ML20063L604: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20063L604
| number = ML20063L604
| issue date = 02/21/1994
| issue date = 02/21/1994
| title = Forwards ISI Ninety-Day Rept Beaver Valley Power Station Unit 2 Outage 4 1993.
| title = Forwards ISI Ninety-Day Rept Beaver Valley Power Station Unit 2 Outage 4 1993
| author name = Sieber J
| author name = Sieber J
| author affiliation = DUQUESNE LIGHT CO.
| author affiliation = DUQUESNE LIGHT CO.

Latest revision as of 17:06, 6 January 2021

Forwards ISI Ninety-Day Rept Beaver Valley Power Station Unit 2 Outage 4 1993
ML20063L604
Person / Time
Site: Beaver Valley
Issue date: 02/21/1994
From: Sieber J
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20063L606 List:
References
NUDOCS 9403070140
Download: ML20063L604 (1)


Text

. - - _ - - _ _ - _ _ . - _ ___

, QQM seaver a ey Power stauon g

Shippingport. PA 15077-0004 JOHN D. SIEBER (412) 393-5255 Senior Vice President and Fan (412) 643-8069 Chief Nuclear Officer Nuclear Power Division February 21, 1994 U. S. Nuclear Regulatory Commission ]

Attn: Document Control Desk i Washington, DC 20555

Subject:

Beaver Valley Power Station, Unit No. 2 Docket No. 50-412, License No. NPF-73 Fourth Refueling Outage Insarvice Inspection Report This letter forwards the Inservice Inspection Ninety-Day report on ASME Class 1, 2, and 3 components examined during the fourth a refueling outage at Beaver Valley Unit No. 2. The ASME Boiler and Pressure Vessel Code,Section XI, Article IWA-6230 requires that an inservice inspection report be submitted to the enforcement and regulatory authority having jurisdiction at the plant site within ninety days after completion of an inservice inspection. The recent i

inservice inspection term at Beaver Valley Unit No. 2 ended on November 24, 1993.

These examinations are part of Interval 1, Period 2 of the Unit No. 2 ISI schedule. The inservice inspections were performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code, 1983-Edition through Summer 1983 Addenda.

If you have any questions, please contact Steve Sovick at (412) 393-5211.

Sincerely,

(

I.

g . D. Sieber Attachment cc: Mr. L. W. Rossbach, Sr. Resident Inspector Mr. T. T. Martin, NRC hegion I Administrator Mr. G. E. Edison, Project Manager i 4 o y

_..e,.m Y { e

l. ELECTRIC unuTyor /

THEYEAR 9403C70140 940221 fl PDR ADOCK 05000412 PDR l

0