Thomas C. Poindexter, Morgan, Lewis and Name of Attorney for Licensee, Mailing Bockius LLP, 1111 Pennsylvania Avenue, Address NW, Washington, DC 20004-2541 NRC Project Manager, Telephone Samson Lee, 301-415-3168 Number III. Notice of Issuance of Amendments to Facility Operating Licenses and Combined Licenses During the period since publication of the last monthly notice, the Commission has issued the following amendments. The Commission has determined for each of these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations. The Commission has made appropriate findings as required by the Act and 24


the Commissions rules and regulations in 10 CFR chapter I, which are set forth in the license amendment.
or combined license, as applicable, proposed NSHC determination, and opportunity for a
A notice of consideration of issuance of amendment to facility operating license or combined license, as applicable, proposed NSHC determination, and opportunity for a hearing in connection with these actions, was published in the Federal Register as indicated in the safety evaluation for each amendment.
Unless otherwise indicated, the Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared for these amendments. If the Commission has prepared an environmental assessment under the special circumstances provision in 10 CFR 51.22(b) and has made a determination based on that assessment, it is so indicated in the safety evaluation for the amendment.
For further details with respect to each action, see the amendment and associated documents such as the Commissions letter and safety evaluation, which may be obtained using the ADAMS accession numbers indicated in the following table.
The safety evaluation will provide the ADAMS accession numbers for the application for amendment and the Federal Register citation for any environmental assessment. All of these items can be accessed as described in the Obtaining Information and Submitting Comments section of this document.
25


License Amendment Issuance(s)
hearing in connection with these actions, was published in the Federal Register as
Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2, Will County, IL; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2, and Independent Spent Fuel Storage Installation; Calvert County, MD; Constellation Energy Generation, LLC; Clinton Power Station, Unit No. 1; DeWitt County, IL; Constellation Energy Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL; Constellation Energy Generation, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA; Constellation Energy Generation, LLC; Peach Bottom Atomic Power Station, Units 1, 2, and 3; York County, PA; Constellation Energy Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock Island County, IL; Constellation Energy Generation, LLC; Three Mile Island Nuclear Station, Unit 1; Dauphin County, PA; Constellation Energy Generation, LLC: Dresden Nuclear Power Plant, Units 1, 2, and 3; Grundy County, IL; Constellation FitzPatrick, LLC and Constellation Energy Generation, LLC; James A FitzPatrick Nuclear Power Plant; Oswego County, NY; Nine Mile Point Nuclear Station, LLC and Constellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego County, NY; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit Nos. 1 and 2; Salem County, NJ; R. E. Ginna Nuclear Power Plant, LLC and Constellation Energy Generation, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY 50-456, 50-457, 50-454, 50-455, 50-317, 50-318, 72-008, 50-461, 50-010, 50-237, 50-249, 50-333, Docket No(s).                         50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-171, 50-277, 50-278, 50-254, 50-265, 50-244, 50-272, 50-311, 50-289 Amendment Date                       February 1, 2022 ADAMS Accession No.                   ML22021B662 (Package)
 
indicated in the safety evaluation for each amendment.
 
Unless otherwise indicated, the Commission has determined that these
 
amendments satisfy the criteria for categorical exclusion in ac cordance with
 
10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no envir onmental impact
 
statement or environmental assessment need be prepared for thes e amendments. If the
 
Commission has prepared an environmental assessment under the s pecial
 
circumstances provision in 10 CFR 51.22(b) and has made a deter mination based on
 
that assessment, it is so indicated in the safety evaluation fo r the amendment.
 
For further details with respect to each action, see the amendm ent and
 
associated documents such as the Commissions letter and safety evaluation, which
 
may be obtained using the ADAMS accession numbers indicated in the following table.
 
The safety evaluation will provide the ADAMS accession numbers for the application for
 
amendment and the Federal Register citation for any environmental assessment. All of
 
these items can be accessed as described in the Obtaining Info rmation and Submitting
 
Comments section of this document.
 
25 License Amendment Issuance(s)
 
Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2, Will County, IL; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 an d 2, and Independent Spent Fuel Storage Installation; Calvert County, MD; Constellat ion Energy Generation, LLC; Clinton Power Station, Unit No. 1; DeWitt Coun ty, IL; Constellation Energy Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL; Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA; Constellation Energy Generation, LLC; Pe ach Bottom Atomic Power Station, Units 1, 2, and 3; York County, PA; Const ellation Energy Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock Island County, IL; Constellation Energy Generation, LLC; Three Mile Is land Nuclear Station, Unit 1; Dauphin County, PA; Constellation Energy Generation, LL C: Dresden Nuclear Power Plant, Units 1, 2, and 3; Grundy County, IL; Constellatio n FitzPatrick, LLC and Constellation Energy Generation, LLC; James A FitzPatrick Nucle ar Power Plant; Oswego County, NY; Nine Mile Point Nuclear Station, LLC and Con stellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2 ; Oswego County, NY; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit No s. 1 and 2; Salem County, NJ; R. E. Ginna Nuclear Power Plant, LLC and Constellation Energy Generation, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY 50-456, 50-457, 50-454, 50-455, 50-317, 50-318, 72-008, 50-461, 50-010, 50-237, 50-249, 50-333, Docket No(s). 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-171, 50-277, 50-278, 50-254, 50-265, 50-244, 50-272, 50-311, 50-289 Amendment Date February 1, 2022 ADAMS Accession No. ML22021B662 (Package)
Braidwood 224 (U-1), 224 (U-2); Byron 226 (U-1),
Braidwood 224 (U-1), 224 (U-2); Byron 226 (U-1),
226 (U-2); Calvert Cliffs 343 (U-1), 321 (U-2), 12 (ISFSI); Clinton 243; Dresden 50 (U-1), 277 (U-2),
226 (U-2); Calvert Cliffs 343 (U-1), 321 (U-2), 12 (ISFSI); Clinton 243; Dresden 50 (U-1), 277 (U-2),
270 (U-3); FitzPatrick 347; Lasalle 254 (U-1), 240 Amendment No(s).                     (U-2); Limerick 255 (U-1), 217 (U-2); Nine Mile Point 247 (U-1), 189 (U-2); Peach Bottom 17 (U-1), 340 (U-2), 343 (U-3); Quad Cities 289 (U-1),
270 (U-3); FitzPatrick 347; Lasalle 254 (U-1), 240 Amendment No(s). (U-2); Limerick 255 (U-1), 217 (U-2); Nine Mile Point 247 (U-1), 189 (U-2); Peach Bottom 17 (U-1), 340 (U-2), 343 (U-3); Quad Cities 289 (U-1),
285 (U-2); Ginna 147; Salem 341 (U-1), 322, (U-2); TMI 302 (U-1)
285 (U-2); Ginna 147; Salem 341 (U-1), 322, (U-2); TMI 302 (U-1)
By order dated November 16, 2021 (ADAMS Accession No. ML21277A192), the NRC staff approved the license transfer application dated February 25, 2021 (ADAMS Accession No. ML21057A273), as supplemented, that was submitted by Exelon Generation Company, LLC, Brief Description of Amendment(s) on behalf of itself and Exelon Corporation; Exelon FitzPatrick, LLC; Nine Mile Point Nuclear Station, LLC; R. E. Ginna Nuclear Power Plant, LLC; and Calvert Cliffs Nuclear Power Plant, LLC. A copy of the NRC staff safety evaluation (ADAMS Accession No. ML21277A248) related to the 26
By order dated November 16, 2021 (ADAMS Accession No. ML21277A192), the NRC staff approved the license transfer application dated February 25, 2021 (ADAMS Accession No. ML21057A273), as supplemented, that was Brief Description of Amendment(s) submitted by Exelon Generation Company, LLC, on behalf of itself and Exelon Corporation; Exelon FitzPatrick, LLC; Nine Mile Point Nuclear Station, LLC; R. E. Ginna Nuclear Power Plant, LLC; and Calvert Cliffs Nuclear Power Plant, LLC. A copy of the NRC staff safety evaluation (ADAMS Accession No. ML21277A248) related to the 26 license transfer application was provided with the order. The license amendments reflect the transfer transaction that closed on February 1, 2022.
Public Comments Received as to Proposed NSHC (Yes/No) No Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Stat ion, Unit No. 3; New London County, CT Docket No(s). 50-423 Amendment Date January 7, 2022 ADAMS Accession No. ML21326A099 Amendment No(s). 281 (Unit 3)
The amendment modified the technical specifications by revising the Reactor Core Safety Limit 2.1.1.2 peak fuel centerline temperature to Brief Description of Amendment(s) reflect the fuel centerline temperature specified in Topical Report WCAP-17642-P-A, Revision 1, Westinghouse Performance Analysis and Design Model (PAD5)"
Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Florida, LLC; Crystal River Unit 3 Nuclear Generati ng Plant; Citrus County, FL Docket No(s). 50-302 Amendment Date November 24, 2021 ADAMS Accession No. ML21322A270 Amendment No(s). 260 (Unit 3)
The amendment revised the Crystal River Nuclear Plant, Unit 3 (CR3), Independent Spent Fuel Storage Installation (ISFSI) Security Plan, Training and Qualification Plan, and Safeguards Brief Description of Amendment(s) Contingency Plan, as well as updated (1) the existing physical security license condition in the facility operating license and (2) the order responses related to additional security measures and fingerprinting for unescorted access at the CR3 ISFSI.
Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-400 Amendment Date January 19, 2022 ADAMS Accession No. ML21316A248 Amendment No(s). 188


license transfer application was provided with the order. The license amendments reflect the transfer transaction that closed on February 1, 2022.
27 The amendment revised the facility operating license condition associated with the adoption of 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors to reflect an alternative approach to the one provided Brief Description of Amendment(s) in Nuclear Energy Institutes (NEI) 00-04, 10 CFR 50.69 SSC Categorization Guideline, Revision 0 (ADAMS Accession No. ML052910035), for evaluating the impact of the seismic hazard in the 10 CFR 50.69 categorization process, and to also delete the license condition that required the completion of certain implementation items prior to the implementation of 10 CFR 50.69.
Public Comments Received as to No Proposed NSHC (Yes/No)
Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-400 Amendment Date January 20, 2022 ADAMS Accession No. ML21320A001 Amendment No(s). 189 The amendment revises the Technical Specifications to reflect the transition of the Brief Description of Amendment(s) licensee-controlled plant procedure PLP-106, Technical Specification Equipment List Program, to a licensee-controlled Technical Requirements Manual.
Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Station, Unit No. 3; New London County, CT Docket No(s).                        50-423 Amendment Date                      January 7, 2022 ADAMS Accession No.                  ML21326A099 Amendment No(s).                    281 (Unit 3)
Public Comments Received as to Proposed NSHC (Yes/No) No Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Perry Nuclear Power Plant, Unit 1; Lake County, OH Docket No(s). 50-440 Amendment Date January 10, 2022 ADAMS Accession No. ML21322A260 Amendment No(s). 197 The amendment revises Technical Specifications (TS) 3.4.9, Residual Heat Removal (RHR)
The amendment modified the technical specifications by revising the Reactor Core Safety Limit 2.1.1.2 peak fuel centerline temperature to Brief Description of Amendment(s)    reflect the fuel centerline temperature specified in Topical Report WCAP-17642-P-A, Revision 1, Westinghouse Performance Analysis and Design Model (PAD5)"
Public Comments Received as to No Proposed NSHC (Yes/No)
Duke Energy Florida, LLC; Crystal River Unit 3 Nuclear Generating Plant; Citrus County, FL Docket No(s).                        50-302 Amendment Date                      November 24, 2021 ADAMS Accession No.                  ML21322A270 Amendment No(s).                    260 (Unit 3)
The amendment revised the Crystal River Nuclear Plant, Unit 3 (CR3), Independent Spent Fuel Storage Installation (ISFSI) Security Plan, Training and Qualification Plan, and Safeguards Contingency Plan, as well as updated (1) the Brief Description of Amendment(s) existing physical security license condition in the facility operating license and (2) the order responses related to additional security measures and fingerprinting for unescorted access at the CR3 ISFSI.
Public Comments Received as to No Proposed NSHC (Yes/No)
Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s).                        50-400 Amendment Date                      January 19, 2022 ADAMS Accession No.                  ML21316A248 Amendment No(s).                    188 27
 
