{{#Wiki_filter:p.          .
{{#Wiki_filter:p.          .
                  '-
AUACIMENT B J.                                                    PROPOSED CilARGES TO THE ILCRtilCALSIECIEICAIl0ftS REVISED PAGES:
,
      .,.
    ,    ,
                                      .
                                        .
                              ,
                                  .
  .
AUACIMENT B
,                    ,
J.                                                    PROPOSED CilARGES TO THE ILCRtilCALSIECIEICAIl0ftS REVISED PAGES:
NPF-11                            NPF-18 3/4 8-1    delete page            3/4 B-1  delete page 3/4 8-1    new page              3/4 b-1  new page 3/4 8-la                          3/4 8-la              i l
NPF-11                            NPF-18 3/4 8-1    delete page            3/4 B-1  delete page 3/4 8-1    new page              3/4 b-1  new page 3/4 8-la                          3/4 8-la              i l
3/4 8-2 delete page              3/4 8 delete page
3/4 8-2 delete page              3/4 8 delete page
                                                                                             .l 3/4 8-2 new page                  3/4 8-2 new page      i 3/4 8-2a new page                3/4 8-2a new page 3/4 8-2b new page                3/4 8-2b new page      i B 3/4 8-1                          B 3/4 8-1                l 1
                                                                                             .l 3/4 8-2 new page                  3/4 8-2 new page      i 3/4 8-2a new page                3/4 8-2a new page 3/4 8-2b new page                3/4 8-2b new page      i B 3/4 8-1                          B 3/4 8-1                l 1
                                                                                            '
INSERT A                          INSERT A l
INSERT A                          INSERT A l
1 l
1 l
                                                                                            !
                                                                                            !
                                                                                            !
                                                                                            !
              ..
kk h P                                                                    t i
kk h P                                                                    t i
0328T:6 l
0328T:6 l
t
t


.
       . i.                                              ..-        ..          .  . ......t          . , .        . . . . . . .
       . i.                                              ..-        ..          .  . ......t          . , .        . . . . . . .
              .
                    '
    '
          ..
                                      .
                              ,
                   ,  3/4.8 CLECTRICAL POWER SYSTEMS 3/4.8.1                                                      RE PLACE A.C. SOURCES-gg g A.C. SOURCES - OPERATING                                      %M                                                e LIMITING CONDITION FOR OPERATION
                   ,  3/4.8 CLECTRICAL POWER SYSTEMS 3/4.8.1                                                      RE PLACE A.C. SOURCES-gg g A.C. SOURCES - OPERATING                                      %M                                                e LIMITING CONDITION FOR OPERATION
                                                                                                      -
                                                                                                                                      '
: 3. 8.1.1 As a minimum, the following A.C. electrical power s rces shall e OPERABLE:                                                                                                        :
: 3. 8.1.1 As a minimum, the following A.C. electrical power s rces shall e OPERABLE:                                                                                                        :
: a. Two physically independent circuits between th' ffsite transmisse                                    I network and the onsite Class 1E distribution stem, and
: a. Two physically independent circuits between th' ffsite transmisse                                    I network and the onsite Class 1E distribution stem, and
: b. Separate and independent diesel generators * , 1A, 2A and IB with:
: b. Separate and independent diesel generators * , 1A, 2A and IB with:
  ,
l 1.. For diesel generator 0, lA and 2A:                        ,
l 1.. For diesel generator 0, lA and 2A:                        ,
                                                                                                                                      -
a)      A separate day fuel tank con ining a minimum of                                        e 250 gallons of fuel.      '
a)      A separate day fuel tank con ining a minimum of                                        e 250 gallons of fuel.      '
b)      A separate fuel storage stem containing a minimum of                                  f 31,000 callons of fuel.
b)      A separate fuel storage stem containing a minimum of                                  f 31,000 callons of fuel.
: 2. For diesel gt.nerator 18,          separate fuel storage tank / day tank' containing a minimum of          ,750 gallons of fuel.
: 2. For diesel gt.nerator 18,          separate fuel storage tank / day tank' containing a minimum of          ,750 gallons of fuel.
: 3. A separate fuel transf r pump.                                    ,
: 3. A separate fuel transf r pump.                                    ,
                                                                                                                                      ,
        ,
APPLICABILITY:    OPERATIONAL CONDIT NS 1, 2, and 3.
APPLICABILITY:    OPERATIONAL CONDIT NS 1, 2, and 3.
                                                                                                                                      '
ACTION:
ACTION:
: a. With either one of site circuit or diesel generator 0 or 1A of the above required A . electrical power sources inoperable, demonstrate                                  ,
: a. With either one of site circuit or diesel generator 0 or 1A of the above required A . electrical power sources inoperable, demonstrate                                  ,
Line 78: Line 47:
                       *See page 3/4 8-1(a)
                       *See page 3/4 8-1(a)
I LASALLE-UNIT 1                              3/4 8-1                      Amendment No. 49
I LASALLE-UNIT 1                              3/4 8-1                      Amendment No. 49
    .          .                          . - - -          -. -      -      ..      ..        . __        -- --.


            ._                            _-                  _          .          _ _      _    .,_
i S/4 S ELICTRICPL POWER SYSTEMS-3/4.6.1.A.C. SOURCES                                                                            ,
i
                                                                                                                      ,
      '
S/4 S ELICTRICPL POWER SYSTEMS-
<
3/4.6.1.A.C. SOURCES                                                                            ,
p%                                                                                                            J
p%                                                                                                            J
     ' ,". s
     ' ,". s A.C. SOURCES - CpERATING
      '
A.C. SOURCES - CpERATING
                                                                                                                    !
                   ' LIMITING CONDITIONS FOR OPERATION                                                                J J
                   ' LIMITING CONDITIONS FOR OPERATION                                                                J J
                                                                                                                    !
3.8.1.1          As a minimum, the following A.C. electrical power sources shall se            i OPERABLE:
3.8.1.1          As a minimum, the following A.C. electrical power sources shall se            i OPERABLE:
  '
: a. . Two physically independent circuits between the offsite transmission          '
: a. . Two physically independent circuits between the offsite transmission          '
network and the onsite Class 1E distribution system, and
network and the onsite Class 1E distribution system, and
Line 106: Line 63:
2,          For diesel generator 1B, a separate fuel storage tank and a day tank containing a combined minimum of 29,750 gallons of fuel.
2,          For diesel generator 1B, a separate fuel storage tank and a day tank containing a combined minimum of 29,750 gallons of fuel.
h                              3.          A separate fuel transfer pump.
h                              3.          A separate fuel transfer pump.
                                                                                                                -
ApDLICABILITY:                  OPERATIONAL CONDITIONS 1, 2, and 3.                  T.: n ACTIDN                                                                                        :
ApDLICABILITY:                  OPERATIONAL CONDITIONS 1, 2, and 3.                  T.: n ACTIDN                                                                                        :
: a. With one offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within' 1 hour and at least once per 8 hours thereafter. . If any of the diesel generators have not been successfully tested within the past 24' hours, demonstrate their OPERABILITY by performing                  r Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, separately, within 24 hours. Restore the offsite circuit-to OPERABLE status within 72 hours or be in at least HOT SHUTDOWN' I                                within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.                                                                    ,
: a. With one offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within' 1 hour and at least once per 8 hours thereafter. . If any of the diesel generators have not been successfully tested within the past 24' hours, demonstrate their OPERABILITY by performing                  r Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, separately, within 24 hours. Restore the offsite circuit-to OPERABLE status within 72 hours or be in at least HOT SHUTDOWN' I                                within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.                                                                    ,
: b. With either the 0 or 1A diesel gene.rator inoperable, demonstrate the OPERABILITY of the above required A.C. offsite sources by performing Survei? lance Requirement 4.8.1.1.1.a within 1 hour and at least once
: b. With either the 0 or 1A diesel gene.rator inoperable, demonstrate the OPERABILITY of the above required A.C. offsite sources by performing Survei? lance Requirement 4.8.1.1.1.a within 1 hour and at least once per S hours thereafter. If the c'iesel generator became inoperable due to any cause other than, preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE
                      '
per S hours thereafter. If the c'iesel generator became inoperable due to any cause other than, preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE
          @
       ...
       ...
* See page 3/4 8-la.
* See page 3/4 8-la.
3/4 8-1                pR0p0 SED AMENDMENT Lt.SALLE-UNIT 1 4
3/4 8-1                pR0p0 SED AMENDMENT Lt.SALLE-UNIT 1 4
          ,    - _ .      _ . _ .          ._ _ . -
                                                    -
                                                            -                    __                    -.


        ,                    .            ._ - .. .        . - . - . - - _ - _ .... -_. . . -                                          -                  .    -    . . - . -
              '
2h nr            .
2h nr            .
1 y ..      ELEl!TRICAL POWER SYSTEMS
1 y ..      ELEl!TRICAL POWER SYSTEMS e                      ,
,
e                      ,
                                                                                                                                                                                           )
                                                                                                                                                                                           )
                                                                                                                                                                                          '
            .
LIMITING CONDITION FOR OPERATION (Continued)
LIMITING CONDITION FOR OPERATION (Continued)
                                                                                                                                                                                       'l J
                                                                                                                                                                                       'l J
                                                                                                                                                                                        ,
1 i
                                                                                                                                                                                          ,
                                                                                                                                                                                          !
1
:
i
                                                                                                                                                                                          .
[                *For the purpose of completing ~ technical specification surveillance requirements 4.8.1.1.2d.1 ana 4.8.1.1.2f.1, as part of a pre planned                                                                                                  .
[                *For the purpose of completing ~ technical specification surveillance requirements 4.8.1.1.2d.1 ana 4.8.1.1.2f.1, as part of a pre planned                                                                                                  .
preventive mainte                      program, on the 0 diesel generator the requirements of                                                                          !
preventive mainte                      program, on the 0 diesel generator the requirements of                                                                          !
action statement                  re modified to:
action statement                  re modified to:
:                                                                              .
                                                                                                                                    -
                                                                                                                                                                                        "
                       ' 1. -                                                                                    techniem1 ana                                ication Eliminate surveillancethe      requirement requirements                        for performing 4.8.1.1.la    and                          (3 A 1.1.2amd7 on each                                  !
                       ' 1. -                                                                                    techniem1 ana                                ication Eliminate surveillancethe      requirement requirements                        for performing 4.8.1.1.la    and                          (3 A 1.1.2amd7 on each                                  !
operable AC source, immediately and once per 8 hours thereafter,
operable AC source, immediately and once per 8 hours thereafter, when the 0 diesel generator.is declared inoperable. .                                                                                                l
    >
when the 0 diesel generator.is declared inoperable. .                                                                                                l
: 2.        Allow an additiona V 6 hours in excess of the 72 hours allowed in action statement              or the 0 diesel generator to be inoperable.                                                                          ,
: 2.        Allow an additiona V 6 hours in excess of the 72 hours allowed in action statement              or the 0 diesel generator to be inoperable.                                                                          ,
                                                                                                                                                                                        '
Provided that the following conditions are met:
Provided that the following conditions are met:
A.        Unit 2 is in operational condition 4 or 5 or defueled prior to
A.        Unit 2 is in operational condition 4 or 5 or defueled prior to
Line 155: Line 87:
B.        Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are-successfully completed, for the offsite power sources and the 1A and 3                                2A diesel generators, within 48 hours print to removal of the 0                                                                                      :
B.        Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are-successfully completed, for the offsite power sources and the 1A and 3                                2A diesel generators, within 48 hours print to removal of the 0                                                                                      :
diesel generator from service.
diesel generator from service.
                                                                                                                                                                                        ,
C.        No maintenance is performed on the offsite circuits or the 1A or 2A                                                                                  !
C.        No maintenance is performed on the offsite circuits or the 1A or 2A                                                                                  !
diesel generators,.while the O dicsal generator is inoperable.
diesel generators,.while the O dicsal generator is inoperable.
D.        Technical specification requirement 4.8.1.1.la is performed daily, while the O diesel generator is inoperable.                                                                                                          ,
D.        Technical specification requirement 4.8.1.1.la is performed daily, while the O diesel generator is inoperable.                                                                                                          ,
                                                                                                                                                                                        ,
E.        The control circuit for the unit cross-tie circuit breakers between
E.        The control circuit for the unit cross-tie circuit breakers between
   ;
   ;
Line 165: Line 95:
The provisions of technical specification 3.0.4 are not applicable.
The provisions of technical specification 3.0.4 are not applicable.
LASALLE-UNIT 1                                                3/4 8-la                                                                  Amendment No. 63
LASALLE-UNIT 1                                                3/4 8-la                                                                  Amendment No. 63
          ,
_                                - . . , - - -    , , , . . . _ .  . _ . ,- ,-.,.-.m..,...                  .-w,,
_                                - . . , - - -    , , , . . . _ .  . _ . ,- ,-.,.-.m..,...                  .-w,,


