ML20155J241: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:' | ||
CONfAINMENTSYSTEMS 3/4.6.2 DEPRESSURIZATION SYSTEMS SUPPRESSION CHAMBE LIMITING CONDITION FOR OPERATION 3.6.2.1 The suppression chamber shall be OPERABLE with: | |||
: a. The pool water: 3 | |||
: 1. Volume between 131,900 ft3 and 128 ft , equivalent to a level between 26 ft. 10 in, and 2 t. 21s in., and a l | |||
: 2. Maximum average temperature of 10 'F Jring OPERATIONAL e CONDITION 1 or 2, except that the mum average temperature , | |||
maybepermgtedtoincreaseto: | |||
a) 105'F, during testing which adds heat to the suppression l l chamber. | |||
b) 110*F with THERMAL POWER less than or equal to 1% of I | |||
; RATED THERMAL POWER. | |||
! c) 120'F with the main steam line isolation valves closed l i following a scram. | |||
: b. Drywell-to-suppression chamber bypass leakage less than or equal to 10% of the acceptable A/8 design value of 0.03 ft2. | |||
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3. | |||
l ACTION: : | |||
4 | |||
: a. With the suppression chamber water level outside the above limits, ! | |||
; restore the water level to within the limits within 1 tour or be in ; | |||
at least HOT SHUTOOWN within the next 12 hours and in COLD SHUTDOWN i within the following 24 hours. | |||
: b. in OPERATIONAL CONDITION 1 or 2 with the suppression chamber average water temperature greater than or equal to 100'F, restore the average temperature to less than or equal to 100*F within 24 hours or be in at least HOT SHUTOOWN within the'next 12 hours and in COLD SHUTDOWN within the following 24 hours, except, as permitted above: , | |||
: 1. With the suppression chamber average water temperature greater than 105'F during testing which adds heat to the suppression ! | |||
! chy ber, stop all testing which adds heat to the suppression . | |||
1 charaber and restore the average temperature to less than or ' | |||
; equal to 100*F within 24 hours or be in at least HOT SHUTOOWN | |||
: within the next 12 hours and in COLD SHUTOOWN within the fo11 ewing l 4 24 hours. i | |||
! 2. With the suppression chamber average water temperat'are greater l than 110'F, place the reactor mode switch in ths Shutdown i position and operate at least one residual heat removal loep in the suppression pool cooling mode. | |||
t 3. 'With the suppression chamber average water terrperature greater I than 120*F, depressurize the reactor pressure vossel to less ! | |||
! than 200 psig within 12 hours. l i | |||
#See Specification 3.S.3 for ECCS requirements. ' | |||
##See Special Test Exception 3.10.8. , l I | |||
$ WMi Oc fober l,1988 +ke loo'F hml+ 't f lacedMed 40 I t 0 *F. Ac+ios b does no+ ap()h; ed ss replacecf bi;f Achon p, | |||
, LA SALLE - UNIT 1 3/4 6-16 Amendment No.13 J 8810250426 000005 PDR ADOCK 05000373 P PNV l | |||
4 CONTAINMENT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued) | |||
~ | |||
ACTION: (Continued) | |||
: c. With one suppression chamber water level instrumentation channel inoperable and/or with one suppression pool water temperature instrumentation division inoperable, restore the inoperable e i instrumentation to OPERABLE status within 7 days or verify suppres-sion chamber water level and/or temperature to be within the limits at least once per 12 hours by local indication. | |||
: d. With both suppression chamber water levol instrumentation channels | |||
. inoperable and/or with both suppression pool water temperature , | |||
instrumentation divisions inoperable, restore at least one i inoperable water level channel and one water temperature division to OPERABLE status within 8 hours or be in at least HOT SHUTOOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. | |||
: e. With the drywell-to-suppression chamber bypass leakage in excess of the limit, restore the bypass leakage to within the limit prior to - | |||
