| | number = ML20071C206 | | | number = ML20071C206 |
| | issue date = 02/14/1983 | | | issue date = 02/14/1983 |
| | title = Responds to NRC 830118 Ltr Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Copies of Reactor Safety Committee (RCS) New Charter Will Be Forwarded to Region Iv.Rcs Audit Function Redefined | | | title = Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Copies of Reactor Safety Committee (RCS) New Charter Will Be Forwarded to Region Iv.Rcs Audit Function Redefined |
| | author name = Egle D | | | author name = Egle D |
| | author affiliation = OKLAHOMA, UNIV. OF, NORMAN, OK | | | author affiliation = OKLAHOMA, UNIV. OF, NORMAN, OK |
Line 11: |
Line 11: |
| | contact person = | | | contact person = |
| | document report number = NUDOCS 8303010560 | | | document report number = NUDOCS 8303010560 |
| | | title reference date = 01-18-1983 |
| | package number = ML20071C200 | | | package number = ML20071C200 |
| | document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE | | | document type = CORRESPONDENCE-LETTERS, EDUCATIONAL INSTITUTION TO NRC, INCOMING CORRESPONDENCE |
Line 22: |
Line 23: |
| . Chief, Reactor Projects Branch 6 3 USNRC - Region IV i N 1] % # J) 611 Ryan Plaza Drive ! | | . Chief, Reactor Projects Branch 6 3 USNRC - Region IV i N 1] % # J) 611 Ryan Plaza Drive ! |
| Suite 1000 Arlington, TX 76011 Daar Mr. Madsen: | | Suite 1000 Arlington, TX 76011 Daar Mr. Madsen: |
| We are replying to yoi!r letter dated January 18, 1983 and received by us on January 21 as requested. We have attempted to respond to the four items as specifically as possible. We, of course, wish to arrive at full agreement with you as soon as possible. | | We are replying to yoi!r {{letter dated|date=January 18, 1983|text=letter dated January 18, 1983}} and received by us on January 21 as requested. We have attempted to respond to the four items as specifically as possible. We, of course, wish to arrive at full agreement with you as soon as possible. |
| Thank you for your assistance and that of your staff. | | Thank you for your assistance and that of your staff. |
| y truly yo m , | | y truly yo m , |
|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML19327B1471989-10-12012 October 1989 Advises That Matls Containing Residual Radioactivity Transferred for Disposal Via Low Level Waste Sys IR 05000112/19890011989-09-13013 September 1989 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-112/89-01 ML20247B0711989-08-31031 August 1989 Responds to Violations Noted in Insp Rept 50-112/89-01 on 890525-26.Corrective Action:Training Program for Radiation Safety & Facility Emergency Procedures for Norman Fire Dept Being Initiated by Radiation Safety Ofc ML20246E0941989-08-18018 August 1989 Forwards Insp Rept 50-112/89-01 on 890525-26 & Notice of Violation.Recognizes That Receipt of Licensee possession- Only License Resulted in Greatly Reduced NRC Requirements Re Reactor Facility ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20244D2041989-06-0505 June 1989 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts in Response to 881025 Application.Environ Assessment & Finding of No Significant Impact & Safety Evaluation Also Encl ML20235Z5661989-03-0909 March 1989 Forwards Addl Info Re Licensee Plan for Decommissioning,Per Request.Biographical Sketch of Author Included ML20205L2151988-10-25025 October 1988 Forwards Application for Amend to License R-53 to Approve Encl Physical Security Plan.W/O Encl ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20196J3701988-03-0808 March 1988 Forwards Amend 12 to License R-53 & Safety Evaluation.Amend Authorizes Possession,But Not Operation,Of Univ of Ok AGN-211P Research Reactor & Includes Tech Spec Changes Requested in Application ML20149L6531988-02-18018 February 1988 Advises That Licensee in Process of Transferring Fuel Back to DOE Possession,Per Telcon.Work Should Be Completed by End of May,Depending on Speed of Paper Work ML20148K3151988-01-21021 January 1988 Forwards Revised Security Plan in Response to D Carlson Request ML20236S2451987-11-19019 November 1987 Forwards Updated Tech Specs for Ou Agn 211-P Reactor Per Conversation W/Nrc.Requests That Facility Be Exempt from 10CFR50.54 (R) Since No Critical Operations Will Be Allowed & Exempt from Maintaining Requalification Program ML20236F6621987-10-26026 October 1987 Informs That J Pellet Replacing R Cooley as Section Chief of Operator Licensing Section in Div of Reactor Safety, Effective 871025 IR 05000112/19870011987-09-0303 September 1987 Ack Receipt of 870414,0529 & 0720 Ltrs Informing NRC of Steps Taken to Correct Violtaions Noted in Insp Rept 50-112/87-01.Addl Info Re Violation a Provided in Adequate to Resolve Concerns,Per 870617 Telcon ML20237J5141987-07-20020 July 1987 Responds to Violation a Noted in Insp Rept 50-112/87-01. Updated Lab Survey Rept Showing LSC Efficiencies for H-3 & C-14 Encl Per Telcon W/Baer.Understands That Response to Violations B & C Acceptable ML20215C2591987-06-11011 June 1987 Advises That Standardization & Non-Power Reactor Project Directorate Now Under Div of Reactor Projects Iii,Iv & V & Special Projects,Ofc of NRR Due to Recent Organization of NRR ML20214W1981987-05-29029 May 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Ltr from Norman Region Hosp Obtained & Sent w/ Which Indicates That Emergency Need Will Be Responded to ML20214H0441987-05-20020 May 1987 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-112/87-01.Requests Addl Info Re Listed Violation from 870316 Notice of Violation ML20209D2621987-04-14014 April 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Application for Mod of Tech Specs to Be Completed & Sent to NRC by 870901,including Request for Mod or Deletion of Emergency Plan ML20207S7041987-03-16016 March 1987 Forwards Insp Rept 50-112/87-01 on 870126-30 & Notice of Violation ML20202J1121986-04-0101 April 1986 Forwards Matls Balance Rept for Oct 1985 - Mar 1986 ML20210H9041986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20136G3971985-08-12012 August 1985 Informs That 850516 Request for Amend of Requalification Training Program Unacceptable,Per 10CFR55,App a & Generic Ltr 83-12A.New Request Should Be Submitted Addressing Listed Required Conditions IR 05000112/19850011985-07-25025 July 1985 Forwards Safety Insp Rept 50-112/85-01 on 850430-0602.No Violations or Deviations Noted ML20100B4081984-11-30030 November 1984 Informs That Emergency Plan Fully Implemented,Emergency Procedures Written & Approved & Training Program W/Fire & Police Personnel Initiated ML20093P2001984-07-24024 July 1984 Ack Receipt of Ltr Approving Emergency Plan.Plan Implementation Begun.Requests Extension for Completion Until 841130 ML20082M7781983-12-0101 December 1983 Submits List of Errors Noted During Review of NUREG-0996. Errors Do Not Affect Conclusions Reached in SER ML20072G6171983-06-20020 June 1983 Forwards Revised SAR Update & Review, & Tech Specs for 20-yr Renewal of License R-53 ML20077D1391983-06-17017 June 1983 Advises That Univ Operating Under Approved Rev to Reactor Operator Requalification Program,Per NRC ML20072N0481983-05-27027 May 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/83-01.Corrective Actions:Check of Flow Rate for Water Purification Sys Procedure Reviewed for Relevance & Implementation ML20071H7871983-05-16016 May 1983 Informs of C Jensen Appointment as Director of Facility ML20079M2451983-02-17017 February 1983 Advises That C Jensen Has Been Appointed as Interim Director of Univ Nuclear Reactor ML20079L4081983-02-14014 February 1983 Advises That All Future Correspondence Re License R-53 Should Be Directed to D Egle ML20071C2061983-02-14014 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Copies of Reactor Safety Committee (RCS) New Charter Will Be Forwarded to Region Iv.Rcs Audit Function Redefined ML20064F8811983-01-0404 January 1983 Forwards Revised Operator Requalification Program,To Be Substituted for Mar 1982 Submittal ML20070N4241982-12-15015 December 1982 Forwards Procedures to Suppl Responding to Notice of Violation for IE Insp Rept 50-112/82-01 ML20070N4171982-12-10010 December 1982 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Change in Sprocket on Safety Rod Drive Will Be Treated as Unreviewed Safety Question & Requalification Program Will Be Revised ML20069M4301982-10-27027 October 1982 Submits Public Version of Status of Emergency Plan,Due 821103.Plan Submitted on 820420 Complies W/Requirements.No New Plan Need Be Developed or Submitted ML20067B5721982-10-11011 October 1982 Forwards Requalification Program for Univ of Ok,For Approval ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20051J8631982-05-0606 May 1982 Forwards Final Segment of SAR Required to Obtain Renewal of License R-53 ML20052D5851982-04-20020 April 1982 Forwards Public Version of Emergency Plan,In Support of 20-yr Renewal of License R-53 for AGN-211 P Reactor ML20042B8321982-03-28028 March 1982 Forwards Addl Info Re Application for 20-yr Renewal of License R-53 for AGN-211P Reactor ML20042C0581982-03-24024 March 1982 Forwards Eia Supporting Renewal of License R-53 ML20052G2631982-03-23023 March 1982 Forwards Requalification Program for Univ of Ok AGN-211P Reactor ML20049J3711982-03-12012 March 1982 Forwards Incomplete Application for 20-yr Renewal of License R-53.Remaining Matls to Be Submitted in 2 Wks.Security Plan Withheld (Ref 10CFR2.790) ML20040H4831982-01-0404 January 1982 Responds to NRC 811207 Ltr Re Violations Noted in IE Insp Rept 50-112/81-01.Corrective Actions:Clarified Procedure Requiring All Exploratory Changes in Sys Be Reviewed by Reactor Safety Committee Prior to Evaluation ML20009C7261981-06-15015 June 1981 Submits Annual Rept for Jul 1980-June 1981 for License R-53 1991-06-18
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20247B0711989-08-31031 August 1989 Responds to Violations Noted in Insp Rept 50-112/89-01 on 890525-26.Corrective Action:Training Program for Radiation Safety & Facility Emergency Procedures for Norman Fire Dept Being Initiated by Radiation Safety Ofc ML20235Z5661989-03-0909 March 1989 Forwards Addl Info Re Licensee Plan for Decommissioning,Per Request.Biographical Sketch of Author Included ML20205L2151988-10-25025 October 1988 Forwards Application for Amend to License R-53 to Approve Encl Physical Security Plan.W/O Encl ML20149L6531988-02-18018 February 1988 Advises That Licensee in Process of Transferring Fuel Back to DOE Possession,Per Telcon.Work Should Be Completed by End of May,Depending on Speed of Paper Work ML20148K3151988-01-21021 January 1988 Forwards Revised Security Plan in Response to D Carlson Request ML20236S2451987-11-19019 November 1987 Forwards Updated Tech Specs for Ou Agn 211-P Reactor Per Conversation W/Nrc.Requests That Facility Be Exempt from 10CFR50.54 (R) Since No Critical Operations Will Be Allowed & Exempt from Maintaining Requalification Program ML20237J5141987-07-20020 July 1987 Responds to Violation a Noted in Insp Rept 50-112/87-01. Updated Lab Survey Rept Showing LSC Efficiencies for H-3 & C-14 Encl Per Telcon W/Baer.Understands That Response to Violations B & C Acceptable ML20214W1981987-05-29029 May 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Ltr from Norman Region Hosp Obtained & Sent w/ Which Indicates That Emergency Need Will Be Responded to ML20209D2621987-04-14014 April 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Application for Mod of Tech Specs to Be Completed & Sent to NRC by 870901,including Request for Mod or Deletion of Emergency Plan ML20100B4081984-11-30030 November 1984 Informs That Emergency Plan Fully Implemented,Emergency Procedures Written & Approved & Training Program W/Fire & Police Personnel Initiated ML20093P2001984-07-24024 July 1984 Ack Receipt of Ltr Approving Emergency Plan.Plan Implementation Begun.Requests Extension for Completion Until 841130 ML20082M7781983-12-0101 December 1983 Submits List of Errors Noted During Review of NUREG-0996. Errors Do Not Affect Conclusions Reached in SER ML20072G6171983-06-20020 June 1983 Forwards Revised SAR Update & Review, & Tech Specs for 20-yr Renewal of License R-53 ML20077D1391983-06-17017 June 1983 Advises That Univ Operating Under Approved Rev to Reactor Operator Requalification Program,Per NRC ML20072N0481983-05-27027 May 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/83-01.Corrective Actions:Check of Flow Rate for Water Purification Sys Procedure Reviewed for Relevance & Implementation ML20071H7871983-05-16016 May 1983 Informs of C Jensen Appointment as Director of Facility ML20079M2451983-02-17017 February 1983 Advises That C Jensen Has Been Appointed as Interim Director of Univ Nuclear Reactor ML20071C2061983-02-14014 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Copies of Reactor Safety Committee (RCS) New Charter Will