MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20113G2691996-09-20020 September 1996 Proposed Tech Specs Change 96-09, Clarification of Work Shift Durations for Overtime Limits ML20117J3391996-08-28028 August 1996 Proposed Tech Specs Revising Psv & MSSV Setpoint Tolerance from Plus or Minus 1% to Plus or Minus 3% ML20117D1651996-08-22022 August 1996 Proposed Tech Specs of SQN Units 1 & 2,deleting Table 4.8.1, DG Reliability, & Revising Section 3.8.1 to Allow Once Per 18 month,7 Day AOT for EDGs ML20117D3121996-08-22022 August 1996 Proposed Tech Specs,Lowering Minimum TS ice-basket Weight of 1,155 Lbs to 1,071 Lbs.Reduced Overall Ice Weight from 2,245,320 Lbs to 2,082,024 Lbs ML20117D3141996-08-21021 August 1996 Proposed TS 3.7.1.3 Re Condensate Storage Tank ML20117D3341996-08-21021 August 1996 Proposed Tech Specs Re Deletion of Surveillance Requirement 4.8.1.1.1.b ML20112H0431996-06-0707 June 1996 Proposed Tech Specs,Revising Section 6, Administrative Controls, to Be More Closely Aligned W/Requirements of STSs ML20101N7071996-04-0404 April 1996 Proposed Tech Specs,Allowing Conversion from Westinghouse Fuel to Fuel Provided by Framatome Cogema Fuels ML20096B3761996-01-0404 January 1996 Proposed Tech Specs Extending Radiation Monitoring Instrumentation Surveillance Period Per GL 93-05 ML20096C2481996-01-0303 January 1996 Proposed Tech Specs,Revising Bases Section 3/4.7.1.2 to Indicate Current Operational Functions of turbine-driven AFW Level Control Valves Modified During Unit 1 Cycle 7 Refueling Outage 1999-08-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217F9701999-10-14014 October 1999 Proposed Tech Specs,Incorporating ARC for Axial Primary Water Stress Corrosion Cracking at Dented Tube Support Plate Intersections ML20217E4301999-10-12012 October 1999 Proposed Tech Specs,Revising Requirements for Containment Penetrations During Refueling Operations ML20211M7341999-08-30030 August 1999 Marked-up & Revised TS Pages,Providing Alternative to Requirement of Actually Measuring Response Times ML20211K1721999-08-30030 August 1999 Proposed Tech Specs,Providing Clarification to Current TS Requirements for Containment Isolation Valves ML20209B7731999-06-30030 June 1999 Proposed Tech Specs Updating Requirmements for RCS Leakage Detection & RCS Operational Leakage Specifications to Be Consistent with NUREG-1431 ML20196F2211999-06-24024 June 1999 Proposed Tech Specs Pages for Amend to Licenses DPR-77 & DPR-79,allowing Use of Fully Qualified & Tested Spare Inverter in Place of Any of Eight Required Inverters ML20196G4701999-06-24024 June 1999 Proposed Tech Specs Pages Re Amends to Licenses DPR-77 & DPR-79,revising TS to Be Consistent with Rev to ISTS Presently Submitted to NEI TSTF for Submittal as Rev to NUREG-1431 ML20196G7961999-06-22022 June 1999 Proposed Tech Specs Bases,Clarifying Proper Application of TS Requirements for Power Distribution Systems & Functions That Inverters Provide to Maintain Operability & Providing Updated Info on Cold Leg Injection Accumulators ML20196G8071999-06-22022 June 1999 Revs to Technical Requirements Manual ML20195E9841999-06-0707 June 1999 Proposed Tech Specs,Increasing Max Allowed Specific Activity of Primary Coolant from 0.35 Microcuries/Gram Dose Equivalent I-131 