ggg nereasing reactor coolant temperature a Nve 200*F. | |||
SURVEILLANCE REQUIREMENTS 4.6.2.1 The suppression chamber shall be demonstrated OPERABLE: | |||
l a. By verifying the suppression chamber water volume to be within the limits at least once per 24 hours. | |||
: b. At least onc pf 4 hours in OPERATIONAL CONDITION 1 or 2 by verifying i the suppre o equalto10'Fphaberaveragewatertemperaturetobelesschanor | |||
,e ept: | |||
: 1. At lea ce per 5 minutes.during testing which adds heat to the suppression chamber, by verifying the suppression chamber average water temperature less than or equal to 105*F. | |||
2.4 At least once per 60 minutes when suppression chamber average I | |||
l water temperature is greater than 100'F, by verifying suppression l l | |||
chamber average water temperature less than or equal to 110*F , | |||
and THERMAL POWER less than or equal to 1% of RATED THERMAL POWER. | |||
, 3. At least once per 30 minutes following a scram with suppression chamber average water temperature greater than or equal to 100*F, by verifying suppression chamber average water temperature less than or equal to 120'F. | |||
4 (Anhl OeJober b 1968 Yb8f SWU'cII Ame repremed is no4 opphc able. | |||
l i | |||
M//O F ui1h/ Ockber I,1988 LA SALLE - UNIT 1 3/4 6-17 Amendment No.18 4 | |||
W . G- e e | |||
a~ , I l' ! | |||
1 , | |||
o P | |||
j INSERT to Unit 1, Page 3/4 6-17 i i | |||
: f. In OPERATIONAL CONDITION 1 or 2: | |||
: 1. With the suppression chamber average water temperature greater than 105'r during testing which adds heat to the suppression , | |||
chamber, stop all testing which adds heat to the suppression - | |||
chamber. ; | |||
, i j 2. With the suppression chamber average water temperature greater l 1 than 110'r, place the reactor mode switch in the Shutdown r | |||
; position and operate at least one residual heat removal loop in ' | |||
the soppression pool cooling mode. i 1 f | |||
: 3. With the suppression chamber average. water temperature greater i l than 120*F, depressurise the reactor pressure vessel to less than , | |||
1 200 psig within 12 hours, l 1 r i | |||
4 3 | |||
i ! | |||
i l I i s | |||
N ' | |||
, l 4 t 4 | |||
h i | |||
i 1 l l | |||
j | |||
} | |||
1 | |||
; '1 i | |||
e CONTAINMENT SYSTEMS SURVEILLANCEREQUIREkENTS(Cor.tinued) . | |||
1 c. By verifying at least two suppression chamber water level instre-mentation channels and at least 14 suppression pool water temperature instrumentation channels, 7 in each of two-divisions, OPERABLE by performance of a: | |||
: 1. CHANNEL CHECK at least once per 24 hours, | |||
: 2. CHANNEL FUNCTIONAL TEST at least once per 31 days, and | |||
: 3. CHANNEL CALIBRATION at least once per 18 months, with the water level and temperature alarm setpoint for: | |||
: 1. High water level i 26'ft. 8 in, l I | |||
: 2. Low water level > 26 . . ; | |||
: 3. High temperature 1 0'F M I | |||
( t | |||
: d. By conducting drywell' to-suppression chamber bypass leak tests and , | |||
verifying that the A/4 calculated from the measured leakage is a | |||
within the specified limit when drywell-to-suppression chamber bypass leak tests are conducted: | |||
: 1. At least once per 18 months at en initial differential pressure : | |||
of 1.5 psi, and J. At the first refueling outay and then on the schedule required for Type A Overall Integrated Containment Leakage Rate tests by Speci- ; | |||
fication 4.6.1.2.a; at an initial differential pressure of 5 psi, i except that, if the first two 5 psi leak tests performed up to that ; | |||
j time result in: ; | |||
: 1. A calculated A/ 4 within the specified limit, and i | |||
) 2. The A/4 calculated from the leak tests at 1.5 psi is*1 20% of i | |||
. the specified limit, l i | |||
j then the leak tests at 5 psi may be discontinued. | |||
l i M- los CF u d I Ocfober b I988 ; | |||