Be Forwarded to Region Iv.Rcs Audit Function Redefined ML20079L4081983-02-14014 February 1983 Advises That All Future Correspondence Re License R-53 Should Be Directed to D Egle ML20064F8811983-01-0404 January 1983 Forwards Revised Operator Requalification Program,To Be Substituted for Mar 1982 Submittal ML20070N4241982-12-15015 December 1982 Forwards Procedures to Suppl Responding to Notice of Violation for IE Insp Rept 50-112/82-01 ML20070N4171982-12-10010 December 1982 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Change in Sprocket on Safety Rod Drive Will Be Treated as Unreviewed Safety Question & Requalification Program Will Be Revised ML20069M4301982-10-27027 October 1982 Submits Public Version of Status of Emergency Plan,Due 821103.Plan Submitted on 820420 Complies W/Requirements.No New Plan Need Be Developed or Submitted ML20067B5721982-10-11011 October 1982 Forwards Requalification Program for Univ of Ok,For Approval ML20051J8631982-05-0606 May 1982 Forwards Final Segment of SAR Required to Obtain Renewal of License R-53 ML20052D5851982-04-20020 April 1982 Forwards Public Version of Emergency Plan,In Support of 20-yr Renewal of License R-53 for AGN-211 P Reactor ML20042B8321982-03-28028 March 1982 Forwards Addl Info Re Application for 20-yr Renewal of License R-53 for AGN-211P Reactor ML20042C0581982-03-24024 March 1982 Forwards Eia Supporting Renewal of License R-53 ML20052G2631982-03-23023 March 1982 Forwards Requalification Program for Univ of Ok AGN-211P Reactor ML20049J3711982-03-12012 March 1982 Forwards Incomplete Application for 20-yr Renewal of License R-53.Remaining Matls to Be Submitted in 2 Wks.Security Plan Withheld (Ref 10CFR2.790) ML20040H4831982-01-0404 January 1982 Responds to NRC 811207 Ltr Re Violations Noted in IE Insp Rept 50-112/81-01.Corrective Actions:Clarified Procedure Requiring All Exploratory Changes in Sys Be Reviewed by Reactor Safety Committee Prior to Evaluation ML20009C7261981-06-15015 June 1981 Submits Annual Rept for Jul 1980-June 1981 for License R-53 ML19332B2881980-09-0202 September 1980 Submits Annual Rept for Jul 1979-June 1980 ML19262B9141980-01-0808 January 1980 Notifies That Cw Terrell Has Been Director of Univ of Ok Reactor Since 780901 ML19259A7031979-01-0505 January 1979 Forwards Amended Copy of App a to Tech Specs.Major Amend Contains Request for Power Increase from 15 Watts to 100 Watts ML20064B8561978-10-0606 October 1978 Requests 20-year Extension/Renewal of NRC Lic R-53. Will Furnish Documentation by mid-Nov. 1978 1989-08-31
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML19327B1471989-10-12012 October 1989 Advises That Matls Containing Residual Radioactivity Transferred for Disposal Via Low Level Waste Sys ML20247B0711989-08-31031 August 1989 Responds to Violations Noted in Insp Rept 50-112/89-01 on 890525-26.Corrective Action:Training Program for Radiation Safety & Facility Emergency Procedures for Norman Fire Dept Being Initiated by Radiation Safety Ofc ML20235Z5661989-03-0909 March 1989 Forwards Addl Info Re Licensee Plan for Decommissioning,Per Request.Biographical Sketch of Author Included ML20205L2151988-10-25025 October 1988 Forwards Application for Amend to License R-53 to Approve Encl Physical Security Plan.W/O Encl ML20149L6531988-02-18018 February 1988 Advises That Licensee in Process of Transferring Fuel Back to DOE Possession,Per Telcon.Work Should Be Completed by End of May,Depending on Speed of Paper Work ML20148K3151988-01-21021 January 1988 Forwards Revised Security Plan in Response to D Carlson Request ML20236S2451987-11-19019 November 1987 Forwards Updated Tech Specs for Ou Agn 211-P Reactor Per Conversation W/Nrc.Requests That Facility Be Exempt from 10CFR50.54 (R) Since No Critical Operations Will Be Allowed & Exempt from Maintaining Requalification Program ML20237J5141987-07-20020 July 1987 Responds to Violation a Noted in Insp Rept 50-112/87-01. Updated Lab Survey Rept Showing LSC Efficiencies for H-3 & C-14 Encl Per Telcon W/Baer.Understands That Response to Violations B & C Acceptable ML20214W1981987-05-29029 May 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Ltr from Norman Region Hosp Obtained & Sent w/ Which Indicates That Emergency Need Will Be Responded to ML20209D2621987-04-14014 April 1987 Responds to NRC Re Violations Noted in Insp Rept 50-112/87-01.Corrective Actions:Application for Mod of Tech Specs to Be Completed & Sent to NRC by 870901,including Request for Mod or Deletion of Emergency Plan ML20100B4081984-11-30030 November 1984 Informs That Emergency Plan Fully Implemented,Emergency Procedures Written & Approved & Training Program W/Fire & Police Personnel Initiated ML20093P2001984-07-24024 July 1984 Ack Receipt of Ltr Approving Emergency Plan.Plan Implementation Begun.Requests Extension for Completion Until 841130 ML20082M7781983-12-0101 December 1983 Submits List of Errors Noted During Review of NUREG-0996. Errors Do Not Affect Conclusions Reached in SER ML20072G6171983-06-20020 June 1983 Forwards Revised SAR Update & Review, & Tech Specs for 20-yr Renewal of License R-53 ML20077D1391983-06-17017 June 1983 Advises That Univ Operating Under Approved Rev to Reactor Operator Requalification Program,Per NRC ML20072N0481983-05-27027 May 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/83-01.Corrective Actions:Check of Flow Rate for Water Purification Sys Procedure Reviewed for Relevance & Implementation ML20071H7871983-05-16016 May 1983 Informs of C Jensen Appointment as Director of Facility ML20079M2451983-02-17017 February 1983 Advises That C Jensen Has Been Appointed as Interim Director of Univ Nuclear Reactor ML20071C2061983-02-14014 February 1983 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Copies of Reactor Safety Committee (RCS) New Charter Will Be Forwarded to Region Iv.Rcs Audit Function Redefined ML20079L4081983-02-14014 February 1983 Advises That All Future Correspondence Re License R-53 Should Be Directed to D Egle ML20064F8811983-01-0404 January 1983 Forwards Revised Operator Requalification Program,To Be Substituted for Mar 1982 Submittal ML20070N4241982-12-15015 December 1982 Forwards Procedures to Suppl Responding to Notice of Violation for IE Insp Rept 50-112/82-01 ML20070N4171982-12-10010 December 1982 Responds to NRC Re Violations Noted in IE Insp Rept 50-112/82-01.Corrective Actions:Change in Sprocket on Safety Rod Drive Will Be Treated as Unreviewed Safety Question & Requalification Program Will Be Revised ML20069M4301982-10-27027 October 1982 Submits Public Version of Status of Emergency Plan,Due 821103.Plan Submitted on 820420 Complies W/Requirements.No New Plan Need Be Developed or Submitted ML20067B5721982-10-11011 October 1982 Forwards Requalification Program for Univ of Ok,For Approval ML20051J8631982-05-0606 May 1982 Forwards Final Segment of SAR Required to Obtain Renewal of License R-53 ML20052D5851982-04-20020 April 1982 Forwards Public Version of Emergency Plan,In Support of 20-yr Renewal of License R-53 for AGN-211 P Reactor ML20042B8321982-03-28028 March 1982 Forwards Addl Info Re Application for 20-yr Renewal of License R-53 for AGN-211P Reactor ML20042C0581982-03-24024 March 1982 Forwards Eia Supporting Renewal of License R-53 ML20052G2631982-03-23023 March 1982 Forwards Requalification Program for Univ of Ok AGN-211P Reactor ML20049J3711982-03-12012 March 1982 Forwards Incomplete Application for 20-yr Renewal of License R-53.Remaining Matls to Be Submitted in 2 Wks.Security Plan Withheld (Ref 10CFR2.790) ML20040H4831982-01-0404 January 1982 Responds to NRC 811207 Ltr Re Violations Noted in IE Insp Rept 50-112/81-01.Corrective Actions:Clarified Procedure Requiring All Exploratory Changes in Sys Be Reviewed by Reactor Safety Committee Prior to Evaluation ML20009C7261981-06-15015 June 1981 Submits Annual Rept for Jul 1980-June 1981 for License R-53 ML19332B2881980-09-0202 September 1980 Submits Annual Rept for Jul 1979-June 1980 ML19262B9141980-01-0808 January 1980 Notifies That Cw Terrell Has Been Director of Univ of Ok Reactor Since 780901 ML19259A7031979-01-0505 January 1979 Forwards Amended Copy of App a to Tech Specs.Major Amend Contains Request for Power Increase from 15 Watts to 100 Watts ML20064B8561978-10-0606 October 1978 Requests 20-year Extension/Renewal of NRC Lic R-53. Will Furnish Documentation by mid-Nov. 1978 1991-06-18
[Table view] |
Text
e k
i l The University ofOklahoma SCHOOL OF AEROSPACE. MECHANICAL AND NUCLEAR ENGINEER!NG 865 Ag Avenue. Room 212 Norman, Oktawa 73019 (405) 325-son February 14, 1983 st."