to 1.0 Microcuries/Gram Dose Equivalent I-131 for Plant Cycle 10 (U2C10) Core ML20206E1611999-04-29029 April 1999 Proposed Tech Spec Change 99-04, Auxiliary Suction Pressure Low Surveillance Frequency Rev. Change Deletes Surveillance ML20206E1391999-04-29029 April 1999 Proposed Tech Spec Change 99-03, Main Control Room Emergency Ventilation Sys Versus Radiation Monitors. Changes Add LCOs 3.3.3.1 & 3.7.7 to Address Inoperability of Radiation Monitoring CREVS & NUREG-1431 Recommendations ML20204E8501999-03-21021 March 1999 Plant,Four Yr Simulator Test Rept for Period Ending 990321 ML20204H4081999-03-19019 March 1999 Proposed Tech Specs,Relocating TS 3.8.3.1,3.8.3.2,3.8.3.3 & Associated Bases Associated with Electrical Equipment Protective Devices to Technical Requirements Manual ML20207D6331999-02-26026 February 1999 Proposed Tech Specs Providing for Consistency When Exiting Action Statements Associated with EDG Sets ML20207D6011999-02-26026 February 1999 Proposed Tech Specs Relocating TS 3.7.6, Flood Protection Plan & Associated Bases from TS to Plant TRM ML20206S0131999-01-15015 January 1999 Proposed Tech Specs 3.3.3.3, Seismic Instrumentation & Associated Bases,Relocated to Plant Technical Requirements Manual ML20199K6001999-01-15015 January 1999 Proposed Tech Specs Adding New Action Statement to 3.1.3.2 That Would Eliminate Need to Enter TS 3.0.3 Whenever Two or More Individual RPIs Per Bank May Be Inoperable,While Maintaining Appropriate Overall Level of Protection ML20195H6111998-11-16016 November 1998 Proposed Tech Specs Revising EDG SRs by Adding Note That Allows SR to Be Performed in Modes 1,2,3 or 4 If Associated Components Are Already OOS for Testing or Maint & Removing SR Verifying Certain Lockout Features Prevent EDG Starting ML20154H7251998-10-0808 October 1998 Proposed Tech Specs Pages,Supplementing Proposed TS Change 96-08,rev 1 to Add CRMP to Administrative Controls Section & Bases of TS ML20238F1091998-08-27027 August 1998 Proposed Tech Specs Providing for Insertion of Limited Number of Lead Test Assemblies,Beginning W/Unit 2 Operating Cycle 10 Core ML20238F3001998-08-27027 August 1998 Proposed Tech Specs Replacing 72 H AOT of TS 3.8.1.1,Action b,w/7 Day AOT Requirement for Inoperability of One EDG or One Train of EDGs ML20209J1631998-08-0707 August 1998 Rev 41 to Sequoyah Nuclear Plant Odcm ML20236G5961998-06-29029 June 1998 Proposed Tech Specs Typed Pages for TS Change 95-19, Section 6 - Administrative Controls Deletions ML20249C6371998-06-26026 June 1998 Proposed Tech Specs Lowering Specific Activity of Primary Coolant from 1.0 Uci/G Dose Equivalent I-131 to 0.35 Uci/G Dose Equivalent I-131,as Provided in GL 95-05 ML20248F0051998-05-28028 May 1998 Proposed Tech Specs for Section 6, Administrative Controls Deletions ML20217N3511998-04-30030 April 1998 Proposed Tech Specs Pages,Modifying Surveillance Requirement 4.4.3.2.1.b to Change Mode Requirement to Allow PORV Stroke Testing in Modes 3,4 & 5 W/Steam Bubble in Pressurizer Rather than Only in Mode 4 ML20203J1681998-02-25025 February 1998 Proposed Tech Specs Pages,Revising EDG Surveillance Requirements to Delete Requirement for 18-month Insp IAW Procedures Prepared in Conjunction W/Vendor Recommendations & Modify SRs Associated