The amendment revised the facility operating license condition associated with the adoption of 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors to reflect an alternative approach to the one provided in Nuclear Energy Institutes (NEI) 00-04, 10 CFR Brief Description of Amendment(s) 50.69 SSC Categorization Guideline, Revision 0 (ADAMS Accession No. ML052910035), for evaluating the impact of the seismic hazard in the 10 CFR 50.69 categorization process, and to also delete the license condition that required the completion of certain implementation items prior to the implementation of 10 CFR 50.69.
Public Comments Received as to No Proposed NSHC (Yes/No)
Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s).                       50-400 Amendment Date                       January 20, 2022 ADAMS Accession No.                 ML21320A001 Amendment No(s).                     189 The amendment revises the Technical Specifications to reflect the transition of the licensee-controlled plant procedure PLP-106, Brief Description of Amendment(s)
Technical Specification Equipment List Program, to a licensee-controlled Technical Requirements Manual.
Public Comments Received as to No Proposed NSHC (Yes/No)
Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Perry Nuclear Power Plant, Unit 1; Lake County, OH Docket No(s).                       50-440 Amendment Date                       January 10, 2022 ADAMS Accession No.                 ML21322A260 Amendment No(s).                     197 The amendment revises Technical Specifications (TS) 3.4.9, Residual Heat Removal (RHR)
Shutdown Cooling System - Hot Shutdown, and TS 3.4.10, Residual Heat Removal (RHR)
Shutdown Cooling System - Hot Shutdown, and TS 3.4.10, Residual Heat Removal (RHR)
Shutdown Cooling System - Cold Shutdown, in Brief Description of Amendment(s)   accordance with Technical Specifications Task Force (TSTF) Traveler, TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling.
Shutdown Cooling System - Cold Shutdown, in Brief Description of Amendment(s) accordance with Technical Specifications Task Force (TSTF) Traveler, TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling.
28
28 Public Comments Received as to Proposed NSHC (Yes/No) No Energy Northwest; Columbia Generating Station; Benton County, W A Docket No(s). 50-397 Amendment Date January 13, 2022 ADAMS Accession No. ML21293A164 Amendment No(s). 266 The amendment removed License Condition (LC) 2.C.(34) and revised LC 2.C.(35). The LC 2.C.(34) is no longer applicable because the Columbia Generating Station (Columbia) Final Safety Analysis Report has been updated to include the license renewal commitments. The Brief Description of Amendment(s) revision to LC 2.C.(35) clarified that future changes to the license renewal commitments, as dictated by operating experience, are made under the provisions of 10 CFR 50.59, Changes, tests, and experiments. The changes do not result in changes to the technical specifications or operating requirements for Columbia.
 
Public Comments Received as to Proposed NSHC (Yes/No) No Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Pl ant, Unit Nos. 1 and 2; Calvert County, MD; Exelon Generation Company, LLC, Clin ton Power Station, Unit No. 1, DeWitt County, IL; Exelon Generation Compa ny, LLC; Dresden Nuclear Power Station, Units 2 and 3; Grundy County, IL; Exelon Generation Company, LLC and Exelon FitzPatrick, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego County, NY; Exelon Generation Company, LLC, LaSal le County Station, Units 1 and 2; LaSalle County, IL; Exelon Generation C ompany, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA; Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego County, NY; Exelon Generation Company, LLC and PSEG Nuclear LLC ; Peach Bottom Atomic Power Station, Units 2 and 3; York and Lancaster Counties, PA; Exelon Generation Company, LLC; Quad Cities Nuclear Power Stati on, Units 1 and 2; Rock Island County, IL; Exelon Generation Company, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY; Exelon Generation Compan y, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA 50-456, 50-457, 50-454, 50-455, 50-317, 50-318, Docket No(s). 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244 Amendment Date January 13, 2022 ADAMS Accession No. ML21347A038
Public Comments Received as to No Proposed NSHC (Yes/No)
Energy Northwest; Columbia Generating Station; Benton County, WA Docket No(s).                         50-397 Amendment Date                         January 13, 2022 ADAMS Accession No.                   ML21293A164 Amendment No(s).                       266 The amendment removed License Condition (LC) 2.C.(34) and revised LC 2.C.(35). The LC 2.C.(34) is no longer applicable because the Columbia Generating Station (Columbia) Final Safety Analysis Report has been updated to include the license renewal commitments. The Brief Description of Amendment(s)     revision to LC 2.C.(35) clarified that future changes to the license renewal commitments, as dictated by operating experience, are made under the provisions of 10 CFR 50.59, Changes, tests, and experiments. The changes do not result in changes to the technical specifications or operating requirements for Columbia.
Public Comments Received as to No Proposed NSHC (Yes/No)
Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2; Calvert County, MD; Exelon Generation Company, LLC, Clinton Power Station, Unit No. 1, DeWitt County, IL; Exelon Generation Company, LLC; Dresden Nuclear Power Station, Units 2 and 3; Grundy County, IL; Exelon Generation Company, LLC and Exelon FitzPatrick, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego County, NY; Exelon Generation Company, LLC, LaSalle County Station, Units 1 and 2; LaSalle County, IL; Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA; Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego County, NY; Exelon Generation Company, LLC and PSEG Nuclear LLC; Peach Bottom Atomic Power Station, Units 2 and 3; York and Lancaster Counties, PA; Exelon Generation Company, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock Island County, IL; Exelon Generation Company, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY; Exelon Generation Company, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA 50-456, 50-457, 50-454, 50-455, 50-317, 50-318, 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, Docket No(s).
50-352, 50-353, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244 Amendment Date                         January 13, 2022 ADAMS Accession No.                   ML21347A038 29


Braidwood 223 (U-1) 223 (U-2); Byron 225 (U-1) 225 (U-2); Calvert Cliffs 341 (U-1) 319 (U-2);
29 Braidwood 223 (U-1) 223 (U-2); Byron 225 (U-1) 225 (U-2); Calvert Cliffs 341 (U-1) 319 (U-2);
Clinton 242; Dresden 276 (U-2) 269 (U-3);
Clinton 242; Dresden 276 (U-2) 269 (U-3);
Amendment No(s).                     FitzPatrick 346; LaSalle 253 (U-1) 239 (U-2);
Amendment No(s). FitzPatrick 346; LaSalle 253 (U-1) 239 (U-2);
Limerick 254 (U-1) 216 (U-2); Nine Mile Point 188 (U-2); Peach Bottom 339 (U-2) 342 (U-3); Quad Cities 288 (U-1) 284 (U-2); Ginna 146 The amendments revised the reactor coolant leakage requirements in the technical specifications for each facility based on Technical Brief Description of Amendment(s)   Specifications Task Force (TSTF) Traveler TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements, (ADAMS Accession No. ML20016A233).
Limerick 254 (U-1) 216 (U-2); Nine Mile Point 188 (U-2); Peach Bottom 339 (U-2) 342 (U-3); Quad Cities 288 (U-1) 284 (U-2); Ginna 146 The amendments revised the reactor coolant leakage requirements in the technical specifications for each facility based on Technical Brief Description of Amendment(s) Specifications Task Force (TSTF) Traveler TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements, (ADAMS Accession No. ML20016A233).
Public Comments Received as to Yes Proposed NSHC (Yes/No)
Public Comments Received as to Proposed NSHC (Yes/No) Yes Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Pl ant, Units 1 and 2; Calvert County, MD Docket No(s). 50-317, 50-318 Amendment Date January 13, 2022 ADAMS Accession No. ML21347A864 Amendment No(s). 342 (Unit 1) and 320 (Unit 2)
Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 and 2; Calvert County, MD Docket No(s).                       50-317, 50-318 Amendment Date                       January 13, 2022 ADAMS Accession No.                 ML21347A864 Amendment No(s).                     342 (Unit 1) and 320 (Unit 2)
The amendments incorporated changes to the Updated Final Safety Analysis Report and the Technical Requirements Manual to allow for a full core offload without the availability of being Brief Description of Amendment(s) supplemented with one loop of the shutdown cooling system during certain refueling outages.
The amendments incorporated changes to the Updated Final Safety Analysis Report and the Technical Requirements Manual to allow for a full core offload without the availability of being Brief Description of Amendment(s)   supplemented with one loop of the shutdown cooling system during certain refueling outages.
The amendments also incorporated a change in calculational methodology used in the Calvert Cliffs spent fuel pool heat-up analysis.
The amendments also incorporated a change in calculational methodology used in the Calvert Cliffs spent fuel pool heat-up analysis.
Public Comments Received as to No Proposed NSHC (Yes/No)
Public Comments Received as to Proposed NSHC (Yes/No) No Florida Power & Light Company, et al.; St. Lucie Plant, Unit No s. 1 and 2; St. Lucie County, FL Docket No(s). 50-335, 50-389 Amendment Date January 14, 2022 ADAMS Accession No. ML21342A209 Amendment No(s). 252 (Unit 1) and 207 (Unit 2)
Florida Power & Light Company, et al.; St. Lucie Plant, Unit Nos. 1 and 2; St. Lucie County, FL Docket No(s).                       50-335, 50-389 Amendment Date                       January 14, 2022 ADAMS Accession No.                 ML21342A209 Amendment No(s).                     252 (Unit 1) and 207 (Unit 2)
The amendments extended technical specification (TS) requirements to permit the use of Risk Informed Completion Times (RICTs) to the 120-Brief Description of Amendment(s) Volt alternating current (AC) Instrument Bus TS, in accordance with TSTF-505, Revision 2, Provide Risk-Informed Completion Times RITSTF Initiative 4b, and Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 30 4b, Risk Managed Technical Specifications (RMTS) Guidelines. Accordingly, these amendments revised License Condition J of the St. Lucie 1 Renewed Facility Operating License (RFOL) and License Condition O of the St. Lucie 2 RFOL, respectively, each of which adds the amendment numbers resulting from this amendment request and deletes the first listed condition specifying activities to be completed prior to implementing the RICT Program. The amendments also modified Unit 1 TS 3.8.2.1 Action b and Unit 2 TS 3.8.3.1 Action b to permit the use of a RICT for the 120 VAC instrument buses.
The amendments extended technical specification (TS) requirements to permit the use of Risk Informed Completion Times (RICTs) to the 120-Volt alternating current (AC) Instrument Bus TS, in Brief Description of Amendment(s) accordance with TSTF-505, Revision 2, Provide Risk-Informed Completion Times RITSTF Initiative 4b, and Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 30
Public Comments Received as to Proposed NSHC (Yes/No) No NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; L inn County, IA Docket No(s). 50-331 Amendment Date January 21, 2022 ADAMS Accession No. ML21172A217 Amendment No(s). 315 The U.S. Nuclear Regulatory Commission (NRC, Commission) has issued Amendment No. 315 to Renewed Facility Operating License No. DPR 49, for the Duane Arnold Energy Center (DAEC),
 
4b, Risk Managed Technical Specifications (RMTS) Guidelines. Accordingly, these amendments revised License Condition J of the St. Lucie 1 Renewed Facility Operating License (RFOL) and License Condition O of the St. Lucie 2 RFOL, respectively, each of which adds the amendment numbers resulting from this amendment request and deletes the first listed condition specifying activities to be completed prior to implementing the RICT Program. The amendments also modified Unit 1 TS 3.8.2.1 Action b and Unit 2 TS 3.8.3.1 Action b to permit the use of a RICT for the 120 VAC instrument buses.
Public Comments Received as to No Proposed NSHC (Yes/No)
NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; Linn County, IA Docket No(s).                     50-331 Amendment Date                     January 21, 2022 ADAMS Accession No.               ML21172A217 Amendment No(s).                   315 The U.S. Nuclear Regulatory Commission (NRC, Commission) has issued Amendment No. 315 to Renewed Facility Operating License No. DPR 49, for the Duane Arnold Energy Center (DAEC),
operated by NextEra Energy Duane Arnold, LLC.
operated by NextEra Energy Duane Arnold, LLC.
The amendment consists of revisions to the Renewed Facility Operating License and the technical specifications (TS) in response to DAEC's application dated February 19, 2021 (ADAMS Accession No. ML21050A189), as supplemented on January 3, 2022 (ADAMS Package Accession No. ML22004A010). These revisions reflect the removal of all spent nuclear Brief Description of Amendment(s) fuel from the DAEC spent fuel pool and its transfer to dry cask storage within an onsite Independent Spent Fuel Storage Installation (ISFSI). These changes more fully reflect the permanently shutdown status of the decommissioning facility, as well as the reduced scope of structures, systems, and components necessary to ensure plant safety once all spent fuel has been permanently moved to the DAEC ISFSI, an activity which is currently scheduled for completion in mid-2022. The changes also include the relocation of administrative controls from the TS to the DAEC Quality Assurance Topical Report, as well as deletion of the 31
The amendment consists of revisions to the Renewed Facility Operating License and the technical specifications (TS) in response to DAEC's application dated February 19, 2021 (ADAMS Accession No. ML21050A189), as supplemented on January 3, 2022 (ADAMS Package Accession No. ML22004A010). These revisions reflect the removal of all spent nuclear Brief Description of Amendment(s) fuel from the DAEC spent fuel pool and its transfer to dry cask storage within an onsite Independent Spent Fuel Storage Installation (ISFSI). These changes more fully reflect the permanently shutdown status of the decommissioning facility, as well as the reduced scope of structures, systems, and components necessary to ensure plant safety once all spent fuel has been permanently moved to the DAEC ISFSI, an activity which is currently scheduled for completion in mid-2022. The changes also include the relocation of administrative controls from the TS to the DAEC Quality Assurance Topical Report, as well as deletion of the


remaining TS Bases, except for certain environmental reporting requirements which are required to remain in the TS in accordance with 10 CFR 50.36a(a)(2). The changes shall be implemented within 60 days following submittal of written notification to the NRC that all spent nuclear fuel assemblies have been transferred out of the DAEC SFP and placed in dry storage within the ISFSI.
31 remaining TS Bases, except for certain environmental reporting requirements which are required to remain in the TS in accordance with 10 CFR 50.36a(a)(2). The changes shall be implemented within 60 days following submittal of written notification to the NRC that all spent nuclear fuel assemblies have been transferred out of the DAEC SFP and placed in dry storage within the ISFSI.
Public Comments Received as to No Proposed NSHC (Yes/No)
Public Comments Received as to Proposed NSHC (Yes/No) No Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Amendment Date January 26, 2022 ADAMS Accession No. ML21344A003 Amendment No(s). Farley - 239 (Unit 1) and 236 (Unit 2), Vogtle - 212 (Unit 1), and 195 (Unit 2)
Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s).                         50-348, 50-364, 50-424, 50-425 Amendment Date                       January 26, 2022 ADAMS Accession No.                   ML21344A003 Farley - 239 (Unit 1) and 236 (Unit 2), Vogtle - 212 Amendment No(s).
The amendments revised TS 3.1.7, Rod Position Indication, TS 3.2.1, Heat Flux Hot Channel Factor (FQ(Z)), and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, to allow the use of an alternate means of determining power distribution information. The amendments allow Brief Description of Amendment(s) the use of a dedicated on-line core power distribution monitoring system (PDMS) to perform surveillance of core thermal limits. The PDMS to be used at Farley, Units 1 and 2; and Vogtle, Units 1 and 2, is the Westinghouse proprietary core analysis system called Best Estimate Analyzer for Core Operations - Nuclear (BEACONTM).
(Unit 1), and 195 (Unit 2)
Public Comments Received as to Proposed NSHC (Yes/No) No Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclea r Plant, Units 1 and 2; Appling County, GA; Southern Nuclear Operating Company, Inc.; Joseph M.
The amendments revised TS 3.1.7, Rod Position Indication, TS 3.2.1, Heat Flux Hot Channel Factor (FQ(Z)), and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, to allow the use of an alternate means of determining power distribution information. The amendments allow the use of a dedicated on-line core power Brief Description of Amendment(s) distribution monitoring system (PDMS) to perform surveillance of core thermal limits. The PDMS to be used at Farley, Units 1 and 2; and Vogtle, Units 1 and 2, is the Westinghouse proprietary core analysis system called Best Estimate Analyzer for Core Operations - Nuclear (BEACONTM).
Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southe rn Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Unit s 1 and 2; Burke County, GA Docket No(s). 50-321, 50-364, 50-366, 50-348, 50-424, 50-425 Amendment Date February 2, 2022 ADAMS Accession No. ML21349A518 Farley - 240 (Unit 1) and 237 (Unit 2), Hatch - 314 Amendment No(s). (Unit 1) and 259 (Unit 2), Vogtle - 213 (Unit 1),
Public Comments Received as to No Proposed NSHC (Yes/No)
Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Appling County, GA; Southern Nuclear Operating Company, Inc.; Joseph M.
Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s).                         50-321, 50-364, 50-366, 50-348, 50-424, 50-425 Amendment Date                       February 2, 2022 ADAMS Accession No.                   ML21349A518 Farley - 240 (Unit 1) and 237 (Unit 2), Hatch - 314 Amendment No(s).                     (Unit 1) and 259 (Unit 2), Vogtle - 213 (Unit 1),
and 196 (Unit 2).
and 196 (Unit 2).
32


In its application dated September 29, 2021, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed license amendment request under the Consolidated Line Item Improvement Process. The amendments revised the technical specifications related to reactor coolant system Brief Description of Amendment(s)   operational leakage and the definition of the term LEAKAGE based on Technical Specifications Task Force (TSTF) Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements, (TSTF-554) (ADAMS Accession No. ML20016A233), and the associated NRC staff safety evaluation of TSTF-554 (ADAMS Accession No. ML20322A024).
32 In its application dated September 29, 2021, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed license amendment request under the Consolidated Line Item Improvement Process. The amendments revised the technical specifications related to reactor coolant system Brief Description of Amendment(s) operational leakage and the definition of the term LEAKAGE based on Technical Specifications Task Force (TSTF) Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements, (TSTF-554) (ADAMS Accession No. ML20016A233), and the associated NRC staff safety evaluation of TSTF-554 (ADAMS Accession No. ML20322A024).
Public Comments Received as to No Proposed NSHC (Yes/No)
Public Comments Received as to Proposed NSHC (Yes/No) No Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1; Rh ea County, TN Docket No(s). 50-390 Amendment Date January 18, 2022 ADAMS Accession No. ML21334A295 Amendment No(s). 151 (Unit 1)
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1; Rhea County, TN Docket No(s).                       50-390 Amendment Date                     January 18, 2022 ADAMS Accession No.                 ML21334A295 Amendment No(s).                   151 (Unit 1)
The amendment revised the existing Note in the Limiting Condition for Operation for Watts Bar Nuclear Plant, Unit 1, Technical Specification 3.7.12, Auxiliary Building Gas Treatment System Brief Description of Amendment(s) (ABGTS), to allow the auxiliary building secondary containment enclosure boundary to be opened, at specific controlled access points, on a continuous basis, during the Watts Bar Nuclear Plant, Unit 2, Cycle 4 refueling outage, when the replacement steam generators will be installed.
The amendment revised the existing Note in the Limiting Condition for Operation for Watts Bar Nuclear Plant, Unit 1, Technical Specification 3.7.12, Auxiliary Building Gas Treatment System (ABGTS), to allow the auxiliary building Brief Description of Amendment(s) secondary containment enclosure boundary to be opened, at specific controlled access points, on a continuous basis, during the Watts Bar Nuclear Plant, Unit 2, Cycle 4 refueling outage, when the replacement steam generators will be installed.
Public Comments Received as to Proposed NSHC (Yes/No) No Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rh ea County, TN Docket No(s). 50-391 Amendment Date January 12, 2022 ADAMS Accession No. ML21334A389 Amendment No(s). 59 (Unit 2)
Public Comments Received as to No Proposed NSHC (Yes/No)
The amendment revised the steam generator (SG) tube rupture analysis to utilize the new Brief Description of Amendment(s) primary and secondary side mass releases and new reactor coolant system and SG masses associated with the Unit 2 replacement SGs.
Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea County, TN Docket No(s).                       50-391 Amendment Date                     January 12, 2022 ADAMS Accession No.                 ML21334A389 Amendment No(s).                   59 (Unit 2)
Public Comments Received as to Proposed NSHC (Yes/No) No
The amendment revised the steam generator (SG) tube rupture analysis to utilize the new Brief Description of Amendment(s)   primary and secondary side mass releases and new reactor coolant system and SG masses associated with the Unit 2 replacement SGs.
 
Public Comments Received as to No Proposed NSHC (Yes/No) 33
33 Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rh ea County, TN Docket No(s). 50-391 Amendment Date January 25, 2022 ADAMS Accession No. ML21306A287 Amendment No(s). 60 (Unit 2)
The amendment revised the Watts Bar Nuclear Plant, Unit 2, technical specifications (TSs) to delete several requirements for steam generator (SG) tube inspection and repair methodologies that will no longer apply following installation of the replacement SGs. The amendment also Brief Description of Amendment(s) revised TS 5.7.2.12.d.2 to reflect the SG inspection interval criteria for Alloy 690 thermally treated tubing. Additionally, the amendment revised Watts Bar, Unit 2s license condition 2.C.(4) to delete the reference to PAD4TCD, which will no longer apply following the installation of the replacement SGs.
Public Comments Received as to Proposed NSHC (Yes/No) No


Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rhea County, TN Docket No(s).                      50-391 Amendment Date                      January 25, 2022 ADAMS Accession No.                ML21306A287 Amendment No(s).                    60 (Unit 2)
The amendment revised the Watts Bar Nuclear Plant, Unit 2, technical specifications (TSs) to delete several requirements for steam generator (SG) tube inspection and repair methodologies that will no longer apply following installation of the replacement SGs. The amendment also Brief Description of Amendment(s)  revised TS 5.7.2.12.d.2 to reflect the SG inspection interval criteria for Alloy 690 thermally treated tubing. Additionally, the amendment revised Watts Bar, Unit 2s license condition 2.C.(4) to delete the reference to PAD4TCD, which will no longer apply following the installation of the replacement SGs.
Public Comments Received as to No Proposed NSHC (Yes/No)
Dated: February 15, 2022.
Dated: February 15, 2022.
For the Nuclear Regulatory Commission.
For the Nuclear Regulatory Commission.
                                        /RA/
 
/RA/
 
Caroline L. Carusone, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
Caroline L. Carusone, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.
34}}
34}}

Latest revision as of 19:00, 18 November 2024

Monthly (28-day) Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 02/22/2022
ML22032A143
Person / Time
Issue date: 02/15/2022
From: Caroline Carusone
Division of Operating Reactor Licensing
To:
References
NRC-2022-0043
Download: ML22032A143 (25)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION

[NRC-2022-0043]

Monthly Notice

Applications and Amendments to Facility Operating Licenses and Combined

Licenses Involving No Significant Hazards Considerations

AGENCY: Nuclear Regulatory Commission.