          - - - .              ._      . - _ - - - - - - . - - - - . - - -                                  - . - . - -          - - - - -
          ..
        '
d                                    .,                                                                                                              i l
d                                    .,                                                                                                              i l
ELECTRICAL POWER SYSTEMS 8EoL. ACE                WLTH LIMITING CON 0! TION f0R OPERATION (Continued)
ELECTRICAL POWER SYSTEMS 8EoL. ACE                WLTH LIMITING CON 0! TION f0R OPERATION (Continued) s            j ACTION (Continued)                                                                                                                  l L      ,
                                                                                                                                              '
s            j ACTION (Continued)                                                                                                                  l L      ,
: c. With both of the above required offsite circuits inoperable,                                        mon-strate the OPERABILITY of the remaining A.C. sources by perf                                        ing u                            Surveillance Requirement 4.8.1.1.2a.4, for one diesel gene tor at                                                    +
: c. With both of the above required offsite circuits inoperable,                                        mon-strate the OPERABILITY of the remaining A.C. sources by perf                                        ing u                            Surveillance Requirement 4.8.1.1.2a.4, for one diesel gene tor at                                                    +
l                            a time, within eight hours, and at least once per 8 hcur thereafter,
l                            a time, within eight hours, and at least once per 8 hcur thereafter, unless the diesel generators are already operating; res re at least i
.
unless the diesel generators are already operating; res re at least i
one of.the inoperable offsite circuits to OPERABLE st us within l
one of.the inoperable offsite circuits to OPERABLE st us within l
'
24 hours or be in at least HOT SHUTDOWN within the                                        t 12 hours.                .
24 hours or be in at least HOT SHUTDOWN within the                                        t 12 hours.                .
With only one offsite circuit restored to OPERABLE tatus, restore at least two offsite circuits to OPERABLE status thin 72 hours-                                                      ,
With only one offsite circuit restored to OPERABLE tatus, restore at least two offsite circuits to OPERABLE status thin 72 hours-                                                      ,
from time of initial loss or be in at least HOT HUTDOWN within the                                                  '
from time of initial loss or be in at least HOT HUTDOWN within the                                                  '
next 12 hours and in COLD SHUTDOWN within the ollowing 24 hours.                                                      i i
next 12 hours and in COLD SHUTDOWN within the ollowing 24 hours.                                                      i i
                                                                                                                                                    '
: d. With diesel generators 0 and 1A of the abo required A.C. electrical power sources inoperable, demonstrate th                                PERABILITY of the remain-                  .
: d. With diesel generators 0 and 1A of the abo required A.C. electrical power sources inoperable, demonstrate th                                PERABILITY of the remain-                  .
ing A.C. sources by performing M rveill ce Requirements 4.8.1.1.la                                                  t within 1 hour and 4.8.1.1.2a.4, for o diesel generator at a
ing A.C. sources by performing M rveill ce Requirements 4.8.1.1.la                                                  t within 1 hour and 4.8.1.1.2a.4, for o diesel generator at a L                            time, within four hours and at least nce per 8 hours thereafter;
                                                                                                                                                    '
L                            time, within four hours and at least nce per 8 hours thereafter;
}                            restore at least one of the inoper e diesel generators 0 and 1A to                                                  .
}                            restore at least one of the inoper e diesel generators 0 and 1A to                                                  .
                                                                                                                                                    '
OPERABLE status within 2 hours or e in at least HOT SHUTDOWN within the next 12 hours and in COLD S                                    within the following 24 hours.
OPERABLE status within 2 hours or e in at least HOT SHUTDOWN within the next 12 hours and in COLD S                                    within the following 24 hours.
Restore both diesel generator                                and 1A to 0PERABLE status within
Restore both diesel generator                                and 1A to 0PERABLE status within 72 hours from time of initia loss or be in at least HOT SHUTDOWN l                            within the next 12 hours'a in COLD SHUTDOWN within the following 24 hours,
.
72 hours from time of initia loss or be in at least HOT SHUTDOWN l                            within the next 12 hours'a in COLD SHUTDOWN within the following 24 hours,
: e. With. diesel generator                                of the above required A.C. electrical power sources inoperable,                              monstrate the OPERABILITY of the remaining                        !
: e. With. diesel generator                                of the above required A.C. electrical power sources inoperable,                              monstrate the OPERABILITY of the remaining                        !
A.C. sources by per orming Surveillance Requirements 4.8.1.1.la                                                      !
A.C. sources by per orming Surveillance Requirements 4.8.1.1.la                                                      !
within I hour, an                              4.8.1.1.2a.4, for one diesc1 generator at a                        l !
within I hour, an                              4.8.1.1.2a.4, for one diesc1 generator at a                        l !
: l.                            time, within si hours, and at least once.per 8 hours'thereafter;
: l.                            time, within si hours, and at least once.per 8 hours'thereafter; restore the i erable diesel generator 18 to OPERABLE status within 72 hours or                          clare the HPCS system inoperable and take the ACTION required b Specification 3.5.1.                                                                                      ;
"
i L                        f. With di el generator 2A of the above required A.C. electrical power                                                  !
restore the i erable diesel generator 18 to OPERABLE status within 72 hours or                          clare the HPCS system inoperable and take the ACTION required b Specification 3.5.1.                                                                                      ;
i
..
L                        f. With di el generator 2A of the above required A.C. electrical power                                                  !
sourc            inoperable, demonstrate the OPERABILITY of the remaining L
sourc            inoperable, demonstrate the OPERABILITY of the remaining L
     ,                      A. C.      ources by performing Surveillance Requirements 4.8.1.1.la and
     ,                      A. C.      ources by performing Surveillance Requirements 4.8.1.1.la and
Line 215: Line 126:
i                            4.8.1.1.la. and 4.8.1.1.2a.4 for diesel generator 1A is not required l                            providad the above systems are delcared inoperable and the ACTION of their respective specifications is taken.
i                            4.8.1.1.la. and 4.8.1.1.2a.4 for diesel generator 1A is not required l                            providad the above systems are delcared inoperable and the ACTION of their respective specifications is taken.
LA SALLE - UNIT 1                                              3/4 8-2                              Amendment No. 18
LA SALLE - UNIT 1                                              3/4 8-2                              Amendment No. 18
_.                              .                  .                                    .


                  ,.,    ,                              .      _  _ _.      __    .. .
_ _ _ ,- _      __
                    *
                                                                                                                       ;
                                                                                                                       ;
l h                '3/4.8 ELECTR! CAL'cCWER SYSTEMS
l h                '3/4.8 ELECTR! CAL'cCWER SYSTEMS j
                                            ,
3/4.8.1'A.C. SOURCES                                                                        1
                                                                                                                    .,
         ,T l
                                  .
5.')h            A.C. SOURCES - OPERATING                                                                      ;
j 3/4.8.1'A.C. SOURCES                                                                        1
         ,T
        *
  ,
l 5.')h            A.C. SOURCES - OPERATING                                                                      ;
LIMITING CONDITIONS FOR OPERATION 1
LIMITING CONDITIONS FOR OPERATION 1
l diesel generators, separately, by performing Surveillance
l diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours *. Restore the diesel              l generator to OPERABLE status within 72 hours or be in at least HOT            )
                                                                                                                      >
                      .
Requirement 4.8.1.1.2.a.4 within 24 hours *. Restore the diesel              l generator to OPERABLE status within 72 hours or be in at least HOT            )
SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.                                                          I
SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.                                                          I
: c. With one offsite circuit of the above-required R.C. sources and            ;
: c. With one offsite circuit of the above-required R.C. sources and            ;
                                                                                                                        '
diesel generator 8 or 1A of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sourcos by parforming Surveillance Requirement 4.8.1.1.1.a within- 1 hour and at least once per 8 hours thereafter. If.the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the              ,
diesel generator 8 or 1A of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sourcos by parforming Surveillance Requirement 4.8.1.1.1.a within- 1 hour and at least once per 8 hours thereafter. If.the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the              ,
OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours *. Restore at least one of the inoperable A.C. sources to OPERABLE status within 12 hours or be in at'least HOT SHUTDOWN'            ,
OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours *. Restore at least one of the inoperable A.C. sources to OPERABLE status within 12 hours or be in at'least HOT SHUTDOWN'            ,
Line 243: Line 141:
24 hours. Restore at least two offsite circuits and diesel-                i
24 hours. Restore at least two offsite circuits and diesel-                i
().                                generators 9 and 1A to'0PERABLE status within 72 hours from the time        .
().                                generators 9 and 1A to'0PERABLE status within 72 hours from the time        .
of initial loss or be in at'least HOT SHUTDOWN within the next 12
of initial loss or be in at'least HOT SHUTDOWN within the next 12 hours'and in COLD SHUTDOWN within the following 24 hours.
                      .
hours'and in COLD SHUTDOWN within the following 24 hours.
                                                                                                                      -
I                                    d. With diesel generator 1B of the above required A.C. electrical power i
I                                    d. With diesel generator 1B of the above required A.C. electrical power i
                                        .
sources inoperable, demonstrate the OPERABILITY of the offsite A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at 'leasf~ence'jer 8 hours thereafter. If the diesel'            >
sources inoperable, demonstrate the OPERABILITY of the offsite A.C
'
sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at 'leasf~ence'jer 8 hours thereafter. If the diesel'            >
generator became inoperable due to any cause other than preplanned        ;
generator became inoperable due to any cause other than preplanned        ;
Ll-                                        preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours *. Restore j'a                                        diesel generator 1B to OPERABLE status within 72 hours or declare
Ll-                                        preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours *. Restore j'a                                        diesel generator 1B to OPERABLE status within 72 hours or declare
:                                    the HPCS system inoperable and, take the ACTION required by.
:                                    the HPCS system inoperable and, take the ACTION required by.
      '
specification 3.5.1.
specification 3.5.1.
: e. With both of the above required offsite circuits inoperable, demonstrate thw OPERABILITY of the remaining A.C. sources,                I reparately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 nours unless the diesel generators are already operating.        >
: e. With both of the above required offsite circuits inoperable, demonstrate thw OPERABILITY of the remaining A.C. sources,                I reparately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 nours unless the diesel generators are already operating.        >
Line 262: Line 153:
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY.        The provisions of Specification 3.0.2 are not applicable.
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY.        The provisions of Specification 3.0.2 are not applicable.
LASALLE-UNIT 1                            3/4 8-2                PROPOSED AMENDMENT a-
LASALLE-UNIT 1                            3/4 8-2                PROPOSED AMENDMENT a-
          - - _ .          _ , -


                                                                                    .. _                            _ _ .__ .. _ _ _ ._ .___._ _ ._ __.__                    . _ . _ _ .
        '
4                                                                                                                                                                              (
4                                                                                                                                                                              (
                                                                                                                                                                                                  -
       ;
       ;
                                                                                                                                                                                                  ,
                                                                                                                                                                                                  *
                                        ..
                                                                                                                                                                                                  ,
ELECTRICA'L p0WER SYSTEMS                                                                                                                                                  ,
ELECTRICA'L p0WER SYSTEMS                                                                                                                                                  ,
fw
fw
                                                                                                                                                                                                  !
* U';/            LIMITING CONDITIONS FOR OPERATION (Continued)                                                                                                                              !
* U';/            LIMITING CONDITIONS FOR OPERATION (Continued)                                                                                                                              !
                                                                                                                                                                                                  !
                                                                                                                                                              -
i ACTION (Continued) i at least two offsite circuits to OPERABLE status within 72 hours from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24                                                                                              "
i ACTION (Continued) i at least two offsite circuits to OPERABLE status within 72 hours from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24                                                                                              "
hours. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.'2.a.'4, performed under this ACTION                                                                                      :
hours. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.'2.a.'4, performed under this ACTION                                                                                      :
                                                                                                                                                                                                  "
statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of A'; TION statement a.                                                                                                      ,
statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of A'; TION statement a.                                                                                                      ,
: f. With -diesel generators 8 and 1 A of the above required A.C.                                                                                    .
: f. With -diesel generators 8 and 1 A of the above required A.C.                                                                                    .
j p
j p
electrical power sources inoperable, demonstrate the OPERABILITY of
electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by pe'rforming Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter,                                                                                        ,
'
the remaining A.C. sources by pe'rforming Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter,                                                                                        ,
and Surve111ance Requirement 4.8.1.1.2.a.4 for the 1B and 2A diesel                                                                                        !
and Surve111ance Requirement 4.8.1.1.2.a.4 for the 1B and 2A diesel                                                                                        !
,,                                    generators, separately, within 8 hours *. Restore'at least one of                                                                                          ,
,,                                    generators, separately, within 8 hours *. Restore'at least one of                                                                                          ,
j'                                    the inoperable diesel generators 8 or 1A to OPERABLE status within 2 hours, or be in at least HOT SHUTDOWN within the next 12 hours and
j'                                    the inoperable diesel generators 8 or 1A to OPERABLE status within 2 hours, or be in at least HOT SHUTDOWN within the next 12 hours and
-                                      in COLD SHUTDOWN within the following 24 hours. Restore both diesel b                                      generators 8 and 1A to OPERABLE status within 72 hours, frotu the time of initial' loss, or be in at least HOT SHUTDOWM,wi. thin.the next 12 hours and in COLD SHUTDOWN within the followin,g 24 hours.
-                                      in COLD SHUTDOWN within the following 24 hours. Restore both diesel b                                      generators 8 and 1A to OPERABLE status within 72 hours, frotu the time of initial' loss, or be in at least HOT SHUTDOWM,wi. thin.the next 12 hours and in COLD SHUTDOWN within the followin,g 24 hours.
: g. With diesel generator 2A of the above required A.C. electrical power                                                                                      5 sources inoperable, demonstrate the OP5RABILITY of the remaining A.C
: g. With diesel generator 2A of the above required A.C. electrical power                                                                                      5 sources inoperable, demonstrate the OP5RABILITY of the remaining A.C l                                                                                                                                                                                                  !
,
l                                                                                                                                                                                                  !
'
sources by parforming Surveillance Requirement 4.8.1.1.1.a within 1 hours and at least once per b hours thereafter.                                                                        If the EA diesel gen'eiator became inoper'able due to any cause other than preplanned
sources by parforming Surveillance Requirement 4.8.1.1.1.a within 1 hours and at least once per b hours thereafter.                                                                        If the EA diesel gen'eiator became inoper'able due to any cause other than preplanned
* preventive maintenance or testing, demonstrate the OPERABILITY of the 1A diesel generator by performing Surveillance Requirement
* preventive maintenance or testing, demonstrate the OPERABILITY of the 1A diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4, within 24 hourse.                                                                    Restore the inoperable diesel generator ?A to OPERABLE status within 72 hours or declare standby                                                                                    '
_
gas treatment system subsystem B, Unit 2 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration systeri train B inoperable, and.take the ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.2.                                  Continueid performance of Survei: lance Requirement 4.8.1.1.1.a is not required previded.the above 'systoms are declared inoperable and the action of their respective specifications is taken.
4.8.1.1.2.a.4, within 24 hourse.                                                                    Restore the inoperable diesel generator ?A to OPERABLE status within 72 hours or declare standby                                                                                    '
!
gas treatment system subsystem B, Unit 2 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration systeri train B inoperable, and.take the ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.2.                                  Continueid performance of Survei: lance Requirement 4.8.1.1.1.a is not required previded.the above 'systoms
      *
          ,
              ,
are declared inoperable and the action of their respective specifications is taken.
    .
                                                                                                                                                                      .
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of
                 >                Specification 3.0.2 are not applicable.
                 >                Specification 3.0.2 are not applicable.
                                                                                                                                                            .                                      .
LASALLE-UNIT 1                                                                3/4 8-2a                                            PROPOSED ' AMENDMENT 4
LASALLE-UNIT 1                                                                3/4 8-2a                                            PROPOSED ' AMENDMENT 4
                    . __ , _ - _                - . _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _


__ _
i
i
            ''                                                                                                            !
    ..
                      ,
                             '-                                                                                              t ELECTRICAL.PCWER SYSTE5S' ch'
                             '-                                                                                              t ELECTRICAL.PCWER SYSTE5S' ch'
     't./        LIMITING CONDITIONS FOR OPERATION (Continued)                                                                i ACTION (Continued) t
     't./        LIMITING CONDITIONS FOR OPERATION (Continued)                                                                i ACTION (Continued) t
Line 324: Line 183:
i.
i.
With either diesel generators e or iA inoperable and diesel                                    .
With either diesel generators e or iA inoperable and diesel                                    .
                                                                                                                          !
generator 1B inoperable, apply the requirements of ACTION b and d specified above.
generator 1B inoperable, apply the requirements of ACTION b and d specified above.
        '
J.
J.
With one offsite circuit of the above required A.C. electrical power                            ,
With one offsite circuit of the above required A.C. electrical power                            ,
Line 335: Line 192:
                                                                                                                         ,;
                                                                                                                         ,;
the requirements of ACTION b and g specified above.
the requirements of ACTION b and g specified above.
          -
    .
  *
                                                                                                                          ,
                                                                                                                          ,
        ,
'
kh LAJALLE-UNIT 1                      3/4 8-2b                                    PROPOSED AMENDMENT        )
kh LAJALLE-UNIT 1                      3/4 8-2b                                    PROPOSED AMENDMENT        )
   .J
   .J
                                                                - - - -  -. _ - - - - _ - _ _ _ _ _                  _


        ..          .
           ^*
           ^*
              ,
b*
b*
: l.      ,
: l.      ,
  '
4 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2              A.C. SOURCES and ONSITE POWER DISTPIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility.              The minimum specified independent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.
4
                                            . .
                                      ,
            -
3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2              A.C. SOURCES and ONSITE POWER DISTPIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility.              The minimum specified independent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.
The ACTION requirements specified for the levels of degradation of the power sources provide' restricticn upon continued facility operation                          TNS MA commensurate with the level of degradation. #The OPERA 8ILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one of the two cnsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only.                                .
The ACTION requirements specified for the levels of degradation of the power sources provide' restricticn upon continued facility operation                          TNS MA commensurate with the level of degradation. #The OPERA 8ILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one of the two cnsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only.                                .
The OPERABILITY of the minimum 'specified A.C. and D.C. power sources and
The OPERABILITY of the minimum 'specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that-(                      (1) the facility can be maintained in the shutdown or refueling condition for extended time periods and (2) sufficient instrumentation and control j                          capability is available for r.onitoring and maintaining the unit status.                            I The surveillance requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory l-l Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Sup-plies," March 10, 1971, with the exception noted in Appendix B to the FSAR, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear f'ower Plants," Revision 1, August 1977.                    !
'
        ,
associated distribution systems during shutdown and refueling ensures that-(                      (1) the facility can be maintained in the shutdown or refueling condition for extended time periods and (2) sufficient instrumentation and control j                          capability is available for r.onitoring and maintaining the unit status.                            I The surveillance requirements for demonstrating the OPERABILITY of the
                      ,
diesel generators are in accordance with the recommendations of Regulatory l-l Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Sup-plies," March 10, 1971, with the exception noted in Appendix B to the FSAR, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear f'ower Plants," Revision 1, August 1977.                    !
The diesel generator fast start surveillance requirements, based on a PRA i
The diesel generator fast start surveillance requirements, based on a PRA i
'                          study, are sufficient to demonstrate the onsite A.C. power system capability to mitigate the consequences of the design basis event for the plant, i.e. , large LOCA coiv.? dent with e loss-of-offsite power, while minimizing the mechanical                      ,
'                          study, are sufficient to demonstrate the onsite A.C. power system capability to mitigate the consequences of the design basis event for the plant, i.e. , large LOCA coiv.? dent with e loss-of-offsite power, while minimizing the mechanical                      ,
l                          stress aad wear on the diesel engine.
l                          stress aad wear on the diesel engine.
The imrvel11ance requirements for der.onstrating the OPERABILITY of the unit batteries are in accordance with the recommendations of flegulatory Guide 1.129, " Maintenance Testing and (!eplacement of Large Lead Storage Batteries for Nuclear Power Plants " February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintanance, Testing, and Replacement of Large Lead Storage Batteries for Generating Station and Substations."
The imrvel11ance requirements for der.onstrating the OPERABILITY of the unit batteries are in accordance with the recommendations of flegulatory Guide 1.129, " Maintenance Testing and (!eplacement of Large Lead Storage Batteries for Nuclear Power Plants " February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintanance, Testing, and Replacement of Large Lead Storage Batteries for Generating Station and Substations."
Verifying average electrolyte temperature above the minimum for which the battery was sized, total battery terminal voltag: onfloat charge, connection resit,tanca values and the performance of batta y service and discharge tests
Verifying average electrolyte temperature above the minimum for which the battery was sized, total battery terminal voltag: onfloat charge, connection resit,tanca values and the performance of batta y service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharya rates and comparec the battery capacity at that time with the rated capacity.
    '
      ,
ensures the effectiveness of the charging system, the ability to handle high discharya rates and comparec the battery capacity at that time with the rated capacity.
LA SALLE - UNIT 1                            8 3/4 8-1 Amendment No.16
LA SALLE - UNIT 1                            8 3/4 8-1 Amendment No.16
                         ~ _ . _            _    _____ _ _ _ _ _ _              _    _ _ _ _ __          _ _ ___ _ ____
                         ~ _ . _            _    _____ _ _ _ _ _ _              _    _ _ _ _ __          _ _ ___ _ ____


[i; v:.      ,          l                                              ,                              1
[i; v:.      ,          l                                              ,                              1
                  ,                                                                                    ..
    -
         .                                                                                                1
         .                                                                                                1
       ;*,,
       ;*,,
l Y                                  .
l Y                                  .
                                      -
l i
l
4 F                                                                                                        l
:                .
i 4
  ,.
F                                                                                                        l
                '
[                                                                                                          )
[                                                                                                          )
l l
l l
4
4 INSERLA                                        )
            '
INSERLA                                        )
!,
                                                                                                            ,
l
l
!                          Action statements'have been included-in the specification to cover all situations where either one AC source or a combination of two AC sources are inoperable. Action statements c, e, and f are intended to be followed to completion once entered and should not be exited until both AC sources are restored.                                                                  1 l
!                          Action statements'have been included-in the specification to cover all situations where either one AC source or a combination of two AC sources are inoperable. Action statements c, e, and f are intended to be followed to completion once entered and should not be exited until both AC sources are restored.                                                                  1 l
Line 400: Line 223:
t.
t.
i
i
                                                                                                          !
                                                                                                           '1 l
                                                                                                          '
:
                                                                                                           '1
                                                                                                            !
l l
l l
l 1
1 i
1 l
l l
l l
l i
1 l
1 1
1 1
                                                                                                          !
i 1
l l
l l
i 1
l 1
l 1
1 l
0328T:7 l
1 0328T:7 l
l
l
_            _        . _ .
                              .,.


_    .._ ._                _ ._                          _ . _ _ _ _                _ . . _ . . _ . _ . _ _ _ _ _ _ _                                    _ _ _ _      __
1 l
                                                          -
                        .,
1
                -          -
                                                        ..
                                          ,
l
                              '
3/4.8 EL'ECTRICAL POWER SYSYEMS                                                                                              g      gTH 3/4.8.1        A.C. SOURCES                                                                                                g      (yb A.C. SOURCES - OPERATING LIN!YING CONDITION FOR OPERATION                                                                                                                                ;
3/4.8 EL'ECTRICAL POWER SYSYEMS                                                                                              g      gTH 3/4.8.1        A.C. SOURCES                                                                                                g      (yb A.C. SOURCES - OPERATING LIN!YING CONDITION FOR OPERATION                                                                                                                                ;
: 3. 8.1.1 As' a minimum, the following A.C. slectrical power sou                                                                        s shall be                !
: 3. 8.1.1 As' a minimum, the following A.C. slectrical power sou                                                                        s shall be                !
OPERA 8LE:                                                                                                                                                      ;
OPERA 8LE:                                                                                                                                                      ;
                                                                          .
I
I
: a.        Two ptysically independent ciri:uits between the o site transmission                                                                          ,
: a.        Two ptysically independent ciri:uits between the o site transmission                                                                          ,
Line 439: Line 246:
* 0                                                                , 2A and 28 with:      l      ,
* 0                                                                , 2A and 28 with:      l      ,
L , For diesel generator 0, 3A and 2A:                                                                                                        ;
L , For diesel generator 0, 3A and 2A:                                                                                                        ;
  '
a)          A separata day fuel tank contai ~ng a minimum of                                                                      :
a)          A separata day fuel tank contai ~ng a minimum of                                                                      :
L                                                                          250 gallons of fuel.                                                                                                .
L                                                                          250 gallons of fuel.                                                                                                .
Line 447: Line 253:
l J.          A ssparate fuel transfer o                                                    .
l J.          A ssparate fuel transfer o                                                    .
l                                APPLICABILITY: CPERATIONAL CONDITIONS , 2, and 3.
l                                APPLICABILITY: CPERATIONAL CONDITIONS , 2, and 3.
                                                                                                                                                                                            .
l                                                                                                                                                              .
l                                                                                                                                                              .
ACTION:
ACTION:
Line 453: Line 258:
the OPERA 8ILITY of                                      remaining A.C. sources by performing Surve11-lance Requirements .4.1.1.1a. within 1 hour, and 4.8.1.1.2a.4.,
the OPERA 8ILITY of                                      remaining A.C. sources by performing Surve11-lance Requirements .4.1.1.1a. within 1 hour, and 4.8.1.1.2a.4.,
for one diesel go retor at a time, within 8 hours, and at least once per 8 hours                                reafter; restore at least two offsite circuits and diesel gen stars 0 and 2A to OPERABLE status within 72 hours or be in at less NOT 5HUTDOWN within the next 12 hours and in COLD SHUTDOWN wi                        n the following 24 hours.
for one diesel go retor at a time, within 8 hours, and at least once per 8 hours                                reafter; restore at least two offsite circuits and diesel gen stars 0 and 2A to OPERABLE status within 72 hours or be in at less NOT 5HUTDOWN within the next 12 hours and in COLD SHUTDOWN wi                        n the following 24 hours.
.
I                                      b.      With one                    faite circuit and diesel generator 0 or 2A of the above require A.C. electrical power sources inoperable, demonstrate the OPERAB ITY of the remaining A.C. sources by performing Surveillance Requi                  nts 4.8.1.1.la. within I hour, and 4.8.1.1.2a.4., for one die i generator at a time, within 6 hours, and at least once per 8        urs thereafter; restore at least one of tha inoperable A.C.
I                                      b.      With one                    faite circuit and diesel generator 0 or 2A of the above require A.C. electrical power sources inoperable, demonstrate the OPERAB ITY of the remaining A.C. sources by performing Surveillance Requi                  nts 4.8.1.1.la. within I hour, and 4.8.1.1.2a.4., for one die i generator at a time, within 6 hours, and at least once per 8        urs thereafter; restore at least one of tha inoperable A.C.
urces to OPERA 8LE status within 12 hours or be in at least HOT HUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. Restc?e at least two offsite circuits and diesel generators 0 and 2A to OPERA 8LE status within 72 hours from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.
urces to OPERA 8LE status within 12 hours or be in at least HOT HUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. Restc?e at least two offsite circuits and diesel generators 0 and 2A to OPERA 8LE status within 72 hours from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours.
ee page 3/4 8-1(a).                                                                                                                                  g LASALLE - UNIT 2                                                                3/4 8-1                                          Amendment No.16
ee page 3/4 8-1(a).                                                                                                                                  g LASALLE - UNIT 2                                                                3/4 8-1                                          Amendment No.16
_ . _ _ _ _ _ _ _                        _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ . . _ . . _ _ _ _ _ , _ _ . _ . . . . - _ .
                                                                              -