l 1 | |||
! ) | |||
1 LA SALLE - UNIT 1 3/4 6 18 Amendment No. 18 1 i | |||
1 | |||
. CONTAXNMENT SYSTEMS 3[4. 4. 2 OEPRESSURf2ATXON SYSTEMS SUPPI SION CHAMBER # | |||
LIMI'iif1G CONDITION FOR OPERATION < | |||
'3.6.2.1 The suppression chamcer shall be OPERABLE with: | |||
: a. The pool water: | |||
: 1. Volume between 131,900 ft3 and 128 - 3, equivalent to a e | |||
level between 25 f t 10 in and 26 f t 21s i ., and a . | |||
: 2. Maximum average temperature of 00F$ur'ngOPERATIONAL I CONDITION 1 or 2, except that t .. um average temperature | |||
, may be permitted to increase to: | |||
a) 105 F, during testing whicu adds heat to the suppression enameer, b) 110 F with THERMAL POWER less than or equal to 1*. of RATED THERMAL POWER. | |||
c) 120*F with the main steam line isolation valves closed following a scram. | |||
: b. Dry ell-to-sucpression chamcer bypass leakage less than or equal to 10*. of the acceptsele A/Jk design value of 0.03 ft2 . | |||
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3. | |||
ACTION: | |||
: a. With the suppression chamber water level outside the above limits, restore the water level to within the limits within 1 hour or be in t least HOT SHUT 00'aN within the. next 12 hours and in COLD SHUT 00'aN w' thin the following 24 hours. | |||
: b. n OPERATIONAL 'ON0! TION 1 or 2 with the suppression chamber average water temoerature greater than or equal to 109*F, restore the average temoersture to less than or equal to 100*F within 24 hours ur be in at least HOT SHUT 00'aN within the next 12 hours and in COLD SHUT 00'aN within the following 24 hours, except, as permitted above: | |||
: 1. With the suceression chamber average water temperature greater than 105*F during testing which adds heat to the suppression cham-ber, st0c all tasting wnich adds heat to the suppression chamber and castore the average temperature to less than or equal to 100*F within 24 hours or be in at least HOT SHUT 00WH within the next 12 hours and in COLD SHUT 00WN within the following 24 heurs. | |||
: 2. With tne su:oression cha :ber average water temperature greater than 110*F, clace the reactor mode switch in the Shutdown position and o::erste at least one residual heat removal loop in the sucerassion pool cooling moda. | |||
: 3. With the su:cression enameer sverage water temperature c' eater than 10", ca:ressuri:e the reactor pressure ve sel N less than 200 :s'; within 10 hours. | |||
edee ;ce:1rica:1cn 3.5.3 ':r ECOS recuirements. | |||
'A $ALLI - UNIT 2 | |||
. 3/a 6-19 g phi Ochber b M88 04. looep hWd is increafed b IIO T. | |||
f i c. b o n b Cl o e S no+ Afh0& M10iS W ""N N N # ' ; | |||
'. [ | |||
t CONTAINMENT SYSTEMS d | |||
LIMITING CONDITION FOR OPERATION (Continued) | |||
'l ACTION: (Continued) | |||
: c. With one suppression chamber water level instrumentation channel inoperable and/or with one suppression pool water temperature instrumentation division inoperable, restore the inoperable instrumentation to OPERABLE status within 7 days or verify suppres- . | |||
sion chamber water level and/or temperature to be within the limits !' | |||
, at least once per 12 hnurs by local indication. | |||
i | |||
: d. With both suppression chamber water level instrumentation channels ! | |||
4 inoperable and/or with both suppression pool water temperature l | |||
: instrumentation divisions inoperable, restore at least one ; | |||
; inoperable water level channel and one water temperature division j | |||
' to OPERABLE status within 8 hours or be in at least HOT SHUTOOWN , | |||
l within the next 12 hours a 9 in COLD SHUTDOWN within the following j 24 hours. ' | |||
i e. With .he drywell-to-suppression chamber bypass leakage in excess of j the limit, restore the bypass loakage to within the limit prior to gg creasing reactor coolant temperature above 200*F. | |||
, SURVEILLANCE REQUIREMENTS l | |||
l 4.6.2.1 The suppression chamber shall be demonstrated OPERABLE: | |||
: a. By verifying the suppression chamber water volume to be within the limits at least once per 24 hours. . | |||
i | |||
: b. At least onc ,e p 4 hours in OPERATIONAL CONDITION 1 or 2 by verifying j the suppre sto ha ber average water temperature to be less th.in or equal to 1 0* , x .pt: | |||
l 1 | |||
: 1. At least once per 5 minutes during testing which adds heat to 3 | |||
the suppression chamber, by verifying the suppression chamber , | |||
i average water temperature less than or equal to 105'F. | |||
[ | |||
: 2. At least once per 60 minutes when suppression chamber average water temperature is greater than 100'F, by verifying suppression ! | |||
chamber average water temperature less than or equal to 110'F l | |||
' and THERMAL POWER less than or equal to 1% of RATED THERMAL i POWER. | |||
l I 3. At least once per 30 minutes following a scram with suppression ! | |||
I chamber average water temperature greater than or equal to | |||
{ 100*F, by verifying suppression chamber average water temperature | |||
! less than or equal to 120'F. | |||
l y hp ochber I, 1968 446s surviellaace i reepwwea4 a no 4 appi,ca.6le . | |||
1 LA SALLE %K - UNIT 40 2 *f usM ochber6 374 20I 1988 4 | |||
l | |||
n - -- - _. | |||
. l INSERT to Unit 2, Page 3/4 6-20 I | |||
: f. In OPERATIONAL CONDITION 1 or 2: ; | |||
: 1. With the suppression cha *er s average water temperature grekter ! | |||
than 105'T during testing which addn heat to the suppression chamber, stop all t esting which adds heat to the suppression ( | |||
chamber. . | |||
I i | |||
1 | |||
: 2. With the suppression chamber average water ;emperature greater ( | |||
l than 110*F, place the reactor mode switch in the Shutdown , | |||
position and operate at least one residual heat removat loop in l the suppression pool ecoling mode. , | |||
: 3. With the suppression chamber average water temperature greater i than 120'F, depressurise the reactor pressure vessel to less than ; | |||
l 200 psig within 12 hours. | |||
l | |||
! f I | |||
l l r a | |||
l l t 1 | |||
l i | |||
f t | |||
I t | |||
l l | |||
i | |||
1 l CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) - | |||
: c. By verifying at least 2 suppression chamber water level instru-mentation channels and at least 14 suppression pool water temperaturi instrumentation channels, 7 in each of two divistors, OPERA 8LE by - | |||
performance of a: | |||
, 1. CHANNEL CHECK at least once per 24 hours, ! | |||
: 2. CHANNEL FUNCTIONAL TEST at least once per 31 days, and | |||
: 3. CHANNEL CALIBRATION at least once per 18 months, , | |||
with the water level and temperattre alarm setpoint for: | |||
: 1. High water level 5 26 ft 8 in, s | |||
: 2. Lo'w water level > 26 f | |||
: 3. High temperature 5 10 'F | |||
: d. By conducting drywell-to-suppression chamber bypass leak tests and verifying that the A/JE calculated from the measured leakage is ! | |||
within the specified limit when drywell-to-suppression chamber bypass leak tests are conducted: l; t | |||
: 1. At least once per 18 months at an initial differential pressure ' | |||
of 1.5 psi, and | |||
: 2. At the first refueling outage and then on the schedule required for Type A Overall Integrated Containment Leakage Rate tests by Spect- ( | |||
fication 4.6.1.2.a., at an initial differential pressure of 5 psi, except that, if the first two 5 psi leak tests performed up to that I time result in: l 1 | |||
: 1. A calculated A/VI within the specified limit, and ; | |||
: 2. The A/JI calculated from the leak tests at 1.5 psi is < 20% of | |||
~ | |||
the specified limit. | |||
j then the leak tests at 5 psi may be discontinued. | |||
i f Of Q \ Cn E l | |||
l ! | |||
1 1.A SALLE - UNIT 2 3/4 6-21 i , | |||
i . | |||
1 1 | |||
