{{#Wiki_filter:March 29, 2006Mr. George B. StrambackManager, Regulatory Services General Electric Company 175 Curtner Avenue San Jose, CA 95125
{{#Wiki_filter:March 29, 2006 Mr. George B. Stramback Manager, Regulatory Services General Electric Company 175 Curtner Avenue San Jose, CA 95125


==SUBJECT:==
==SUBJECT:==
GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDINGINFORMATION FROM PUBLIC DISCLOSURE FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MC 9681)
GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MC9681)


==Dear Mr. Stramback:==
==Dear Mr. Stramback:==


By letter dated January 26, 2006, Entergy Nuclear Operations, Inc. (ENO or the licensee)submitted an affidavit dated October 24, 2005, executed by yourself. You requested that theinformation contained in Attachment 5 of the licensee's January 26, 2006, letter, NEDC-33087P, Revision 1, September 2005, "J.A. FitzPatrick Nuclear Power Plant APRM [Average Power Range Monitor]/RBM [Rod Block Monitor]/Technical Specifications/Maximum Extended Operation Domain (ARTS/MEOD)," be withheld from public disclosure pursuant to Title 10 of
By letter dated January 26, 2006, Entergy Nuclear Operations, Inc. (ENO or the licensee) submitted an affidavit dated October 24, 2005, executed by yourself. You requested that the information contained in Attachment 5 of the licensees January 26, 2006, letter, NEDC-33087P, Revision 1, September 2005, J.A. FitzPatrick Nuclear Power Plant APRM [Average Power Range Monitor]/RBM [Rod Block Monitor]/Technical Specifications/Maximum Extended Operation Domain (ARTS/MEOD), be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.
A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.
The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:
: a.      Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electrics competitors without license from General Electric constitutes a competitive economic advantage over other companies.
: b.      Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.


the Code of Federal Regulations (10 CFR) Section 2.390.A nonproprietary copy of this document has been placed in the Nuclear RegulatoryCommission's (NRC's) Public Document Room and added to the Agencywide DocumentsAccess and Management System Public Electronic Reading Room.The affidavit stated that the submitted information should be considered exempt frommandatory public disclosure for the following reasons:  a.Information that discloses a process, method, or apparatus, including supportingdata and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over other companies.b.Information which, if used by a competitor, would reduce his expenditure ofresources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.We have reviewed your application and the material in accordance with the requirements of10 CFR 2.390 and, on the basis of your statements, have determined that the submittedinformation sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. Therefore, the version of the submitted information marked as proprietary will be withheld frompublic disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
G. Stramback                                   Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
G. Stramback-2-Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-2901. Sincerely,/RA/John P. Boska, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-333 cc: see next page G. Stramback-2-Withholding from public inspection shall not affect the right, if any, of persons properly anddirectly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.If the basis for withholding this information from public inspection should change in the futuresuch that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to reviewthis determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determinationadverse to the above, you will be notified in advance of any public disclosure.If you have any questions regarding this matter, I may be reached at 301-415-2901. Sincerely,/RA/John Boska, Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket No. 50-333 cc: see next pageDistributionPUBLICRidsNrrDssSbwbRidsNrrLASLittleRidsOgc RpLPLI-1 ReadingRidsNrrDorlLplaRidsNrrPMJBoskaRidsRgn1MailCenterNMorganADAMS Accession Number: ML060730003OFFICELPLI-1/PELPLI-1/PMLPLI-1/LASBWB/BCLPLI-1/BCNAMENMorganJBoskaSLittleGCranstonRLaufer DATE3/22/063/22/062/23/063/27/063/29/06OFFICIAL RECORD COPY FitzPatrick Nuclear Power Plant cc:
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
Mr. Gary J. TaylorChief Executive Officer Entergy Operations, Inc.
If you have any questions regarding this matter, I may be reached at 301-415-2901.
1340 Echelon Parkway Jackson, MS 39213Mr. John T. HerronSr. VP and Chief Operating Officer Entergy Nuclear Operations, Inc.
Sincerely,
440 Hamilton Avenue White Plains, NY 10601Mr. Theodore A. SullivanSite Vice President Entergy Nuclear Operations, Inc.
                                              /RA/
James A. FitzPatrick Nuclear Power Plant
John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: see next page