                                                                                                  .
                                                                                                                                                  -
                                                                                                                                                      -- - . - -          .-                              - . , . . - -
                                                                                                                                                                                                            .
                      ,
                     +.                                                                                                                                                                                                          l 3/4. 9 ELEC71 CAL p0WER SYSTEMS                                                                                                                                                                'j
                     +.                                                                                                                                                                                                          l 3/4. 9 ELEC71 CAL p0WER SYSTEMS                                                                                                                                                                'j
                               - 3/4. 8.1; A.'C.' SOURCES                                                                                                                              e
                               - 3/4. 8.1; A.'C.' SOURCES                                                                                                                              e A.C. SOURCES - OPERATING                                                                                                                                                                        l LIMITING CONDITIONS FOR OPERATION                                                                                                                                                                ;
      '
A.C. SOURCES - OPERATING                                                                                                                                                                        l
:
LIMITING CONDITIONS FOR OPERATION                                                                                                                                                                ;
a                                                                                                                                                                                                                          .
a                                                                                                                                                                                                                          .
                                                                                                                                                                        *
                                                                                                                                                                                                                              !
3.8.1.1          As a minimum, the following A.C. electrical power sources shall be                                                                                                            i OPERABLE:                                                                                                                                                                      l
3.8.1.1          As a minimum, the following A.C. electrical power sources shall be                                                                                                            i OPERABLE:                                                                                                                                                                      l
: a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and                                                                                                                      3
: a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and                                                                                                                      3
                                                                                                                                                                                                                              ,
: b. Separate and independent diesel generators
: b. Separate and independent diesel generators
* 6,1A, 2A and 2B with:
* 6,1A, 2A and 2B with:
: 1.            For diesel generator 8,                                                        1A and 2A                                                                        ,
: 1.            For diesel generator 8,                                                        1A and 2A                                                                        ,
                                                                                                                                                                                                                              '
,
a)                A separate day fuel tank containing a minimum of 250' gallons of fuel.                                                                                                                              ,
a)                A separate day fuel tank containing a minimum of 250' gallons of fuel.                                                                                                                              ,
                                                                                                                                                                                                                          '
b)                A separata fusi etorage s>stom containing a. minimum of                                                                                        >
b)                A separata fusi etorage s>stom containing a. minimum of                                                                                        >
                                                                                                                                                                                                                                *
          ,
31,000 gallons of fuel.
31,000 gallons of fuel.
: 2.            For diesel generator 28, a separate fuel storage tank and a day                                                                                                ,
: 2.            For diesel generator 28, a separate fuel storage tank and a day                                                                                                ,
       . .                                                      tank containing a combined minimum of 29,759 gallot.s of fuel.                                                                                                  !
       . .                                                      tank containing a combined minimum of 29,759 gallot.s of fuel.                                                                                                  !
                                                                                                                                                                                                                              '
  .
            &%
D'                                                                                                                                                                '''
D'                                                                                                                                                                '''
3.
3.
                                                                                                                                                                                                                              '
A 2eparate fuel transfor pump.
A 2eparate fuel transfor pump.
APPLICABILITY: OPERATIONAL CONDITIONS.1, 2, and 3.                                                                                                                                          ,  ;
APPLICABILITY: OPERATIONAL CONDITIONS.1, 2, and 3.                                                                                                                                          ,  ;
Line 502: Line 283:
: a. With one.offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate.the OPERABILITY of the remaining A.C. sources by performing Surve111ance Requirement 4.8.1.t.1.a o                                          within 1 hour and at .least once per 8 hours thereafter.                                                                            If any of the diesel generators have not been successfully tested within the I                                              past 24 hours, demonstrate their OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, s,eparately, within 24 hours.                                                                          Restore the offsite                          circuit        '
: a. With one.offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate.the OPERABILITY of the remaining A.C. sources by performing Surve111ance Requirement 4.8.1.t.1.a o                                          within 1 hour and at .least once per 8 hours thereafter.                                                                            If any of the diesel generators have not been successfully tested within the I                                              past 24 hours, demonstrate their OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, s,eparately, within 24 hours.                                                                          Restore the offsite                          circuit        '
               .                                to OPERABLE status within 72 hours or be in at least HOT SHUTDOWN within the next 12 hours and in. COLD SHUTDOWN within the following                                                                                                            l 24 hours.                                                                                                                                                          ,
               .                                to OPERABLE status within 72 hours or be in at least HOT SHUTDOWN within the next 12 hours and in. COLD SHUTDOWN within the following                                                                                                            l 24 hours.                                                                                                                                                          ,
                                                                                                                                                                                                                              ,
i-                                        b. With either the 9 or 2A diesel generator inoperable, demonstrate the l'                                              OPERABILITY of ahe above required A.C. offsite sources by performing i
i-                                        b. With either the 9 or 2A diesel generator inoperable, demonstrate the l'                                              OPERABILITY of ahe above required A.C. offsite sources by performing i
'
Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter.                                                                  If the diesel generator became inoperable due te any cause other then preplanned preventive maintenance oc testing, demonstrate ther OPERABILITY of the remaining OPERABLE l            @
        .
Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter.                                                                  If the diesel generator became inoperable due te any cause other then preplanned preventive maintenance oc testing, demonstrate ther OPERABILITY of the remaining OPERABLE
.
l            @
_
* See page 3/4 8-la.
* See page 3/4 8-la.
LASALLE-UNIT 2                                                                                        3/4 8-1                            pR0p0 SED AMENDMENT i
LASALLE-UNIT 2                                                                                        3/4 8-1                            pR0p0 SED AMENDMENT i
Line 517: Line 292:
C                                                                                                                      l u <                                                                                                                    ;
C                                                                                                                      l u <                                                                                                                    ;
3 ai? ?
3 ai? ?
                     - ELECTRICAL POWER SYSTEMS
                     - ELECTRICAL POWER SYSTEMS LINITING CONDITION FOR OPERATION (Continued) i t
                              .
                                .
LINITING CONDITION FOR OPERATION (Continued) i
                                                                                                                        ,
t
                                                                                                                         ;
                                                                                                                         ;
[.  !
[.  !
Line 528: Line 298:
requirements 4 8.1.1.2d.1 and 4.8.1.1.2f.1, as part of a pre planned                            '
requirements 4 8.1.1.2d.1 and 4.8.1.1.2f.1, as part of a pre planned                            '
;                      preventative mainten                    program, on the O diesel generator the requirements of action statements are modified to:                                  ,                        j
;                      preventative mainten                    program, on the O diesel generator the requirements of action statements are modified to:                                  ,                        j
    <
                             '1.        Eliminate the requirement for performing technical specification                l
                             '1.        Eliminate the requirement for performing technical specification                l
                                     . surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4, on each
                                     . surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4, on each
Line 542: Line 311:
l D.      Technical Specification requirer. ants 4.8.1.1.la is performed daily,            ;
l D.      Technical Specification requirer. ants 4.8.1.1.la is performed daily,            ;
while the O diesel generator is inoperable.
while the O diesel generator is inoperable.
E.      The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers
E.      The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the 0                '
,
to be closed with a diesel generator feeding the bus, while the 0                '
I diesel generator is inoperable.
I diesel generator is inoperable.
The provisions of technical specification 3.0.4 are not app 1tcable.
The provisions of technical specification 3.0.4 are not app 1tcable.
LASALLE - Ul;IT 2                                3/4 8-la                  Amendment No. 44 f
LASALLE - Ul;IT 2                                3/4 8-la                  Amendment No. 44 f
i
i
              . -- ,      --      . _ ,    ---,, .--- -- -.-


                              .      -                  . -            -    - - -        --          . - - - _ - . -
                    ,
i            .
i            .
                                                                                                                                        !
i i
i i
1                                            * .
1                                            * .
l q                ELECTRICAL POWER SYSTEMS g              g  gg    /  !
l q                ELECTRICAL POWER SYSTEMS g              g  gg    /  !
    ,
        ,
LIMITING CONDITION FOR OPERATION (Continued)                                                          PAGE.  -
LIMITING CONDITION FOR OPERATION (Continued)                                                          PAGE.  -
L
L ACTION: (Continued)
.
ACTION: (Continued)
: c.          With both of the above required offsite circuits inoper                            e.
: c.          With both of the above required offsite circuits inoper                            e.
L                                        demonstrate the OPERABILITY of the remaihing A.C. sour s by per-l                                        foming Surveillance Requirement 4.8.1.1.2a.4. , for o diesel                                  '
L                                        demonstrate the OPERABILITY of the remaihing A.C. sour s by per-l                                        foming Surveillance Requirement 4.8.1.1.2a.4. , for o diesel                                  '
generator at a time, within 8 hours, and at least o e per 8 hours
generator at a time, within 8 hours, and at least o e per 8 hours
;                                        thereafter, unless the diesel generators are alrea operating; E
;                                        thereafter, unless the diesel generators are alrea operating; E
restore at'least one of the inoperable offsite c e cuits to OPERABLE
restore at'least one of the inoperable offsite c e cuits to OPERABLE status within 24 hours or be in at least HOT SH DOWN within the next 12 hours. With only one offsite circuit stored to OPERABLE                              '
                                                                                                                                      ,
status within 24 hours or be in at least HOT SH DOWN within the next 12 hours. With only one offsite circuit stored to OPERABLE                              '
stetus, restore at least two offsite circuit to 0PERABLE status within 72 hourn from time of initial-loss o be in at least H0T                              ;
stetus, restore at least two offsite circuit to 0PERABLE status within 72 hourn from time of initial-loss o be in at least H0T                              ;
SHUTDOWN within the nem 12 hours and in                            .D SHUTDOWN within the    ;
SHUTDOWN within the nem 12 hours and in                            .D SHUTDOWN within the    ;
Line 576: Line 333:
: d.        With diesel generators 0 and 2A of th above required A.C. electrical power sources inoperable, demonstrat< the OPERABILITY of the remain-                        ,
: d.        With diesel generators 0 and 2A of th above required A.C. electrical power sources inoperable, demonstrat< the OPERABILITY of the remain-                        ,
;.                                        ing A.C. sources by performing Surv 11ance Requirements 4.8.1.1.la.
;.                                        ing A.C. sources by performing Surv 11ance Requirements 4.8.1.1.la.
  -
within I hour and 4.8.1.1.2a.4., f r one diesel generator at a time,                        '
within I hour and 4.8.1.1.2a.4., f r one diesel generator at a time,                        '
,
''
within 4 hours and at least once r 8 hours thereafter; restore at least one of the inoperable die 1 generatnrs 0 and 2A to OPERABLE status within 2 hours or be i at least HOT SHUTDOWN within the next 12 hours and in COLD SHUT                          within the following 24 hours. Restore e
within 4 hours and at least once r 8 hours thereafter; restore at least one of the inoperable die 1 generatnrs 0 and 2A to OPERABLE status within 2 hours or be i at least HOT SHUTDOWN within the next 12 hours and in COLD SHUT                          within the following 24 hours. Restore e
both diesel generators 0.a 2A to OPERABLE status within 72 hours L
both diesel generators 0.a 2A to OPERABLE status within 72 hours L
Line 587: Line 341:
within 1 hour, a 4.8.1.1.2a.4., for one diesel generator at a                                i time, within 6 h rs, and at least once per 8 hours thereafter;                              !
within 1 hour, a 4.8.1.1.2a.4., for one diesel generator at a                                i time, within 6 h rs, and at least once per 8 hours thereafter;                              !
restore the in arable diesel generator 28 to OPERABLE, status within 72 hours or                    lare the HPCS system inoperable and take the ACTION required by                  ecification 3.5.1.
restore the in arable diesel generator 28 to OPERABLE, status within 72 hours or                    lare the HPCS system inoperable and take the ACTION required by                  ecification 3.5.1.
                                                                                                                                      ,
: f.          With dies              generator IA of the above required A.C. electrical power sources              operable, demonstrate the OPERABILITY of the remaining A.C. se ces by perfoming Surveillance Requirements 4.8.1.1.la.
: f.          With dies              generator IA of the above required A.C. electrical power sources              operable, demonstrate the OPERABILITY of the remaining A.C. se ces by perfoming Surveillance Requirements 4.8.1.1.la.
withi 1 hour, and 4.8.1.1.2a.4. for diesel generator 2A, within 2 ho s, and at least once per 8 hours thereafter; restore the in-op able diesel generator 1A to OPERA 8LE status within 72 hours or                          t d lare standby gas treatment system subsystem A, Unit 1 drywell and ppression chamber hydrogen recombiner system, and control room and auxiliary electric equipumnt room emergency filtration system train A inoperable and take the ACTION required by Specifications 3.6.5.3, 3.0.6.1, and 3.7.2; continued performance of Surveillance Requirements 4.8.1.1.la. and 4.8.1.1.2a.4. for diesel generator 2A is not required provided the above systems are declared inoperable and the ACTION of their respective specifications is taken.
withi 1 hour, and 4.8.1.1.2a.4. for diesel generator 2A, within 2 ho s, and at least once per 8 hours thereafter; restore the in-op able diesel generator 1A to OPERA 8LE status within 72 hours or                          t d lare standby gas treatment system subsystem A, Unit 1 drywell and ppression chamber hydrogen recombiner system, and control room and auxiliary electric equipumnt room emergency filtration system train A inoperable and take the ACTION required by Specifications 3.6.5.3, 3.0.6.1, and 3.7.2; continued performance of Surveillance Requirements 4.8.1.1.la. and 4.8.1.1.2a.4. for diesel generator 2A is not required provided the above systems are declared inoperable and the ACTION of their respective specifications is taken.
                                                                                                                                      ,
SALLE - UNIT 2                                                3/4 8-2
SALLE - UNIT 2                                                3/4 8-2
          - _ _ _ . . . _ _ _ _ - _ _ . . . _ _ . . _ _ _ _ _ - - - - -


                 ,  .    - - - -              . .-    ..    - . . - - - - - -          . - . . ~ - -            . . - . - -    .-
                 ,  .    - - - -              . .-    ..    - . . - - - - - -          . - . . ~ - -            . . - . - -    .-
     ,'        (i,                                                            '
     ,'        (i,                                                            '
                       -3/4.8 ELECTRICAL'p0WER SY3TEMS f                            '
                       -3/4.8 ELECTRICAL'p0WER SY3TEMS f                            '
                                                                                        *
                                                                                                                                                 )
                                                                                                                                                 )
                                                                                                                                                 \
                                                                                                                                                 \
   ,                    3/4.'8.1 A.C'.      SOURCES.
   ,                    3/4.'8.1 A.C'.      SOURCES.
             /:s
             /:s
           ' V2        A.C. - SOURCES - OPERATING
           ' V2        A.C. - SOURCES - OPERATING LIMITING CONDIT10CS FOR OPERATION                                                                                        !
                                                                                                                                                ,
LIMITING CONDIT10CS FOR OPERATION                                                                                        !
                                                                                                                                                 )
                                                                                                                                                 )
                                                                                                            .                                  .
diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2. a.4 within 24 hourse. Restore the diesel                                      j generator to OPERABLE status within 72 hours or be in at least HOT                                      i SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the                                      i following 24 hours.
diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2. a.4 within 24 hourse. Restore the diesel                                      j generator to OPERABLE status within 72 hours or be in at least HOT                                      i SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the                                      i following 24 hours.
: c. With one offsite circuit of the above-required A.C. sources and diesel- generator 9 or 2A of tho' above required A.C. electrical power                                ;
: c. With one offsite circuit of the above-required A.C. sources and diesel- generator 9 or 2A of tho' above required A.C. electrical power                                ;
sources inoperable, demonstrate the OPERA 81LITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a
sources inoperable, demonstrate the OPERA 81LITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least once per 8 hours thereafter. If the                                  '
                                                                                                                                          -
within 1 hour and at least once per 8 hours thereafter. If the                                  '
                                                                                                                                              '
pl                                      diesel generator became inoperable due to any cause other than''
pl                                      diesel generator became inoperable due to any cause other than''
j c                                      preplanned preventive maintenance or testing, demonstrate tho'                                        '
j c                                      preplanned preventive maintenance or testing, demonstrate tho'                                        '
OPERA 81LITY of the remaining OPERABLE . diesel generators, separately, by performing Surve111ance Requirement 4.8.1*.1.2.a.4 within 8
OPERA 81LITY of the remaining OPERABLE . diesel generators, separately, by performing Surve111ance Requirement 4.8.1*.1.2.a.4 within 8
                                                                                                                                '
                                                                                                                                       +
                                                                                                                                       +
'
hourse. Restore at least one of the inoperable'A.C. sources to.
hourse. Restore at least one of the inoperable'A.C. sources to.
                                                                                                                                              '
l OPERABLE status within 12 hours or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. Restore at least two offsite circuits and diesel:
l OPERABLE status within 12 hours or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24 hours. Restore at least two offsite circuits and diesel:
             /ph                        generators 9 and 2A to OPERABLE status within 72 hours from the time                                  .
             /ph                        generators 9 and 2A to OPERABLE status within 72 hours from the time                                  .
D                          of initial loss or be in at least HOT SHUTDOWN within the next 12
D                          of initial loss or be in at least HOT SHUTDOWN within the next 12 hours aus in COLD SHUTDOWN within the following 24 hours.'                            -
      .
l                                d. With diesel generator 28 of the above required. A.C. electrical power sources inopwable, demonstrate the OPERABILITY of the offsite A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within i hour and at least once per 4 hours thereafter. 'If the diesel'                                      -l generator bortame inoperable due to any cause other than preplanned preventive .aintenance -or testing, demonstrat's the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing
hours aus in COLD SHUTDOWN within the following 24 hours.'                            -
l                                d. With diesel generator 28 of the above required. A.C. electrical power sources inopwable, demonstrate the OPERABILITY of the offsite A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within i hour and at least once per 4 hours thereafter. 'If the diesel'                                      -l generator bortame inoperable due to any cause other than preplanned
              ,
preventive .aintenance -or testing, demonstrat's the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing
:                                    Surveillance Requirement 4.8.1.1.2.a.4 within 24 hourse. Restore i
:                                    Surveillance Requirement 4.8.1.1.2.a.4 within 24 hourse. Restore i
diesel generator 2B to OPERABLE status within 72 hours or declare u'                                      the HpCS system inoperable and take the ACTION required by specification 3.5.1.                                                                                  j L
diesel generator 2B to OPERABLE status within 72 hours or declare u'                                      the HpCS system inoperable and take the ACTION required by specification 3.5.1.                                                                                  j L
i l
i l
        .
: e. With both of the above required offsite circuits inoperable,                                          i L
: e. With both of the above required offsite circuits inoperable,                                          i L
                                       . demonstrate the OPERABILITY of the remaining A.C. sources,                                          j L                                      separately, by' performing Surveillance Requirement 4.8.1,.1.2.a.4
                                       . demonstrate the OPERABILITY of the remaining A.C. sources,                                          j L                                      separately, by' performing Surveillance Requirement 4.8.1,.1.2.a.4
Line 642: Line 378:
3/4 8-2                pR0p0 SED AMENDMENT LASALLE-UNIT 2 h 't
3/4 8-2                pR0p0 SED AMENDMENT LASALLE-UNIT 2 h 't


                                                                                            ..      _ _ _ __.
___ ,
Ol                                                                                                                      j
Ol                                                                                                                      j
                 .                                                                                                          ;
                 .                                                                                                          ;
       .:                                                                                                                  d ILCCTRICAI pCWER SYSTE!'tS
       .:                                                                                                                  d ILCCTRICAI pCWER SYSTE!'tS
                              .
           .3...
           .3...
       . $i
       . $i LIMITING CONDITIONS FOR OPERATION-(Continued)
        '
LIMITING CONDITIONS FOR OPERATION-(Continued)
ACTION (Continued) at least two offsite circuits to OPERABLE status within 72 hours                        ;
ACTION (Continued) at least two offsite circuits to OPERABLE status within 72 hours                        ;
from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24                        ,
from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours and in COLD SHUTDOWN within the following 24                        ,
                                                                                                                          '
hours. A successful' test (s) of diesel generator OPERABILITY per
hours. A successful' test (s) of diesel generator OPERABILITY per
                                   - Surveillance Requirement; 4.8.1.1.2.a.4, performed under this ACTIDM
                                   - Surveillance Requirement; 4.8.1.1.2.a.4, performed under this ACTIDM
                                   . statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement a.                                    ,
                                   . statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement a.                                    ,
                                                                                                                          -
   ,                        f. With diesel generators e and 2A of the atave required A.C.
   ,                        f. With diesel generators e and 2A of the atave required A.C.
       ..                          electrical power sources. inoperable, demonstrate the OPERABILITY of.                  :
       ..                          electrical power sources. inoperable, demonstrate the OPERABILITY of.                  :
,-                                the remaining A.C. sources by performing Surveillance Requirement
,-                                the remaining A.C. sources by performing Surveillance Requirement 4.3.1.1.1.a within 1 hour and at' least 'once per 8 hcurs thereafter,                  i l.
'
4.3.1.1.1.a within 1 hour and at' least 'once per 8 hcurs thereafter,                  i l.
and Surveillance Requirement 4.8.1.1.2.a.4 for the 2B'and 1A diesel                  <
and Surveillance Requirement 4.8.1.1.2.a.4 for the 2B'and 1A diesel                  <
                                                                                                                        '
generators, separately,Jwithin 8 hourse. Restore.at least one of              .
generators, separately,Jwithin 8 hourse. Restore.at least one of              .
the inoparable diesel generators 8 or 2A to. OPERABLE status within 2                ;
the inoparable diesel generators 8 or 2A to. OPERABLE status within 2                ;
l hours, or be in at least HOT SHUTDOWN within the next 12 hours and' ll                                in COLD SHUTDOWN within the following 24 hours. Restore tioth diesel                  !
l hours, or be in at least HOT SHUTDOWN within the next 12 hours and' ll                                in COLD SHUTDOWN within the following 24 hours. Restore tioth diesel                  !
!
           ,.s                      generators 6 and 2A to OPERABLE status within 72 hours, frosethe            _
           ,.s                      generators 6 and 2A to OPERABLE status within 72 hours, frosethe            _
                                                                                                                        ,
[g; g .                  time of initial loss, or be in at least HOT SHUTDOWN within the next              ..
[g; g .                  time of initial loss, or be in at least HOT SHUTDOWN within the next              ..
                                                                                                                        '
l                                  12 hoca and in' COLD SHUTDOWN within the fo11owing.24 hours.
l                                  12 hoca and in' COLD SHUTDOWN within the fo11owing.24 hours.
t        \u.
t        \u.
Line 679: Line 402:
       .                          sources inoperable, demonstrate the OPERABILITY of the remaining A.C sources by performing Surveillance' Requirement 4.8.1.1.1.a within 1                  -
       .                          sources inoperable, demonstrate the OPERABILITY of the remaining A.C sources by performing Surveillance' Requirement 4.8.1.1.1.a within 1                  -
hours and at least once per 8 hours thereafter.        If the 1A diesel generator became insperable due to any cause other than peoplanned prevemtive maintenance or testing, .descr< strate the OPERABILITY of
hours and at least once per 8 hours thereafter.        If the 1A diesel generator became insperable due to any cause other than peoplanned prevemtive maintenance or testing, .descr< strate the OPERABILITY of
    -
                   ;-              the 2A diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4,~*within 24 hourse.      Restore the inoperable diesel generator 1A to OPERABLE status within 72 hours or' declare standby gas treatment system subsystem A, Unit 1 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary                    .
                   ;-              the 2A diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4,~*within 24 hourse.      Restore the inoperable diesel generator 1A to OPERABLE status within 72 hours or' declare standby
electric equipment room emergency filtration system train A inoperable, and take the~ ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.8.      Continued performance of Surve111ance Requirement 4.8.1.1.1.a is not required provided the above systoms are declared inoperable and the action of their respective I
* gas treatment system subsystem A, Unit 1 drywell and suppression
          '
chamber hydrogen recombiner system, and control room and auxiliary                    .
electric equipment room emergency filtration system train A inoperable, and take the~ ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.8.      Continued performance of Surve111ance Requirement 4.8.1.1.1.a is not required provided the above systoms
                                '
are declared inoperable and the action of their respective I
            ,
specifications is taken.
specifications is taken.
1'                            ,                                                                                          t l
1'                            ,                                                                                          t l
              .
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY.        The provisions'of Specification 3.0.2 are not applicable.
* This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY.        The provisions'of Specification 3.0.2 are not applicable.
                                                                            '
LASALLE-UNIT 2                        3/4 8-2a                  pR0p0 SED AMENDMENT J'
LASALLE-UNIT 2                        3/4 8-2a                  pR0p0 SED AMENDMENT J'


                      .                    - . - .        . . . .              -    .-. . - . . - .            - . . -
           ,74      .
           ,74      .
1
1 ELECTRICAL'p0WER SYSTEMS
                    *                                                                                                              '
            ,                                                                                                                  ,
      .
ELECTRICAL'p0WER SYSTEMS
                                                                                                                                       ;
                                                                                                                                       ;
               . ;.        LIMITING CONDITIONS FOR OPERATION (Continued)              -
               . ;.        LIMITING CONDITIONS FOR OPERATION (Continued)              -
i
i ACTION . (Continued)                                                                                      l l
:
  '
  ,
        '
ACTION . (Continued)                                                                                      l l
l
l
: h. With one offsite circuit of the above required A.C. electrical power.                        ,
: h. With one offsite circuit of the above required A.C. electrical power.                        ,
sources and diesel generator 2B inoperable, apply the requirements                          -
sources and diesel generator 2B inoperable, apply the requirements                          -
of ACTION a and d specified above.
of ACTION a and d specified above.
                                                                                                                                    -
1.-  With either diesel generators 9 or 2A inoperable and diesel T                                generator 29 inoperable, apply the requirements of ACTION b and d
1.-  With either diesel generators 9 or 2A inoperable and diesel T                                generator 29 inoperable, apply the requirements of ACTION b and d
                                       .specified above.    .
                                       .specified above.    .
                                                                                                                             >, i With!one offsite. circuit of the above required A.C. electrical ~ power
                                                                                                                             >, i With!one offsite. circuit of the above required A.C. electrical ~ power
                                                                                                                                    '
                                 ,3 sour:es.and diesel generator 1A inoperable, apply the requirements ,
                                 ,3 sour:es.and diesel generator 1A inoperable, apply the requirements ,
of ACTION a and g specified above.
of ACTION a and g specified above.
Line 724: Line 426:
o
o
: 1. With diesel generator.8 and diesel generator 1A. inoperable, apply the requirements of ACTION b and g specified above.
: 1. With diesel generator.8 and diesel generator 1A. inoperable, apply the requirements of ACTION b and g specified above.
                                                                                                      .
             .f.
             .f.
             @~J/                                                                        .
             @~J/                                                                        .
O                                            . .
O                                            . .
                                                          ,
l
l
                                                                                                                                 }
                                                                                                                                 }
                                                                    .
     +.                                                                                                                            i (g
     +.                                                                                                                            i (g
a      .
a      .
                        -
                                                                                                        .
4 e
4 e
                                                                              .
                                                                                                                                  !
                  .
8 p
8 p
                                                                        .
            @
LASALLE-UNIT 2                            3/4 8-2b                    PRCp0 SED AMENDMENT A
LASALLE-UNIT 2                            3/4 8-2b                    PRCp0 SED AMENDMENT A
                                                                                                                                   .I
                                                                                                                                   .I


__ . -      .- .              -. .-    . - - - .    -. . - - - .-            --
            .
                                                                                                              .
        .
3/4.8 ELECTRICAL POWER SYSTEMS                                                              !
3/4.8 ELECTRICAL POWER SYSTEMS                                                              !
BASES 3/4.8.1 and 3/4.8.2 A.C SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distri-          I bution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility.        The minimum specified indenndent and redundant A.C. and D.C.
BASES 3/4.8.1 and 3/4.8.2 A.C SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distri-          I bution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility.        The minimum specified indenndent and redundant A.C. and D.C.
power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.
power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.
MERT 4 The ACTION requirements speci ed for the levels of degradation of the power sources provide restrictio upon continued facility operation commensurate with the level of degradation.          he OPERABILITY of the power sources are consis-
MERT 4 The ACTION requirements speci ed for the levels of degradation of the power sources provide restrictio upon continued facility operation commensurate with the level of degradation.          he OPERABILITY of the power sources are consis-tent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C.
    .
tent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C.
power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of one of the two onsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only.                                                          -
power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of one of the two onsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only.                                                          -
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that (1) the facility can be maintained in the shutdown or refueling cendition for extended time periods and (2) sufficient instrumentation end control capability it, available for monitoring and maintaining the unit status.
The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that (1) the facility can be maintained in the shutdown or refueling cendition for extended time periods and (2) sufficient instrumentation end control capability it, available for monitoring and maintaining the unit status.
Line 766: Line 452:
Verifying average ele:trolyte temperature above the minimum for which the battery was sized, total battery terminal voltage onfloat charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.
Verifying average ele:trolyte temperature above the minimum for which the battery was sized, total battery terminal voltage onfloat charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.
1        LA SALLE - UNIT 2                          B 3/4 8-1
1        LA SALLE - UNIT 2                          B 3/4 8-1
  '
  '
          .        . . -          -_


  ,              ,.                                                          . . _ . .
t 7
                                                                                -        . - . .-
                         .                                                                                              l I
                                                                                            -
t
          .
                                                                                                                      !
    .                                                                                                                .
      ,
7
                            '
                         .                                                                                              l
                          .
I
                                                                                                                      .
                                                                                                                      ,
9 k
9 k
                                                                                                                      .
i INSERT A                                                        ,
i INSERT A                                                        ,
1
1 Action statements have been included in the specification to cover all situations where either one AC source or a combination of two AC sources                          i are. inoperable. Action statements c, e, and f are' intended to be followed to completion once' entered and should not be exited until'both'AC sources' are restored.
:
Action statements have been included in the specification to cover all situations where either one AC source or a combination of two AC sources                          i are. inoperable. Action statements c, e, and f are' intended to be followed to completion once' entered and should not be exited until'both'AC sources' are restored.
                                                                          *
                                                      -
                                                                                                                      ,
                                                                                                                       ?
                                                                                                                       ?
e l-                                                                                                                    ,
e l-                                                                                                                    ,
l
l i.
                                                                                                                      !
i.
                                                                                                                      '
?
?
l~
l~
Line 805: Line 466:
l-                                                                                                                    .
l-                                                                                                                    .
l 0328T:7
l 0328T:7
                                                                          - .                ..  . . . - , - - . .
                                                        . . . . .  .
_
            .        .        ..  - -  . - - . .-.              ,  . -


_              _      _    _
                                                                                                          ,,
l f.
l f.
     .s-t
     .s-t
                                                                                                         \  ,
                                                                                                         \  ,
  ,
AHACIMGLC SLGRIEICANT HAZARDS CONSIDERATIM i
AHACIMGLC
                                                                                                              !
SLGRIEICANT HAZARDS CONSIDERATIM i
l Commonwealth Edison has evaluated the proposed Technical Specification              ,
l Commonwealth Edison has evaluated the proposed Technical Specification              ,
amendment and determined that it does not represent a significant hazards                      '
amendment and determined that it does not represent a significant hazards                      '
Line 828: Line 480:
             ;2) Create the possibility of a new or different kind of accident from any accident previously evaluated >because:
             ;2) Create the possibility of a new or different kind of accident from any accident previously evaluated >because:
Limiting the number of diesel generator starts required by the Technical Specifications does not dagrade the reliability of.the diesel generators, therefore, the possibility o.' a new or different kind of accident is not created.
Limiting the number of diesel generator starts required by the Technical Specifications does not dagrade the reliability of.the diesel generators, therefore, the possibility o.' a new or different kind of accident is not created.
                      .
                ,.        .
: 3) ' Involve a significant reduction in the margin of safety because:
: 3) ' Involve a significant reduction in the margin of safety because:
The proposed amendments do not degrade the reliability of the diesel generators, therefore, this proposal does not involve a significant reduction in the margin of safety. Since the proposed amendment will reduce the degradation of the diesel generators caused by excessive testing, the margin of safety may actually be improved.
The proposed amendments do not degrade the reliability of the diesel generators, therefore, this proposal does not involve a significant reduction in the margin of safety. Since the proposed amendment will reduce the degradation of the diesel generators caused by excessive testing, the margin of safety may actually be improved.
0328T:8
0328T:8
,
: e.                -    >                  ,_                    -      -  -  --
: e.                -    >                  ,_                    -      -  -  --
: n.  .
: n.  .
      .
  ,.
                      '
                .
                    '
                                                                                                               )
                                                                                                               )
l l
l l
Line 852: Line 496:
1 l
1 l
l l
l l
l                                                                                                            l
l                                                                                                            l l
                                                                                                              '
l
,                                                                                                            l t                                                                                                            1 i                                                                                                            l l
,                                                                                                            l t                                                                                                            1 i                                                                                                            l l
1 i
1 i

Revision as of 01:32, 1 February 2020

Proposed Tech Spec Pages 3/4 8-1,3/4 8-1a,3/4 8-2,3/4 8-2a, 3/4 8-2b & Bases for 3/4 8-1 Re Diesel Generator Testing
ML19325E365
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 10/26/1989
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML19325E361 List:
References
NUDOCS 8911060333
Download: ML19325E365 (21)


Text

p. .

AUACIMENT B J. PROPOSED CilARGES TO THE ILCRtilCALSIECIEICAIl0ftS REVISED PAGES:

NPF-11 NPF-18 3/4 8-1 delete page 3/4 B-1 delete page 3/4 8-1 new page 3/4 b-1 new page 3/4 8-la 3/4 8-la i l

3/4 8-2 delete page 3/4 8 delete page

.l 3/4 8-2 new page 3/4 8-2 new page i 3/4 8-2a new page 3/4 8-2a new page 3/4 8-2b new page 3/4 8-2b new page i B 3/4 8-1 B 3/4 8-1 l 1

INSERT A INSERT A l

1 l

kk h P t i

0328T:6 l

t

. i. ..- .. . . ......t . , . . . . . . . .

, 3/4.8 CLECTRICAL POWER SYSTEMS 3/4.8.1 RE PLACE A.C. SOURCES-gg g A.C. SOURCES - OPERATING %M e LIMITING CONDITION FOR OPERATION

3. 8.1.1 As a minimum, the following A.C. electrical power s rces shall e OPERABLE:  :
a. Two physically independent circuits between th' ffsite transmisse I network and the onsite Class 1E distribution stem, and
b. Separate and independent diesel generators * , 1A, 2A and IB with:

l 1.. For diesel generator 0, lA and 2A: ,

a) A separate day fuel tank con ining a minimum of e 250 gallons of fuel. '

b) A separate fuel storage stem containing a minimum of f 31,000 callons of fuel.

2. For diesel gt.nerator 18, separate fuel storage tank / day tank' containing a minimum of ,750 gallons of fuel.
3. A separate fuel transf r pump. ,

APPLICABILITY: OPERATIONAL CONDIT NS 1, 2, and 3.

ACTION:

a. With either one of site circuit or diesel generator 0 or 1A of the above required A . electrical power sources inoperable, demonstrate ,

the OPERABILIT of the. remaining A.C. sources by performing Surve11-lance Require nts 4.8.1.2.la within I hour, and 4.8.1.ll2a.4,

'for one die: I generator at a time, within eight hours, and at least once per 81ours thereafter; restore at least two offsite circuits and dies generators 0 ard 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTD within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

b. Wi one offsite circuit and diesel generator 0 or 1A of the above quired A.C. electrical power sources inoperable, demonstrate the PERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4, for one diesel generator at a time, within six hours, and at leat,t once per 8 hotsrs thereafter; restore at least one of the inoperabir A.C.

sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT 4 SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and 1 diesel generators 0 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

  • See page 3/4 8-1(a)

I LASALLE-UNIT 1 3/4 8-1 Amendment No. 49

i S/4 S ELICTRICPL POWER SYSTEMS-3/4.6.1.A.C. SOURCES ,

p% J

' ,". s A.C. SOURCES - CpERATING

' LIMITING CONDITIONS FOR OPERATION J J

3.8.1.1 As a minimum, the following A.C. electrical power sources shall se i OPERABLE:

a. . Two physically independent circuits between the offsite transmission '

network and the onsite Class 1E distribution system, and

b. Separate and independent diesel generators
  • 0, 1A, 2A and 1B with:
1. For dier.el generator 9, 1A and 2A i

a) A separate day fuel tank containing a minim.tm of 250 gallons of fuel.

b) ,

A separate fuel storage system containing a minimum of 7 31,000 gallons of fuel.

2, For diesel generator 1B, a separate fuel storage tank and a day tank containing a combined minimum of 29,750 gallons of fuel.

h 3. A separate fuel transfer pump.

ApDLICABILITY: OPERATIONAL CONDITIONS 1, 2, and 3. T.: n ACTIDN  :

a. With one offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within' 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. . If any of the diesel generators have not been successfully tested within the past 24' hours, demonstrate their OPERABILITY by performing r Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, separately, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit-to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN' I within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,
b. With either the 0 or 1A diesel gene.rator inoperable, demonstrate the OPERABILITY of the above required A.C. offsite sources by performing Survei? lance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per S hours thereafter. If the c'iesel generator became inoperable due to any cause other than, preplanned preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE

...

  • See page 3/4 8-la.

3/4 8-1 pR0p0 SED AMENDMENT Lt.SALLE-UNIT 1 4

2h nr .

1 y .. ELEl!TRICAL POWER SYSTEMS e ,

)

LIMITING CONDITION FOR OPERATION (Continued)

'l J

1 i

[ *For the purpose of completing ~ technical specification surveillance requirements 4.8.1.1.2d.1 ana 4.8.1.1.2f.1, as part of a pre planned .

preventive mainte program, on the 0 diesel generator the requirements of  !

action statement re modified to:

' 1. - techniem1 ana ication Eliminate surveillancethe requirement requirements for performing 4.8.1.1.la and (3 A 1.1.2amd7 on each  !

operable AC source, immediately and once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, when the 0 diesel generator.is declared inoperable. . l

2. Allow an additiona V 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> in excess of the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement or the 0 diesel generator to be inoperable. ,

Provided that the following conditions are met:

A. Unit 2 is in operational condition 4 or 5 or defueled prior to

.taking the O diesel generator out of service: (

B. Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are-successfully completed, for the offsite power sources and the 1A and 3 2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> print to removal of the 0  :

diesel generator from service.

C. No maintenance is performed on the offsite circuits or the 1A or 2A  !

diesel generators,.while the O dicsal generator is inoperable.

D. Technical specification requirement 4.8.1.1.la is performed daily, while the O diesel generator is inoperable. ,

E. The control circuit for the unit cross-tie circuit breakers between

buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the O diesel generator is inoperable.

The provisions of technical specification 3.0.4 are not applicable.

LASALLE-UNIT 1 3/4 8-la Amendment No. 63

_ - . . , - - - , , , . . . _ . . _ . ,- ,-.,.-.m..,... .-w,,

d ., i l

ELECTRICAL POWER SYSTEMS 8EoL. ACE WLTH LIMITING CON 0! TION f0R OPERATION (Continued) s j ACTION (Continued) l L ,

c. With both of the above required offsite circuits inoperable, mon-strate the OPERABILITY of the remaining A.C. sources by perf ing u Surveillance Requirement 4.8.1.1.2a.4, for one diesel gene tor at +

l a time, within eight hours, and at least once per 8 hcur thereafter, unless the diesel generators are already operating; res re at least i

one of.the inoperable offsite circuits to OPERABLE st us within l

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SHUTDOWN within the t 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. .

With only one offsite circuit restored to OPERABLE tatus, restore at least two offsite circuits to OPERABLE status thin 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />s- ,

from time of initial loss or be in at least HOT HUTDOWN within the '

next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the ollowing 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. i i

d. With diesel generators 0 and 1A of the abo required A.C. electrical power sources inoperable, demonstrate th PERABILITY of the remain- .

ing A.C. sources by performing M rveill ce Requirements 4.8.1.1.la t within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and 4.8.1.1.2a.4, for o diesel generator at a L time, within four hours and at least nce per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter;

} restore at least one of the inoper e diesel generators 0 and 1A to .

OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or e in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD S within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

Restore both diesel generator and 1A to 0PERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initia loss or be in at least HOT SHUTDOWN l within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />'a in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,

e. With. diesel generator of the above required A.C. electrical power sources inoperable, monstrate the OPERABILITY of the remaining  !

A.C. sources by per orming Surveillance Requirements 4.8.1.1.la  !

within I hour, an 4.8.1.1.2a.4, for one diesc1 generator at a l !

l. time, within si hours, and at least once.per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />'thereafter; restore the i erable diesel generator 18 to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or clare the HPCS system inoperable and take the ACTION required b Specification 3.5.1.  ;

i L f. With di el generator 2A of the above required A.C. electrical power  !

sourc inoperable, demonstrate the OPERABILITY of the remaining L

, A. C. ources by performing Surveillance Requirements 4.8.1.1.la and

4. .1.2.a4, for diesel generator 1A, within one hour, and at j

! I st'once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore the inoperable diesel

- enerator 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare standby g'

gas treatment system subsystem 8, Unit 2 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration system train B inoperable

, and take the ACTION required by Specifications 3.6.5.3, 3.6.6.1.,

and 3.7.2; continued performance of Surveillance Requirements l.

i 4.8.1.1.la. and 4.8.1.1.2a.4 for diesel generator 1A is not required l providad the above systems are delcared inoperable and the ACTION of their respective specifications is taken.