W/Verifying Capability of DGs ML20202J7651998-02-13013 February 1998 Technical Requirements Manual ML20202J7141998-02-13013 February 1998 Proposed Tech Specs Adding New LCO That Addresses Requirements for Main Feedwater Isolation,Regulating & Bypass Valves ML20202J6961998-02-13013 February 1998 Proposed Tech Specs Incorporating MSIV Requirements to Be Consistent W/Std TS (NUREG-1431) ML20202J7601998-02-13013 February 1998 Proposed Tech Specs Section 3.7.9 Re Relocation of Snubber Requirements ML20198T4311998-01-21021 January 1998 Proposed Tech Specs Re New Position Title & Update of Description of Nuclear Organization ML20199F8231997-11-30030 November 1997 Cycle 9 Restart Physics Test Summary, for 971011-971130 ML20199K4571997-11-21021 November 1997 Proposed Tech Specs Adding one-time Allowance Through Operating Cycle 9 to Surveillance Requirement 4.4.3.2.1.b to Perform Stroke Testing of PORVs in Mode 5 Rather than Mode 4,as Currently Required ML20211A3191997-09-17017 September 1997 Proposed Tech Specs Re Pressure Differential Surveillance Requirements for Containment Spray Pumps ML20203B9731997-08-0505 August 1997 Rev 1 to RD-466, Test & Calculated Results Pressure Locking ML20217J5581997-07-31031 July 1997 Cycle Restart Physics Test Summary, for Jul 1997 ML20210J1671997-04-30030 April 1997 Snp Unit 1 Cycle 8 Refueling Outage Mar-Apr 1997,Results of SG Tube ISI as Required by TS Section 4.4.5.5.b & Results of Alternate Plugging Criteria Implementation as Required by Commitment from TS License Condition 2C(9)(d) ML20137T0871997-04-0909 April 1997 Proposed Tech Specs Re Elimination of Cycle 8 Limitation for SG Alternate Plugging Criteria ML20137M8581997-04-0101 April 1997 Proposed Tech Specs 2.1 Re Safety Limits & TS 3/4.2 Re Power Distribution Limits ML20137C8421997-03-19019 March 1997 Proposed Tech Specs Re Conversion from Westinghouse Electric Corp Fuel to Framatome Cogema Fuel ML20136J0381997-03-13013 March 1997 Proposed Tech Specs Section 5.6.1.2,revising Enrichment of Fuel for New Fuel Pit Storage Racks ML20134P8631997-02-14014 February 1997 Proposed Tech Specs Requesting Discretionary Enforcement for 48 Hours Which Is in Addition to 72 Hours Allowed Outage Time Provided by TS Action 3.8.1.1.b ML20134K9981997-02-0707 February 1997 Proposed Tech Specs Revising TS Change Request 96-01, Conversion from W Electric Corp Fuel to Framatome Cogema Fuel (MARK-BW-17), to Ensure That Core Analysis Computer Code Output Actions Are Consistent W/Hot Channel Factor SRs ML20138F2581997-01-17017 January 1997 Rev 39 to Sequoyah Nuclear Plant Odcm ML20134L9261996-11-0808 November 1996 Proposed Tech Specs Re Placing of Channel in Trip for Reactor Trip & Engineered Safety Feature Instrumentation Sys Solely to Perform Testing as Not Requiring Channel to Be Declared Inoperable ML20129D2661996-10-18018 October 1996 Proposed Tech Specs,Removing Existing Footnotes That Limit Application of Apc for Plant S/G Tubes to Cycle 8 Operation for Both Units ML20129G7301996-09-26026 September 1996 Proposed Tech Specs 3/4.3.3 Re Fire Detection instrumentation,3/4.7.11 Re Fire Suppression Systems & 3/4.7.12 Re Fire Protection Penetrations ML20134J9991996-09-23023 September 1996 Fuel Assembly Insp Program 1999-08-30
[Table view] |
Text
.