P.O. Box 110 Lycoming, NY 13093Mr. Kevin J. MulliganGeneral Manager, Plant Operations Entergy Nuclear Operations, Inc.
G. Stramback                                  Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
James A. FitzPatrick Nuclear Power Plant
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions regarding this matter, I may be reached at 301-415-2901.
Sincerely,
                                              /RA/
John Boska, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: see next page Distribution PUBLIC                  RidsNrrDssSbwb                RidsNrrLASLittle      RidsOgc Rp LPLI-1 Reading          RidsNrrDorlLpla                RidsNrrPMJBoska        RidsRgn1MailCenter NMorgan ADAMS Accession Number: ML060730003 OFFICE          LPLI-1/PE        LPLI-1/PM      LPLI-1/LA      SBWB/BC        LPLI-1/BC NAME            NMorgan          JBoska          SLittle        GCranston      RLaufer DATE                3/22/06      3/22/06        2/23/06        3/27/06        3/29/06 OFFICIAL RECORD COPY


P.O. Box 110 Lycoming, NY 13093Mr. Oscar LimpiasVice President Engineering Entergy Nuclear Operations, Inc.
FitzPatrick Nuclear Power Plant cc:
440 Hamilton Avenue White Plains, NY 10601Mr. Christopher SchwarzVice President, Operations Support Entergy Nuclear Operations, Inc.
Mr. Gary J. Taylor                      Resident Inspector's Office Chief Executive Officer                  James A. FitzPatrick Nuclear Power Plant Entergy Operations, Inc.                U. S. Nuclear Regulatory Commission 1340 Echelon Parkway                    P.O. Box 136 Jackson, MS 39213                        Lycoming, NY 13093 Mr. John T. Herron                      Ms. Charlene D. Faison Sr. VP and Chief Operating Officer      Manager, Licensing Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. John F. McCannDirector, Licensing Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                      440 Hamilton Avenue White Plains, NY 10601                  White Plains, NY 10601 Mr. Theodore A. Sullivan                Mr. Michael J. Colomb Site Vice President                      Director of Oversight Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Resident Inspector's OfficeJames A. FitzPatrick Nuclear Power Plant U. S. Nuclear Regulatory Commission
James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue P.O. Box 110                             White Plains, NY 10601 Lycoming, NY 13093 Mr. David Wallace Mr. Kevin J. Mulligan                    Director, Nuclear Safety Assurance General Manager, Plant Operations        Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.        James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110                            Lycoming, NY 13093 Lycoming, NY 13093 Mr. James Costedio Mr. Oscar Limpias                        Manager, Regulatory Compliance Vice President Engineering               Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc.        James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue                     P.O. Box 110 White Plains, NY 10601                  Lycoming, NY 13093 Mr. Christopher Schwarz                  Mr. Travis C. McCullough Vice President, Operations Support       Assistant General Counsel Entergy Nuclear Operations, Inc.        Entergy Nuclear Operations, Inc.
440 Hamilton Avenue                      440 Hamilton Avenue White Plains, NY 10601                  White Plains, NY 10601 Mr. John F. McCann                      Mr. Charles Donaldson, Esquire Director, Licensing                     Assistant Attorney General Entergy Nuclear Operations, Inc.         New York Department of Law 440 Hamilton Avenue                     120 Broadway White Plains, NY 10601                  New York, NY 10271


P.O. Box 136 Lycoming, NY  13093Ms. Charlene D. FaisonManager, Licensing Entergy Nuclear Operations, Inc.
FitzPatrick Nuclear Power Plant cc:
440 Hamilton Avenue White Plains, NY  10601Mr. Michael J. ColombDirector of Oversight Entergy Nuclear Operations, Inc.
Regional Administrator, Region I      Ms. Stacey Lousteau U.S. Nuclear Regulatory Commission     Treasury Department 475 Allendale Road                     Entergy Services, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. David WallaceDirector, Nuclear Safety Assurance Entergy Nuclear Operations, Inc.
King of Prussia, PA 19406              639 Loyola Avenue Mail Stop L-ENT-15E Oswego County Administrator           New Orleans, LA 70113 Mr. Steven Lyman 46 East Bridge Street                 Mr. Michael Kansler Oswego, NY 13126                      President Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant
Mr. Peter R. Smith, President          440 Hamilton Avenue New York State Energy, Research,       White Plains, NY 10601 and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306}}
 
P.O. Box 110 Lycoming, NY 13093Mr. James CostedioManager, Regulatory Compliance Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant
 
P.O. Box 110 Lycoming, NY 13093Mr. Travis C. McCulloughAssistant General Counsel Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601Mr. Charles Donaldson, EsquireAssistant Attorney General New York Department of Law 120 Broadway New York, NY  10271 FitzPatrick Nuclear Power Plant cc:
Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126Mr. Peter R. Smith, PresidentNew York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399Mr. Paul EddyNew York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350SupervisorTown of Scriba Route 8, Box 382 Oswego, NY 13126Mr. James H. SniezekBWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490Mr. Michael D. LysterBWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306Ms. Stacey LousteauTreasury Department Entergy Services, Inc.
639 Loyola Avenue Mail Stop L-ENT-15E New Orleans, LA 70113Mr. Michael KanslerPresident Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY  10601}}