P' Mr. G. L, Madsen i
. Chief, Reactor Projects Branch 6 3 USNRC - Region IV i N 1] % # J) 611 Ryan Plaza Drive !
Suite 1000 Arlington, TX 76011 Daar Mr. Madsen:
We are replying to yoi!r letter dated January 18, 1983 and received by us on January 21 as requested. We have attempted to respond to the four items as specifically as possible. We, of course, wish to arrive at full agreement with you as soon as possible.
Thank you for your assistance and that of your staff.
y truly yo m ,
/W 7 ' L G G Davis M. Egle Director DME/ec cc Dr. Terrell Professor Jensen Dr. Klehr J. James Enclosure
/go <
f"303010560 830225 PDR ADOCK 05000112
/
n PDR
Item 1:
We understand this question to ask the real authority of the Reactor Safety Coninittee (RSC).
The RSC has t% authority to request that the reactor be shut down at any time they are disatisfied with an action or the lack of' it. Suen a request, made to the Reactor Director, must be honored until a meeting of the RSC, the Reactor Staff and the Director of AMNE resolves the issue to everyones satisfaction. The Charter of the RSC is currently being revised to reflect specifically the above authority.
Our basic policy is, and really has been (though we have slipped on several occasions), that if a Tech. Spec. or Surveillance Test has not been met, the function will not be performed. Examples: A licensed operator has not taken the written test by the required date. Policy is he cannot operate the reactor until the test is completed. Or, the Log N-Period amplifier calibratior. is not completed by the required date. Then the reactor may not operate until the calibraclon is performed.
It is the function of the RSC, through audits of operations, to ensure the above policy.
Should an honest disagreement develop between the RSC, the Director of Ai4NE, and/or the Reactor Director, the RSC has the option of requesting a
- reading from the NRC or from a higher administrative authority at 00 such as the VP for Administrative Affairs to which the RSC reports.
We plan to forward copies of the new charter to Region IV.
Item 2:
Based on a redefinition of the RSC's audit functions, the audit areas are now proposed as
- 1. Reactor Operations
- 2. Facilities Manual (procedures)
- 3. Maintenance and Design Changes
- 4. Surveillance. Tests ,
- 5. Experimental and Sample Irradiation Forms Specifice audit procedures are being written at the present time.
These materials will also be forwarded to Region IV.
Lader Reactor Operations, the scope of this audit includes:
Reactor Operations Log All procedures which deal directly with opearations
- Review of all experiments
- Sample irradition forms Item 3:
I l We accept your definition of weekly, monthly, yearly and are currently l
following it. We, of course, concur, that we were not in full compliance l
on several items, even by our definition.
Item 4:
l
!- We have now defined the " normal background" as follows: The activity present in the water as a function of operating time is to be measured next week (the procedura must be cleared by the RSC). Referring to the sketch
. _ _ - . ~ .
.. .. 3, ,
which shows the activity in water as a function of time, tne reactor goes to full power at t). The time t 2 2a - - - - - - - - - - -- - --
b T
i
].
<c a ------- -
t 1 t 2
time represents the planned operating time (say one hour). Upon reaching full power the operator will set and record the scram setting at value 2a. If the activity exceeds 2a before the time t is reached the reactor is 2
shutdown and the cause investigated.
To ensure the . validity of the curve it will be measured again in 6 months.