IR 05000382/2015402: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML16056A330 | | number = ML16056A330 | ||
| issue date = 03/02/2016 | | issue date = 03/02/2016 | ||
| title = Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 ( | | title = Non-Public Security Inspection Plan for Waterford Steam Electric Station, Unit 3 (Nrc Physical Security Inspection Report Number 05000382/2015402) | ||
| author name = Haire M S | | author name = Haire M S | ||
| author affiliation = NRC/RGN-IV/DRS/PSB-1 | | author affiliation = NRC/RGN-IV/DRS/PSB-1 |
Revision as of 01:53, 13 February 2018
ML16056A330 | |
Person / Time | |
---|---|
Site: | Waterford ![]() |
Issue date: | 03/02/2016 |
From: | Haire M S Plant Support Branch-1 |
To: | Chisum M R Entergy Operations |
References | |
IR 2015402 | |
Download: ML16056A330 (4) | |
Text
" " March 2, 2016
Mr. Michael Site Vice President Entergy Operations, Inc. 17265 River Road Killona, LA 70057-0751
SUBJECT: NON-PUBLIC SECURITY INSPECTION PLAN FOR WATERFORD STEAM ELECTRIC STATION, UNIT 3 (NRC PHYSICAL SECURITY INSPECTION REPORT NUMBER 05000382/2015402)
Dear Mr. Chisum:
On February 17, 2016, the NRC completed its end-of-cycle performance review of Waterford Steam Electric Station, Unit 3. The results of that review have been transmitted to you separately in a publicly available assessment letter. This letter informs you of the NRC's plans for future security-related inspections at your facility.
The enclosed inspection plan lists the security-related inspections scheduled through December 31, 2017. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the next semiannual performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
While we are fully committed to our goal of ensuring openness in our regulatory process, we must balance that goal with the more immediate need of ensuring the continued safety and secure operation of nuclear facilities and the protection of nuclear materials in our country.
Thus due to the security-related information contained in this correspondence, and in accordance with NRC Policy For Handling, Marking, and Protecting Sensitive Unclassified Non-Safeguards Information, a copy of this letter and its enclosure will not be available for public inspection in either the NRC Public Document Room or the Publicly Available Records (PARS) component of NRC's document system (ADAMS). Please contact me at (817) 200-1527 with any questions you have regarding this letter.
Sincerely,/RA/ Mark S. Haire, Chief Plant Support Branch 1 Division of Reactor Safety Docket No. 50-382 License No. NPF-38
Enclosure:
Inspection Plan