ENCLOSURE 1 PROPOSED TECHNICAL SPECIFICATION SEQUOYAH NUCLEAR PLANT UNIT 2 TVA-SQN-TS-45 TEMPORARY CHANGE IN THE SURVEILLANCE REQUIREMENTS FOR ROD DROP TIME (TS 4.1.3.4.C)
AND FOR FULL LENGTH CONTROL ROD POSITION LIMIT SWITCHES ON TABLE 4.3-6 (TS 4 3 3 5) a r306230453 830621 PDR ADOCK 05000328 p PDR
_ 3. . . . . ~ ~ . . ._ y.._- . .. .. .
. ._. . . . . . . . _ . - - ' ' ~~ '
1
. . .l j
REACTIVITY CONTROL SYSTEMS l ROD OROP TIME LIMITING CONDITION FOR OPERATION j 3.1.3.2 The individual full length (snutdown and control) rod drop time from the fully withdrawn position shall be less than or equal to 2.2 seconds from beginning of cecay of stationary gripper coil voltage to dashpor entry with:
- a. T,yg greater than or equal to'541 F, and
- b. All reactor coolant pumps operating.
APPL!CABILITY: MODES 1 and 2.
ACTION:
- a. With the drop time of any full length rod determined to exceed the above limit, restore the rod drop time to within the above limit prior to proceeding to "00E 1 or 2. A
- b. Witn the rod drop times within limits but determined with 3 reactor coolant pumps operating, operation may proceed provided THERMAL POWER is restricted to less than or equal to 71% of RATED THERMAL POWER.
SURVEILLANCE REQUIREMENTS 4.1.3.4 The rod drop time of full length rods shall be demonstrated through measurement prior M reactor criticality:
- a. For all . rods following each removal of the reactor vessel head,
- b. For specifically affected ~ individual rods following any maintenance on or modification to the contcol rod drive system which could affect the drop time of those specific rod.s, and .
- c. At least once per 18 months. *
- For cycle 1, this surveillance is to be completed before the next cooldown or by August 5, 1983 whichever is earlier.
SEQUOYAH - UNIT 2 3/4 1-19
^
m--- u ,.. .,.,e.- . .. _ . . _. . _ . .
y .-
Y '
N TABLE 4.3-6 ,
,I M N. 'E REMOTE SHUT 00WN HONITORING INSTRUMENTATION I O SURVEILLANCE REQUIREMENTS
! E i; . '
L c CliANNEL CHANNEL CilECK CALIBRATION h INSTRUMENT f 1. Source Range Nuclear Flux H R I.
h 2. Reactor Trip Breaker Indication H N.A.
- 3. Reactor Coolant lemperature - Hot Leg H R j 4. Pressurizer, Pressure H ,
R l 5. Pressurizer Level M R
". 6. Steam Generator Pressure H R
- 7. Steam Generator Level -
M R 0'
l
- 8. Full Length Control Rod Position Limit Switches M . R*
- 9. RHR F10w Rate M' R
- 10. RHR Temperature H R
- 11. Auxiliary Feedwater Flow Rati H R .
t
- 12. Pressurizer Relief Tank Pressure H R ,
- 13. Containment Pressure H R
- For cycle 1, this surveillance is to be completed before the next cooldown or by Abgust 5, 1983 whichever is earlier.
I .l
A .-y . air -. # _ 4.ea.. __ A h- 1._ _.Ja 4_ __.,ws_<,.4 4_J a A . 4+r av42 2m._4.____4,.a A .,A# e 4amm,. _4, 4 .--a g
.e e 4 1
i i 1
1
~ ENCLOSURE 2 a
O JUSTIFICATION FOR PROPOSED TECHNICAL SPECIFICATION CHANdE ;
1 4
l f.
i SEQUOYAH NUCLEAR PLANT UNIT 2 i
f .
1 1~
t TVA-SQN-TS-45 i t l
4 d
4 e
t 8
1
[ .
I e
i r
t t' -
- s . .. ~.m , _ _ . _ .. .. c ,, ., .