ACTION: Monthly notice.

SUMMARY

Pursuant to section 189.a.(2) of the Atomic Energy Act of 1954, as

amended (the Act), the U.S. Nuclear Regulatory Commission (NRC) is publishing this

regular monthly notice. The Act requires the Commission to pub lish notice of any

amendments issued, or proposed to be issued, and grants the Com mission the authority

to issue and make immediately effective any amendment to an ope rating license or

combined license, as applicable, upon a determination by the Co mmission that such

amendment involves no significant hazards consideration (NSHC), notwithstanding the

pendency before the Commission of a request for a hearing from any person. This

monthly notice includes all amendments issued, or proposed to b e issued, from

January 7, 2022, to February 3, 2022. The last monthly notice was published on

January 25, 2022.

DATES: Comments must be filed by March 24, 2022. A request for a hearing or

petitions for leave to intervene must be filed by April 25, 2022.

ADDRESSES: You may submit comments by any of the following methods; howe ver,

the NRC encourages electronic comment submission through the Federal rulemaking

website:

Federal rulemaking website: Go to https://www.regulations.gov and search

for Docket ID NRC-2022-0043. Address questions about Docket IDs in Regulations.gov

to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schu mann@nrc.gov. For

technical questions, contact the individual listed in the For Further Information Contact

section of this document.

Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M,

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program

Management, Announcements and Editing Staff.

For additional direction on obtaining information and submittin g comments, see

Obtaining Information and Submitting Comments in the SUPPLEME NTARY

INFORMATION section of this document.

FOR FURTHER INFORMATION CONTACT: Kay Goldstein, Office of Nuclear Reactor

Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,

telephone: 301-415-1506, email: Kay.Goldstein@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Obtaining Information and Submitting Comments

A. Obtaining Information

Please refer to Docket ID NRC-2022-0043, facility name, unit number(s), docket

number(s), application date, and subject when contacting the NR C about the availability

of information for this action. You may obtain publicly availa ble information related to

this action by any of the following methods:

Federal Rulemaking Website: Go to https://www.regulations.gov and

search for Docket ID NRC-2022-0043.

NRCs Agencywide Documents Access and Management System

(ADAMS): You may obtain publicly available documents online in the ADA MS Public

2 Documents collection at https ://www.nrc.gov/reading-rm/adams.html. To begin the

search, select Begin Web-based ADAMS Search. For problems wi th ADAMS, please

contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209,

301-415-4737, or by email to PDR.Resource@nrc.gov. For the con venience of the

reader, instructions about obtaining materials referenced in th is document are provided

in the Availability of Documents section.

NRCs PDR: You may examine and purchase copies of public documents,

by appointment, at the NRCs PDR, Room P1 B35, One White Flint North, 11555

Rockville Pike, Rockville, Maryland 20852. To make an appointm ent to visit the PDR,

please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-

4737, between 8:00 a.m. and 4:00 p.m. (ET), Monday through Frid ay, except Federal

holidays.

B. Submitting Comments

The NRC encourages electronic comment submission through the Federal

rulemaking website (https://www.regulations.gov). Please include Docket ID NRC-

2022-0043, facility name, unit number(s), docket number(s), application date, and

subject, in your comment submission.

The NRC cautions you not to include identifying or contact info rmation that you

do not want to be publicly disclosed in your comment submission. The NRC will post all

comment submissions at https://www.regulations.gov as well as e nter the comment

submissions into ADAMS. The NRC does not routinely edit commen t submissions to

remove identifying or contact information.

If you are requesting or aggregating comments from other person s for

submission to the NRC, then you should inform those persons not to include identifying

or contact information that they do not want to be publicly dis closed in their comment

3 submission. Your request should state that the NRC does not routinely edit comment

submissions to remove such information before making the commen t submissions

available to the public or entering the comment into ADAMS.

II. Notice of Consideration of Issuance of Amendments to Facili ty Operating

Licenses and Combined Licenses and Proposed No Significant Haza rds

Consideration Determination

For the facility-specific amendment requests shown in this not ice, the

Commission finds that the licensees analyses provided, consist ent with section 50.91 of

title 10 of the Code of Federal Regulations (10 CFR), are sufficient to support the

proposed determinations that these amendment requests involve N SHC. Under the

Commissions regulations in 10 CFR 50.92, operation of the faci lities in accordance with

the proposed amendments would not (1) involve a significant inc rease in the probability

or consequences of an accident previously evaluated; or (2) cre ate the possibility of a

new or different kind of accident from any accident previously evaluated; or (3) involve a

significant reduction in a margin of safety.

The Commission is seeking public comments on these proposed de terminations.

Any comments received within 30 days after the date of publicat ion of this notice will be

considered in making any final determinations.

Normally, the Commission will not issue the amendments until t he expiration of

60 days after the date of publication of this notice. The Comm ission may issue any of

these license amendments before expiration of the 60-day period provided that its final

determination is that the amendment involves NSHC. In addition, the Commission may

issue any of these amendments prior to the expiration of the 30 -day comment period if

circumstances change during the 30-day comment period such that failure to act in a

timely way would result, for example in derating or shutdown of the facility. If the

4 Commission takes action on any of these amendments prior to the expiration of either

the comment period or the notice period, it will publish in the Federal Register a notice of

issuance. If the Commission makes a final NSHC determination f or any of these

amendments, any hearing will take place after issuance. The Co mmission expects that

the need to take action on any amendment before 60 days have el apsed will occur very

infrequently.

A. Opportunity to Request a Hearing and Petition for Leave to I ntervene

Within 60 days after the date of publication of this notice, an y persons (petitioner)

whose interest may be affected by any of these actions may file a request for a hearing

and petition for leave to intervene (petition) with respect to that action. Petitions shall be

filed in accordance with the Commissions Agency Rules of Prac tice and Procedure in

10 CFR part 2. Interested persons should consult a current cop y of 10 CFR 2.309. The

NRCs regulations are accessible electronically from the NRC Li brary on the NRCs

website at https://www.nrc.gov/reading-rm/doc-collections/cfr/. If a petition is filed, the

Commission or a presiding officer will rule on the petition and, if appropriate, a notice of

a hearing will be issued.

As required by 10 CFR 2.309(d) the petition should specifically explain the

reasons why intervention should be permitted with particular re ference to the following

general requirements for standing: (1) the name, address, and telephone number of the

petitioner; (2) the nature of the petitioners right to be made a party to the proceeding;

(3) the nature and extent of the petitioners property, financi al, or other interest in the

proceeding; and (4) the possible effect of any decision or orde r which may be entered in

the proceeding on the petitioners interest.

In accordance with 10 CFR 2.309(f), the petition must also set forth the specific

contentions that the petitioner seeks to have litigated in the proceeding. Each contention

5 must consist of a specific statement of the issue of law or fac t to be raised or

controverted. In addition, the petitioner must provide a brief explanation of the bases for

the contention and a concise statement of the alleged facts or expert opinion that

support the contention and on which the petitioner intends to r ely in proving the

contention at the hearing. The petitioner must also provide re ferences to the specific

sources and documents on which the petitioner intends to rely t o support its position on

the issue. The petition must include sufficient information to show that a genuine dispute

exists with the applicant or licensee on a material issue of la w or fact. Contentions must

be limited to matters within the scope of the proceeding. The contention must be one

that, if proven, would entitle the petitioner to relief. A pet itioner who fails to satisfy the

requirements at 10 CFR 2.309(f) with respect to at least one co ntention will not be

permitted to participate as a party.

Those permitted to intervene become parties to the proceeding, subject to any

limitations in the order granting leave to intervene. Parties have the opportunity to

participate fully in the conduct of the hearing with respect to resolution of that partys

admitted contentions, including the opportunity to present evid ence, consistent with the

NRCs regulations, policies, and procedures.

Petitions must be filed no later than 60 days from the date of publication of this

notice. Petitions and motions for leave to file new or amended contentions that are filed

after the deadline will not be entertained absent a determinati on by the presiding officer

that the filing demonstrates good cause by satisfying the three factors in

10 CFR 2.309(c)(1)(i) through (iii). The petition must be file d in accordance with the

filing instructions in the Electronic Submissions (E-Filing) section of this document.

If a hearing is requested, and the Commission has not made a fi nal

determination on the issue of NSHC, the Commission will make a final determination on

6 the issue of NSHC. The final determination will serve to estab lish when the hearing is

held. If the final determination is that the amendment request involves NSHC, the

Commission may issue the amendment and make it immediately effe ctive,

notwithstanding the request for a hearing. Any hearing would t ake place after issuance

of the amendment. If the final determination is that the amend ment request involves a

significant hazards consideration, then any hearing held would take place before the

issuance of the amendment unless the Commission finds an immine nt danger to the

health or safety of the public, in which case it will issue an appropriate order or rule

under 10 CFR part 2.

A State, local governmental body, Federally recognized Indian T ribe, or agency

thereof, may submit a petition to the Commission to participate as a party under

10 CFR 2.309(h)(1). The petition should state the nature and e xtent of the petitioners

interest in the proceeding. The petition should be submitted t o the Commission no later

than 60 days from the date of publication of this notice. The petition must be filed in

accordance with the filing instructions in the Electronic Subm issions (E-Filing) section

of this document, and should meet the requirements for petition s set forth in this section,

except that under 10 CFR 2.309(h)(2) a State, local governmenta l body, or Federally

recognized Indian Tribe, or agency thereof does not need to add ress the standing

requirements in 10 CFR 2.309(d) if the facility is located with in its boundaries.

Alternatively, a State, local governmental body, Federally reco gnized Indian Tribe, or

agency thereof may participate as a non-party under 10 CFR 2.31 5(c).

If a petition is submitted, any person who is not a party to th e proceeding and is

not affiliated with or represented by a party may, at the discr etion of the presiding officer,

be permitted to make a limited appearance pursuant to the provi sions of

10 CFR 2.315(a). A person making a limited appearance may make an oral or written

7 statement of his or her position on the issues but may not othe rwise participate in the

proceeding. A limited appearance may be made at any session of the hearing or at any

prehearing conference, subject to the limits and conditions as may be imposed by the

presiding officer. Details regarding the opportunity to make a limited appearance will be

provided by the presiding officer if such sessions are schedule d.

B. Electronic Submissions (E-Filing)

All documents filed in NRC adjudicatory proceedings including d ocuments filed

by an interested State, local governmental body, Federally reco gnized Indian Tribe, or

designated agency thereof that requests to participate under 10 CFR 2.315(c), must be

filed in accordance with 10 CFR 2.302. The E-Filing process re quires participants to

submit and serve all adjudicatory documents over the internet, or in some cases, to mail

copies on electronic storage media, unless an exemption permitt ing an alternative filing

method, as discussed in this notice, is granted. Detailed guid ance on electronic

submissions is located in the Guidance for Electronic Submissio ns to the NRC (ADAMS

Accession No. ML13031A056) and on t he NRC website at https://www.nrc.gov/site-

help/e-submittals.html.