1 I | |||
ATTACB8EurT.C ; | |||
1 1 . | |||
TECHtfICAL SPIC.IflCATIGi CHANGE REQUEST LASALLE COUNTY STATICif UNITS.1 an 2 | |||
] ' | |||
a J . | |||
.,! SUPPLEMENTAL SUPPORTING INFORMATIGi 5 | |||
i i | |||
[ | |||
I 1 | |||
j ! | |||
l I j t i i I | |||
t i | |||
I J | |||
d i | |||
I . | |||
l k | |||
4992K i | |||
I i | |||
l 1 | |||
.}} |
Latest revision as of 04:52, 17 December 2020
ML20155J241 | |
Person / Time | |
---|---|
Site: | LaSalle ![]() |
Issue date: | 08/05/1988 |
From: | COMMONWEALTH EDISON CO. |
To: | |
Shared Package | |
ML19297H135 | List: |
References | |
NUDOCS 8810250426 | |
Download: ML20155J241 (9) | |
Text
'
CONfAINMENTSYSTEMS 3/4.6.2 DEPRESSURIZATION SYSTEMS SUPPRESSION CHAMBE LIMITING CONDITION FOR OPERATION 3.6.2.1 The suppression chamber shall be OPERABLE with:
- a. The pool water: 3
- 1. Volume between 131,900 ft3 and 128 ft , equivalent to a level between 26 ft. 10 in, and 2 t. 21s in., and a l
- 2. Maximum average temperature of 10 'F Jring OPERATIONAL e CONDITION 1 or 2, except that the mum average temperature ,
maybepermgtedtoincreaseto:
a) 105'F, during testing which adds heat to the suppression l l chamber.
b) 110*F with THERMAL POWER less than or equal to 1% of I
- RATED THERMAL POWER.
! c) 120'F with the main steam line isolation valves closed l i following a scram.
- b. Drywell-to-suppression chamber bypass leakage less than or equal to 10% of the acceptable A/8 design value of 0.03 ft2.
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
l ACTION: :
4
- a. With the suppression chamber water level outside the above limits, !
- restore the water level to within the limits within 1 tour or be in ;
at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN i within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- b. in OPERATIONAL CONDITION 1 or 2 with the suppression chamber average water temperature greater than or equal to 100'F, restore the average temperature to less than or equal to 100*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTOOWN within the'next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, except, as permitted above: ,
- 1. With the suppression chamber average water temperature greater than 105'F during testing which adds heat to the suppression !
! chy ber, stop all testing which adds heat to the suppression .
1 charaber and restore the average temperature to less than or '
- equal to 100*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTOOWN
- within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTOOWN within the fo11 ewing l 4 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. i
! 2. With the suppression chamber average water temperat'are greater l than 110'F, place the reactor mode switch in ths Shutdown i position and operate at least one residual heat removal loep in the suppression pool cooling mode.
t 3. 'With the suppression chamber average water terrperature greater I than 120*F, depressurize the reactor pressure vossel to less !
! than 200 psig within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. l i
- See Specification 3.S.3 for ECCS requirements. '
- See Special Test Exception 3.10.8. , l I
$ WMi Oc fober l,1988 +ke loo'F hml+ 't f lacedMed 40 I t 0 *F. Ac+ios b does no+ ap()h; ed ss replacecf bi;f Achon p,
, LA SALLE - UNIT 1 3/4 6-16 Amendment No.13 J 8810250426 000005 PDR ADOCK 05000373 P PNV l
4 CONTAINMENT SYSTEMS LIMITING CONDITION FOR OPERATION (Continued)
~
ACTION: (Continued)
- c. With one suppression chamber water level instrumentation channel inoperable and/or with one suppression pool water temperature instrumentation division inoperable, restore the inoperable e i instrumentation to OPERABLE status within 7 days or verify suppres-sion chamber water level and/or temperature to be within the limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by local indication.
- d. With both suppression chamber water levol instrumentation channels
. inoperable and/or with both suppression pool water temperature ,
instrumentation divisions inoperable, restore at least one i inoperable water level channel and one water temperature division to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTOOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- e. With the drywell-to-suppression chamber bypass leakage in excess of the limit, restore the bypass leakage to within the limit prior to -
ggg nereasing reactor coolant temperature a Nve 200*F.
SURVEILLANCE REQUIREMENTS 4.6.2.1 The suppression chamber shall be demonstrated OPERABLE:
l a. By verifying the suppression chamber water volume to be within the limits at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- b. At least onc pf 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in OPERATIONAL CONDITION 1 or 2 by verifying i the suppre o equalto10'Fphaberaveragewatertemperaturetobelesschanor
,e ept:
- 1. At lea ce per 5 minutes.during testing which adds heat to the suppression chamber, by verifying the suppression chamber average water temperature less than or equal to 105*F.
2.4 At least once per 60 minutes when suppression chamber average I
l water temperature is greater than 100'F, by verifying suppression l l
chamber average water temperature less than or equal to 110*F ,
and THERMAL POWER less than or equal to 1% of RATED THERMAL POWER.
, 3. At least once per 30 minutes following a scram with suppression chamber average water temperature greater than or equal to 100*F, by verifying suppression chamber average water temperature less than or equal to 120'F.
4 (Anhl OeJober b 1968 Yb8f SWU'cII Ame repremed is no4 opphc able.
l i
M//O F ui1h/ Ockber I,1988 LA SALLE - UNIT 1 3/4 6-17 Amendment No.18 4
W . G- e e
a~ , I l' !
1 ,
o P
j INSERT to Unit 1, Page 3/4 6-17 i i
- f. In OPERATIONAL CONDITION 1 or 2:
- 1. With the suppression chamber average water temperature greater than 105'r during testing which adds heat to the suppression ,
chamber, stop all testing which adds heat to the suppression -
chamber. ;
, i j 2. With the suppression chamber average water temperature greater l 1 than 110'r, place the reactor mode switch in the Shutdown r
- position and operate at least one residual heat removal loop in '
the soppression pool cooling mode. i 1 f
- 3. With the suppression chamber average. water temperature greater i l than 120*F, depressurise the reactor pressure vessel to less than ,
1 200 psig within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />, l 1 r i
4 3
i !
i l I i s
N '
, l 4 t 4
h i
i 1 l l
j
}
1
- '1 i
e CONTAINMENT SYSTEMS SURVEILLANCEREQUIREkENTS(Cor.tinued) .
1 c. By verifying at least two suppression chamber water level instre-mentation channels and at least 14 suppression pool water temperature instrumentation channels, 7 in each of two-divisions, OPERABLE by performance of a:
- 1. CHANNEL CHECK at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
- 2. CHANNEL FUNCTIONAL TEST at least once per 31 days, and
- 3. CHANNEL CALIBRATION at least once per 18 months, with the water level and temperature alarm setpoint for:
- 1. High water level i 26'ft. 8 in, l I
- 2. Low water level > 26 . . ;
- 3. High temperature 1 0'F M I
( t
- d. By conducting drywell' to-suppression chamber bypass leak tests and ,
verifying that the A/4 calculated from the measured leakage is a
within the specified limit when drywell-to-suppression chamber bypass leak tests are conducted:
- 1. At least once per 18 months at en initial differential pressure :
of 1.5 psi, and J. At the first refueling outay and then on the schedule required for Type A Overall Integrated Containment Leakage Rate tests by Speci- ;
fication 4.6.1.2.a; at an initial differential pressure of 5 psi, i except that, if the first two 5 psi leak tests performed up to that ;
j time result in: ;
- 1. A calculated A/ 4 within the specified limit, and i
) 2. The A/4 calculated from the leak tests at 1.5 psi is*1 20% of i
. the specified limit, l i
j then the leak tests at 5 psi may be discontinued.