LA SALLE - UNIT 1 3/4 8-2 Amendment No. 18

l h '3/4.8 ELECTR! CAL'cCWER SYSTEMS j

3/4.8.1'A.C. SOURCES 1

,T l

5.')h A.C. SOURCES - OPERATING  ;

LIMITING CONDITIONS FOR OPERATION 1

l diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore the diesel l generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT )

SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. I

c. With one offsite circuit of the above-required R.C. sources and  ;

diesel generator 8 or 1A of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sourcos by parforming Surveillance Requirement 4.8.1.1.1.a within- 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If.the diesel generator became inoperable due to any cause other than preplanned preventive maintenance or testing, demonstrate the ,

OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *. Restore at least one of the inoperable A.C. sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at'least HOT SHUTDOWN' ,

within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following  ;

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel- i

(). generators 9 and 1A to'0PERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time .

of initial loss or be in at'least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />'and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I d. With diesel generator 1B of the above required A.C. electrical power i

sources inoperable, demonstrate the OPERABILITY of the offsite A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at 'leasf~ence'jer 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel' >

generator became inoperable due to any cause other than preplanned  ;

Ll- preventive maintenance or testing, demonstrate the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> *. Restore j'a diesel generator 1B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare

the HPCS system inoperable and, take the ACTION required by.

specification 3.5.1.

e. With both of the above required offsite circuits inoperable, demonstrate thw OPERABILITY of the remaining A.C. sources, I reparately, by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 nours unless the diesel generators are already operating. >

Restore at least one offsite circuit to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be'in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. '

With only one offsite circuit restored to OpFRABLE status, restcre 1' .

  • This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.

LASALLE-UNIT 1 3/4 8-2 PROPOSED AMENDMENT a-

4 (

ELECTRICA'L p0WER SYSTEMS ,

fw

  • U';/ LIMITING CONDITIONS FOR OPERATION (Continued)  !

i ACTION (Continued) i at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 "

hours. A successful test (s) of diesel generator OPERABILITY per Surveillance Requirement 4.8.1.1.'2.a.'4, performed under this ACTION  :

statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of A'; TION statement a. ,

f. With -diesel generators 8 and 1 A of the above required A.C. .

j p

electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by pe'rforming Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, ,

and Surve111ance Requirement 4.8.1.1.2.a.4 for the 1B and 2A diesel  !

,, generators, separately, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> *. Restore'at least one of ,

j' the inoperable diesel generators 8 or 1A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and

- in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore both diesel b generators 8 and 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, frotu the time of initial' loss, or be in at least HOT SHUTDOWM,wi. thin.the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the followin,g 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

g. With diesel generator 2A of the above required A.C. electrical power 5 sources inoperable, demonstrate the OP5RABILITY of the remaining A.C l  !

sources by parforming Surveillance Requirement 4.8.1.1.1.a within 1 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per b hours thereafter. If the EA diesel gen'eiator became inoper'able due to any cause other than preplanned

  • preventive maintenance or testing, demonstrate the OPERABILITY of the 1A diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4, within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />se. Restore the inoperable diesel generator ?A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare standby '

gas treatment system subsystem B, Unit 2 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary electric equipment room emergency filtration systeri train B inoperable, and.take the ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.2. Continueid performance of Survei: lance Requirement 4.8.1.1.1.a is not required previded.the above 'systoms are declared inoperable and the action of their respective specifications is taken.

  • This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of

> Specification 3.0.2 are not applicable.

LASALLE-UNIT 1 3/4 8-2a PROPOSED ' AMENDMENT 4

i

'- t ELECTRICAL.PCWER SYSTE5S' ch'

't./ LIMITING CONDITIONS FOR OPERATION (Continued) i ACTION (Continued) t

h. .With one offsite circuit of the above required A.C. electrical power sources and diesel generator 1B inoperable, apply the requirements of ACTION a and d specified above. ,

i.

With either diesel generators e or iA inoperable and diesel .

generator 1B inoperable, apply the requirements of ACTION b and d specified above.

J.

With one offsite circuit of the above required A.C. electrical power ,

sources and diesel generator 2A inoperable, apply the requirements ^

of ACTION a'and g specified above.

k. With diesel generator 18 and diesel generator 2A inoperable, apply the requirements of ACTION d and g sp9cified above.
1. With diesel generator 9 and diesel generator 2A inoperable, apply [

,;

the requirements of ACTION b and g specified above.

kh LAJALLE-UNIT 1 3/4 8-2b PROPOSED AMENDMENT )

.J

^*

b*

l. ,

4 3/4.8 ELECTRICAL POWER SYSTEMS BASES 3/4.8.1 and 3/4.8.2 A.C. SOURCES and ONSITE POWER DISTPIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distribution systems during operation ensures that sufficient power will be available to supply the safety related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility. The minimum specified independent and redundant A.C. and 0.C. power sources and distribution systems satisfy the requirements of General Design Criteria 17 of Appendix "A" to 10 CFR 50.

The ACTION requirements specified for the levels of degradation of the power sources provide' restricticn upon continued facility operation TNS MA commensurate with the level of degradation. #The OPERA 8ILITY of the power sources are consistent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C. power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss of offsite power and single failure of one of the two cnsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only. .

The OPERABILITY of the minimum 'specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that-( (1) the facility can be maintained in the shutdown or refueling condition for extended time periods and (2) sufficient instrumentation and control j capability is available for r.onitoring and maintaining the unit status. I The surveillance requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory l-l Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Sup-plies," March 10, 1971, with the exception noted in Appendix B to the FSAR, and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear f'ower Plants," Revision 1, August 1977.  !

The diesel generator fast start surveillance requirements, based on a PRA i

' study, are sufficient to demonstrate the onsite A.C. power system capability to mitigate the consequences of the design basis event for the plant, i.e. , large LOCA coiv.? dent with e loss-of-offsite power, while minimizing the mechanical ,

l stress aad wear on the diesel engine.

The imrvel11ance requirements for der.onstrating the OPERABILITY of the unit batteries are in accordance with the recommendations of flegulatory Guide 1.129, " Maintenance Testing and (!eplacement of Large Lead Storage Batteries for Nuclear Power Plants " February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintanance, Testing, and Replacement of Large Lead Storage Batteries for Generating Station and Substations."

Verifying average electrolyte temperature above the minimum for which the battery was sized, total battery terminal voltag: onfloat charge, connection resit,tanca values and the performance of batta y service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharya rates and comparec the battery capacity at that time with the rated capacity.

LA SALLE - UNIT 1 8 3/4 8-1 Amendment No.16

~ _ . _ _ _____ _ _ _ _ _ _ _ _ _ _ _ __ _ _ ___ _ ____

[i; v:. , l , 1

. 1

  • ,,

l Y .

l i

4 F l

[ )

l l

4 INSERLA )

l

! Action statements'have been included-in the specification to cover all situations where either one AC source or a combination of two AC sources are inoperable. Action statements c, e, and f are intended to be followed to completion once entered and should not be exited until both AC sources are restored. 1 l

  • l l

t.

i

'1 l

l l

l 1

1 i

1 l

l l

l i

1 l

1 1

l 1

0328T:7 l

l

1 l

3/4.8 EL'ECTRICAL POWER SYSYEMS g gTH 3/4.8.1 A.C. SOURCES g (yb A.C. SOURCES - OPERATING LIN!YING CONDITION FOR OPERATION  ;

3. 8.1.1 As' a minimum, the following A.C. slectrical power sou s shall be  !

OPERA 8LE:  ;

I

a. Two ptysically independent ciri:uits between the o site transmission ,

network and the onsite Class 1E distribution sys , and '

, b. Separate and independent diesel generators

  • 0 , 2A and 28 with: l ,

L , For diesel generator 0, 3A and 2A:  ;

a) A separata day fuel tank contai ~ng a minimum of  :

L 250 gallons of fuel. .

I b) A separate fuel storage sys containing a minimum of [

31,000 gallons of fuel.

2. For diesel generator 28 a ses rate fuel storage tank / day tank containing a minimum of 2g 7 ' gallons of fuel.

l J. A ssparate fuel transfer o .

l APPLICABILITY: CPERATIONAL CONDITIONS , 2, and 3.

l .

ACTION:

a. With either one offsito ircuit or diesel generator 0 o* 2A of the abeve required A.C. el ctrical power sources inoperable, demonstrate '

the OPERA 8ILITY of remaining A.C. sources by performing Surve11-lance Requirements .4.1.1.1a. within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4.,

for one diesel go retor at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> reafter; restore at least two offsite circuits and diesel gen stars 0 and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at less NOT 5HUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN wi n the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

I b. With one faite circuit and diesel generator 0 or 2A of the above require A.C. electrical power sources inoperable, demonstrate the OPERAB ITY of the remaining A.C. sources by performing Surveillance Requi nts 4.8.1.1.la. within I hour, and 4.8.1.1.2a.4., for one die i generator at a time, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and at least once per 8 urs thereafter; restore at least one of tha inoperable A.C.

urces to OPERA 8LE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT HUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restc?e at least two offsite circuits and diesel generators 0 and 2A to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

ee page 3/4 8-1(a). g LASALLE - UNIT 2 3/4 8-1 Amendment No.16

+. l 3/4. 9 ELEC71 CAL p0WER SYSTEMS 'j

- 3/4. 8.1; A.'C.' SOURCES e A.C. SOURCES - OPERATING l LIMITING CONDITIONS FOR OPERATION  ;

a .

3.8.1.1 As a minimum, the following A.C. electrical power sources shall be i OPERABLE: l

a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system, and 3
b. Separate and independent diesel generators
  • 6,1A, 2A and 2B with:
1. For diesel generator 8, 1A and 2A ,

a) A separate day fuel tank containing a minimum of 250' gallons of fuel. ,

b) A separata fusi etorage s>stom containing a. minimum of >

31,000 gallons of fuel.

2. For diesel generator 28, a separate fuel storage tank and a day ,

. . tank containing a combined minimum of 29,759 gallot.s of fuel.  !

D'

3.

A 2eparate fuel transfor pump.

APPLICABILITY: OPERATIONAL CONDITIONS.1, 2, and 3. ,  ;

BGT1Qlit *

~

a. With one.offsite circuit of the above required A.C. electrical power sources inoperable, demonstrate.the OPERABILITY of the remaining A.C. sources by performing Surve111ance Requirement 4.8.1.t.1.a o within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at .least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If any of the diesel generators have not been successfully tested within the I past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, demonstrate their OPERABILITY by performing Surveillance Requirement 4.8.1.1.2.a.4 for each such diesel generator, s,eparately, within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore the offsite circuit '

. to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in. COLD SHUTDOWN within the following l 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,

i- b. With either the 9 or 2A diesel generator inoperable, demonstrate the l' OPERABILITY of ahe above required A.C. offsite sources by performing i

Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the diesel generator became inoperable due te any cause other then preplanned preventive maintenance oc testing, demonstrate ther OPERABILITY of the remaining OPERABLE l @

  • See page 3/4 8-la.

LASALLE-UNIT 2 3/4 8-1 pR0p0 SED AMENDMENT i

l2 o

e, , - , ---,-,,,m, ,-,,...,,--,,---an,.,,., . , - , , - . , - . . , - , , _ , . . . , . - - - , , - , - , _ - - - - - - - - . - - - - -

C l u <  ;

3 ai? ?

- ELECTRICAL POWER SYSTEMS LINITING CONDITION FOR OPERATION (Continued) i t

[.  !

  • For the purposes of. completing' technical specification surveillance .:

requirements 4 8.1.1.2d.1 and 4.8.1.1.2f.1, as part of a pre planned '

preventative mainten program, on the O diesel generator the requirements of action statements are modified to
, j

'1. Eliminate the requirement for performing technical specification l

. surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4, on each

  • operable AC source, immediately and once per 8 hoars thereafter, '1 when'the 0 diesel generator is declared inoperable.; ,;
2. Allow an additions' 96 hours0.00111 days <br />0.0267 hours <br />1.587302e-4 weeks <br />3.6528e-5 months <br />'in excess of-the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed in action statement (y or the 0 diesel- generator to be inoperable.

( Provided that the following conditions are met:

F A. Unit 1 is in operational condition 4 or 5 or defueled prior to taking the,0 diesel generator out of service.

B. Surveillance requirements 4.8.1.1.la and 4.8.1.1.2a.4 are "

successfully. completed, for the offsite power sources'and the 1A or

2A diesel generators, within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> prior to removal of the O diesel-generator from service.

C. No maintenance is performed on the offsite circuits or the 1A or 2A

  • diesel generators, while the O diesel generator is inoperable.

l D. Technical Specification requirer. ants 4.8.1.1.la is performed daily,  ;

while the O diesel generator is inoperable.

E. The control circuit for the unit cross-tie circuit breakers between buses 142Y and 242Y are temporarily modified to allow the breakers to be closed with a diesel generator feeding the bus, while the 0 '

I diesel generator is inoperable.

The provisions of technical specification 3.0.4 are not app 1tcable.

LASALLE - Ul;IT 2 3/4 8-la Amendment No. 44 f

i

i .

i i

1 * .

l q ELECTRICAL POWER SYSTEMS g g gg /  !

LIMITING CONDITION FOR OPERATION (Continued) PAGE. -

L ACTION: (Continued)

c. With both of the above required offsite circuits inoper e.

L demonstrate the OPERABILITY of the remaihing A.C. sour s by per-l foming Surveillance Requirement 4.8.1.1.2a.4. , for o diesel '

generator at a time, within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and at least o e per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />

thereafter, unless the diesel generators are alrea operating; E

restore at'least one of the inoperable offsite c e cuits to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT SH DOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. With only one offsite circuit stored to OPERABLE '

stetus, restore at least two offsite circuit to 0PERABLE status within 72 hourn from time of initial-loss o be in at least H0T  ;

SHUTDOWN within the nem 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in .D SHUTDOWN within the  ;

following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,

d. With diesel generators 0 and 2A of th above required A.C. electrical power sources inoperable, demonstrat< the OPERABILITY of the remain- ,
. ing A.C. sources by performing Surv 11ance Requirements 4.8.1.1.la.

within I hour and 4.8.1.1.2a.4., f r one diesel generator at a time, '

within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> and at least once r 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable die 1 generatnrs 0 and 2A to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be i at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUT within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore e

both diesel generators 0.a 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> L

L from time of initial loss r be in at least H0T SHUTDOWN within the .

next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COL SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. ,

e. With diesel generator 8 of the above required A.C. electrical power sources inoperable, nstre.te the OPERABILITY of the remaining A.C. sources by per orming Surve111aner Requirements 4.8.1.1.la. '

within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, a 4.8.1.1.2a.4., for one diesel generator at a i time, within 6 h rs, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter;  !

restore the in arable diesel generator 28 to OPERABLE, status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or lare the HPCS system inoperable and take the ACTION required by ecification 3.5.1.

f. With dies generator IA of the above required A.C. electrical power sources operable, demonstrate the OPERABILITY of the remaining A.C. se ces by perfoming Surveillance Requirements 4.8.1.1.la.

withi 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and 4.8.1.1.2a.4. for diesel generator 2A, within 2 ho s, and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore the in-op able diesel generator 1A to OPERA 8LE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or t d lare standby gas treatment system subsystem A, Unit 1 drywell and ppression chamber hydrogen recombiner system, and control room and auxiliary electric equipumnt room emergency filtration system train A inoperable and take the ACTION required by Specifications 3.6.5.3, 3.0.6.1, and 3.7.2; continued performance of Surveillance Requirements 4.8.1.1.la. and 4.8.1.1.2a.4. for diesel generator 2A is not required provided the above systems are declared inoperable and the ACTION of their respective specifications is taken.

SALLE - UNIT 2 3/4 8-2

, . - - - - . .- .. - . . - - - - - - . - . . ~ - - . . - . - - .-

,' (i, '

-3/4.8 ELECTRICAL'p0WER SY3TEMS f '

)

\

, 3/4.'8.1 A.C'. SOURCES.

/:s

' V2 A.C. - SOURCES - OPERATING LIMITING CONDIT10CS FOR OPERATION  !

)

diesel generators, separately, by performing Surveillance Requirement 4.8.1.1.2. a.4 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />se. Restore the diesel j generator to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT i SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the i following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

c. With one offsite circuit of the above-required A.C. sources and diesel- generator 9 or 2A of tho' above required A.C. electrical power  ;

sources inoperable, demonstrate the OPERA 81LITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the '

pl diesel generator became inoperable due to any cause other than

j c preplanned preventive maintenance or testing, demonstrate tho' '

OPERA 81LITY of the remaining OPERABLE . diesel generators, separately, by performing Surve111ance Requirement 4.8.1*.1.2.a.4 within 8

+

hourse. Restore at least one of the inoperable'A.C. sources to.

l OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and diesel:

/ph generators 9 and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time .

D of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> aus in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.' -

l d. With diesel generator 28 of the above required. A.C. electrical power sources inopwable, demonstrate the OPERABILITY of the offsite A.C sources by performing Surveillance Requirement 4.8.1.1.1.a within i hour and at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> thereafter. 'If the diesel' -l generator bortame inoperable due to any cause other than preplanned preventive .aintenance -or testing, demonstrat's the OPERABILITY of the remaining OPERABLE diesel generators, separately, by performing

Surveillance Requirement 4.8.1.1.2.a.4 within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />se. Restore i

diesel generator 2B to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or declare u' the HpCS system inoperable and take the ACTION required by specification 3.5.1. j L

i l

e. With both of the above required offsite circuits inoperable, i L

. demonstrate the OPERABILITY of the remaining A.C. sources, j L separately, by' performing Surveillance Requirement 4.8.1,.1.2.a.4

'~ within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> unless the diesel generators are 'aiready operating.

Restore 'at least.one offsite circuit to OPERABLE status within 24 '

L hours, or be in at least HOT SHUTDOWN within the next 11 hours1.273148e-4 days <br />0.00306 hours <br />1.818783e-5 weeks <br />4.1855e-6 months <br />.

With only one offsite circuit restored to OPERABLE status, restore

  • This test isi required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions of Specification 3.0.2 are not applicable.

3/4 8-2 pR0p0 SED AMENDMENT LASALLE-UNIT 2 h 't

Ol j

.  ;

.: d ILCCTRICAI pCWER SYSTE!'tS

.3...

. $i LIMITING CONDITIONS FOR OPERATION-(Continued)

ACTION (Continued) at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />  ;

from the time of initial loss or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 ,

hours. A successful' test (s) of diesel generator OPERABILITY per

- Surveillance Requirement; 4.8.1.1.2.a.4, performed under this ACTIDM

. statement for the OPERABLE diesel generators, satisfies the diesel generator test requirements of ACTION statement a. ,

, f. With diesel generators e and 2A of the atave required A.C.

.. electrical power sources. inoperable, demonstrate the OPERABILITY of.  :

,- the remaining A.C. sources by performing Surveillance Requirement 4.3.1.1.1.a within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> and at' least 'once per 8 hcurs thereafter, i l.

and Surveillance Requirement 4.8.1.1.2.a.4 for the 2B'and 1A diesel <

generators, separately,Jwithin 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />se. Restore.at least one of .

the inoparable diesel generators 8 or 2A to. OPERABLE status within 2  ;

l hours, or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and' ll in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore tioth diesel  !

,.s generators 6 and 2A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, frosethe _

[g; g . time of initial loss, or be in at least HOT SHUTDOWN within the next ..

l 12 hoca and in' COLD SHUTDOWN within the fo11owing.24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

t \u.

g. With diesel generator 1A of the above required A.C.' electrical power

. sources inoperable, demonstrate the OPERABILITY of the remaining A.C sources by performing Surveillance' Requirement 4.8.1.1.1.a within 1 -

hours and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter. If the 1A diesel generator became insperable due to any cause other than peoplanned prevemtive maintenance or testing, .descr< strate the OPERABILITY of

- the 2A diesel generator by performing Surveillance Requirement 4.8.1.1.2.a.4,~*within 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />se. Restore the inoperable diesel generator 1A to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or' declare standby gas treatment system subsystem A, Unit 1 drywell and suppression chamber hydrogen recombiner system, and control room and auxiliary .

electric equipment room emergency filtration system train A inoperable, and take the~ ACTION required by specifications 3.6.5.3, 3.6.6.1, and 3.7.8. Continued performance of Surve111ance Requirement 4.8.1.1.1.a is not required provided the above systoms are declared inoperable and the action of their respective I

specifications is taken.

1' , t l

  • This test is required to be completed regardless of when the inoperable diesel generator is restored to OPERABILITY. The provisions'of Specification 3.0.2 are not applicable.

LASALLE-UNIT 2 3/4 8-2a pR0p0 SED AMENDMENT J'

,74 .

1 ELECTRICAL'p0WER SYSTEMS

. ;. LIMITING CONDITIONS FOR OPERATION (Continued) -

i ACTION . (Continued) l l

l

h. With one offsite circuit of the above required A.C. electrical power. ,

sources and diesel generator 2B inoperable, apply the requirements -

of ACTION a and d specified above.

1.- With either diesel generators 9 or 2A inoperable and diesel T generator 29 inoperable, apply the requirements of ACTION b and d

.specified above. .

>, i With!one offsite. circuit of the above required A.C. electrical ~ power

,3 sour:es.and diesel generator 1A inoperable, apply the requirements ,

of ACTION a and g specified above.

k. With diesel generator 2B and diesel generator 1A inoperable, apply the requirements of ACTION d and g specifiN.above. -

o

1. With diesel generator.8 and diesel generator 1A. inoperable, apply the requirements of ACTION b and g specified above.

.f.

@~J/ .

O . .

l

}

+. i (g

a .

4 e

8 p

LASALLE-UNIT 2 3/4 8-2b PRCp0 SED AMENDMENT A

.I

3/4.8 ELECTRICAL POWER SYSTEMS  !

BASES 3/4.8.1 and 3/4.8.2 A.C SOURCES and ONSITE POWER DISTRIBUTION SYSTEMS The OPERABILITY of the A.C. and D.C. power sources and associated distri- I bution systems during operation ensures that sufficient power will be available to supply the safety-related equipment required for (1) the safe shutdown of the facility and (2) the mitigation and control of accident conditions within the facility. The minimum specified indenndent and redundant A.C. and D.C.

power sources and distribution systems satisfy the requirements of General Design Criterion 17 of Appendix A to 10 CFR Part 50.

MERT 4 The ACTION requirements speci ed for the levels of degradation of the power sources provide restrictio upon continued facility operation commensurate with the level of degradation. he OPERABILITY of the power sources are consis-tent with the initial condition assumptions of the accident analyses and are based upon maintaining at least Division I or II of the onsite A.C. and D.C.

power sources and associated distribution systems OPERABLE during accident conditions coincident with an assumed loss-of-offsite power and single failure of one of the two onsite A.C. sources. Division III supplies the high pressure core spray (HPCS) system only. -

The OPERABILITY of the minimum specified A.C. and D.C. power sources and associated distribution systems during shutdown and refueling ensures that (1) the facility can be maintained in the shutdown or refueling cendition for extended time periods and (2) sufficient instrumentation end control capability it, available for monitoring and maintaining the unit status.

The surveillance requirements for demonstrating the OPERABILITY of the diesel generators are in accordance with the recommendations of Regulatory l Guide 1.9, " Selection of Diesel Generator Set Capacity for Standby Power Supplies," March 10, 1971, with the exception noted in Appendix B to the FSAR, l

and Regulatory Guide 1.108, " Periodic Testing of Diesel Generator Units Used l' as Onsite Electric Power Systems at Nuclear Power Plants," Revision 1,

. August 1977.

The diesel generator fast start surveillance requirements, based on a PRA study, are sufficient to demonstrate the onsite A.C. power system capability to mitigate the consequences of the design basis event for the plant, i.e., large l

LOCA coincident with a loss of-offsite power, while minimizing the mechanical l stress and wear on the diesel enginc.

The surveillance requirements for demonstrating the OPERABILITY of the unit batteries are in accordance with the recommendations of Regulatory Guide 1.129, " Maintenance Testing and Replacement of Large Lead Storage Batteries for Nuclear Power Plants," February 1978, and IEEE Std 450-1980, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Large Lead Storage Batteries for Generating Station and Substations."

Verifying average ele:trolyte temperature above the minimum for which the battery was sized, total battery terminal voltage onfloat charge, connection resistance values and the performance of battery service and discharge tests ensures the effectiveness of the charging system, the ability to handle high discharge rates and compares the battery capacity at that time with the rated capacity.

1 LA SALLE - UNIT 2 B 3/4 8-1

t 7

. l I

9 k

i INSERT A ,

1 Action statements have been included in the specification to cover all situations where either one AC source or a combination of two AC sources i are. inoperable. Action statements c, e, and f are' intended to be followed to completion once' entered and should not be exited until'both'AC sources' are restored.

?

e l- ,

l i.

?

l~

1 l

l- .

l 0328T:7

l f.

.s-t

\ ,

AHACIMGLC SLGRIEICANT HAZARDS CONSIDERATIM i

l Commonwealth Edison has evaluated the proposed Technical Specification ,

amendment and determined that it does not represent a significant hazards '

consideration. Based on the criterla for defining a significant hazards consideration established in 10 CFR 50.92, operation of LaSalle County Station  ;

Units 1 and 2 in accordance with the proposed amendment will not: "

1); Involve a significant increase in the probability or consequences of an accident previously evaluated because: )

The' proposed amendments contained in this submittal will help to enhance diesel generator reliability by minimizing the degradation of the diesel -

generators caused by excessive testing. Since the reliabilit) of the I diesel generators is not degraded, and may actually be improved by the I proposed change, the probability or consequences of an accident previously evaluated will not be increased.

2) Create the possibility of a new or different kind of accident from any accident previously evaluated >because

Limiting the number of diesel generator starts required by the Technical Specifications does not dagrade the reliability of.the diesel generators, therefore, the possibility o.' a new or different kind of accident is not created.

3) ' Involve a significant reduction in the margin of safety because:

The proposed amendments do not degrade the reliability of the diesel generators, therefore, this proposal does not involve a significant reduction in the margin of safety. Since the proposed amendment will reduce the degradation of the diesel generators caused by excessive testing, the margin of safety may actually be improved.

0328T:8

e. - > ,_ - - - --
n. .

)

l l

l Guidance has been provided ic "/inal Procedures and Standards on No l i.

Significant Hazards Considerations", Final Rule, 51 FR 7744, for the applica- I l tion of standards to license change requests for determination of the existence l

l. of significant hazards consideratiors. This document provides examples of l amendments which are and are not considered likely to involve significant i hazards considerations. This proposal is considered to be an administrative i change and, as such, does no.t involve a significant relaxation of the criteria l l used to establish safety limits, a significant relaxation of the bases for the limiting safety system settings, or a significant relaxation of the bases for ,

limiting conditions for operation. Therefore, based on the guidance provided (

in the federal Register and the criteria established in 10 CFR 50.92(e), the l proposed change does not constitute a significant hazards consideration. I l

l l

l l

1 l

l l

l l l

, l t 1 i l l

1 i

l <

I l l

l l

l 0328T:9

_ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ -