ML20070E403: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 2: Line 2:
| number = ML20070E403
| number = ML20070E403
| issue date = 12/13/1982
| issue date = 12/13/1982
| title = Advises That Specific Containment & Purge Valves Identified in NRC 821110 Ltr Are Not Applicable to Facilities.Meeting Requested to Determine Status of Remaining Issue Re Purging & Venting
| title = Advises That Specific Containment & Purge Valves Identified in NRC Are Not Applicable to Facilities.Meeting Requested to Determine Status of Remaining Issue Re Purging & Venting
| author name = Beckham J
| author name = Beckham J
| author affiliation = GEORGIA POWER CO.
| author affiliation = GEORGIA POWER CO.
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = TAC-42603, TAC-42604, TAC-51984, TAC-51985, NUDOCS 8212170246
| document report number = TAC-42603, TAC-42604, TAC-51984, TAC-51985, NUDOCS 8212170246
| title reference date = 11-10-1982
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 1
| page count = 1
| project = TAC:42603, TAC:42604, TAC:51984, TAC:51985
| stage = Meeting
}}
}}



Revision as of 08:28, 31 May 2023

Advises That Specific Containment & Purge Valves Identified in NRC Are Not Applicable to Facilities.Meeting Requested to Determine Status of Remaining Issue Re Purging & Venting
ML20070E403
Person / Time
Site: Hatch  
Issue date: 12/13/1982
From: Beckham J
GEORGIA POWER CO.
To:
Office of Nuclear Reactor Regulation
References
TAC-42603, TAC-42604, TAC-51984, TAC-51985, NUDOCS 8212170246
Download: ML20070E403 (1)


Text

r

}

Georg.a Par.er Corrpany 333 Pecat Avenue Atlanti G?crg a 30308 Telep%a 4L4 526 7020 Meing Address Post Offce Bon 4545 Atbnta. Georg.a 30302 Georgia Power J. T. Beckham, Jr. " " * " " * * *

  • December 13, 1982 Vce Pres 4dert and General Manager Nuclear Generation Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 STATUS OF CONTAINMENT PURGE AND VENT Gentlemen:

This letter is provided in response to your letter of November 10, 1982. In a review of the correspondence on this issue, it has become obvious that the need exists to establish the status of each of the various requests for information, submittals and commitments which have been made in response to your requests.

With regard to Attachment 1 of the above mentioned letter, Georgia Power Cpmpany has determined that nora of the specific valve type questions are a plicable to Plant Hatch. Furthermore, our commitment in our October 1, 1 982 letter to have the purge valves open less than 1% of the time primary containment is required would seem to have resolved the issue of BTP 6.2.4.

n consideration of our commitment, the intent of your November 10, 1982, etter is not clear. Therefore we request a meeting between our staffs to etermine the exact status of each remaining issue regarding purging and venting during normal operation. We will work with the Hatch Licensing Project Manager to develop a mutually acceptable time and place.

If you have any further questions, please contact this office.

Very truly yours, h = h J. T. Beckham, Jr.

MJB/mb xc: H. C. Nix, Jr.

J. P. O' Reilly Senior Resident Inspector 1

8212170246 821213 hcp\

PDR ADOCK 05000321 P PDR