To comply with the procedural requirements of E-Filing, at leas t 10 days prior to

the filing deadline, the participant should contact the Office of the Secretary by email at

Hearing.Docket@nrc.gov, or by telephone at 301-415-1677, to (1) request a digital

identification (ID) certificate, which allows the participant ( or its counsel or

representative) to digitally sign submissions and access the E-Filing system for any

proceeding in which it is participating; and (2) advise the Sec retary that the participant

will be submitting a petition or other adjudicatory document (e ven in instances in which

the participant, or its counsel or representative, already hold s an NRC-issued digital ID

certificate). Based upon this information, the Secretary will establish an electronic

8 docket for the proceeding if the Secretary has not already esta blished an electronic

docket.

Information about applying for a digital ID certificate is avai lable on the NRCs

public website at https://www.nrc.gov/site-help/e-submittals/ge tting-started.html. After a

digital ID certificate is obtained and a docket created, the pa rticipant must submit

adjudicatory documents in Portable Document Format. Guidance o n submissions is

available on the NRCs public website at https://www.nrc.gov/si te-help/electronic-sub-ref-

mat.html. A filing is considered complete at the time the docu ment is submitted through

the NRCs E-Filing system. To be timely, an electronic filing must be submitted to the E-

Filing system no later than 11:59 p.m. Eastern Time on the due date. Upon receipt of a

transmission, the E-Filing system timestamps the document and s ends the submitter an

e-mail confirming receipt of the document. The E-Filing system also distributes an e-

mail that provides access to the document to the NRCs Office o f the General Counsel

and any others who have advised the Office of the Secretary tha t they wish to participate

in the proceeding, so that the filer need not serve the documen t on those participants

separately. Therefore, applicants and other participants (or t heir counsel or

representative) must apply for and receive a digital ID certifi cate before adjudicatory

documents are filed to obtain access to the documents via the E -Filing system.

A person filing electronically u sing the NRCs adjudicatory E-Filing system may

seek assistance by contacting the NRCs Electronic Filing Help Desk through the

Contact Us link located on the NRCs public website at https: //www.nrc.gov/site-help/e-

submittals.html, by email to MSHD.Resource@nrc.gov, or by a tol l-free call at 1-866-

672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m.,

Eastern Time, Monday through Friday, excluding government holid ays.

9 Participants who believe that they have good cause for not subm itting documents

electronically must file an exemption request, in accordance wi th 10 CFR 2.302(g), with

their initial paper filing stating why there is good cause for not filing electronically and

requesting authorization to continue to submit documents in pap er format. Such filings

must be submitted in accordance with 10 CFR 2.302(b)-(d). Part icipants filing

adjudicatory documents in this manner are responsible for servi ng their documents on all

other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must

still meet the electronic formatting requirement in 10 CFR 2.30 2(g)(1), unless the

participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1).

Documents submitted in adjudicatory proceedings will appear in the NRCs

electronic hearing docket, which is publicly available at https ://adams.nrc.gov/ehd,

unless excluded pursuant to an order of the presiding officer. If you do not have an

NRC-issued digital ID certificate as previously described, click cancel when the link

requests certificates and you will be automatically directed to the NRCs electronic

hearing dockets where you will be able to access any publicly a vailable documents in a

particular hearing docket. Participants are requested not to i nclude personal privacy

information such as social security numbers, home addresses, or personal phone

numbers in their filings unless an NRC regulation or other law requires submission of

such information. With respect to copyrighted works, except fo r limited excerpts that

serve the purpose of the adjudicatory filings and would constit ute a Fair Use application,

participants should not include copyrighted materials in their submission.

The following table provides the plant name, docket number, dat e of application,

ADAMS accession number, and location in the application of the licensees proposed

NSHC determinations. For further details with respect to these license amendment

applications, see the applications for amendment, which are ava ilable for public

10 inspection in ADAMS. For additional direction on accessing inf ormation related to this

document, see the Obtaining Information and Submitting Comment s section of this

document.

License Amendment Request(s)

Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA Docket No(s). 50-352, 50-353 Application date March 11, 2021, as supplemented by letter(s) dated May 5, 2021, and December 15, 2021

ADAMS Accession No. ML21070A412, ML21125A215, and ML21349B364

Location in Application of NSHC Pages 18-20 of Attachment 1 to Letter dated December 15, 2021

The license amendment request was originally noticed in the Federal Register on August 10, 2021 (86 FR 43690). The notice is being reissued in its entirety to include the revised scope, description of the amendment request, and proposed no significant hazards consideration determination. The proposed amendments would modify the licensing basis Brief Description of Amendment(s) by revising the license condition in Appendix C to allow the use of an alternate defense-in-depth categorization process, an alternate pressure boundary categorization process, and an alternate seismic Tier 1 categorization process to allow the implementation of risk-informed categorization and treatment of structures, systems and components in accordance with 10 CFR 50.69.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Tamra Domeyer, Associate General Counsel, Address Constellation Energy Generation, LLC, 4300 Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone Number V. Sreenivas, 301-415-2597 Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA Docket No(s). 50-352, 50-353 Application date December 15, 2021 ADAMS Accession No. ML21349B378 Location in Application of NSHC Pages 27-29 of Attachment 1

11 The proposed amendments would revise technical specification (TS) surveillance requirements for emergency diesel generator (EDG) frequency and voltage tolerances and for emergency core cooling system pump flows. Specifically, the amendments would revise certain frequency and voltage acceptance criteria for steady-state EDG surveillance requirements under TS 3/4.8.1, Brief Description of Amendment(s) "A.C. Sources - Operating. The proposed changes are consistent with WCAP-17308-NP-A.Rev 0, Treatment of Diesel Generator (DG) Technical Specification Frequency and Voltage Tolerances, dated July 2017. The proposed amendments would also revise the flow acceptance criteria of the emergency core cooling system (ECCS) pump surveillance requirements under TS3/ 4.5.1, ECCS-Operating.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Tamra Domeyer, Associate General Counsel, Address Constellation Energy Generation, LLC, 4300 Winfield Road, Warrenville, IL 60555 NRC Project Manager, Telephone Number V. Sreenivas, 301-415-2597 Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 an d 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nucl ear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC ; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear P ower Plant, Unit 1; Wake and Chatham Counties, NC; Duke Energy Carolinas, L LC; William States Lee III Nuclear Station, Units 1 and 2; Cherokee County, SC.

50-325, 50-324, 50-413, 50-414, 50-400, 50-Docket No(s). 369, 50-370, 50-269, 50-270, 50-287, 50-261,52-018, 52-019 Application date December 14, 2021 ADAMS Accession No. ML21348A003 Location in Application of NSHC Pages 16-18 of Enclosure 1 The proposed amendments would relocate the Duke Energy Common Emergency Operations Facility (EOF) from 526 South Church Street, Brief Description of Amendment(s) Charlotte, NC, to 9700 David Taylor Drive, Charlotte, NC. The new location is approximately nine air miles from the current location. Since the proposed change to the EOFs location results in the EOF being 12 greater than 25 miles from any of the Duke Energy nuclear sites, NRC approval is required per 10 CFR part 50 appendix E, IV.E.8.b.

Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number Andrew Hon, 301-415-8480 Duke Energy Carolinas, LLC; Catawba Nuclear Station, Units 1 an d 2; York County, SC; Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 and 2; Mecklenburg County, NC; Duke Energy Carolinas, LLC; Oconee Nucl ear Station, Units 1, 2, and 3; Oconee County, SC; Duke Energy Progress, LLC ; Brunswick Steam Electric Plant, Units 1 and 2; Brunswick County, NC; Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC; Duke Energy Progress, LLC; Shearon Harris Nuclear P ower Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-325, 50-324, 50-413, 50-414, 50-400, 50-369, 50-370, 50-269, 50-270, 50-287, 50-261 Application date January 18, 2022 ADAMS Accession No. ML22018A236 Location in Application of NSHC Pages 9-11 of Enclosure 1 The proposed amendments would modify certain technical specification (TS) surveillance requirements (SRs) by adding exceptions to consider the SR met when automatic valves or dampers are locked, sealed, or otherwise secured in the actuated position, in order to consider the SR met Brief Description of Amendment(s) based on TS Task Force (TSTF) Traveler TSTF-541, Revision 2, "Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position" (ADAMS Accession No. ML19240A315), and the associated NRC safety evaluation for TSTF-541, Revision 2 (ADAMS Accession No. ML19323E926).

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Kathryn B. Nolan, Deputy General Counsel, Address Duke Energy Corporation, 550 South Tryon Street (DEC45A), Charlotte, NC 28202 NRC Project Manager, Telephone Number Luke Haeg, 301-415-0272 Duke Energy Carolinas, LLC; McGuire Nuclear Station, Units 1 an d 2; Mecklenburg County, NC

13 Docket No(s). 50-369, 50-370 Application date December 20, 2021 ADAMS Accession No. ML21355A362 Location in Application of NSHC Pages 9 and 10 of Enclosure The proposed amendments would revise McGuire's Unit 1 and 2 Technical Specification 3.4.3, "RCS Pressure and Temperature (P/T)

Brief Description of Amendment(s) Limits," to reflect that Unit 1's P/T limit curves are applicable up to 54 effective full power years (EFPY) and that Unit 2's P/T limit curves are applicable up to 38.6 EFPY.

Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number John Klos, 301-415-5136 Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s). 50-261 Application date December 9, 2021, as supplemented by letter dated January 6, 2022 ADAMS Accession No. ML21343A047, ML22006A240 Location in Application of NSHC Pages 2-3 of the Enclosure The proposed amendment would adopt Technical Specifications Task Force (TSTF)

Traveler TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections. Additionally, Duke Energy proposed a steam generator tube inspection period of 72 effective full power months for the Brief Description of Amendment(s) Robinson inspection period that began December 8, 2020. This is a variation from the TS changes described in TSTF-577 because the enhanced probe inspection method has not previously been used for steam generator tube inspections at Robinson.

For all future steam generator tube inspections, the enhanced probe inspection method will be utilized.

Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202

14 NRC Project Manager, Telephone Number Tanya Hood, 301-415-1387 Duke Energy Progress, LLC; H. B. Robinson Steam Electric Plant, Unit No. 2; Darlington County, SC Docket No(s). 50-261 Application date December 9, 2021 ADAMS Accession No. ML21343A087 Location in Application of NSHC Pages 5-6 of the Enclosure 1 The proposed amendment would revise Technical Specification (TS) 3.4.3, RCS

[Reactor Coolant System] Pressure and Brief Description of Amendment(s) Temperature (P/T) Limits. Specifically, a portion of TS Figure 3.4.3-2 (P/T limit cooldown curves) is being corrected because it does not reflect the data approved in Amendment No. 248.