! _1 ' _ ., , -_--_ _ . -_._. . . . - . . . . . . . . . _.,..... . . _ _ , - . ~ . . _ . . . . _ , _ _ _ _ _ - - _ . ~ , . . - . _ . - . . . . . _ _ - _ - . _ , - , _ -
JUSTIFICATION FOR PROPOSED TECHNICAL SPECIFICATION Increase in Rod Drop Test and Remote Shutdown Control Rod Limit Switch Calibration Surveillance Intervals Sequoyah unit 2 surveillance requirement 4.1.3.4.c requires that the rod drop time be measured every 18 months. The last test was performed on September 2,1981. The test results expire on July 21, 1983 if one year is assumed to have 366 days, one-half year is assumed to be 184 days, and the 25-percent allowance permitted by specification 4.0.2 is used. (NOTE: the expiration date would be July 31, 1983 if eighteen 31 days months and the 25-percent allowance are assumed.)
Unit 2 surveillance requirement 4.3 3 5, item 8 requires calibration of the control rod bottom lights in the remote shutddown control room every eighteen months. The last test performed was on August 28, 1981. The test results will expire on July 16, 1983 (NOTE: the expiration date would be July 26, 1983 if the second method is used for the calculation.)
The present shutdown date for the first Sequoyah unit 2 refueling outage is August 5, 1983 This date is based on the fuel currently available in this core, the state of outage preparation, and the assumed capacity factor for the remainder of the cycle. The expiration dates for both the rod drop test and the rod bottom light calibration will occur before the end of cycle.
The unrecoverable cost to TVA if Sequoyah unit 2 were required to shut down on July 16, 1983 rather than - August 5,1983 amounts to over $1.5 million.
This cost results from the unused fuel that would remain in the fuel bundles to be replaced during the refueling. The plant would not be restarted after a July 16, 1983 shutdown to complete the fuel burn because of the additional costs that occur with water processing, plant heatup, and
.startup surveillance testing.
The increase in the surveillance interval amounts to a maximum of 20 days.
The last day for extension of the surveillance interval is August 5, 1983 The maximum surveillance interval permitted by specification 4.0.2 amounts to 687 days. The" increase is less than 3 percent of the total allowed interval. We believe that this small increase in the surveillance interval I would not increase the rod drop time. Furthermore, the control rods are i
verified operable every 31 days in accordance with surveillance requirement 4.1.3 1.2. Also, rod drop times have not been a problem at Westinghouse plants. The testing and experience to date lead us to believe with a high I degree of confidence that the rods would drop into the core in the required I time. We believe that the increase in the surveillance interval would not
- increase the possibility that the rod bottom limit switches will not operate properly. The remaining portion of the circuit will be tested before the extended period is entered to verify the operability of the rod bottom lights in the remote shutdown control room. Also, the rod position indicators, which provide input to the bottom light bistables, have not exhibited calibration problems in the hot condition.- These conditions lead us to believe with a high degree of confidence that the rod bottom lights would work in the remote shutdown control room in the unlikely event they I were needed.
. [ __ , , _
^~'
_5__
a .. ,
Tha reque:ted changa hac been cveluntsd pursuant to 10 CFR 50.92 rnd no significant hazards considerations are involved becruca the changs does not:
- 1) Involve an increase in the probability or consequences of an accident previously evaluated.
Based on the testing that we are continuing to perform and the experience to data, we believe that the rods will drop within the required time li: nits and that the rod bottom lights will work if needed. Also, because the increase in the surveillance interval is less than 3 percent of the total time interval, we do not believe there will be an increase in the rod drop time, or that the increase in surveillance interval will increase the possibility of the rod bottom switches to not operate properly.
- 2) Create the possibility of a new or different kind of accident from any accident previously evaluated.
Based on the fact that the control rods are tested every 31 days in accordance with the surveillance requirements and that rod drop times have not been a problem at other plants with Westinghouse equipment, we believe that the equipment will respond as designed.
- 3) Involve a reduction in the margin of safety.
The increase in the surveillance interval does not reduce the margin of safety and the testing and experience to date lead us to believe that the equipment will opet-ate as designed.