ML070590435

From kanterella
Jump to navigation Jump to search

Draft Safety Evaluation for Implementation of the Average Power Rate Monitor, Rod Block Monitor Technical Specification Improvements with the Maximum Extended Operating Domain Analysis
ML070590435
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/05/2007
From: Boska J
NRC/NRR/ADRO/DORL/LPLI-1
To: Kansler M
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC MC9681
Download: ML070590435 (5)


Text

March 5, 2007 Mr. Michael R. Kansler President Entergy Nuclear Operations, Inc.

440 Hamilton Avenue White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - DRAFT SAFETY EVALUATION FOR IMPLEMENTATION OF THE AVERAGE POWER RATE MONITOR, ROD BLOCK MONITOR TECHNICAL SPECIFICATION IMPROVEMENTS WITH THE MAXIMUM EXTENDED OPERATING DOMAIN ANALYSIS (TAC NO. MC9681)

Dear Mr. Kansler:

By letter dated January 26, 2006, as supplemented by letter dated December 21, 2006, Entergy Nuclear Operations, Inc. (Entergy), submitted an application for a proposed amendment for the James A. FitzPatrick Nuclear Power Plant. Enclosed for your review and comment is a copy of the Nuclear Regulatory Commission (NRC) staff's draft safety evaluation (SE) for the amendment.

Pursuant to Section 2.390 of Title 10 of the Code of Federal Regulations (10 CFR), we have determined that Enclosure 2, our draft non-proprietary SE, does not contain proprietary information. However, we will delay placing this draft non-proprietary SE in the public document room for a period of 10 working days from the date of this letter to provide you with the opportunity to comment on any proprietary aspects. If you believe that any information in the enclosure is proprietary, please identify such information line-by-line and define the basis pursuant to the criteria of 10 CFR 2.390. After 10 working days, the draft non-proprietary SE will be made publicly available, and an additional 10 working days are provided to you to comment on any factual errors or clarity concerns contained in either the draft non-proprietary SE or in Enclosure 1, our draft proprietary SE. The final non-proprietary and proprietary SEs will be issued after making any necessary changes. The final non-proprietary SE will be made publicly available. The NRC staff's disposition of your comments on the draft non-proprietary and proprietary SEs will be discussed in the final non-proprietary and proprietary SEs. The proprietary information in Enclosure 1 is identified by a double underline inside double square brackets.

To facilitate the NRC staff's review of your comments, please provide a marked-up copy of the draft non-proprietary and proprietary SE showing proposed changes and provide a summary table of the proposed changes.

M. Kansler Please contact me at (301) 415-2901 if you have any questions on this issue.

Sincerely,

/RA/

John P. Boska, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-333

Enclosures:

1. Draft Proprietary SE
2. Draft Non-proprietary SE cc w/o encls: See next page

ML070590435 : ML070590442 Enclosure 2: ML070590461 OFFICE LPL1-1/PM LPL1-1/LA SBWB/BC LPL1-1/BC NAME JBoska SLittle GCranston JBoska DATE 3/01/07 3/01/07 3/05/07 3/05/07 FitzPatrick Nuclear Power Plant cc:

Mr. Gary J. Taylor Ms. Charlene D. Faison Chief Executive Officer Manager, Licensing Entergy Operations, Inc. Entergy Nuclear Operations, Inc.

1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. John T. Herron Mr. Michael J. Colomb Sr. VP and Chief Operating Officer Director of Oversight Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Mr. Peter T. Dietrich Mr. David Wallace Site Vice President Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. Kevin J. Mulligan Mr. James Costedio General Manager, Plant Operations Manager, Regulatory Compliance Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.

James A. FitzPatrick Nuclear Power Plant James A. FitzPatrick Nuclear Power Plant P.O. Box 110 P.O. Box 110 Lycoming, NY 13093 Lycoming, NY 13093 Mr. Oscar Limpias Assistant General Counsel Vice President Engineering Entergy Nuclear Operations, Inc.

Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Regional Administrator, Region I Mr. Christopher Schwarz U.S. Nuclear Regulatory Commission Vice President, Operations Support 475 Allendale Road Entergy Nuclear Operations, Inc. King of Prussia, PA 19406 440 Hamilton Avenue White Plains, NY 10601 Resident Inspector's Office James A. FitzPatrick Nuclear Power Plant Mr. John F. McCann U. S. Nuclear Regulatory Commission Director, Licensing P.O. Box 136 Entergy Nuclear Operations, Inc. Lycoming, NY 13093 440 Hamilton Avenue White Plains, NY 10601

FitzPatrick Nuclear Power Plant cc:

Mr. Charles Donaldson, Esquire Mr. Garrett D. Edwards Assistant Attorney General 814 Waverly Road New York Department of Law Kennett Square, PA 19348 120 Broadway New York, NY 10271 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Paul Eddy New York State Dept. of Public Service 3 Empire State Plaza Albany, NY 12223-1350 Oswego County Administrator Mr. Steven Lyman 46 East Bridge Street Oswego, NY 13126 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James H. Sniezek BWR SRC Consultant 5486 Nithsdale Drive Salisbury, MD 21801-2490 Mr. Michael D. Lyster BWR SRC Consultant 5931 Barclay Lane Naples, FL 34110-7306