l i M- los CF u d I Ocfober b I988 ;
l 1
! )
1 LA SALLE - UNIT 1 3/4 6 18 Amendment No. 18 1 i
1
. CONTAXNMENT SYSTEMS 3[4. 4. 2 OEPRESSURf2ATXON SYSTEMS SUPPI SION CHAMBER #
LIMI'iif1G CONDITION FOR OPERATION <
'3.6.2.1 The suppression chamcer shall be OPERABLE with:
- a. The pool water:
- 1. Volume between 131,900 ft3 and 128 - 3, equivalent to a e
level between 25 f t 10 in and 26 f t 21s i ., and a .
- 2. Maximum average temperature of 00F$ur'ngOPERATIONAL I CONDITION 1 or 2, except that t .. um average temperature
, may be permitted to increase to:
a) 105 F, during testing whicu adds heat to the suppression enameer, b) 110 F with THERMAL POWER less than or equal to 1*. of RATED THERMAL POWER.
c) 120*F with the main steam line isolation valves closed following a scram.
- b. Dry ell-to-sucpression chamcer bypass leakage less than or equal to 10*. of the acceptsele A/Jk design value of 0.03 ft2 .
APPLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3.
ACTION:
- a. With the suppression chamber water level outside the above limits, restore the water level to within the limits within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or be in t least HOT SHUT 00'aN within the. next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00'aN w' thin the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
- b. n OPERATIONAL 'ON0! TION 1 or 2 with the suppression chamber average water temoerature greater than or equal to 109*F, restore the average temoersture to less than or equal to 100*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> ur be in at least HOT SHUT 00'aN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00'aN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, except, as permitted above:
- 1. With the suceression chamber average water temperature greater than 105*F during testing which adds heat to the suppression cham-ber, st0c all tasting wnich adds heat to the suppression chamber and castore the average temperature to less than or equal to 100*F within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUT 00WH within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT 00WN within the following 24 heurs.
- 2. With tne su:oression cha :ber average water temperature greater than 110*F, clace the reactor mode switch in the Shutdown position and o::erste at least one residual heat removal loop in the sucerassion pool cooling moda.
- 3. With the su:cression enameer sverage water temperature c' eater than 10", ca:ressuri:e the reactor pressure ve sel N less than 200 :s'; within 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br />.
edee ;ce:1rica:1cn 3.5.3 ':r ECOS recuirements.
'A $ALLI - UNIT 2
. 3/a 6-19 g phi Ochber b M88 04. looep hWd is increafed b IIO T.
f i c. b o n b Cl o e S no+ Afh0& M10iS W ""N N N # ' ;
'. [
t CONTAINMENT SYSTEMS d
LIMITING CONDITION FOR OPERATION (Continued)
'l ACTION: (Continued)
- c. With one suppression chamber water level instrumentation channel inoperable and/or with one suppression pool water temperature instrumentation division inoperable, restore the inoperable instrumentation to OPERABLE status within 7 days or verify suppres- .
sion chamber water level and/or temperature to be within the limits !'
, at least once per 12 hnurs by local indication.
i
- d. With both suppression chamber water level instrumentation channels !
4 inoperable and/or with both suppression pool water temperature l
- instrumentation divisions inoperable, restore at least one ;
- inoperable water level channel and one water temperature division j
' to OPERABLE status within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or be in at least HOT SHUTOOWN ,
l within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> a 9 in COLD SHUTDOWN within the following j 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. '
i e. With .he drywell-to-suppression chamber bypass leakage in excess of j the limit, restore the bypass loakage to within the limit prior to gg creasing reactor coolant temperature above 200*F.
, SURVEILLANCE REQUIREMENTS l
l 4.6.2.1 The suppression chamber shall be demonstrated OPERABLE:
- a. By verifying the suppression chamber water volume to be within the limits at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. .
i
- b. At least onc ,e p 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> in OPERATIONAL CONDITION 1 or 2 by verifying j the suppre sto ha ber average water temperature to be less th.in or equal to 1 0* , x .pt:
l 1
- 1. At least once per 5 minutes during testing which adds heat to 3
the suppression chamber, by verifying the suppression chamber ,
i average water temperature less than or equal to 105'F.
[
- 2. At least once per 60 minutes when suppression chamber average water temperature is greater than 100'F, by verifying suppression !
chamber average water temperature less than or equal to 110'F l
' and THERMAL POWER less than or equal to 1% of RATED THERMAL i POWER.
l I 3. At least once per 30 minutes following a scram with suppression !
I chamber average water temperature greater than or equal to
{ 100*F, by verifying suppression chamber average water temperature
! less than or equal to 120'F.
l y hp ochber I, 1968 446s surviellaace i reepwwea4 a no 4 appi,ca.6le .
1 LA SALLE %K - UNIT 40 2 *f usM ochber6 374 20I 1988 4
l
n - -- - _.
. l INSERT to Unit 2, Page 3/4 6-20 I
- f. In OPERATIONAL CONDITION 1 or 2: ;
- 1. With the suppression cha *er s average water temperature grekter !
than 105'T during testing which addn heat to the suppression chamber, stop all t esting which adds heat to the suppression (
chamber. .
I i
1
- 2. With the suppression chamber average water ;emperature greater (
l than 110*F, place the reactor mode switch in the Shutdown ,
position and operate at least one residual heat removat loop in l the suppression pool ecoling mode. ,
- 3. With the suppression chamber average water temperature greater i than 120'F, depressurise the reactor pressure vessel to less than ;
l 200 psig within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
l
! f I
l l r a
l l t 1
l i
f t
I t
l l
i
1 l CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) -
- c. By verifying at least 2 suppression chamber water level instru-mentation channels and at least 14 suppression pool water temperaturi instrumentation channels, 7 in each of two divistors, OPERA 8LE by -
performance of a:
, 1. CHANNEL CHECK at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, !
- 2. CHANNEL FUNCTIONAL TEST at least once per 31 days, and
- 3. CHANNEL CALIBRATION at least once per 18 months, ,
with the water level and temperattre alarm setpoint for:
- 1. High water level 5 26 ft 8 in, s
- 2. Lo'w water level > 26 f
- 3. High temperature 5 10 'F
- d. By conducting drywell-to-suppression chamber bypass leak tests and verifying that the A/JE calculated from the measured leakage is !
within the specified limit when drywell-to-suppression chamber bypass leak tests are conducted: l; t
- 1. At least once per 18 months at an initial differential pressure '
of 1.5 psi, and
- 2. At the first refueling outage and then on the schedule required for Type A Overall Integrated Containment Leakage Rate tests by Spect- (
fication 4.6.1.2.a., at an initial differential pressure of 5 psi, except that, if the first two 5 psi leak tests performed up to that I time result in: l 1
- 1. A calculated A/VI within the specified limit, and ;
- 2. The A/JI calculated from the leak tests at 1.5 psi is < 20% of
~
the specified limit.
j then the leak tests at 5 psi may be discontinued.
i f Of Q \ Cn E l
l !
1 1.A SALLE - UNIT 2 3/4 6-21 i ,
i .
1 1
1 I
ATTACB8EurT.C ;
1 1 .
TECHtfICAL SPIC.IflCATIGi CHANGE REQUEST LASALLE COUNTY STATICif UNITS.1 an 2
] '
a J .
.,! SUPPLEMENTAL SUPPORTING INFORMATIGi 5
i i
[
I 1
j !
l I j t i i I
t i
I J
d i
I .
l k
4992K i
I i
l 1
.