Proposed Determination NSHC Tracey Mitchell LeRoy, Deputy General Name of Attorney for Licensee, Mailing Counsel, Duke Energy Corporation, 550 South Address Tryon Street, Mail Code DEC45A, Charlotte, NC 28202 NRC Project Manager, Telephone Number Tanya Hood, 301-415-1387 Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Beaver Valley Power Station, Units 1 and 2; Beaver County, PA Docket No(s). 50-334, 50-412 Application date September 15, 2021 ADAMS Accession No. ML21258A319 Location in Application of NSHC Pages 3-5 of Enclosure Energy Harbor Nuclear Corp. requests adoption of Technical Specifications Task Force (TSTF) Traveler, TSTF-577-A, Revision Brief Description of Amendment(s) 1, Revised Frequencies for Steam Generator Tube Inspections. The technical specifications related to steam generator tube inspections and reporting would be revised based on operating history.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Rick Giannantonio, General Counsel, Energy Address Harbor Nuclear Corp., Mail Stop A-GO-15, 76 South Main Street, Akron, OH 44308 NRC Project Manager, Telephone Number Sujata Goetz, 301-415-8004 Energy Northwest; Columbia Generating Station; Benton County, W A Docket No(s). 50-397 Application date November 9, 2021 15 ADAMS Accession No. ML21314A224 Location in Application of NSHC Pages 24-25 of the Enclosure The proposed amendment would modify the Columbia Generating Station licensing basis by the addition of a license condition to allow Brief Description of Amendment(s) for the implementation of the provisions of 10 CFR 50.69, Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Kathleen Galioto, Assistant General Counsel, Address Energy Northwest, MD 1020, P.O. Box 968, Richland, WA 99352 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Entergy Operations, Inc.; Arkansas Nuclear One, Unit 1; Pope Co unty, AR Docket No(s). 50-313

Application date September 30, 2021, as supplemented by letter dated December 2, 2021 ADAMS Accession No. ML21274A874, ML21337A245 Location in Application of NSHC Pages 28 - 29 of the Enclosure The proposed amendment would revise the Dose Equivalent I-131 and the reactor coolant system (RCS) primary activity limits required by Technical Specification (TS) 3.4.12, RCS Specific Activity, for Arkansas Nuclear One, Unit 1. In addition, the primary-to-secondary Brief Description of Amendment(s) leak rate limit provided in TS 3.4.13, RCS Operational Leakage, would be revised.

These proposed changes are proposed to address non-conservative inputs used in the steam generator tube rupture accident, the main steam line break accident, and the control rod ejection accident dose consequence calculations.

Proposed Determination NSHC Anna Vinson Jones, Assistant General Name of Attorney for Licensee, Mailing Counsel, Entergy Services, Inc.,101 Address Constitution Avenue, NW, Suite 200 East, Washington, DC 20001 NRC Project Manager, Telephone Number Thomas Wengert, 301-415-4037 Indiana Michigan Power Company; Donald C. Cook Nuclear Plant, U nits 1 and 2; Berrien County, MI Docket No(s). 50-315, 50-316 Application date November 8, 2021

16 ADAMS Accession No. ML21312A518 Location in Application of NSHC Pages 2-3 of Enclosure 2 The proposed amendments would revise the technical specifications to adopt Technical Brief Description of Amendment(s) Specifications Task Force (TSTF) Traveler, TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Robert B. Haemer, Senior Nuclear Counsel, Address Indiana Michigan Power Company, One Cook Place, Bridgman, MI 49106 NRC Project Manager, Telephone Number Scott Wall, 301-415-2855 National Institute of Standards and Technology (NIST), National Bureau of Standards test reactor, Montgomery County, Maryland Docket No(s). 50-184 December 23, 2021, as supplemented by Application date NSHC Supplement Rev.1 letter dated January 11, 2022 ADAMS Accession No. ML21361A246 (Package), ML22012A090 Location in Application of NSHC Pages 2-4 of supplement The proposed amendment would revise Technical Specification (TS) 3.9.2.1, removing permission to use height checks to verify latching of fuel elements and requiring that both a rotational check and visual verification be performed to verify latching of fuel elements. The proposed TS revisions would provide additional confidence that a fuel element is properly latched and will remain in position during reactor operation. Proper Brief Description of Amendment(s) latching of the fuel element during operation ensures adequate cooling flow to the fuel element preventing overheating of the element during normal reactor operations. Specifically, the proposed amendment would revise TS 3.9.2.1 by changing the specification statement from shall be accomplished by one of the following methods, to shall be accomplished by both of the following methods. Additionally, TS 3.9.2.1.1 Elevation check of the fuel element with main pump flow, is deleted entirely.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Henry N. Wixon, Chief of Counsel, National Address Institute of Standards and Technology, 100

17 Bureau Drive, Stop 1052, Room A534, Gaithersburg, MD 20899-1052 NRC Project Manager, Telephone Number Patrick G. Boyle, 301-415-3936 Northern States Power Company; Monticello Nuclear Generating Pl ant; Wright County, MN Docket No(s). 50-263 Application date December 13, 2021 ADAMS Accession No. ML21348A718 Location in Application of NSHC Pages 19 and 20 of Enclosure The proposed amendment would revise the Monticello Nuclear Generating Plant Technical Specifications (TSs). Specifically, the amendment would revise TS 3.8.3, "Diesel Brief Description of Amendment(s) Fuel Oil, Lube Oil, and Starting Air," and TS 3.8.2 "AC Sources - Shutdown," to allow the common fuel oil storage tank to be out of service for up to 14 days to perform inspection required by license renewal.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Peter M. Glass, Assistant General Counsel, Address Xcel Energy, 414 Nicollet Mall - 401-8, Minneapolis, MN 55401 NRC Project Manager, Telephone Number Robert Kuntz, 301-415-3733 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL Docket No(s). 50-348, 50-364 Application date December 13, 2021 ADAMS Accession No. ML21348A733 Location in Application of NSHC Pages E-14 and E-15 of Enclosu re The proposed amendment would revise the peak calculated containment internal pressure for the design basis loss-of-coolant accident Brief Description of Amendment(s) (LOCA) described in the Joseph M. Farley Nuclear Plant, Units 1 and 2, Technical Specifications 5.5.17, Containment Leakage Rate Testing Program.

Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number Stephanie Devlin-Gill, 301-415-5301

18 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Application date December 21, 2021 ADAMS Accession No. ML21356B499 Location in Application of NSHC Pages E-2 and E-3 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF) Traveler 269-A, Revision 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves. The Brief Description of Amendment(s) proposed amendment would modify Technical Specification 3.6.3, Containment Isolation Valves. Consistent with TSTF-269-A, Notes would be added to allow isolation devices that are locked, sealed or otherwise secured be verified by use of administrative means.

Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Application date December 22, 2021 ADAMS Accession No. ML21356B484 Location in Application of NSHC Pages E-8 and E-9 of Enclosure The proposed amendment would revise the Farley Technical Specifications (TS) by relocating some detailed information from TS 5.5.16, "Main Steamline Inspection Program,"

Brief Description of Amendment(s) to the Farley Updated Final Safety Analysis Report (UFSAR). The proposed amendment would also revise the Vogtle TS by relocating some detailed information from TS 5.5.16, "MS [Main Steam] and FW [Feedwater] Piping Inspection Program," to the Vogtle UFSAR.

Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 19 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Southern Nuclear Operating Company, Inc.; Vogtle Electric Gener ating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-424, 50-425 Application date December 22, 2021 ADAMS Accession No. ML21356B485 Location in Application of NSHC Pages E-6 and E-8 of Enclosure The proposed amendment would adopt the NRC-approved Technical Specification Task Force (TSTF)-283-A, Revision 3, "Modify Section 3.8 Mode Restriction Notes." The proposed amendment would modify Technical Brief Description of Amendment(s) Specifications (TS) 3.8.1, "AC Sources -

Operating", and TS 3.8.4, "DC Sources -

Operating." Consistent with TSTF-283-A, Notes would be added to allow greater flexibility in performing Surveillance Requirements in Modes 1, 2, 3, or 4.

Proposed Determination NSHC Millicent Ronnlund, Vice President and Name of Attorney for Licensee, Mailing General Counsel, Southern Nuclear Operating Address Co., Inc., P. O. Box 1295, Birmingham, AL 35201-1295 NRC Project Manager, Telephone Number John Lamb, 301-415-3100 Susquehanna Nuclear, LLC and Allegheny Electric Cooperative, In c.;

Susquehanna Steam Electric Station, Units 1 and 2; Luzerne Coun ty, PA Docket No(s). 50-387, 50-388 Application date October 5, 2021, as supplemented by letter dated December 16, 2021

ADAMS Accession No. ML21279A026, ML21350A265 Pages 9-11 of Enclosure 1 of October 5, 2021 Location in Application of NSHC submittal, and Page 2 of supplement dated December 16, 2021 The proposed amendments would revise the instrumentation allowable values for the core spray and the low pressure cooling injection systems reactor steam dome pressure low initiation and injection permissive Brief Description of Amendment(s) instrumentation functions in Table 3.3.5.1-1 in Technical Specification 3.3.5.1, Emergency Core Cooling System (ECCS)

Instrumentation. The proposed amendments would also modify the associated analytical limits and setpoint values for these functions.

Proposed Determination NSHC 20 Name of Attorney for Licensee, Mailing Damon D. Obie, Esq, 835 Hamilton St., Suite Address 150, Allentown, PA 18101 NRC Project Manager, Telephone Number Audrey Klett, 301-415-0489 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s). 50-259, 50-260, 50-296 Application date November 5, 2021 ADAMS Accession No. ML21309A038 Location in Application of NSHC Pages E E-12 of the Enclos ure The proposed amendments would allow the use of a manually operated chilled water cross-tie line between the Browns Ferry Nuclear Plant (Browns Ferry), Unit 3, control bay chilled water system and the Browns Ferry, Unit 1/2 control bay chilled water system to be used in the event of an abnormal Brief Description of Amendment(s) condition when both trains of the Unit 1/2 chilled water system are inoperable. The proposed amendments also would revise Browns Ferry, Units 1, 2, and 3, Technical Specification 3.8.7, "Distribution Systems -

Operating," to provide a one-time use exception to the Required Actions during the installation and testing of the cross-tie.

Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3; Limestone County, AL Docket No(s). 50-259, 50-260, 50-296 Application date December 3, 2021 ADAMS Accession No. ML21337A227 Location in Application of NSHC Pages E-4 and E-5 of the Enclo sure The proposed amendments would revise a few of the instrument testing and calibration definitions in the Browns Ferry Nuclear Plant (Browns Ferry), Units 1, 2, and 3 technical Brief Description of Amendment(s) specifications (TSs), as well as incorporate the surveillance frequency control program in a couple of the same definitions. The proposed amendments are based on Technical Specification Task Force (TSTF) Traveler 21 TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.

Additionally, the proposed amendments would rescind the consolidation of several previously approved surveillance requirements approved in Amendment Nos. 315, 338, and 298 for Browns Ferry, Units 1, 2, and 3, respectively, and restore the surveillance requirements to their prior status with the frequencies as "In accordance with the Surveillance Frequency Control Program."

Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Tennessee Valley Authority; Watts Bar Nuclear Plant, Units 1 an d 2; Rhea County, TN Docket No(s). 50-390, 50-391 Application date December 9, 2021 ADAMS Accession No. ML21344A027 Location in Application of NSHC Pages E-3 and E-4 of the Enclo sure The proposed amendments would revise several instrumentation testing and calibration definitions in the Watts Bar Nuclear Plant, Units 1 and 2, technical specifications, as well as incorporate the surveillance frequency control program in a few of the same Brief Description of Amendment(s) definitions. The proposed amendments are based on Technical Specification Task Force (TSTF) Traveler TSTF-205-A, Revision 3, Revision of Channel Calibration, Channel Functional Test, and Related Definitions, and TSTF-563-A, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program.

