ML20010H221: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:f                                                                                                          7
{{#Wiki_filter:f                                                                                                          7 COLLEGE OF ENGINEERING l                                                    . ; (: ^
  .;  .
COLLEGE OF ENGINEERING l                                                    . ; (: ^
R      3 i  VIRGINIA POLYTECHNIC INSTITUTE 'AND STATE UNIVERSITY si
R      3 i  VIRGINIA POLYTECHNIC INSTITUTE 'AND STATE UNIVERSITY si
                                                                     ,, p        Blacksburg, Virginia 24061 NUG. EAR REACTOR LABORATORY
                                                                     ,, p        Blacksburg, Virginia 24061 NUG. EAR REACTOR LABORATORY

Latest revision as of 09:03, 17 February 2020

Responds to NRC 810817 Ltr Re Violation Noted in IE Insp Rept 50-124/81-02.Corrective Actions:Interim Procedure Change Has Been Properly Documented & Approved According to Procedure VI.6
ML20010H221
Person / Time
Site: 05000124
Issue date: 08/25/1981
From: Parkinson T
VIRGINIA STATE UNIV., PETERSBURG, VA
To: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20010H219 List:
References
NUDOCS 8109240230
Download: ML20010H221 (3)


Text

f 7 COLLEGE OF ENGINEERING l . ; (: ^

R 3 i VIRGINIA POLYTECHNIC INSTITUTE 'AND STATE UNIVERSITY si

,, p Blacksburg, Virginia 24061 NUG. EAR REACTOR LABORATORY

'I n ' 3 a u: 3 ,-

August 25, 1981 Mr. R. C. Lewis, Director Region II, U.S. Nuclear Regulatory Commission 101 Marietta St., N.W., Suite 3100 Atlanta, Georgia 30303 Re: License No. R-62 Docket No. 50-124

Dear Sir:

This letter addresses the Severity Level V Violation received as the result of a routine inspection conducted by your office on August 3-7, 1981.

Pursuant to the provisions of 10 CFP 2.201 we submit the following explanations to this Notice of Violation:

1. Admission or denial of the alleged violation:

We admit to the violation of nuclear reactor procedure VI.6.

2. The reasons for the violation:

An oversight by the reactor staff occurred when the interim procedure change to II.2 Control Rod Reactivity Worth and Rate Measurements was not submitted to the next regularly scheduled Reactor Safety Committee (RSC) meeting.

The procedure modification was not properly filed and thus was overlooked when the RSC meeting agenda items were beinh prepared. This procedure is performed only on an annual basis; therefore it has not been performed since the interim change in December 1980.

3. The corrective steps which have been taken and the results achieved:

The interim procedure change has been properly documented and approved according to procedure VI.6. Procedure II.2 will be reviewed by the RSC prior to its performance during the next annual maintenance period scheduled for December 1981.

8109240230 sto9of gDRADOCK 05000124 PDR

F' m Mr. R. C. Lewis August 25, 1981

.Page 2-

4. Corrective steps which will be taken to avoid further violations:

A new administrative control for procedure changes has been generated. The form attached to this letter will be used to document any procedure change and filed in the copy of the procedure manual located at the reactor control console. These forms will be included in the next regularly scheduled RSC meeting agenda and reviewed by the committee. This form will then be kept en permanent file and the procedures promulgated to all copies of the procedure manual in their final form.

This should prevent any further oversight in the procedure review process.

5. The date hen full compliance will be achieved:

Full compliance will be achieved by October 30, 1981.

The procedure will be reviewed at the next meeting of the RSC scheduled for late October 1981.

Sincerely yours,

/. -

T. F. Parkinson, Titector Nuclear Reactor laboratory cc: Alan P. Curtner, Reactor Supervisor A. K. Furr, Deputy Director, NRL R. A. Teekell, Chairman, RSC

. ;

  • PROCEDURE MODIFICATION PROCEDURE:

Describe changes below: (use continuation sheet if necessary)

O I- certify this change meets the requirements of VI.6 Procedure on Reactor Procedures, step II.B Procedure Modification:

Reactor Supervisor Date Senior Reactor Operator Date Reactor Radiation Safety Officer Date O-Final review and approval:

Chairman, Reactor Safety C6mmittee Date_

bli_ .

__--.-__-_._-m_.__m-__ .u- _ _ _ - _ _ _ _ _ _ .___ _-m._-__.-_.m ___ .u_-__ __ _._.._. _.____-_-