Latest revision as of 21:09, 23 November 2019

General Electric Company, Request for Withholding Information from Public Disclosure for James A. FitzPatrick Nuclear Power Plant
ML060730003
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/29/2006
From: Boska J
NRC/NRR/ADRO/DORL/LPLA
To: Stramback G
General Electric Co
Boska J, NRR, 301-415-2901
References
TAC MC9681
Download: ML060730003 (5)


Text

March 29, 2006 Mr. George B. Stramback Manager, Regulatory Services General Electric Company 175 Curtner Avenue San Jose, CA 95125

SUBJECT:

GENERAL ELECTRIC COMPANY, REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE FOR JAMES A. FITZPATRICK NUCLEAR POWER PLANT (TAC NO. MC9681)

Dear Mr. Stramback:

By letter dated January 26, 2006, Entergy Nuclear Operations, Inc. (ENO or the licensee) submitted an affidavit dated October 24, 2005, executed by yourself. You requested that the information contained in Attachment 5 of the licensees January 26, 2006, letter, NEDC-33087P, Revision 1, September 2005, J.A. FitzPatrick Nuclear Power Plant APRM [Average Power Range Monitor]/RBM [Rod Block Monitor]/Technical Specifications/Maximum Extended Operation Domain (ARTS/MEOD), be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390.

A nonproprietary copy of this document has been placed in the Nuclear Regulatory Commission's (NRC's) Public Document Room and added to the Agencywide Documents Access and Management System Public Electronic Reading Room.

The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure for the following reasons:

a. Information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electrics competitors without license from General Electric constitutes a competitive economic advantage over other companies.
b. Information which, if used by a competitor, would reduce his expenditure of resources or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing of a similar product.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.

Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

G. Stramback Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-2901.

Sincerely,

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: see next page

G. Stramback Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

If you have any questions regarding this matter, I may be reached at 301-415-2901.

Sincerely,

/RA/

John Boska, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333 cc: see next page Distribution PUBLIC RidsNrrDssSbwb RidsNrrLASLittle RidsOgc Rp LPLI-1 Reading RidsNrrDorlLpla RidsNrrPMJBoska RidsRgn1MailCenter NMorgan ADAMS Accession Number: ML060730003 OFFICE LPLI-1/PE LPLI-1/PM LPLI-1/LA SBWB/BC LPLI-1/BC NAME NMorgan JBoska SLittle GCranston RLaufer DATE 3/22/06 3/22/06 2/23/06 3/27/06 3/29/06 OFFICIAL RECORD COPY

FitzPatrick Nuclear Power Plant cc:

Mr. Gary J. Taylor Resident Inspector's Office Chief Executive Officer James A. FitzPatrick Nuclear Power Plant Entergy Operations, Inc. U. S. Nuclear Regulatory Commission 1340 Echelon Parkway P.O. Box 136 Jackson, MS 39213 Lycoming, NY 13093 Mr. John T. Herron Ms. Charlene D. Faison Sr. VP and Chief Operating Officer Manager, Licensing Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Theodore A. Sullivan Mr. Michael J. Colomb Site Vice President Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue P.O. Box 110 White Plains, NY 10601 Lycoming, NY 13093 Mr. David Wallace Mr. Kevin J. Mulligan Director, Nuclear Safety Assurance General Manager, Plant Operations Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. James Costedio Mr. Oscar Limpias Manager, Regulatory Compliance Vice President Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. James A. FitzPatrick Nuclear Power Plant 440 Hamilton Avenue P.O. Box 110 White Plains, NY 10601 Lycoming, NY 13093 Mr. Christopher Schwarz Mr. Travis C. McCullough Vice President, Operations Support Assistant General Counsel Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. John F. McCann Mr. Charles Donaldson, Esquire Director, Licensing Assistant Attorney General Entergy Nuclear Operations, Inc. New York Department of Law 440 Hamilton Avenue 120 Broadway White Plains, NY 10601 New York, NY 10271

FitzPatrick Nuclear Power Plant cc:

Regional Administrator, Region I Ms. Stacey Lousteau U.S. Nuclear Regulatory Commission Treasury Department 475 Allendale Road Entergy Services, Inc.

King of Prussia, PA 19406 639 Loyola Avenue Mail Stop L-ENT-15E Oswego County Administrator New Orleans, LA 70113 Mr. Steven Lyman 46 East Bridge Street Mr. Michael Kansler Oswego, NY 13126 President Entergy Nuclear Operations, Inc.

Mr. Peter R. Smith, President 440 Hamilton Avenue New York State Energy, Research, White Plains, NY 10601 and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306