Proposed Determination NSHC David Fountain, Executive VP and General Name of Attorney for Licensee, Mailing Counsel, Tennessee Valley Authority, 400 Address West Summit Hill Drive, WT 6A, Knoxville, TN 37902

22 NRC Project Manager, Telephone Number Kimberly Green, 301-415-1627 Union Electric Company; Callaway Plant, Unit No. 1; Callaway Co unty, MO Docket No(s). 50-483 Application date September 28, 2021, as supplemented by letter dated December 1, 2021

ADAMS Accession No. ML21272A167 (Package), ML21335A451 (Package)

Location in Application of NSHC Pages 158-160 of Enclosure 1 of the Supplement The proposed amendments would revise the technical specifications and authorize changes to the final safety analysis report to support a full-scope application of the regulations in 10 CFR 50.67, Alternative Source Term, and described in NRC Regulatory Guide 1.183, Revision 0, Alternative Radiological Source Brief Description of Amendment(s) Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors. Specifically, the amendments would revise technical specification (TS) 3.7.10, Control Room Emergency Ventilation System (CREVS), TS 5.5.11, Ventilation Filter Testing Program, and TS 5.5.17, Control Room Envelope Habitability Program.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Jay E. Silberg, Pillsbury Winthrop Shaw Address Pittman LLP, 1200 17th St., NW, Washington, DC 20036 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Union Electric Company; Callaway Plant, Unit No. 1; Callaway Co unty, MO Docket No(s). 50-483 Application date October 21, 2021, as supplemented by letter dated November 24, 2021

ADAMS Accession No. ML21294A393 (Package), ML21328A182 (Package)

Location in Application of NSHC Pages 6-8 of Attachment 1 The proposed amendment would adopt Technical Specifications Task Force (TSTF)

Traveler TSTF-505, Revision 2, "Provide Risk-Informed Extended Completion Times -

Brief Description of Amendment(s) RITSTF [Risk-Informed TSTF] Initiative 4b,"

and TSTF-439, Revision 2, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO [Limiting Condition for Operation] and would time 23 completion times contained in the applicable technical specifications (TSs). The amendment would modify the TS requirements to add a new TS 5.5.19, Risk Informed Completion Time Program, to 5.0, "Administrative Controls."

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Jay E. Silberg, Pillsbury Winthrop Shaw Address Pittman LLP, 1200 17th St., NW, Washington, DC 20036 NRC Project Manager, Telephone Number Mahesh Chawla, 301-415-8371 Wolf Creek Nuclear Operating Corporation; Wolf Creek Generating Station, Unit 1; Coffey County, KS Docket No(s). 50-482 Application date January 12, 2022 ADAMS Accession No. ML22012A217 Location in Application of NSHC Pages 3-4 of Attachment I The proposed amendment would remove the Table of Contents from the Wolf Creek Brief Description of Amendment(s) Generating Station, Unit 1, Technical Specifications and place it under the licensee control.

Proposed Determination NSHC Name of Attorney for Licensee, Mailing Thomas C. Poindexter, Morgan, Lewis and Address Bockius LLP, 1111 Pennsylvania Avenue, NW, Washington, DC 20004-2541 NRC Project Manager, Telephone Number Samson Lee, 301-415-3168

III. Notice of Issuance of Amendments to Facility Operating Lic enses and

Combined Licenses

During the period since publication of the last monthly notice, the Commission

has issued the following amendments. The Commission has determ ined for each of

these amendments that the application complies with the standar ds and requirements of

the Atomic Energy Act of 1954, as amended (the Act), and the Co mmissions rules and

regulations. The Commission has made appropriate findings as r equired by the Act and

24 the Commissions rules and regulations in 10 CFR chapter I, whi ch are set forth in the

license amendment.

A notice of consideration of issuance of amendment to facility operating license

or combined license, as applicable, proposed NSHC determination, and opportunity for a

hearing in connection with these actions, was published in the Federal Register as

indicated in the safety evaluation for each amendment.

Unless otherwise indicated, the Commission has determined that these

amendments satisfy the criteria for categorical exclusion in ac cordance with

10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), no envir onmental impact

statement or environmental assessment need be prepared for thes e amendments. If the

Commission has prepared an environmental assessment under the s pecial

circumstances provision in 10 CFR 51.22(b) and has made a deter mination based on

that assessment, it is so indicated in the safety evaluation fo r the amendment.

For further details with respect to each action, see the amendm ent and

associated documents such as the Commissions letter and safety evaluation, which

may be obtained using the ADAMS accession numbers indicated in the following table.

The safety evaluation will provide the ADAMS accession numbers for the application for

amendment and the Federal Register citation for any environmental assessment. All of

these items can be accessed as described in the Obtaining Info rmation and Submitting

Comments section of this document.

25 License Amendment Issuance(s)

Constellation Energy Generation, LLC; Braidwood Station, Units 1 and 2, Will County, IL; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Constellation Energy Generation, LLC; Calvert Cliffs Nuclear Power Plant, Units 1 an d 2, and Independent Spent Fuel Storage Installation; Calvert County, MD; Constellat ion Energy Generation, LLC; Clinton Power Station, Unit No. 1; DeWitt Coun ty, IL; Constellation Energy Generation, LLC; LaSalle County Station, Units 1 and 2; LaSalle County, IL; Constellation Energy Generation, LLC; Limerick Generating Stati on, Units 1 and 2; Montgomery County, PA; Constellation Energy Generation, LLC; Pe ach Bottom Atomic Power Station, Units 1, 2, and 3; York County, PA; Const ellation Energy Generation, LLC; Quad Cities Nuclear Power Station, Units 1 and 2; Rock Island County, IL; Constellation Energy Generation, LLC; Three Mile Is land Nuclear Station, Unit 1; Dauphin County, PA; Constellation Energy Generation, LL C: Dresden Nuclear Power Plant, Units 1, 2, and 3; Grundy County, IL; Constellatio n FitzPatrick, LLC and Constellation Energy Generation, LLC; James A FitzPatrick Nucle ar Power Plant; Oswego County, NY; Nine Mile Point Nuclear Station, LLC and Con stellation Energy Generation, LLC; Nine Mile Point Nuclear Station, Units 1 and 2 ; Oswego County, NY; PSEG Nuclear LLC; Salem Nuclear Generating Station, Unit No s. 1 and 2; Salem County, NJ; R. E. Ginna Nuclear Power Plant, LLC and Constellation Energy Generation, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY 50-456, 50-457, 50-454, 50-455, 50-317, 50-318,72-008, 50-461,50-010, 50-237, 50-249, 50-333, Docket No(s). 50-373, 50-374, 50-352, 50-353, 50-220, 50-410, 50-171, 50-277, 50-278, 50-254, 50-265, 50-244, 50-272, 50-311, 50-289 Amendment Date February 1, 2022 ADAMS Accession No. ML22021B662 (Package)

Braidwood 224 (U-1), 224 (U-2); Byron 226 (U-1),

226 (U-2); Calvert Cliffs 343 (U-1), 321 (U-2), 12 (ISFSI); Clinton 243; Dresden 50 (U-1), 277 (U-2),

270 (U-3); FitzPatrick 347; Lasalle 254 (U-1), 240 Amendment No(s). (U-2); Limerick 255 (U-1), 217 (U-2); Nine Mile Point 247 (U-1), 189 (U-2); Peach Bottom 17 (U-1), 340 (U-2), 343 (U-3); Quad Cities 289 (U-1),

285 (U-2); Ginna 147; Salem 341 (U-1), 322, (U-2); TMI 302 (U-1)

By order dated November 16, 2021 (ADAMS Accession No. ML21277A192), the NRC staff approved the license transfer application dated February 25, 2021 (ADAMS Accession No. ML21057A273), as supplemented, that was Brief Description of Amendment(s) submitted by Exelon Generation Company, LLC, on behalf of itself and Exelon Corporation; Exelon FitzPatrick, LLC; Nine Mile Point Nuclear Station, LLC; R. E. Ginna Nuclear Power Plant, LLC; and Calvert Cliffs Nuclear Power Plant, LLC. A copy of the NRC staff safety evaluation (ADAMS Accession No. ML21277A248) related to the 26 license transfer application was provided with the order. The license amendments reflect the transfer transaction that closed on February 1, 2022.

Public Comments Received as to Proposed NSHC (Yes/No) No Dominion Energy Nuclear Connecticut, Inc.; Millstone Power Stat ion, Unit No. 3; New London County, CT Docket No(s). 50-423 Amendment Date January 7, 2022 ADAMS Accession No. ML21326A099 Amendment No(s). 281 (Unit 3)

The amendment modified the technical specifications by revising the Reactor Core Safety Limit 2.1.1.2 peak fuel centerline temperature to Brief Description of Amendment(s) reflect the fuel centerline temperature specified in Topical Report WCAP-17642-P-A, Revision 1, Westinghouse Performance Analysis and Design Model (PAD5)"

Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Florida, LLC; Crystal River Unit 3 Nuclear Generati ng Plant; Citrus County, FL Docket No(s). 50-302 Amendment Date November 24, 2021 ADAMS Accession No. ML21322A270 Amendment No(s). 260 (Unit 3)

The amendment revised the Crystal River Nuclear Plant, Unit 3 (CR3), Independent Spent Fuel Storage Installation (ISFSI) Security Plan, Training and Qualification Plan, and Safeguards Brief Description of Amendment(s) Contingency Plan, as well as updated (1) the existing physical security license condition in the facility operating license and (2) the order responses related to additional security measures and fingerprinting for unescorted access at the CR3 ISFSI.

Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-400 Amendment Date January 19, 2022 ADAMS Accession No. ML21316A248 Amendment No(s). 188

27 The amendment revised the facility operating license condition associated with the adoption of 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors to reflect an alternative approach to the one provided Brief Description of Amendment(s) in Nuclear Energy Institutes (NEI) 00-04, 10 CFR 50.69 SSC Categorization Guideline, Revision 0 (ADAMS Accession No. ML052910035), for evaluating the impact of the seismic hazard in the 10 CFR 50.69 categorization process, and to also delete the license condition that required the completion of certain implementation items prior to the implementation of 10 CFR 50.69.

Public Comments Received as to Proposed NSHC (Yes/No) No Duke Energy Progress, LLC; Shearon Harris Nuclear Power Plant, Unit 1; Wake and Chatham Counties, NC Docket No(s). 50-400 Amendment Date January 20, 2022 ADAMS Accession No. ML21320A001 Amendment No(s). 189 The amendment revises the Technical Specifications to reflect the transition of the Brief Description of Amendment(s) licensee-controlled plant procedure PLP-106, Technical Specification Equipment List Program, to a licensee-controlled Technical Requirements Manual.

Public Comments Received as to Proposed NSHC (Yes/No) No Energy Harbor Nuclear Corp. and Energy Harbor Nuclear Generation LLC; Perry Nuclear Power Plant, Unit 1; Lake County, OH Docket No(s). 50-440 Amendment Date January 10, 2022 ADAMS Accession No. ML21322A260 Amendment No(s). 197 The amendment revises Technical Specifications (TS) 3.4.9, Residual Heat Removal (RHR)

Shutdown Cooling System - Hot Shutdown, and TS 3.4.10, Residual Heat Removal (RHR)

Shutdown Cooling System - Cold Shutdown, in Brief Description of Amendment(s) accordance with Technical Specifications Task Force (TSTF) Traveler, TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystem, and TSTF-580, Revision 1, Provide Exception from Entering Mode 4 With No Operable RHR Shutdown Cooling.

28 Public Comments Received as to Proposed NSHC (Yes/No) No Energy Northwest; Columbia Generating Station; Benton County, W A Docket No(s). 50-397 Amendment Date January 13, 2022 ADAMS Accession No. ML21293A164 Amendment No(s). 266 The amendment removed License Condition (LC) 2.C.(34) and revised LC 2.C.(35). The LC 2.C.(34) is no longer applicable because the Columbia Generating Station (Columbia) Final Safety Analysis Report has been updated to include the license renewal commitments. The Brief Description of Amendment(s) revision to LC 2.C.(35) clarified that future changes to the license renewal commitments, as dictated by operating experience, are made under the provisions of 10 CFR 50.59, Changes, tests, and experiments. The changes do not result in changes to the technical specifications or operating requirements for Columbia.

Public Comments Received as to Proposed NSHC (Yes/No) No Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Braidwood Station, Units 1 and 2; Will County, IL; Exelon Generation Company, LLC; Byron Station, Unit Nos. 1 and 2, Ogle County, IL; Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Pl ant, Unit Nos. 1 and 2; Calvert County, MD; Exelon Generation Company, LLC, Clin ton Power Station, Unit No. 1, DeWitt County, IL; Exelon Generation Compa ny, LLC; Dresden Nuclear Power Station, Units 2 and 3; Grundy County, IL; Exelon Generation Company, LLC and Exelon FitzPatrick, LLC; James A. FitzPatrick Nuclear Power Plant; Oswego County, NY; Exelon Generation Company, LLC, LaSal le County Station, Units 1 and 2; LaSalle County, IL; Exelon Generation C ompany, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA; Exelon Generation Company, LLC; Nine Mile Point Nuclear Station, Units 1 and 2; Oswego County, NY; Exelon Generation Company, LLC and PSEG Nuclear LLC ; Peach Bottom Atomic Power Station, Units 2 and 3; York and Lancaster Counties, PA; Exelon Generation Company, LLC; Quad Cities Nuclear Power Stati on, Units 1 and 2; Rock Island County, IL; Exelon Generation Company, LLC; R. E. Ginna Nuclear Power Plant; Wayne County, NY; Exelon Generation Compan y, LLC; Limerick Generating Station, Units 1 and 2; Montgomery County, PA 50-456, 50-457, 50-454, 50-455, 50-317, 50-318, Docket No(s). 50-461, 50-237, 50-249, 50-333, 50-373, 50-374, 50-352, 50-353, 50-410, 50-277, 50-278, 50-254, 50-265, 50-244 Amendment Date January 13, 2022 ADAMS Accession No. ML21347A038

29 Braidwood 223 (U-1) 223 (U-2); Byron 225 (U-1) 225 (U-2); Calvert Cliffs 341 (U-1) 319 (U-2);

Clinton 242; Dresden 276 (U-2) 269 (U-3);

Amendment No(s). FitzPatrick 346; LaSalle 253 (U-1) 239 (U-2);

Limerick 254 (U-1) 216 (U-2); Nine Mile Point 188 (U-2); Peach Bottom 339 (U-2) 342 (U-3); Quad Cities 288 (U-1) 284 (U-2); Ginna 146 The amendments revised the reactor coolant leakage requirements in the technical specifications for each facility based on Technical Brief Description of Amendment(s) Specifications Task Force (TSTF) Traveler TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements, (ADAMS Accession No. ML20016A233).

Public Comments Received as to Proposed NSHC (Yes/No) Yes Exelon Generation Company, LLC; Calvert Cliffs Nuclear Power Pl ant, Units 1 and 2; Calvert County, MD Docket No(s). 50-317, 50-318 Amendment Date January 13, 2022 ADAMS Accession No. ML21347A864 Amendment No(s). 342 (Unit 1) and 320 (Unit 2)

The amendments incorporated changes to the Updated Final Safety Analysis Report and the Technical Requirements Manual to allow for a full core offload without the availability of being Brief Description of Amendment(s) supplemented with one loop of the shutdown cooling system during certain refueling outages.

The amendments also incorporated a change in calculational methodology used in the Calvert Cliffs spent fuel pool heat-up analysis.

Public Comments Received as to Proposed NSHC (Yes/No) No Florida Power & Light Company, et al.; St. Lucie Plant, Unit No s. 1 and 2; St. Lucie County, FL Docket No(s). 50-335, 50-389 Amendment Date January 14, 2022 ADAMS Accession No. ML21342A209 Amendment No(s). 252 (Unit 1) and 207 (Unit 2)

The amendments extended technical specification (TS) requirements to permit the use of Risk Informed Completion Times (RICTs) to the 120-Brief Description of Amendment(s) Volt alternating current (AC) Instrument Bus TS, in accordance with TSTF-505, Revision 2, Provide Risk-Informed Completion Times RITSTF Initiative 4b, and Nuclear Energy Institute (NEI) 06-09, Risk-Informed Technical Specifications Initiative 30 4b, Risk Managed Technical Specifications (RMTS) Guidelines. Accordingly, these amendments revised License Condition J of the St. Lucie 1 Renewed Facility Operating License (RFOL) and License Condition O of the St. Lucie 2 RFOL, respectively, each of which adds the amendment numbers resulting from this amendment request and deletes the first listed condition specifying activities to be completed prior to implementing the RICT Program. The amendments also modified Unit 1 TS 3.8.2.1 Action b and Unit 2 TS 3.8.3.1 Action b to permit the use of a RICT for the 120 VAC instrument buses.

Public Comments Received as to Proposed NSHC (Yes/No) No NextEra Energy Duane Arnold, LLC; Duane Arnold Energy Center; L inn County, IA Docket No(s). 50-331 Amendment Date January 21, 2022 ADAMS Accession No. ML21172A217 Amendment No(s). 315 The U.S. Nuclear Regulatory Commission (NRC, Commission) has issued Amendment No. 315 to Renewed Facility Operating License No. DPR 49, for the Duane Arnold Energy Center (DAEC),

operated by NextEra Energy Duane Arnold, LLC.

The amendment consists of revisions to the Renewed Facility Operating License and the technical specifications (TS) in response to DAEC's application dated February 19, 2021 (ADAMS Accession No. ML21050A189), as supplemented on January 3, 2022 (ADAMS Package Accession No. ML22004A010). These revisions reflect the removal of all spent nuclear Brief Description of Amendment(s) fuel from the DAEC spent fuel pool and its transfer to dry cask storage within an onsite Independent Spent Fuel Storage Installation (ISFSI). These changes more fully reflect the permanently shutdown status of the decommissioning facility, as well as the reduced scope of structures, systems, and components necessary to ensure plant safety once all spent fuel has been permanently moved to the DAEC ISFSI, an activity which is currently scheduled for completion in mid-2022. The changes also include the relocation of administrative controls from the TS to the DAEC Quality Assurance Topical Report, as well as deletion of the

31 remaining TS Bases, except for certain environmental reporting requirements which are required to remain in the TS in accordance with 10 CFR 50.36a(a)(2). The changes shall be implemented within 60 days following submittal of written notification to the NRC that all spent nuclear fuel assemblies have been transferred out of the DAEC SFP and placed in dry storage within the ISFSI.

Public Comments Received as to Proposed NSHC (Yes/No) No Southern Nuclear Operating Company, Inc.; Joseph M. Farley Nucl ear Plant, Units 1 and 2; Houston County, AL; Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Burke County, GA Docket No(s). 50-348, 50-364, 50-424, 50-425 Amendment Date January 26, 2022 ADAMS Accession No. ML21344A003 Amendment No(s). Farley - 239 (Unit 1) and 236 (Unit 2), Vogtle - 212 (Unit 1), and 195 (Unit 2)

The amendments revised TS 3.1.7, Rod Position Indication, TS 3.2.1, Heat Flux Hot Channel Factor (FQ(Z)), and TS 3.3.1, Reactor Trip System (RTS) Instrumentation, to allow the use of an alternate means of determining power distribution information. The amendments allow Brief Description of Amendment(s) the use of a dedicated on-line core power distribution monitoring system (PDMS) to perform surveillance of core thermal limits. The PDMS to be used at Farley, Units 1 and 2; and Vogtle, Units 1 and 2, is the Westinghouse proprietary core analysis system called Best Estimate Analyzer for Core Operations - Nuclear (BEACONTM).

Public Comments Received as to Proposed NSHC (Yes/No) No Southern Nuclear Operating Company, Inc.; Edwin I. Hatch Nuclea r Plant, Units 1 and 2; Appling County, GA; Southern Nuclear Operating Company, Inc.; Joseph M.

Farley Nuclear Plant, Units 1 and 2; Houston County, AL; Southe rn Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Unit s 1 and 2; Burke County, GA Docket No(s). 50-321, 50-364, 50-366, 50-348, 50-424, 50-425 Amendment Date February 2, 2022 ADAMS Accession No. ML21349A518 Farley - 240 (Unit 1) and 237 (Unit 2), Hatch - 314 Amendment No(s). (Unit 1) and 259 (Unit 2), Vogtle - 213 (Unit 1),

and 196 (Unit 2).

32 In its application dated September 29, 2021, the licensee requested that the U.S. Nuclear Regulatory Commission (NRC, the Commission) process the proposed license amendment request under the Consolidated Line Item Improvement Process. The amendments revised the technical specifications related to reactor coolant system Brief Description of Amendment(s) operational leakage and the definition of the term LEAKAGE based on Technical Specifications Task Force (TSTF) Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements, (TSTF-554) (ADAMS Accession No. ML20016A233), and the associated NRC staff safety evaluation of TSTF-554 (ADAMS Accession No. ML20322A024).

Public Comments Received as to Proposed NSHC (Yes/No) No Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 1; Rh ea County, TN Docket No(s). 50-390 Amendment Date January 18, 2022 ADAMS Accession No. ML21334A295 Amendment No(s). 151 (Unit 1)

The amendment revised the existing Note in the Limiting Condition for Operation for Watts Bar Nuclear Plant, Unit 1, Technical Specification 3.7.12, Auxiliary Building Gas Treatment System Brief Description of Amendment(s) (ABGTS), to allow the auxiliary building secondary containment enclosure boundary to be opened, at specific controlled access points, on a continuous basis, during the Watts Bar Nuclear Plant, Unit 2, Cycle 4 refueling outage, when the replacement steam generators will be installed.

Public Comments Received as to Proposed NSHC (Yes/No) No Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rh ea County, TN Docket No(s). 50-391 Amendment Date January 12, 2022 ADAMS Accession No. ML21334A389 Amendment No(s). 59 (Unit 2)

The amendment revised the steam generator (SG) tube rupture analysis to utilize the new Brief Description of Amendment(s) primary and secondary side mass releases and new reactor coolant system and SG masses associated with the Unit 2 replacement SGs.

Public Comments Received as to Proposed NSHC (Yes/No) No

33 Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2; Rh ea County, TN Docket No(s). 50-391 Amendment Date January 25, 2022 ADAMS Accession No. ML21306A287 Amendment No(s). 60 (Unit 2)

The amendment revised the Watts Bar Nuclear Plant, Unit 2, technical specifications (TSs) to delete several requirements for steam generator (SG) tube inspection and repair methodologies that will no longer apply following installation of the replacement SGs. The amendment also Brief Description of Amendment(s) revised TS 5.7.2.12.d.2 to reflect the SG inspection interval criteria for Alloy 690 thermally treated tubing. Additionally, the amendment revised Watts Bar, Unit 2s license condition 2.C.(4) to delete the reference to PAD4TCD, which will no longer apply following the installation of the replacement SGs.

Public Comments Received as to Proposed NSHC (Yes/No) No

Dated: February 15, 2022.

For the Nuclear Regulatory Commission.

/RA/

Caroline L. Carusone, Deputy Director, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

34