ML14352A012: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 2: Line 2:
| number = ML14352A012
| number = ML14352A012
| issue date = 12/17/2014
| issue date = 12/17/2014
| title = Acceptance Review for Revision to Indian Point 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule
| title = NRR E-mail Capture - Acceptance Review for Revision to Indian Point 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule
| author name = Pickett D
| author name = Pickett D
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1

Latest revision as of 02:45, 5 December 2019

NRR E-mail Capture - Acceptance Review for Revision to Indian Point 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML14352A012
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 12/17/2014
From: Pickett D
Plant Licensing Branch 1
To: Prussman S
Entergy Nuclear Operations
References
TAC MF5148
Download: ML14352A012 (2)


Text

NRR-PMDAPEm Resource From: Pickett, Douglas Sent: Wednesday, December 17, 2014 9:28 AM To: Prussman, Stephen G (SPrussm@entergy.com)

Cc: Young, Austin; Rosenberg, Stacey; Beasley, Benjamin

Subject:

Acceptance Review for Revision to Indian Point 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule Mr. Prussman:

By letter dated November 5, 2014, Entergy Nuclear Operations, Inc. submitted a proposed revision to the reactor vessel surveillance capsule withdrawal schedule in accordance with 10 CFR 50, Appendix H for Indian Point Nuclear Generating Unit No. 3.

The purpose of this e-mail is to provide the results of the Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Please contact me if you have any questions. A copy of this email will be made publicly available in ADAMS.

Doug Douglas V. Pickett, Senior Project Manager Indian Point Nuclear Generating Unit Nos. 2 & 3 James A FitzPatrick Nuclear Power Plant Douglas.Pickett@nrc.gov 301-415-1364 1

Hearing Identifier: NRR_PMDA Email Number: 1774 Mail Envelope Properties (Douglas.Pickett@nrc.gov20141217092700)

Subject:

Acceptance Review for Revision to Indian Point 3 Reactor Vessel Surveillance Capsule Withdrawal Schedule Sent Date: 12/17/2014 9:27:47 AM Received Date: 12/17/2014 9:27:00 AM From: Pickett, Douglas Created By: Douglas.Pickett@nrc.gov Recipients:

"Young, Austin" <Austin.Young@nrc.gov>

Tracking Status: None "Rosenberg, Stacey" <Stacey.Rosenberg@nrc.gov>

Tracking Status: None "Beasley, Benjamin" <Benjamin.Beasley@nrc.gov>

Tracking Status: None "Prussman, Stephen G (SPrussm@entergy.com)" <SPrussm@entergy.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 1937 12/17/2014 9:27:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: