{{#Wiki_filter:P AS 1.asgo DOCKETED USNRC UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD January 17, 2007 (738am)OFFICE OF SECRETARY RULEMAKINGS AND ADJUDICATIONS STAFF Before Administrative Judges: E. Roy Hawkens, Chair Dr. Paul B. Abramson Dr. Anthony J. Baratta)In the Matter of: ))AmerGen Energy Company, LLC ))(License Renewal for Oyster Creek Nuclear )Generating Station) )))January 16, 2007 Docket No. 50-219 AMERGEN'S ANSWER TO CITIZENS' MOTION FOR LEAVE TO ADD CONTENTIONS AND MOTION TO ADD CONTENTIONS Pursuant to 10 C.F.R. § 2.309(h)(1), AmerGen Energy Company, LLC ("AmerGen")
{{#Wiki_filter:PAS    1.asgo DOCKETED USNRC UNITED STATES OF AMERICA January 17, 2007 (738am)
hereby files its Answer opposing Citizens'!
NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY ATOMIC SAFETY AND LICENSING BOARD                                      RULEMAKINGS AND ADJUDICATIONS STAFF Before Administrative Judges:
Motion for Leave to Add Contentions and Motion to Add Contentions, dated December 20, 2006 ("Motion").2 As discussed below, the Motion should be denied because it is untimely, does not meet Citizens are Nuclear Information and Resource Service ("NIRS"), Jersey Shore Nuclear Watch, Inc. ("JSNW"), Grandmothers, Mothers and More for Energy Safety ("GRAMMES"), New Jersey Public Interest Research Group ("NJPIRG"), New Jersey Sierra Club ("NJ Sierra Club"), and New Jersey Environmental Federation
E. Roy Hawkens, Chair Dr. Paul B. Abramson Dr. Anthony J. Baratta
("NJEF").The Board previously held that if Citizens elected to file a new contention, AmerGen and the NRC Staff could file an answer in accordance with the requirements of 10 C.F.R. § 2.309(h)(1).
                                                                      )
See Memorandum and Order, LBP-06-16, 63 N.R.C. 737, 745 (2006). Accordingly, this response is due within 25 days of Citizens' submission, or January 16, 2007, as required by section 2.309(h)(I).
In the Matter of:                                               )       January 16, 2007
Additionally, because this Answer is submitted pursuant to 10 C.F.R.§ 2.309(h)(1), rather than § 2.323(c) (Answers to Motions), the Board's I0-page limit on responsive pleadings to motions does not apply. See Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives) (Apr. 19, 2006).I -WA/2681991 atm lo. =e c -
                                                                      )
the applicable requirements regarding untimely petitions, and fails to meet the applicable substantive standards for admissibility contrary to 10 C.F.R. § 2.309.I. PROCEDURAL HISTORY Citizens are seeking to add two new contentions to this proceeding based on allegedly new and material information disclosed by AmerGen as a result of activities performed during the October 2006 Oyster Creek refueling outage. The proposed contentions concern planned ultrasonic testing ("UT") of the sand bed and embedded regions of the drywell shell.' Because the first proposed contention (regarding the embedded region) is directly related to Citizens' numerous prior failed attempts to expand the scope of the sole contention admitted in this proceeding concerning UT of the shell in the sand bed region, and the second proposed contention is related to that admitted contention, a summary of the relevant procedural history of this matter is warranted here. Doing so highlights the repetitive, duplicative, and non-meritorious nature of Citizens' oft-repeated attempts to expand the scope of this proceeding and introduce delay.On November 14, 2005, Citizens filed their original Request for Hearing and Petition to Intervene
AmerGen Energy Company, LLC                                     )
("Original Petition")
                                                                      )       Docket No. 50-219 (License Renewal for Oyster Creek Nuclear                       )
in this proceeding.
Generating Station)                                             )
In the Original Petition, Citizens alleged that the Application was deficient:
                                                                      )
by failing to adequately and reasonably assure the continued integrity  
                                                                      )
... [of] the drywell liner or drywell shell, by providing confirmatory ultrasonic testing (UT) measurements at all critical The "embedded region" is that region of the drywell shell that is below the former sand bedregion and is encased in concrete on both sides. The term "embedded," however, refers to any part of the drywell shell that is adjacent to concrete on one or two sides. This includes the "embedded region" as well as the interior of the drywell up to the interior concrete curb. See Ex. ANC 2 at 37 (Figure 5).I-WA/2681991 j
AMERGEN'S ANSWER TO CITIZENS' MOTION FOR LEAVE TO ADD CONTENTIONS AND MOTION TO ADD CONTENTIONS Pursuant to 10 C.F.R. § 2.309(h)(1), AmerGen Energy Company, LLC
* areas of the known degraded component to determine the actual remaining wall thickness  
("AmerGen") hereby files its Answer opposing Citizens'! Motion for Leave to Add Contentions and Motion to Add Contentions, dated December 20, 2006 ("Motion").2 As discussed below, the Motion should be denied because it is untimely, does not meet Citizens are Nuclear Information and Resource Service ("NIRS"), Jersey Shore Nuclear Watch, Inc. ("JSNW"), Grandmothers, Mothers and More for Energy Safety ("GRAMMES"), New Jersey Public Interest Research Group ("NJPIRG"), New Jersey Sierra Club ("NJ Sierra Club"), and New Jersey Environmental Federation ("NJEF").
....Original Petition at 3. On December 12, 2005, AmerGen filed its Answer Opposing[Citizens']
The Board previously held that if Citizens elected to file a new contention, AmerGen and the NRC Staff could file an answer in accordance with the requirements of 10 C.F.R. § 2.309(h)(1). See Memorandum and Order, LBP-06-16, 63 N.R.C. 737, 745 (2006). Accordingly, this response is due within 25 days of Citizens' submission, or January 16, 2007, as required by section 2.309(h)(I). Additionally, because this Answer is submitted pursuant to 10 C.F.R.
Request for Hearing and Petition to Intervene, arguing among other things, that Citizens did not define "critical levels" or provide any support for their demand that UT measurements be greatly expanded into areas not previously inspected.
              § 2.309(h)(1), rather than § 2.323(c) (Answers to Motions), the Board's I0-page limit on responsive pleadings to motions does not apply. See Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives) (Apr. 19, 2006).
AmerGen Answer to Original Petition at 25 (referencing Citizens' Original Petition at 3-4). In the Combined Reply of Petitioners
I-WA/2681991 lo.
("Reply Brief'), filed on December 19, 2005, Citizens stated that "all critical levels" included the sand bed region as well as several elevations above the sand bed region, Reply Brief at 6, and that "the steel drywell liner.just below the concrete is obviously another critical level." Id at 14.AmerGen filed a Motion to Strike new arguments and new supporting information contained in Citizens' Reply Brief on December 29, 2005 ("AmerGen Motion to Strike").
atm=e c -
In pertinent part, AmerGen argued that Citizens had not challenged the integrity of the drywell shell below the sand bed region in their Original Petition, and that Citizens were prohibited from amending their contention in their Reply Brief by expanding the bases to cover the area of the drywell shell embedded in concrete below the sand bed region. AmerGen Motion to Strike at 4.On February 7, 2006, Citizens filed a Motion for Leave to Add Contentions or Supplement the Basis of the Current Contention
 
("Motion to Add or Supplement").
the applicable requirements regarding untimely petitions, and fails to meet the applicable substantive standards for admissibility contrary to 10 C.F.R. § 2.309.
In it, Citizens attempted to add a new contention regarding the monitoring regime for the inaccessible areas of the drywell, including the embedded area below the concrete floor.Motion to Add or Supplement at 11-13. In support of the new contention, Citizens cited 3 I -WA/2681991 to exhibits included in their Original Petition that allegedly demonstrated that the concrete floor adjacent to the drywell had "cracks," "crevices," and "craters." Id. at 12.The Licensing Board granted Citizens' Original Petition, but narrowed the contention to apply only to the aging management program for corrosion in the sand bed region of the drywell shell. Memorandum and Order, LBP-06-07, 63 NR.C; 1 88, 211 (2006). Importantly, the Board rejected Citizens' assertion "developed for the first time in its Reply Brief' that the original contention should be construed as encompassing the drywell shell below the sand bed region (i.e. the embedded region). Id. at 217 n.28 (holding that Citizens, "having failed to develop this argument in [their Original]
I.       PROCEDURAL HISTORY Citizens are seeking to add two new contentions to this proceeding based on allegedly new and material information disclosed by AmerGen as a result of activities performed during the October 2006 Oyster Creek refueling outage. The proposed contentions concern planned ultrasonic testing ("UT") of the sand bed and embedded regions of the drywell shell.' Because the first proposed contention (regarding the embedded region) is directly related to Citizens' numerous prior failed attempts to expand the scope of the sole contention admitted in this proceeding concerning UT of the shell in the sand bed region, and the second proposed contention is related to that admitted contention, a summary of the relevant procedural history of this matter is warranted here. Doing so highlights the repetitive, duplicative, and non-meritorious nature of Citizens' oft-repeated attempts to expand the scope of this proceeding and introduce delay.
Petition,[are] foreclosed from doing so in the first instance in [their] Reply Brief').The Licensing Board also denied Citizens' proposed new contention challenging AmerGen's monitoring regime for the embedded region. Memorandum and Order, LBP-06-11, 63 N.R.C. 391 (2006). Specifically, the Board held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id § 2.309(f)(2)(ii))." LBP-06-11, 63 N.R.C. at 397. The Board also noted that Citizens previously-and unsuccessfully-sought to raise the issue of corrosion in the embedded region in their Reply Brief. Id, On April 25, 2006, AmerGen filed motions seeking, among other things, to dismiss Citizens' admitted contention as moot on the basis of AmerGen's docketed commitment to conduct.periodic UT measurements in the sand bed region of the drywell shell throughout the period of extended operation.
On November 14, 2005, Citizens filed their original Request for Hearing and Petition to Intervene ("Original Petition") in this proceeding. In the Original Petition, Citizens alleged that the Application was deficient:
AmerGen's Motions to Dismiss 4 I-WA/2681991 Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2-3. The Board granted AmerGen's Motion, but allowed Citizens to seek leave to file a new contention within 20 days of the Order, the substance of which had to be limited to AmerGen's UT program for the sand bed region. LBP-06-16, 63 N.R.C. at 744.Citizens filed their new contention on June 23, 2006 and subsequently supplemented it on July 25, 2006. The Licensing Board admitted only that part of Citizens' new contention pertaining to whether AmerGen's scheduled UT monitoring frequency in the sand bed region is sufficient to maintain an adequate safety margin.Memorandum and Order, LBP-06-22, slip op. at 9 (Oct. 10, 2006). On December 20, 2006, Citizens filed the instant Motion, seeking admission of two late-filed contentions, as discussed below.II. LEGAL STANDARDS GOVERNING ADMISSIBILITY OF CITIZENS'NEW CONTENTIONS The standards governing admissibility of Citizens' new contentions are set forth in the Board's March 22, 2006 ruling denying Citizens' Motion to Add or Supplement.
by failing to adequately and reasonably assure the continued integrity ... [of] the drywell liner or drywell shell, by providing confirmatory ultrasonic testing (UT) measurements at all critical The "embedded region" is that region of the drywell shell that is below the former sand bedregion and is encased in concrete on both sides. The term "embedded," however, refers to any part of the drywell shell that is adjacent to concrete on one or two sides. This includes the "embedded region" as well as the interior of the drywell up to the interior concrete curb. See Ex. ANC 2 at 37 (Figure 5).
See LBP-06-11, 63 N.R.C. at 395-396. Where, as here, the regulatory time limit has long since expired for filing a petition to intervene, a petitioner may submit a new contention only with leave of the presiding officer upon a showing that: (i) The information upon which the amended or new contention is based was not previously available;(ii) The information upon which the amended or new contention is based is materially different than information previously available; and (iii) The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.
I-WA/2681991 j
5 1 -WA/2681 991 See 10 C.F.R. § 2.309(f)(2)(i)-(iii).
* areas of the known degraded component to determine the actual remaining wall thickness ....
If a new contention meets the above three criteria, then it is considered "timely" and the petitioner is not required to satisfy the requirements of 10 C.F.R. § 2.309(c)(1) for non-timely filings. LBP-06-11, 63 N.R.C. at 396 n.3.If, however, the information underlying the proposed contention is not new or materially different from previously available information, then to be admitted the new contention must satisfy Section 2.309(c)(1) as well. Id. If Citizens are required to address Section 2.309(c) in their filings and fail to do so, then the non-timely aspects of the contention are to be rejected.4 Additionally, to add a new contention, a petitioner must satisfy the following standard admissibility requirements in 10 C.F.R. § 2.309(f)(1):
Original Petition at 3. On December 12, 2005, AmerGen filed its Answer Opposing
(1) specify the issue to be raised; (2) briefly explain the basis for the contention; (3) demonstrate that the issue is within the scope of the proceeding; (4) demonstrate that the issue is material to the proceeding; (5) provide a concise statement of the alleged facts or expert opinion that support the petitioner's opinion; and (6) demonstrate that a genuine dispute .exists on a material issue of law or fact, and include specific references to allegedly deficient portions of the application.
[Citizens'] Request for Hearing and Petition to Intervene, arguing among other things, that Citizens did not define "critical levels" or provide any support for their demand that UT measurements be greatly expanded into areas not previously inspected. AmerGen Answer to Original Petition at 25 (referencing Citizens' Original Petition at 3-4). In the Combined Reply of Petitioners ("Reply Brief'), filed on December 19, 2005, Citizens stated that "all critical levels" included the sand bed region as well as several elevations above the sand bed region, Reply Brief at 6, and that "the steel drywell liner.just below the concrete is obviously another critical level." Id at 14.
II. CITIZENS' CONTENTIONS ARE UNTIMELY AND MUST BE REJECTED A. Proposed Contention 1 is Inadmissible Proposed Contention 1: The proposed UT monitoring program for the embedded region of the drywell shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because the spatial scope of the In this proceeding, the Board, on several occasions, has put Citizens on notice that non-timely contentions must satisfy Section 2.309(c) and that they should address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely.
AmerGen filed a Motion to Strike new arguments and new supporting information contained in Citizens' Reply Brief on December 29, 2005 ("AmerGen Motion to Strike"). In pertinent part, AmerGen argued that Citizens had not challenged the integrity of the drywell shell below the sand bed region in their Original Petition, and that Citizens were prohibited from amending their contention in their Reply Brief by expanding the bases to cover the area of the drywell shell embedded in concrete below the sand bed region. AmerGen Motion to Strike at 4.
E.g. LBP-06-22, slip op. at 6 n.7. Failure to do so acts as a waiver, which forecloses Citizens from making an untimely attempt to satisfy Section 2.309(c).
On February 7, 2006, Citizens filed a Motion for Leave to Add Contentions or Supplement the Basis of the Current Contention ("Motion to Add or Supplement"). In it, Citizens attempted to add a new contention regarding the monitoring regime for the inaccessible areas of the drywell, including the embedded area below the concrete floor.
Id.6 I-WA/268199!
Motion to Add or Supplement at 11-13. In support of the new contention, Citizens cited 3
I -WA/2681991
 
to exhibits included in their Original Petition that allegedly demonstrated that the concrete floor adjacent to the drywell had "cracks," "crevices," and "craters." Id. at 12.
The Licensing Board granted Citizens' Original Petition, but narrowed the contention to apply only to the aging management program for corrosion in the sand bed region of the drywell shell. Memorandum and Order, LBP-06-07, 63 NR.C; 188, 211 (2006). Importantly, the Board rejected Citizens' assertion "developed for the first time in its Reply Brief' that the original contention should be construed as encompassing the drywell shell below the sand bed region (i.e. the embedded region). Id. at 217 n.28 (holding that Citizens, "having failed to develop this argument in [their Original] Petition,
[are] foreclosed from doing so in the first instance in [their] Reply Brief').
The Licensing Board also denied Citizens' proposed new contention challenging AmerGen's monitoring regime for the embedded region. Memorandum and Order, LBP-06-11, 63 N.R.C. 391 (2006). Specifically, the Board held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.
§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id § 2.309(f)(2)(ii))." LBP-06-11, 63 N.R.C. at 397. The Board also noted that Citizens previously-and unsuccessfully-sought to raise the issue of corrosion in the embedded region in their Reply Brief. Id, On April 25, 2006, AmerGen filed motions seeking, among other things, to dismiss Citizens' admitted contention as moot on the basis of AmerGen's docketed commitment to conduct.periodic UT measurements in the sand bed region of the drywell shell throughout the period of extended operation. AmerGen's Motions to Dismiss 4
I-WA/2681991
 
Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2-3. The Board granted AmerGen's Motion, but allowed Citizens to seek leave to file a new contention within 20 days of the Order, the substance of which had to be limited to AmerGen's UT program for the sand bed region. LBP-06-16, 63 N.R.C. at 744.
Citizens filed their new contention on June 23, 2006 and subsequently supplemented it on July 25, 2006. The Licensing Board admitted only that part of Citizens' new contention pertaining to whether AmerGen's scheduled UT monitoring frequency in the sand bed region is sufficient to maintain an adequate safety margin.
Memorandum and Order, LBP-06-22, slip op. at 9 (Oct. 10, 2006). On December 20, 2006, Citizens filed the instant Motion, seeking admission of two late-filed contentions, as discussed below.
II.     LEGAL STANDARDS GOVERNING ADMISSIBILITY OF CITIZENS' NEW CONTENTIONS The standards governing admissibility of Citizens' new contentions are set forth in the Board's March 22, 2006 ruling denying Citizens' Motion to Add or Supplement.
See LBP-06-11, 63 N.R.C. at 395-396. Where, as here, the regulatory time limit has long since expired for filing a petition to intervene, a petitioner may submit a new contention only with leave of the presiding officer upon a showing that:
(i)     The information upon which the amended or new contention is based was not previously available; (ii)   The information upon which the amended or new contention is based is materially different than information previously available; and (iii)   The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.
1-WA/2681 991 5
 
See 10 C.F.R. § 2.309(f)(2)(i)-(iii). If a new contention meets the above three criteria, then it is considered "timely" and the petitioner is not required to satisfy the requirements of 10 C.F.R. § 2.309(c)(1) for non-timely filings. LBP-06-11, 63 N.R.C. at 396 n.3.
If, however, the information underlying the proposed contention is not new or materially different from previously available information, then to be admitted the new contention must satisfy Section 2.309(c)(1) as well. Id. If Citizens are required to address Section 2.309(c) in their filings and fail to do so, then the non-timely aspects of the contention are to be rejected. 4 Additionally, to add a new contention, a petitioner must satisfy the following standard admissibility requirements in 10 C.F.R. § 2.309(f)(1): (1) specify the issue to be raised; (2) briefly explain the basis for the contention; (3) demonstrate that the issue is within the scope of the proceeding; (4) demonstrate that the issue is material to the proceeding; (5) provide a concise statement of the alleged facts or expert opinion that support the petitioner's opinion; and (6) demonstrate that a genuine dispute .exists on a material issue of law or fact, and include specific references to allegedly deficient portions of the application.
II.       CITIZENS' CONTENTIONS ARE UNTIMELY AND MUST BE REJECTED A.       Proposed Contention 1 is Inadmissible Proposed Contention 1: The proposed UT monitoring program for the embedded region of the drywell shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because the spatial scope of the In this proceeding, the Board, on several occasions, has put Citizens on notice that non-timely contentions must satisfy Section 2.309(c) and that they should address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely. E.g. LBP-06-22, slip op. at 6 n.
: 7. Failure to do so acts as a waiver, which forecloses Citizens from making an untimely attempt to satisfy Section 2.309(c). Id.
6 I-WA/268199!
 
monitoring program is too restricted, a reasonable potential corrosion rate has not been developed, the proposed frequency of monitoring is not justified, and the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring.
monitoring program is too restricted, a reasonable potential corrosion rate has not been developed, the proposed frequency of monitoring is not justified, and the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring.
Motion at 4.1. The First Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. 8 2.309(f)(2)
Motion at 4.
As a preliminary matter, the first proposed contention is not based on new information.
: 1.       The First Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. 8 2.309(f)(2)
Citizens have, time and time again, tried and failed to introduce a new contention on the monitoring regime for the portion of the drywell shell embedded in the concrete-first in their December 19, 2005 Reply Brief, and then again in their February 7, 2006 Motion to Add or Supplement.
As a preliminary matter, the first proposed contention is not based on new information. Citizens have, time and time again, tried and failed to introduce a new contention on the monitoring regime for the portion of the drywell shell embedded in the concrete-first in their December 19, 2005 Reply Brief, and then again in their February 7, 2006 Motion to Add or Supplement. In each case, the Board rejected the proposed new "embedded" contention and noted that the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are "embedded" in concrete, and thus, the allegedly new information underlying Citizens' proposed new contention was in existence when they submitted their Original Petition. LBP I1 63 NRC at 398.
In each case, the Board rejected the proposed new "embedded" contention and noted that the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are "embedded" in concrete, and thus, the allegedly new information underlying Citizens' proposed new contention was in existence when they submitted their Original Petition.
The Board, therefore, already has held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R. § 2.309(f)(2)(i)), nor materially different than information that was previously available'(id § 2.309(f)(2)(ii))."
LBP I1 63 NRC at 398.The Board, therefore, already has held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R. § 2.309(f)(2)(i)), nor materially different than information that was previously available'(id  
Id. at 397. That same rationale holds true today.
§ 2.309(f)(2)(ii))." Id. at 397. That same rationale holds true today.The fact that AmerGen recently committed to conduct UT monitoring of the embedded shell does not erase the Board's binding legal conclusion that Citizens previously waived their right to address monitoring of the embedded region by not raising it in their Original Petition.
The fact that AmerGen recently committed to conduct UT monitoring of the embedded shell does not erase the Board's binding legal conclusion that Citizens previously waived their right to address monitoring of the embedded region by not raising it in their Original Petition. As a matter of law and logic, if-as Citizens allege-7 1-WA/2681991
As a matter of law and logic, if-as Citizens allege-7 1-WA/2681991 AmerGen's enhanced monitoring program for the embedded region is inadequate, then the absence of a monitoring program in that same region was afortiori inadequate, and Citizens had a regulatory obligation to challenge it in their original petition -which they did not. See LBP-06-22, slip op. at 23. Further, as a matter of policy, AmerGen's decision to improve the existing drywell monitoring program does not confer upon Citizens an automatic opportunity to advance new contentions.
 
Id.Citizens recite the following pieces of allegedly new and material information as the basis for their proposed first contention.
AmerGen's enhanced monitoring program for the embedded region is inadequate, then the absence of a monitoring program in that same region was afortioriinadequate, and Citizens had a regulatory obligation to challenge it in their original petition - which they did not. See LBP-06-22, slip op. at 23. Further, as a matter of policy, AmerGen's decision to improve the existing drywell monitoring program does not confer upon Citizens an automatic opportunity to advance new contentions. Id.
As described below, this information is neither new nor materially different than information previously available.(a) New Commitments Regarding UT Monitoring:
Citizens recite the following pieces of allegedly new and material information as the basis for their proposed first contention. As described below, this information is neither new nor materially different than information previously available.
The new information cited by Citizens in support of their first new proposed contention is that "[o]n December 3, 2006, AmerGen committed to taking UT measurements in the trench in Bay 5 in 2008 'at the same locations examined in 2006."' Motion at 3, citing Ex. ANC I Enclosure
(a) New Commitments Regarding UT Monitoring: The new information cited by Citizens in support of their first new proposed contention is that "[o]n December 3, 2006, AmerGen committed to taking UT measurements in the trench in Bay 5 in 2008 'at the same locations examined in 2006."' Motion at 3, citing Ex. ANC I Enclosure ("LRA Supplement") at 52-53. They note that "AmerGen further committed to repeating these UT measurements 'at refueling outages during the period of extended operation until the trenches are restored to the original design configuration.. . ." Id., citing LRA Supplement at 53. As this enhanced commitment simply expands upon and augments the existing Aging Management Program, it is not the kind of new information that can support admission of the first late-filed contention. See LBP-06-22, slip op. at 23 (holding that an applicant's decision to improve an existing program to promote health and safety or to boost public support and confidence should not be viewed as conferring Citizens with an automatic opportunity to advance a new contention).
("LRA Supplement")
8 I-WA/2681991
at 52-53. They note that "AmerGen further committed to repeating these UT measurements  
 
'at refueling outages during the period of extended operation until the trenches are restored to the original design configuration..  
(b) Pathways for Water to Reach the Exterior of the Drywell Shell in the Embedded Region: Another category of purportedly new information identified by Citizens begins with the misstatement--cloaked as a new revelation-that "AmerGen's latest submission to the ACRS reveals that the bottom of the drywell is below the level of the groundwater table." Motion at 3. The depth of the drywell (i.e., 29.6 feet below mean sea level) is by no means new information as it has not changed since original construction of the reactor in the 1960s. In fact, Citizens raised the issue of groundwater intrusion into the embedded region in their presentation to the ACRS license renewal subcommittee on October 3, 2006, clearly demonstrating that this information is not new.
.." Id., citing LRA Supplement at 53. As this enhanced commitment simply expands upon and augments the existing Aging Management Program, it is not the kind of new information that can support admission of the first late-filed contention.
E-mail from M. Junge to D. Ashley at slide 6 (Oct. 3, 2006), availableat ADAMS Accession No. ML063030109 ("Citizens' ACRS Presentation").
See LBP-06-22, slip op. at 23 (holding that an applicant's decision to improve an existing program to promote health and safety or to boost public support and confidence should not be viewed as conferring Citizens with an automatic opportunity to advance a new contention).
In addition, "[tiurning to the potential for water to come from above," Citizens reference a 1992 repair to the epoxy on the concrete floor of the drywell and Exhibit ANC 5, an Engineering Action Request (AR) that AmerGen generated during the 2006 refueling outage to evaluate repair of the epoxy covering the concrete floor in the sand bed region. Motion at 4. The AR states that "since 1996 inspections have found indications of the epoxy separating from the concrete" shield wall. Motion at 4, citing Ex. ANC 5. Citizens go further, however, and seemingly attempt to argue that the AR is somehow germane to their first proposed contention because "[t]he document goes on to note that 'the separated seams could potentially allow some water to get under the epoxy coating [floor] repair." Id.
8 I -WA/2681991 (b) Pathways for Water to Reach the Exterior of the Drywell Shell in the Embedded Region: Another category of purportedly new information identified by Citizens begins with the misstatement--cloaked as a new revelation-that "AmerGen's latest submission to the ACRS reveals that the bottom of the drywell is below the level of the groundwater table." Motion at 3. The depth of the drywell (i.e., 29.6 feet below mean sea level) is by no means new information as it has not changed since original construction of the reactor in the 1960s. In fact, Citizens raised the issue of groundwater intrusion into the embedded region in their presentation to the ACRS license renewal subcommittee on October 3, 2006, clearly demonstrating that this information is not new.E-mail from M. Junge to D. Ashley at slide 6 (Oct. 3, 2006), available at ADAMS Accession No. ML063030109
This information is not materially different than information previously available.
("Citizens' ACRS Presentation").
Prior to the floor repair in the early 1990s, water was in contact with the concrete floor in 9
In addition, "[tiurning to the potential for water to come from above," Citizens reference a 1992 repair to the epoxy on the concrete floor of the drywell and Exhibit ANC 5, an Engineering Action Request (AR) that AmerGen generated during the 2006 refueling outage to evaluate repair of the epoxy covering the concrete floor in the sand bed region. Motion at 4. The AR states that "since 1996 inspections have found indications of the epoxy separating from the concrete" shield wall. Motion at 4, citing Ex. ANC 5. Citizens go further, however, and seemingly attempt to argue that the AR is somehow germane to their first proposed contention because "[t]he document goes on to note that 'the separated seams could potentially allow some water to get under the epoxy coating [floor] repair." Id.This information is not materially different than information previously available.
I-WA/2681991
Prior to the floor repair in the early 1990s, water was in contact with the concrete floor in 9 I -WA/2681991 the sand bed region, and likely in contact with the exterior embedded shell. See Letter, M. Gallagher (AmerGen) to NRC (June 20, 2006) at 11-12, available at ADAMS Accession No. ML063490294
 
("June 20, 2006 RAI Response")(cited in Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006)). When corrective actions were taken in the late 1980s and early 1990s, the water above the floor was removed while the water below the floor was not.5- See generally id at 12-13 (discussing insignificant impacts from water remaining in contact with the exterior embedded shell). Accordingly, the statement that water "could potentially" get under the epoxy that covers the concrete floor is not materially new information.
the sand bed region, and likely in contact with the exterior embedded shell. See Letter, M. Gallagher (AmerGen) to NRC (June 20, 2006) at 11-12, available at ADAMS Accession No. ML063490294 ("June 20, 2006 RAI Response")(cited in Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006)). When corrective actions were taken in the late 1980s and early 1990s, the water above the floor was removed while the water below the floor was not.5- See generally id at 12-13 (discussing insignificant impacts from water remaining in contact with the exterior embedded shell). Accordingly, the statement that water "could potentially" get under the epoxy that covers the concrete floor is not materially new information. Motion at 4, citing Ex. ANC 5; see-also id. ("water infiltrated into the exterior sand bed floor at times between 1969 and 1992, and between 1996 and 2006 and may do so again").
Motion at 4, citing Ex. ANC 5; see-also id. ("water infiltrated into the exterior sand bed floor at times between 1969 and 1992, and between 1996 and 2006 and may do so again").Citizens' Exhibit ANC 6 also demonstrates that the presence of water on the sand bed floor, and potentially migrating into the floor, is not new information.
Citizens' Exhibit ANC 6 also demonstrates that the presence of water on the sand bed floor, and potentially migrating into the floor, is not new information. That exhibit mentions the results of a March 2006 NRC inspection involving the disposition of water collected from the sand bed floor, and states that the associated NRC Inspection Report was issued on September 21, 2006 (three months before Citizens filed their Motion) and that the Inspection Report was publicly available on ADAMS (Accession No.
That exhibit mentions the results of a March 2006 NRC inspection involving the disposition of water collected from the sand bed floor, and states that the associated NRC Inspection Report was issued on September 21, 2006 (three months before Citizens filed their Motion) and that the Inspection Report was publicly available on ADAMS (Accession No.ML062650059).
ML062650059). See also Motion at 4 ("water infiltrated into the exterior sand bed floor.
See also Motion at 4 ("water infiltrated into the exterior sand bed floor.and may do so again")(emphasis added). Citizens' first proposed contention is, therefore, untimely.AmerGen explained in its June 20, 2006 docketed submittal to the NRC that this water is not corrosive.
and may do so again")(emphasis added). Citizens' first proposed contention is, therefore, untimely.
See June 20, 2006 RAI Response at 11-12.10 1 -WA/268 1991
AmerGen explained in its June 20, 2006 docketed submittal to the NRC that this water is not corrosive. See June 20, 2006 RAI Response at 11-12.
1-WA/268 1991 10
: 2. Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)
: 2. Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)
Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted.
Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted. Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the first proposed contention should be denied.
Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the first proposed contention should be denied.3. The First Proposed Contention Also Fails to Satisfy the Requirements in 10 C.F.R. § 2.309(f)(1)
: 3. The First Proposed Contention Also Fails to Satisfy the Requirements in 10 C.F.R. § 2.309(f)(1)
Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for a new contention, Citizens have not demonstrated that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1).
Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for a new contention, Citizens have not demonstrated that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1).
In support of the new contention, Citizens cite the following alleged deficiencies in the embedded region monitoring program: (1) the spatial scope of the monitoring program is too restricted; (2) a reasonable potential corrosion rate has not been developed; (3) the proposed frequency of monitoring is not justified; and (4) the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring.
In support of the new contention, Citizens cite the following alleged deficiencies in the embedded region monitoring program: (1) the spatial scope of the monitoring program is too restricted; (2) a reasonable potential corrosion rate has not been developed; (3) the proposed frequency of monitoring is not justified; and (4) the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring. As demonstrated below, Citizens have failed to support these allegations with adequate factual or legal bases and thus, have not satisfied Section 2.309(f)(1).
As demonstrated below, Citizens have failed to support these allegations with adequate factual or legal bases and thus, have not satisfied Section 2.309(f)(1).(a) Potential for Corrosion:
(a) Potential for Corrosion: Citizens themselves acknowledge that "the measured corrosion in the embedded region in Bay 5 was not very severe .... " Motion at 5.
Citizens themselves acknowledge that "the measured corrosion in the embedded region in Bay 5 was not very severe .... " Motion at 5.Nevertheless, they claim that the mere existence of such corrosion "affirms Dr. Hausler's previous assessments that such corrosion is possible." Id. An "assessment" of the 11 I -WA/268 1991 possibility of a minute amount of corrosion, however, does not meet the stringent requirements of Section 2.309(f)(1), as it is non-specific, lacks basis, and does not raise a genuine dispute of material fact because the drywell shell can perform its intended functions even if there is a minute amount of ongoing corrosion (see discussion of remaining thickness in Section 3(c) below).Citizens next jump to the conclusion that the potential for and existence of corrosion "undercuts previous assertions from AmerGen that corrosion in the embedded region was unlikely." Id. Citizens provide no citations to AmerGen documents to support this allegation, thus failing to meet the minimum requirements of 10 C.F.R.§ 2.309(fJ(1)(vi).
Nevertheless, they claim that the mere existence of such corrosion "affirms Dr. Hausler's previous assessments that such corrosion is possible." Id. An "assessment" of the I-WA/268 1991 11
In any event, AmerGen has previously stated that "only limited corrosion would be anticipated for the drywell embedded shell." June 20, 2006 RAI Response at 13. The detailed scientific argument supporting this conclusion was provided to the NRC in the June 20, 2006 RAI Response at 12-13.6 Moreover, laboratory analysis of water taken from the Bay 5 trench in October 2006 confirmed that the water in contact with the embedded shell is "non-aggressive" with respect to pH, chlorides and sulfates.
 
LRA Supplement at 18.Citizens' alleged deficiencies are magnified in their ensuing conclusion that since"water is routinely in contact with the inside of the [embedded]
possibility of a minute amount of corrosion, however, does not meet the stringent requirements of Section 2.309(f)(1), as it is non-specific, lacks basis, and does not raise a genuine dispute of material fact because the drywell shell can perform its intended functions even if there is a minute amount of ongoing corrosion (see discussion of remaining thickness in Section 3(c) below).
drywell shell ... it is possible that the thinnest areas of the embedded region of the drywell shell have corrosion that is occurring from the inside and the outside." Motion at 5-6 (emphasis added). Citizens correctly note that "when the filler material was removed from the existing trench in Bay 5approximately
Citizens next jump to the conclusion that the potential for and existence of corrosion "undercuts previous assertions from AmerGen that corrosion in the embedded region was unlikely." Id. Citizens provide no citations to AmerGen documents to support this allegation, thus failing to meet the minimum requirements of 10 C.F.R.
[sic] 5 inches of standing water was discovered in This information was, of course, available to Citizens last summer.12 1 -WA/268 1991 the bottom of the trench." Id. at 3. Citizens further observe that "[wihen AmerGen pumped water from the trench, it refilled at a slow rate," and conclude by stating that"AmerGen thus decided to assume that under normal operating conditions the interior of[the] drywell shell at or below the interior floor level is in contact with water." Id.(emphasis added).Citizens' initial correct characterization of AmerGen's assumption later devolves into the incorrect pronouncement that "AmerGen established during the recent outage that water is routinely in contact with the inside of the drywell shell." Id. at 5 (emphasis added). This latter statement cannot serve as the factual basis for admission of a contention, because it is false on its face. Moreover, this statement does not raise a genuine issue of material fact because, even if true, the water is not corrosive and, as demonstrated by UT measurements, will not affect the intended functions of the drywell shell during the period of extended operation.
§ 2.309(fJ(1)(vi). In any event, AmerGen has previously stated that "only limited corrosion would be anticipated for the drywell embedded shell." June 20, 2006 RAI Response at 13. The detailed scientific argument supporting this conclusion was provided to the NRC in the June 20, 2006 RAI Response at 12-13.6 Moreover, laboratory analysis of water taken from the Bay 5 trench in October 2006 confirmed that the water in contact with the embedded shell is "non-aggressive" with respect to pH, chlorides and sulfates. LRA Supplement at 18.
Similarly, Citizens speculate that "AmerGen has also recently revealed its assessment that water could have infiltrated into the floor at the bottom of the sandbed region for all but four of the thirty seven years that the reactor has been operating." Id. at 6. This speculation is fraught with errors. First, there is no such "recent" revelation, as demonstrated by a discussion of water collected from the sand bed drains in Exhibit ANC 6, dated November 9, 2006, and of which Citizens were aware in September 2006.Second, and more importantly, there is no "assessment" that water could have affected the drywell shell, since Exhibit ANC 5 clearly explains that seams/voids in the epoxy coating on the drywell floor in the sand bed region are located "awayfirom the domwell vessel" and near the concrete shield wall. Emphasis added.13 1 -WA/2681991 Finally, Citzens' assertions about groundwater affecting the embedded shell do not satisfy Section 2.309(f)(1) because they are based on a misreading of publicly-available documents.
Citizens' alleged deficiencies are magnified in their ensuing conclusion that since "water is routinely in contact with the inside of the [embedded] drywell shell ... it is possible that the thinnest areas of the embedded region of the drywell shell have corrosion that is occurring from the inside and the outside." Motion at 5-6 (emphasis added). Citizens correctly note that "when the filler material was removed from the existing trench in Bay 5approximately [sic] 5 inches of standing water was discovered in This information was, of course, available to Citizens last summer.
Such a misreading does not raise a genuine dispute on a material issue of law or fact. Specifically, Citizens boldly assert that "[t]o respond to the concern that groundwater could contribute to corrosion in the embedded region, AmerGen claims that groundwater could not seep onto the exterior of the shell, but fails to provide any back up information." Motion at 3, citing Ex. ANC 2 at 7-4. Yet, as plainly stated in the cited Exhibit ANC 2: The Reactor Building Foundation floor is a 10 ft thick reinforced concrete slab. The bottom elevation of the slab is minus 29' 6" and its top elevation is minus 19' 6". There is a waterproof membrane at the bottom of the mat that extends up the outside of the exterior walls to an Elevation of 5' 0".... In order for ground water to reach the lowest point of the containment shell it would need to penetrate the waterproof membrane then migrate through the 10 ft concrete mat then migrate through the pedestal concrete.Since there is no waterproofing on this interior concrete pedestal ... any water contained or migrating in the pedestal would seek the path of least resistance and flow into the Torus Room. If water was able to make its way along the path outlined above... the Torus Room would be flooded. There are sumps in the basement of the Reactor Building that collect any water in leakage and would prevent significant accumulation of water in the Torus Room (emphasis added).Ex. ANC 2 at 7-4 to 7-5.AmerGen also provided in that Package a figure showing the waterproof membrane (including a label pointing to the membrane) and the orientation of the torus room with respect to the drywell on page 3-6 of Exhibit ANC 2. This figure clearly shows why the torus room would need to be flooded for groundwater to reach the embedded region. AmerG en has established that design features prevent groundwater leakage onto the exterior of the shell. Apparently, Citizens simply failed to read the 14 1 -WA/2681991 ACRS Information Package that they cite in their Motion.2 Such an oversight does not support admissibility of the contention.(b) Monitoring Program: Citizens claim that they have identified "many deficiencies in the proposed monitoring regime." Motion at 6. First, and according to Citizens-'"most glaring"-is the accusation that "AmerGen did not choose to monitor the embedded region in a bay where the lower sandbed region is highly corroded." Id Further to this charge, Citizens attribute material importance to the fact that "AmerGen has failed to even discuss whether the results in Bay 5 represent worst case conditions in the embedded region." Id. There is no such material import stemming from Citizens'claim, because they fail to recognize that there is no statutory, regulatory, or precedential requirement for such a "worst case" analysis.
1-WA/268 1991                                       12
See 10 C.F.R. § 54.29, Standards for Issuance of a Renewed License (requiring only "reasonable assurance" that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB (emphasis added)).Furthermore, the corrosion in the shell exposed in the Bay 5 trench would be expected to be greater than in Bay 17 because only the Bay 5 trench contained standing water when the filler material was first removed during the 2006 refueling outage.8 Citizens further complain that AmerGen did not provide any figures for the rate at which water is being pumped from sumps in the Torus room. As noted above, groundwater cannot credibly contribute to Corrosion in the embedded region and groundwater leakage into the Torus room has not been a problem at Oyster Creek. Thus, there is no rational reason to provide any Torus room pump rate figures.AmerGen decided to further excavate the Bay 5 trench because its base was at elevation 8'9", while the Bay 17 trench base was at elevation 9'3". See Ex. ANC 2 at 8-1. The exterior embedded region starts at approximately elevation 8' 11". Id. Accordingly, excavating the Bay 5 trench required removing only sufficient concrete to expose six additional inches of the drywell shell, while excavating the Bay 17 trench would have required removing more concrete than Bay 5.15 I -WA/2681991 Thus, there is no material dispute of fact that the Bay 5 data are, at a minimum, representative of corrosion caused by water that might be in contact with the interior embedded shell.Relying on final Interim Staff Guidance (ISG), 2 Citizens next attempt to argue that it creates some sort of binding "requirement" that license renewal applicants"develop or establish a corrosion rate from past UT measurements or representative samples and then 'demonstrate that the shell will have sufficient wall thickness to perform its function through the period of extended operation."'
 
Motion at 6, citing 71 Fed. Reg. 67,923 (Nov. 24, 2006). The ISG, however, has no binding regulatory effect: the ISG includes "recommended actions" only and does not have the force of law unlike the regulations in 10 C.F.R. Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plans." As a result, Citizens have yet again failed to articulate a material dispute of fact stemming from the ISG.(c) Proposed Monitoring Frequency:
the bottom of the trench." Id. at 3. Citizens further observe that "[wihen AmerGen pumped water from the trench, it refilled at a slow rate," and conclude by stating that "AmerGen thus decided to assume that under normal operating conditions the interior of
Next, Citizens argue that the "one set of measurements of corrosion in the embedded region from the trench in Bay 5... is insufficient to establish a corrosion rate because there is no way of knowing over which time period the corrosion occurred." Motion at 6. Citizens note that during the October 2006 outage, "AmerGen deepened an existing trench in Bay 5 by six inches to expose a limited area of the embedded region." Motion at 2. AmerGen then took "42 UT 2 License Renewal Interim Staff Guidance LR-ISG-2006-01:
[the] drywell shell at or below the interior floor level is in contact with water." Id.
Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell, (Nov. 16, 2006). Citizens have been involved in the development of this ISG, are knowledgeable of its content, and even used the draft in a prior attempt to support a new contention.
(emphasis added).
Motion to Add or Supplement, at 3-4.16 1 -WA/2681991 measurements in the newly exposed area," which showed that "the average thickness had decreased from a nominal 1.154 inches to 1.113 inches, a loss of 0.041 inches." Id.What Citizens fail to do, however, is demonstrate why this information, even if it is accurate, is material or raises a genuine dispute of fact or law. UT measurements had never been taken from the embedded drywell shell prior to 2006, so any measurements, at first glance, could reflect loss of metal at any time between 1969 and 2006. But Citizens fail to appreciate that trained and qualified AmerGen personnel were able to look-with their eyes-at the interior surface of the drywell shell when the concrete'was removed for the first time in 2006, and these personnel identified "no recordable (significant) corrosion on the inner surface of [sic] shell." LRA Supplement at 19. Thus, the loss of 41 mils of metal measured by UT in 2006 is properly attributed to loss from the embedded exterior of the shell. And AmerGen has further concluded that essentially all of the loss of metal from the exterior would have occurred prior to 1992, when the sand, water, and corrosion byproducts were removed from the sand bed region, the concrete floor in the sand bed region was covered with an epoxy coating, and caulk was applied to seal the joint between the exterior drywell shell and the concrete floor.The real crux of Citizens' argument-that AmerGen cannot establish a corrosion rate for the embedded region-appears to be that water in contact with the embedded shell on either side can cause significant corrosion.
Citizens' initial correct characterization of AmerGen's assumption later devolves into the incorrect pronouncement that "AmerGen established during the recent outage that water is routinely in contact with the inside of the drywell shell." Id. at 5 (emphasis added). This latter statement cannot serve as the factual basis for admission of a contention, because it is false on its face. Moreover, this statement does not raise a genuine issue of material fact because, even if true, the water is not corrosive and, as demonstrated by UT measurements, will not affect the intended functions of the drywell shell during the period of extended operation.
This concern, however, is undermined by simple logic. Citizens argue that water has been in contact with the exterior and interior surfaces of the embedded drywell shell since 1969. Motion at 4 ("water infiltrated into the exterior sand bed floor at times between 1 969 and 1992, and between 1996 and 2006") and at 5 ("water is routinely in contact with the inside of the 17 I -WA/2681991 drywell shell"). If the condition of water in contact with tile embedded drywell shell results in significant corrosion, then the UT measurements in the trench in Bay 5 in 2006 would have identified it. Yet only 41 mils total loss of metal was measured in 2006, representing the loss of material between 1969 and 2006. Assuming that Citizens are correct-that water has been in contact with the embedded drywell shell since 1969, and the corrective actions in the sand bed region had no positive effect on the underlying external embedded region-then the corrosion of 41 mils would be equally spread over those 37 years resulting in a corrosion rate of slightly over I mil per year.Even if the Board accepts Citizens' speculation, it does not rise to the level of a genuine issue of material fact for purposes of license renewal. Simple math demonstrates that there are 377 mils of margin remaining before the 0.736 inch "general area" acceptance criterion is surpassed (1.113 -0.736), and 623 mils of margin remaining before the 0.490 inch "very local area" acceptance criterion is surpassed (1.113 -0.490 inches). See LRA Supplement at 20.- Thus, approximately 15 milsper year of future corrosion would need to occur to surpass the 0.736 inch acceptance criteria, and almost twice that amount would need to occur to surpass the 0.490 inch acceptance criterion.
Similarly, Citizens speculate that "AmerGen has also recently revealed its assessment that water could have infiltrated into the floor at the bottom of the sandbed region for all but four of the thirty seven years that the reactor has been operating." Id. at
There simply is no evidence of this kind of corrosion in the embedded region.1 1 The UT data demonstrate only insignificant corrosion in the embedded region. Moreover, tile LO AmerGen conservatively has assumed that another 41 mils of corrosion will occur before the current license term expires in 2009 in order to conclude that 336 mils remains at the start of the period of extended operation.
: 6. This speculation is fraught with errors. First, there is no such "recent" revelation, as demonstrated by a discussion of water collected from the sand bed drains in Exhibit ANC 6, dated November 9, 2006, and of which Citizens were aware in September 2006.
See Ex. ANC I at 20 (listing 336 mils).L Citizens state that AmerGen "boldly concludes" that there will be 0.336 inches remaining at end of renewed life, and that AmerGen has "scant knowledge" about con'osion of the embedded shell.Motion at 8. As discussed above, this is not the case.18 I -WA/2681991 water in contact with the concrete and the drywell shell is alkaline and not corrosively aggressive.
Second, and more importantly, there is no "assessment" that water could have affected the drywell shell, since Exhibit ANC 5 clearly explains that seams/voids in the epoxy coating on the drywell floor in the sand bed region are located "awayfirom the domwell vessel" and near the concrete shield wall. Emphasis added.
See June 20, 2006 RAI Response at 12-13; LRA Supplement at 18.Making a leap of logic-and on the basis of their unfounded supposition that corrosion in the embedded portions of the drywell shell is of concern-Citizens posit that"[tio establish the frequency of monitoring in the embedded region, AmerGen should establish the current smallest margin and apply a worst case corrosion rate and a projection of uncertainty to determine how quickly the region could lose margin." Motion at 6 (emphasis added). They cite no regulatory authority in support of this "worst case" projection demand, and this Board does not have the authority to amend existing NRC rules and regulations to impose Citizens' wishes upon AmerGen.-Based on their desire for a "worst case" analysis, and nothing more, Citizens reach the untenable and unsupported conclusion-contrary to established fact and definitive analysis-that "AmerGen is unable to determine what would be an appropriate monitoring frequency." Motion at 6. As discussed above, AmerGen does not need to perform any UT monitoring of the embedded region to demonstrate that the embedded drywell shell will perform its intended functions through the period of extended operation.
1-WA/2681991 13
Nevertheless, AmerGen has committed to perform at least one more round of UT measurements in the embedded region in the Bay 5 trench in 2008 to confirm that corrosion in the embedded region of the drywell shell is, indeed, "insignificant." LRA Supplement at 14, 21.2 As-noted previously, NRC's license renewal regulations require only "reasonable assurance" that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB -not worst case projections.
 
See 10 C.F.R. § 54.29. If Citizens wish to amend this regulation to require worst case analyses, they must submit a petition for rulemaking under 10 C.F.R. § 2.802(a).19 1-WA/2681991 For all of these reasons, the first proposedcontention should be rejected in its entirety.B. Proposed Contention 2 is Also Inadmissible Proposed Contention 2: The proposed UT monitoring program for monitoring the lower portion of the sand bed region from the outside of the shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because it fails to provide systematic monitoring of potential corrosion occurring from the inside of the drywell shell in the sand bed region.Motion at 4-5. This proposed contention is focused on a portion of the sand bed region.Specifically, it is limited to a 3.5-foot vertical section of the drywell shell that is embedded in concrete inside the drywell, and that corresponds with the (unembedded) sand bed region outside the drywell. See Ex. ANC 2 at 3-7 (Figure 5). Identification of this 3.5-foot section is derived from the fact that the embedded shell inside the drywell has a top elevation of 12'3" (the top of the interior concrete curb) and a bottom elevation of approximately 8'l 1" (the floor in the sand bed region). See, e.g., id. at 8-1. The top of the interior concrete curb is stepped-down to elevation 11 '0" where there is interference from torus vent-header penetrations.
Finally, Citzens' assertions about groundwater affecting the embedded shell do not satisfy Section 2.309(f)(1) because they are based on a misreading of publicly-available documents. Such a misreading does not raise a genuine dispute on a material issue of law or fact. Specifically, Citizens boldly assert that "[t]o respond to the concern that groundwater could contribute to corrosion in the embedded region, AmerGen claims that groundwater could not seep onto the exterior of the shell, but fails to provide any back up information." Motion at 3, citing Ex. ANC 2 at 7-4. Yet, as plainly stated in the cited Exhibit ANC 2:
See Ex. ANC 4 ("Hausler Memorandum")
The Reactor Building Foundation floor is a 10 ft thick reinforced concrete slab. The bottom elevation of the slab is minus 29' 6" and its top elevation is minus 19' 6". There is a waterproof membrane at the bottom of the mat that extends up the outside of the exterior walls to an Elevation of 5' 0".... In order for ground water to reach the lowest point of the containment shell it would need to penetrate the waterproof membrane then migrate through the 10 ft concrete mat then migrate through the pedestal concrete.
at 10. It is above this lower curb elevation that UT grid measurements are taken (i.e., at elevation 11'3"). Id.Some background is required to place this contention further in context. Prior to coating the external surface of the drywell shell in the sand bed region in 1992 with a multi-layer epoxy coating system, OCNGS identified approximately 125 "points" on the shell that were the thinnest points in each bay, based on visual observations and micrometer readings.
Since there is no waterproofing on this interior concrete pedestal ... any water contained or migrating in the pedestal would seek the path of least resistance and flow into the Torus Room. If water was able to make its way along the path outlined above... the Torus Room would be flooded. There are sumps in the basement of the Reactor Building that collect any water in leakage and would prevent significant accumulation of water in the Torus Room (emphasis added).
See Ex. ANC 2 at 6-2, 6-11. Prior to coating, a small area surrounding these 125 points was ground to create a smooth surface upon which the UT probe could be placed. See, e.g., Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006), 20! -WA/268 1991 Document No. C-1302-187-5320-024, OC Drywell Ext. UT Evaluation in Sandbed, Rev.1 (Apr. 14, 2006), at 44, available at ADAMS Accession No. ML063490294.
Ex. ANC 2 at 7-4 to 7-5.
Single UT measurements of the shell were then taken at these 125 points. Ex. ANC 2 at 6-2, 6-11.These points were not measured between 1992 and 2006, and AmerGen was able to locate and take UT measurements at only 106 of those points during the 2006 outage.13 Id. at 6-12 n.1. Although each of the 106 points are between elevations 12'3" and 8'11", about half correspond to areas above the low interior concrete curb, and thus, are not embedded.These point measurements are not the only UT measurements of the drywell shell in the sand bed region. AmerGen also took UT measurements during the 2006 refueling outage from 19 "grid" locations on the interior of the drywell shell that correspond with the historical "bath tub" ring of corrosion on the exterior sand bed region (i.e., between elevation 11 '0" and 12'0")., Id. at 6-17. UT measurements were previously taken from these grid locations in 1992, 1994, and 1996. Id.1. The Second Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(2)
AmerGen also provided in that Package a figure showing the waterproof membrane (including a label pointing to the membrane) and the orientation of the torus room with respect to the drywell on page 3-6 of Exhibit ANC 2. This figure clearly shows why the torus room would need to be flooded for groundwater to reach the embedded region. AmerG en has established that design features prevent groundwater leakage onto the exterior of the shell. Apparently, Citizens simply failed to read the 14 1-WA/2681991
 
ACRS Information Package that they cite in their Motion. 2 Such an oversight does not support admissibility of the contention.
(b) Monitoring Program: Citizens claim that they have identified "many deficiencies in the proposed monitoring regime." Motion at 6. First, and according to Citizens-'"most glaring"-is the accusation that "AmerGen did not choose to monitor the embedded region in a bay where the lower sandbed region is highly corroded." Id Further to this charge, Citizens attribute material importance to the fact that "AmerGen has failed to even discuss whether the results in Bay 5 represent worst case conditions in the embedded region." Id. There is no such material import stemming from Citizens' claim, because they fail to recognize that there is no statutory, regulatory, or precedential requirement for such a "worst case" analysis. See 10 C.F.R. § 54.29, Standards for Issuance of a Renewed License (requiring only "reasonableassurance" that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB (emphasis added)).
Furthermore, the corrosion in the shell exposed in the Bay 5 trench would be expected to be greater than in Bay 17 because only the Bay 5 trench contained standing water when the filler material was first removed during the 2006 refueling outage.8 Citizens further complain that AmerGen did not provide any figures for the rate at which water is being pumped from sumps in the Torus room. As noted above, groundwater cannot credibly contribute to Corrosion in the embedded region and groundwater leakage into the Torus room has not been a problem at Oyster Creek. Thus, there is no rational reason to provide any Torus room pump rate figures.
AmerGen decided to further excavate the Bay 5 trench because its base was at elevation 8'9",
while the Bay 17 trench base was at elevation 9'3". See Ex. ANC 2 at 8-1. The exterior embedded region starts at approximately elevation 8' 11". Id. Accordingly, excavating the Bay 5 trench required removing only sufficient concrete to expose six additional inches of the drywell shell, while excavating the Bay 17 trench would have required removing more concrete than Bay 5.
15 I-WA/2681991
 
Thus, there is no material dispute of fact that the Bay 5 data are, at a minimum, representative of corrosion caused by water that might be in contact with the interior embedded shell.
Relying on final Interim Staff Guidance (ISG), 2 Citizens next attempt to argue that it creates some sort of binding "requirement" that license renewal applicants "develop or establish a corrosion rate from past UT measurements or representative samples and then 'demonstrate that the shell will have sufficient wall thickness to perform its function through the period of extended operation."' Motion at 6, citing 71 Fed. Reg. 67,923 (Nov. 24, 2006). The ISG, however, has no binding regulatory effect:
the ISG includes "recommended actions" only and does not have the force of law unlike the regulations in 10 C.F.R. Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plans." As a result, Citizens have yet again failed to articulate a material dispute of fact stemming from the ISG.
(c) Proposed Monitoring Frequency: Next, Citizens argue that the "one set of measurements of corrosion in the embedded region from the trench in Bay 5... is insufficient to establish a corrosion rate because there is no way of knowing over which time period the corrosion occurred." Motion at 6. Citizens note that during the October 2006 outage, "AmerGen deepened an existing trench in Bay 5 by six inches to expose a limited area of the embedded region." Motion at 2. AmerGen then took "42 UT 2       License Renewal Interim Staff Guidance LR-ISG-2006-01: Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell, (Nov. 16, 2006). Citizens have been involved in the development of this ISG, are knowledgeable of its content, and even used the draft in a prior attempt to support a new contention. Motion to Add or Supplement, at 3-4.
16 1-WA/2681991
 
measurements in the newly exposed area," which showed that "the average thickness had decreased from a nominal 1.154 inches to 1.113 inches, a loss of 0.041 inches." Id.
What Citizens fail to do, however, is demonstrate why this information, even if it is accurate, is material or raises a genuine dispute of fact or law. UT measurements had never been taken from the embedded drywell shell prior to 2006, so any measurements, at first glance, could reflect loss of metal at any time between 1969 and 2006. But Citizens fail to appreciate that trained and qualified AmerGen personnel were able to look-with their eyes-at the interior surface of the drywell shell when the concrete'was removed for the first time in 2006, and these personnel identified "no recordable (significant) corrosion on the inner surface of [sic] shell." LRA Supplement at 19. Thus, the loss of 41 mils of metal measured by UT in 2006 is properly attributed to loss from the embedded exterior of the shell. And AmerGen has further concluded that essentially all of the loss of metal from the exterior would have occurred prior to 1992, when the sand, water, and corrosion byproducts were removed from the sand bed region, the concrete floor in the sand bed region was covered with an epoxy coating, and caulk was applied to seal the joint between the exterior drywell shell and the concrete floor.
The real crux of Citizens' argument-that AmerGen cannot establish a corrosion rate for the embedded region-appears to be that water in contact with the embedded shell on either side can cause significant corrosion. This concern, however, is undermined by simple logic. Citizens argue that water has been in contact with the exterior and interior surfaces of the embedded drywell shell since 1969. Motion at 4
("water infiltrated into the exterior sand bed floor at times between 1969 and 1992, and between 1996 and 2006") and at 5 ("water is routinely in contact with the inside of the 17 I-WA/2681991
 
drywell shell"). If the condition of water in contact with tile embedded drywell shell results in significant corrosion, then the UT measurements in the trench in Bay 5 in 2006 would have identified it. Yet only 41 mils total loss of metal was measured in 2006, representing the loss of material between 1969 and 2006. Assuming that Citizens are correct-that water has been in contact with the embedded drywell shell since 1969, and the corrective actions in the sand bed region had no positive effect on the underlying external embedded region-then the corrosion of 41 mils would be equally spread over those 37 years resulting in a corrosion rate of slightly over I mil per year.
Even if the Board accepts Citizens' speculation, it does not rise to the level of a genuine issue of material fact for purposes of license renewal. Simple math demonstrates that there are 377 mils of margin remaining before the 0.736 inch "general area" acceptance criterion is surpassed (1.113 - 0.736), and 623 mils of margin remaining before the 0.490 inch "very local area" acceptance criterion is surpassed (1.113 - 0.490 inches). See LRA Supplement at 20.- Thus, approximately 15 milsperyear of future corrosion would need to occur to surpass the 0.736 inch acceptance criteria, and almost twice that amount would need to occur to surpass the 0.490 inch acceptance criterion.
There simply is no evidence of this kind of corrosion in the embedded region.1 1 The UT data demonstrate only insignificant corrosion in the embedded region. Moreover, tile LO       AmerGen conservatively has assumed that another 41 mils of corrosion will occur before the current license term expires in 2009 in order to conclude that 336 mils remains at the start of the period of extended operation. See Ex. ANC I at 20 (listing 336 mils).
L       Citizens state that AmerGen "boldly concludes" that there will be 0.336 inches remaining at end of renewed life, and that AmerGen has "scant knowledge" about con'osion of the embedded shell.
Motion at 8. As discussed above, this is not the case.
I-WA/2681991 18
 
water in contact with the concrete and the drywell shell is alkaline and not corrosively aggressive. See June 20, 2006 RAI Response at 12-13; LRA Supplement at 18.
Making a leap of logic-and on the basis of their unfounded supposition that corrosion in the embedded portions of the drywell shell is of concern-Citizens posit that
"[tio establish the frequency of monitoring in the embedded region, AmerGen should establish the current smallest margin and apply a worst case corrosion rate and a projection of uncertainty to determine how quickly the region could lose margin."
Motion at 6 (emphasis added). They cite no regulatory authority in support of this "worst case" projection demand, and this Board does not have the authority to amend existing NRC rules and regulations to impose Citizens' wishes upon AmerGen.-
Based on their desire for a "worst case" analysis, and nothing more, Citizens reach the untenable and unsupported conclusion-contrary to established fact and definitive analysis-that "AmerGen is unable to determine what would be an appropriate monitoring frequency." Motion at 6. As discussed above, AmerGen does not need to perform any UT monitoring of the embedded region to demonstrate that the embedded drywell shell will perform its intended functions through the period of extended operation. Nevertheless, AmerGen has committed to perform at least one more round of UT measurements in the embedded region in the Bay 5 trench in 2008 to confirm that corrosion in the embedded region of the drywell shell is, indeed, "insignificant." LRA Supplement at 14, 21.
2       As-noted previously, NRC's license renewal regulations require only "reasonableassurance"that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB - not worst case projections. See 10 C.F.R. § 54.29. If Citizens wish to amend this regulation to require worst case analyses, they must submit a petition for rulemaking under 10 C.F.R. § 2.802(a).
19 1-WA/2681991
 
For all of these reasons, the first proposedcontention should be rejected in its entirety.
B.       Proposed Contention 2 is Also Inadmissible Proposed Contention 2: The proposed UT monitoring program for monitoring the lower portion of the sand bed region from the outside of the shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because it fails to provide systematic monitoring of potential corrosion occurring from the inside of the drywell shell in the sand bed region.
Motion at 4-5. This proposed contention is focused on a portion of the sand bed region.
Specifically, it is limited to a 3.5-foot vertical section of the drywell shell that is embedded in concrete inside the drywell, and that corresponds with the (unembedded) sand bed region outside the drywell. See Ex. ANC 2 at 3-7 (Figure 5). Identification of this 3.5-foot section is derived from the fact that the embedded shell inside the drywell has a top elevation of 12'3" (the top of the interior concrete curb) and a bottom elevation of approximately 8'l1" (the floor in the sand bed region). See, e.g., id. at 8-1. The top of the interior concrete curb is stepped-down to elevation 11 '0" where there is interference from torus vent-header penetrations. See Ex. ANC 4 ("Hausler Memorandum") at 10. It is above this lower curb elevation that UT grid measurements are taken (i.e., at elevation 11'3"). Id.
Some background is required to place this contention further in context. Prior to coating the external surface of the drywell shell in the sand bed region in 1992 with a multi-layer epoxy coating system, OCNGS identified approximately 125 "points" on the shell that were the thinnest points in each bay, based on visual observations and micrometer readings. See Ex. ANC 2 at 6-2, 6-11. Prior to coating, a small area surrounding these 125 points was ground to create a smooth surface upon which the UT probe could be placed. See, e.g., Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006),
20
!-WA/268 1991
 
Document No. C-1302-187-5320-024, OC Drywell Ext. UT Evaluation in Sandbed, Rev.
1 (Apr. 14, 2006), at 44, available at ADAMS Accession No. ML063490294. Single UT measurements of the shell were then taken at these 125 points. Ex. ANC 2 at 6-2, 6-11.
These points were not measured between 1992 and 2006, and AmerGen was able to locate and take UT measurements at only 106 of those points during the 2006 outage.13 Id. at 6-12 n.1. Although each of the 106 points are between elevations 12'3" and 8'11",
about half correspond to areas above the low interior concrete curb, and thus, are not embedded.
These point measurements are not the only UT measurements of the drywell shell in the sand bed region. AmerGen also took UT measurements during the 2006 refueling outage from 19 "grid" locations on the interior of the drywell shell that correspond with the historical "bath tub" ring of corrosion on the exterior sand bed region (i.e., between elevation 11 '0" and 12'0")., Id. at 6-17. UT measurements were previously taken from these grid locations in 1992, 1994, and 1996. Id.
: 1.       The Second Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(2)
As with the first proposed contention discussed above, the second proposed contention also is based on information that is neither new nor materially different than information that was previously available, and for that reason, must be dismissed per 10 C.F.R. § 2.309(f)(2).
As with the first proposed contention discussed above, the second proposed contention also is based on information that is neither new nor materially different than information that was previously available, and for that reason, must be dismissed per 10 C.F.R. § 2.309(f)(2).
Citizens are attempting to re-litigate the spatial scope of UT measurements in the sand bed region. They specifically state that there is a "newly identified corrosion L; New equipment allows UT measurements to be taken through the epoxy coating, while not including the coating in the thickness measurement.
Citizens are attempting to re-litigate the spatial scope of UT measurements in the sand bed region. They specifically state that there is a "newly identified corrosion L;       New equipment allows UT measurements to be taken through the epoxy coating, while not including the coating in the thickness measurement.
21 I -WA/2681991 mechanism" that requires AmerGen to expand "the spatial scope of the UT monitoring
21 I-WA/2681991
... from the outside of the sand bed region." Motion at 8. This Licensing Board, however, already ruled that spatial scope of UT measurements in the sand bed region cannot form the basis of a new contention when the UT measurement locations were previously known. LBP-06-22, slip op. at 28-30. The UT measurement points on the outside of the drywell shell in the sand bed region are the same locations as measured in 1992. See Ex. ANC 2 at 6-18.Moreover, the new "mechanism" Citizens identify is purported to be corrosion of the interior embedded shell between elevations 12'3" and 8'11". Id. at 3, 7. Yet this mechanism is the same one that Citizens raised in multiple attempts to litigate the embedded region beginning more than a year ago. See, e.g., Reply Brief at 13.Moreover, the NRC's request for information about potential corrosion in this interior embedded region, and the elements of AmerGen' s Aging Management Program for this area have been public information since April 2006 (7 months before Citizens filed their now very-late-filed contention).
 
See AMR-164, "Inaccessible Portion of the Drywell" (Oct. 31, 2005), attached to e-mail from J. Hufnagel (AmerGen) to D. Ashley (Apr. 3, 2006) available at ADAMS Accession No. ML060940146.
mechanism" that requires AmerGen to expand "the spatial scope of the UT monitoring from the outside of the sand bed region." Motion at 8. This Licensing Board,
In addition, as the Board has previously recognized, the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are embedded in concrete.
  ...
See LBP-06-11, 63 NRC at 398. Accordingly, any challenges to the embedded shell inside the drywell could have been raised a long time ago.Finally, Citizens raised this very concern in their presentation to the ACRS 22 I -WA/2681991 Subcommittee on October 3, 2006. Citizens' ACRS Presentation at Slide 15. Their presentation specifically argues that "[m]uch of the sandbed is inaccessible from the inside [of the drywell]," and that the "spatial scope" of UT thickness measurements is inadequate.
however, already ruled that spatial scope of UT measurements in the sand bed region cannot form the basis of a new contention when the UT measurement locations were previously known. LBP-06-22, slip op. at 28-30. The UT measurement points on the outside of the drywell shell in the sand bed region are the same locations as measured in 1992. See Ex. ANC 2 at 6-18.
Id. Accordingly, Citizens had developed this argument about three months before they filed this second proposed contention, Their attempt to raise this argument now before the Board comes too late.For these reasons, the Board should once again rule that Citizens have failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id. § 2.309(f)(2)(ii))." LBP-06-11, 63 NRC at 397.2. Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)
Moreover, the new "mechanism" Citizens identify is purported to be corrosion of the interior embedded shell between elevations 12'3" and 8'11". Id. at 3, 7. Yet this mechanism is the same one that Citizens raised in multiple attempts to litigate the embedded region beginning more than a year ago. See, e.g., Reply Brief at 13.
Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted.
Moreover, the NRC's request for information about potential corrosion in this interior embedded region, and the elements of AmerGen' s Aging Management Program for this area have been public information since April 2006 (7 months before Citizens filed their now very-late-filed contention). See AMR-164, "Inaccessible Portion of the Drywell" (Oct. 31, 2005), attached to e-mail from J. Hufnagel (AmerGen) to D. Ashley (Apr. 3, 2006) available at ADAMS Accession No. ML060940146.
Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factoirs for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the second proposed contention should be denied.3. The Second Proposed Contention Also Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(1)
In addition, as the Board has previously recognized, the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are embedded in concrete. See LBP-06-11, 63 NRC at 398. Accordingly, any challenges to the embedded shell inside the drywell could have been raised a long time ago.
Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for this second proposed contention, they have again failed to demonstrate I-WA/2681991 that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1), and this contention should therefore be rejected.Citizens' first argument that the proposed UT monitoring of the sand bed region from the outside of the shell is deficient is that the 106 points were selected in 1992, based on the visual inspection of corrosion on the exterior of the shell, not on where"interior corrosion would be most likely." Motion at 7. Citizens' only basis as to why this is a deficiency is their reliance on Dr. Hausler's opinion, that "interior corrosion would more likely occur as a 'bathtub ring' below the [interior]
Finally, Citizens raised this very concern in their presentation to the ACRS 22 I -WA/2681991
concrete curb." Id. citing Ex. ANC 4 at 4. Dr. Hausler elaborates that:[I]f in fact water had entered the gap [between the drywell shell and the concrete curb] the same type of differential aeration cell would have formed and would have lead [sic] to corrosion rates comparable to the rates found in the sandbed. In fact a new bathtub ring might have formed afew inches below the top of the curb.The dangers of such a ring, we suggest are significant and AmerGen must conduct further UT testing to discover whether interior corrosion below the concrete curb is significant.
 
Ex. ANC 4 at 4 (emphasis added).This argument does not raise a genuine issue of material fact that supports admitting Citizens' second proposed contention because it ignores reality. Dr. Hausler is concerned that there may be a bathtub ring of corrosion on the inside of the drywell shell a "few inches" below the concrete curb. His concern thus focuses onl the interior drywell shell at approximately elevation 12'0" because, as discussed above, the top of the interior concrete curb is located at elevation 12'3". There cannot be a bath tub ring at elevation 12'0" because water cannot collect at this elevation.
Subcommittee on October 3, 2006. Citizens' ACRS Presentation at Slide 15. Their presentation specifically argues that "[m]uch of the sandbed is inaccessible from the inside [of the drywell]," and that the "spatial scope" of UT thickness measurements is inadequate. Id. Accordingly, Citizens had developed this argument about three months before they filed this second proposed contention, Their attempt to raise this argument now before the Board comes too late.
The lower curb at 1 1'0" would allow any water behind the curb above 11 '0" to drain out and not remain behind the upper part of the curb. Also, because the curb was totally removed at the two trenches in 24 l -WA/2681!991 1986, water could not remain above elevation 10'3" (the concrete floor) after 1986. See Ex. ANC 2 at 3-7 (Figure 5); Ex. ANC 4 at 10.Citizens and Dr. Hausler apparently fail to appreciate that because the concrete curb, was entirely removed when the two trenches were excavated 1986, that it would be plain to the naked eye if there was a bathtub ring of corrosion below the former concrete curb at elevation 12'0" (or at any other excavated internal elevation).
For these reasons, the Board should once again rule that Citizens have failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.
No such ring was identified.
§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id. § 2.309(f)(2)(ii))." LBP-06-11, 63 NRC at 397.
UT measurements from the exterior of the shell, therefore, are simply not necessary to identify an alleged bathtub ring of corrosion on the inside, when such a ring would be obvious to the naked eye.Citizens also ignore the scientific analysis discussed in AmerGen's June 20, 2006 RAI Response, which explains why only insignificant corrosion would be expected in any embedded region; namely, that the water becomes alkaline from the concrete, creating a non-aggressive envirornent that essentially protects the metal in the drywell shell. June 20, 2006 RAI Response, at 12-13; Ex. ANC 2 at 7-5 to 7-6. And if that was not enough, Citizens ignore the very important fact that the interior of the drywell "'is inerted with nitrogen during operations." Ex. ANC 2 at 8-3. Accordingly, the amount of oxygen that is available in a normal atmosphere is not present on the inside of the drywell except when the drywell is open during outages. See id.In an attempt to ground their concern in reality, Citizens once again grasp at the final ISG for support that "when ultrasonic thickness measurements are performed, one foot square grids must be used, unless justified otherwise." Motion at 7, citing 71 Fed.Reg. 67,923. Citizens therefore conclude that AlnerGen's UT monitoring program is deficient because it includes only single points rather than grids as discussed in the ISG.25 I -WA/268 1991 As explained above in response to the first proposed contention, the final ISG has no binding regulatory effect; it includes "recommended actions" only and does not have the force of law as do the NRC's regulations.
: 2.     Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)
In addition, one foot grids are only specified by the ISG "unless justified otherwise." 71 Fed. Reg. at 67,925. A grid can only be used where the metal surface is essentially flat. Yet the exterior surface of the shell is not flat; a condition caused by the historical corrosion.
Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted. Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factoirs for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the second proposed contention should be denied.
Ex. ANC 2 at 6-17. As explained above, a small area surrounding each of the 106 points was ground to create a smooth surface upon which the UT probe could be placed before the shell in the sand bed region was coated in 1992. Accordingly, these points are the only locations where UT measurements can be taken on the exterior shell between elevations 12'3" and 8'11".Thus, even if the final ISG applied here, AmerGen would have an adequate justification to limit UT to point measurements.
: 3.     The Second Proposed Contention Also Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(1)
Citizens also argue that their contention raises a material dispute because"AmerGen does not explicitly state that the proposed monitoring regime will ensure that margins will be maintained for any extended period of licensed operation." Motion at 8.There is, however, no requirement that AmerGen demonstrate that the "margins will be maintained" to the end of the period of extended operation.
Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for this second proposed contention, they have again failed to demonstrate I-WA/2681991
Rather, NRC regulations require that AmerGen have an Aging Management Program ("AMP") that provides"reasonable assurance" that it can manage the effects of aging during the period of extended operation prior to the loss of intended function.
 
10 C.F.R. § 54.29(a).'
that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1), and this contention should therefore be rejected.
AmerGen credits pressure testing in accordance with 10 C.F.R. Part 50, Appendix J I -WA/2681991 (Type A test) and ASME Section XI for managing aging effects of inaccessible portions of the drywell shell consistent with NUREG-1801 (the GALL Report).4 In conclusion, the insignificant loss of metal in the embedded region measured by UT to date, coupled with the scientific analysis demonstrating the insignificance of any posited loss of metal, and the pressure testing performed by AmerGen in accordance with 10 C.F.R. Part 50, Appendix J, provide reasonable assurance that the embedded drywell shell will perform its intended function as required by 10 C.F.R. Part 54 throughout the requested period of extended operation.
Citizens' first argument that the proposed UT monitoring of the sand bed region from the outside of the shell is deficient is that the 106 points were selected in 1992, based on the visual inspection of corrosion on the exterior of the shell, not on where "interior corrosion would be most likely." Motion at 7. Citizens' only basis as to why this is a deficiency is their reliance on Dr. Hausler's opinion, that "interior corrosion would more likely occur as a 'bathtub ring' below the [interior] concrete curb." Id. citing Ex. ANC 4 at 4. Dr. Hausler elaborates that:
Accordingly, Citizens' second proposed contention does not raise a genuine issue of material fact or law, and thus, should be dismissed.
[I]f in fact water had entered the gap [between the drywell shell and the concrete curb] the same type of differential aeration cell would have formed and would have lead [sic] to corrosion rates comparable to the rates found in the sandbed. In fact a new bathtub ring might have formed afew inches below the top of the curb.
L4 See AMR-164, "Inaccessible Portion of the Drywell" (April 3, 2006) at 15, available a/ ADAMS Accession No. ML060940146.
The dangers of such a ring, we suggest are significant and AmerGen must conduct further UT testing to discover whether interiorcorrosionbelow the concrete curb is significant.
The embedded portion of the drywell shell-whether it is embedded on both sides or just one-is exempt firom visual examination in accordance with IWE-1232. Id.27 I -WA/2681991 IV. CONCLUSION Citizens' two new late-filed contentions have no substantive merit and lack legal foundation.
Ex. ANC 4 at 4 (emphasis added).
Because the new contentions lack an adequate basis and fail to meet the requirements of 10 C.F.R. §§ 2.309(c), (f)(1), and (f)(2), they should be dismissed by the Board.Respectfully submitted, Donald J. Silverman, Kathryn M. Sutton, Esq.Alex S. Polonsky, Esq.MORGAN, LEWIS & BOCKIUS, LLP 1111 Pennsylvania Avenue, N.W.Washington, DC 20004 Phone: (202) 739-5502 E-mail: dsilvermana,,morganlewis.com E-mail: ksuttoni(morganlewis.com E-mail: apolonskyvmorganlewis.com J. Bradley Fewell Associate General Counsel Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 Phone: (630) 657-3769 E-mail: Bradley.Fewell@exeloncolnp.con COUNSEL FOR AMERGEN ENERGY COMPANY, LLC Dated in Washington, D.C.this 16th day of January 2007 28 I -WA/2681991 UNITED STATES OF AMERICA NUCLEAR REGULATORY, COMMISSION ATOMIC SAFETY AND LICENSING BOARD)In the Matter of: ))AmerGen Energy Company, LLC ))(License Renewal for Oyster Creek Nuclear )Generating Station) )January 16, 2007 Docket No. 50-219 AMENDED NOTICE OF APPEARANCE The undersigned attorney hereby amends his Notice of Appearance in this proceeding.
This argument does not raise a genuine issue of material fact that supports admitting Citizens' second proposed contention because it ignores reality. Dr. Hausler is concerned that there may be a bathtub ring of corrosion on the inside of the drywell shell a "few inches" below the concrete curb. His concern thus focuses onl the interior drywell shell at approximately elevation 12'0" because, as discussed above, the top of the interior concrete curb is located at elevation 12'3". There cannot be a bath tub ring at elevation 12'0" because water cannot collect at this elevation. The lower curb at 11'0" would allow any water behind the curb above 11 '0" to drain out and not remain behind the upper part of the curb. Also, because the curb was totally removed at the two trenches in l -WA/2681!991 24
In accordance with 10 C.F.R. § 2.314(b), the following information is provided: Name: Address: E-Mail: Telephone:
 
Facsimile:
1986, water could not remain above elevation 10'3" (the concrete floor) after 1986. See Ex. ANC 2 at 3-7 (Figure 5); Ex. ANC 4 at 10.
Admissions:
Citizens and Dr. Hausler apparently fail to appreciate that because the concrete curb, was entirely removed when the two trenches were excavated 1986, that it would be plain to the naked eye if there was a bathtub ring of corrosion below the former concrete curb at elevation 12'0" (or at any other excavated internal elevation). No such ring was identified. UT measurements from the exterior of the shell, therefore, are simply not necessary to identify an alleged bathtub ring of corrosion on the inside, when such a ring would be obvious to the naked eye.
Name of Party: J. Bradley Fewell Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 bradley.fewell  
Citizens also ignore the scientific analysis discussed in AmerGen's June 20, 2006 RAI Response, which explains why only insignificant corrosion would be expected in any embedded region; namely, that the water becomes alkaline from the concrete, creating a non-aggressive envirornent that essentially protects the metal in the drywell shell. June 20, 2006 RAI Response, at 12-13; Ex. ANC 2 at 7-5 to 7-6. And if that was not enough, Citizens ignore the very important fact that the interiorof the drywell "'is inerted with nitrogen during operations." Ex. ANC 2 at 8-3. Accordingly, the amount of oxygen that is available in a normal atmosphere is not present on the inside of the drywell except when the drywell is open during outages. See id.
@ exeloncorp.com (630) 657-3769 (630) 657-4335 Pennsylvania Court of Appeals New Jersey Supreme Court AmerGen Energy Company, LLC Respectfully submitted, 1-WA/2686009 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD)In the Matter of: ))AmerGen Energy Company, LLC ))(License Renewal for Oyster Creek Nuclear )Generating Station) )))January 16, 2007 Docket No. 50-219 CERTIFICATE OF SERVICE I hereby certify that copies of the "AmerGen's Answer to Citizens' Motion for Leave to Add Contentions and Motion to Add Contentions" and J. Bradley Fewell's Amended Notice of Appearance were served this day upon the persons listed below, by E-mail and first class mail, unless otherwise noted.Secretary of the Commission*
In an attempt to ground their concern in reality, Citizens once again grasp at the final ISG for support that "when ultrasonic thickness measurements are performed, one foot square grids must be used, unless justified otherwise." Motion at 7, citing 71 Fed.
U.S. Nuclear Regulatory Commission Attn: Rulemakings and Adjudications Staff One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 (E-mail: HEARINGDOCKETanrc.gov)
Reg. 67,923. Citizens therefore conclude that AlnerGen's UT monitoring program is deficient because it includes only single points rather than grids as discussed in the ISG.
Administrative Judge Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop -T-3 F23 U.S. Nuclear Regulatory, Commnission Washington, D.C. 20555-0001 (E-mail: pba nrc.gov )Administrative Judge E. Roy Hawkens, Chair Atomic Safety and Licensing Board Panel Mail Stop -T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 (E-mail: erhanrc.gov)
I -WA/268 1991 25
Administrative Judge Anthony J. Baratta Atomic Safety and Licensing Board Panel Mail Stop -T-3 F23 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 (E-mail: aib5Wnrc.gov)
 
I -W A/2686002 John A. Covino Ellen Barney Balint Valerie Anne Gray Caroline Stahl Division of Law Environmental Permitting and Counseling Section P.O. Box 093 Hughes Justice Complex Trenton, NJ 08625 (E-mail: j ohln.covino'dol.lps.state.nj.us)(E-mail:, Ellen. Balintalps.state.ni  
As explained above in response to the first proposed contention, the final ISG has no binding regulatory effect; it includes "recommended actions" only and does not have the force of law as do the NRC's regulations. In addition, one foot grids are only specified by the ISG "unless justified otherwise." 71 Fed. Reg. at 67,925. A grid can only be used where the metal surface is essentially flat. Yet the exterior surface of the shell is not flat; a condition caused by the historical corrosion. Ex. ANC 2 at 6-17. As explained above, a small area surrounding each of the 106 points was ground to create a smooth surface upon which the UT probe could be placed before the shell in the sand bed region was coated in 1992. Accordingly, these points are the only locations where UT measurements can be taken on the exterior shell between elevations 12'3" and 8'11".
.us)(E-mail: Valerie.Graykdol.lps.state.ni .us)(E-mail: Caroline.Stahl@Ips.state.ni.us)
Thus, even if the final ISG applied here, AmerGen would have an adequate justification to limit UT to point measurements.
Office of Commission Appellate Adjudication**
Citizens also argue that their contention raises a material dispute because "AmerGen does not explicitly state that the proposed monitoring regime will ensure that margins will be maintained for any extended period of licensed operation." Motion at 8.
U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Richard Webster Rutgers Environmental Law Clinic 123 Washington Street Newark, NJ 07102-5695 (E-mail: rwebster()kinoy.rutgers.edu)
There is, however, no requirement that AmerGen demonstrate that the "margins will be maintained" to the end of the period of extended operation. Rather, NRC regulations require that AmerGen have an Aging Management Program ("AMP") that provides "reasonable assurance" that it can manage the effects of aging during the period of extended operation prior to the loss of intended function. 10 C.F.R. § 54.29(a).'
Suzanne Leta NJPIRG 11 N. Willow Street Trenton, NJ 08608 (E-mail: sletaanipirg.org)
AmerGen credits pressure testing in accordance with 10 C.F.R. Part 50, Appendix J I-WA/2681991
Mitzi A. Young Steven C. Hamrick Jody C. Martin Office of the General Counsel, 0-15D21 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 (E-mail: may aqnrc.gov)(E-mail: sch I @nrc.gov)(E-mail: icm5@nrc.gov)
 
* Original and 2 copies** First Class Mail only Paul Gunter Nuclear Information and Resource Service 1424 16th Street, NW Suite 404 Washington, DC 20036 (E-mail: pgunteranirs.org)
(Type A test) and ASME Section XI for managing aging effects of inaccessible portions of the drywell shell consistent with NUREG-1801 (the GALL Report).                 4 In conclusion, the insignificant loss of metal in the embedded region measured by UT to date, coupled with the scientific analysis demonstrating the insignificance of any posited loss of metal, and the pressure testing performed by AmerGen in accordance with 10 C.F.R. Part 50, Appendix J, provide reasonable assurance that the embedded drywell shell will perform its intended function as required by 10 C.F.R. Part 54 throughout the requested period of extended operation. Accordingly, Citizens' second proposed contention does not raise a genuine issue of material fact or law, and thus, should be dismissed.
Debra Wolf Law Clerk Atomic Safety and Licensing Board Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 (E-mail: dawl @nrc.gov)Pphael P/./uyler 2}}
L4       See AMR-164, "Inaccessible Portion of the Drywell" (April 3, 2006) at 15, available a/ ADAMS Accession No. ML060940146. The embedded portion of the drywell shell-whether it is embedded on both sides or just one-is exempt firom visual examination in accordance with IWE-1232. Id.
27 I -WA/2681991
 
IV. CONCLUSION Citizens' two new late-filed contentions have no substantive merit and lack legal foundation. Because the new contentions lack an adequate basis and fail to meet the requirements of 10 C.F.R. §§ 2.309(c), (f)(1), and (f)(2), they should be dismissed by the Board.
Respectfully submitted, Donald J. Silverman, Kathryn M. Sutton, Esq.
Alex S. Polonsky, Esq.
MORGAN, LEWIS & BOCKIUS, LLP 1111 Pennsylvania Avenue, N.W.
Washington, DC 20004 Phone: (202) 739-5502 E-mail: dsilvermana,,morganlewis.com E-mail: ksuttoni(morganlewis.com E-mail: apolonskyvmorganlewis.com J. Bradley Fewell Associate General Counsel Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 Phone: (630) 657-3769 E-mail: Bradley.Fewell@exeloncolnp.con COUNSEL FOR AMERGEN ENERGY COMPANY, LLC Dated in Washington, D.C.
this 16th day of January 2007 28 I -WA/2681991
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY, COMMISSION ATOMIC SAFETY AND LICENSING BOARD
                                                    )
In the Matter of:                                   )       January 16, 2007
                                                    )
AmerGen Energy Company, LLC                         )
                                                    )       Docket No. 50-219 (License Renewal for Oyster Creek Nuclear           )
Generating Station)                                 )
AMENDED NOTICE OF APPEARANCE The undersigned attorney hereby amends his Notice of Appearance in this proceeding. In accordance with 10 C.F.R. § 2.314(b), the following information is provided:
Name:                 J. Bradley Fewell Address:             Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 E-Mail:              bradley.fewell @exeloncorp.com Telephone:            (630) 657-3769 Facsimile:            (630) 657-4335 Admissions:          Pennsylvania Court of Appeals New Jersey Supreme Court Name of Party:        AmerGen Energy Company, LLC Respectfully submitted, 1-WA/2686009
 
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD
                                                      )
In the Matter of:                                     )       January 16, 2007
                                                      )
AmerGen Energy Company, LLC                           )
                                                      )       Docket No. 50-219 (License Renewal for Oyster Creek Nuclear             )
Generating Station)                                   )
                                                      )
                                                      )
CERTIFICATE OF SERVICE I hereby certify that copies of the "AmerGen's Answer to Citizens' Motion for Leave to Add Contentions and Motion to Add Contentions" and J. Bradley Fewell's Amended Notice of Appearance were served this day upon the persons listed below, by E-mail and first class mail, unless otherwise noted.
Secretary of the Commission*                           Administrative Judge U.S. Nuclear Regulatory Commission                     E. Roy Hawkens, Chair Attn: Rulemakings and Adjudications Staff             Atomic Safety and Licensing Board Panel One White Flint North                                 Mail Stop - T-3 F23 11555 Rockville Pike                                 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852-2738                         Washington, D.C. 20555-0001 (E-mail: HEARINGDOCKETanrc.gov)                       (E-mail: erhanrc.gov)
Administrative Judge                                  Administrative Judge Paul B. Abramson                                     Anthony J. Baratta Atomic Safety and Licensing Board Panel              Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23                                    Mail Stop - T-3 F23 U.S. Nuclear Regulatory, Commnission                 U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001                           Washington, D.C. 20555-0001 (E-mail: pba nrc.gov )                                (E-mail: aib5Wnrc.gov)
I-W A/2686002
 
John A. Covino                                  Office of Commission Appellate Ellen Barney Balint                              Adjudication**
Valerie Anne Gray                              U.S. Nuclear Regulatory Commission Caroline Stahl                                  Washington, DC 20555-0001 Division of Law Environmental Permitting and Counseling Section P.O. Box 093 Hughes Justice Complex                         Richard Webster Trenton, NJ 08625                               Rutgers Environmental Law Clinic (E-mail: johln.covino'dol.lps.state.nj.us)       123 Washington Street (E-mail:, Ellen. Balintalps.state.ni . us)     Newark, NJ 07102-5695 (E-mail: Valerie.Graykdol.lps.state.ni .us)     (E-mail: rwebster()kinoy.rutgers.edu)
(E-mail: Caroline.Stahl@Ips.state.ni.us)
Suzanne Leta                                    Paul Gunter NJPIRG                                          Nuclear Information and Resource Service 11 N. Willow Street                              1424 16th Street, NW Trenton, NJ 08608                              Suite 404 (E-mail: sletaanipirg.org)                     Washington, DC 20036 (E-mail: pgunteranirs.org)
Mitzi A. Young                                 Debra Wolf Steven C. Hamrick                               Law Clerk Jody C. Martin                                 Atomic Safety and Licensing Board Office of the General Counsel, 0-15D21         Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission              U.S. Nuclear Regulatory Commission Washington, D.C. 20555                         Washington, DC 20555-0001 (E-mail: may aqnrc.gov)                         (E-mail: dawl @nrc.gov)
(E-mail: sch I@nrc.gov)
(E-mail: icm5@nrc.gov)
* Original and 2 copies
** First Class Mail only Pphael P/./uyler 2}}

Revision as of 10:23, 23 November 2019

2007/01/16-AmerGen's Answer to Citizens' Motion for Leave to Add Contentions and Motion to Add Contentions with Amended Notice of Appearance of J. Bradley Fewell
ML070190312
Person / Time
Site: Oyster Creek
Issue date: 01/16/2007
From: Polonsky A
AmerGen Energy Co, Morgan, Morgan, Lewis & Bockius, LLP
To: Abramson P, Anthony Baratta, Hawkens E
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-219-LR, ASLBP 06-844-01-LR, RAS 12880
Download: ML070190312 (31)


Text

PAS 1.asgo DOCKETED USNRC UNITED STATES OF AMERICA January 17, 2007 (738am)

NUCLEAR REGULATORY COMMISSION OFFICE OF SECRETARY ATOMIC SAFETY AND LICENSING BOARD RULEMAKINGS AND ADJUDICATIONS STAFF Before Administrative Judges:

E. Roy Hawkens, Chair Dr. Paul B. Abramson Dr. Anthony J. Baratta

)

In the Matter of: ) January 16, 2007

)

AmerGen Energy Company, LLC )

) Docket No. 50-219 (License Renewal for Oyster Creek Nuclear )

Generating Station) )

)

)

AMERGEN'S ANSWER TO CITIZENS' MOTION FOR LEAVE TO ADD CONTENTIONS AND MOTION TO ADD CONTENTIONS Pursuant to 10 C.F.R. § 2.309(h)(1), AmerGen Energy Company, LLC

("AmerGen") hereby files its Answer opposing Citizens'! Motion for Leave to Add Contentions and Motion to Add Contentions, dated December 20, 2006 ("Motion").2 As discussed below, the Motion should be denied because it is untimely, does not meet Citizens are Nuclear Information and Resource Service ("NIRS"), Jersey Shore Nuclear Watch, Inc. ("JSNW"), Grandmothers, Mothers and More for Energy Safety ("GRAMMES"), New Jersey Public Interest Research Group ("NJPIRG"), New Jersey Sierra Club ("NJ Sierra Club"), and New Jersey Environmental Federation ("NJEF").

The Board previously held that if Citizens elected to file a new contention, AmerGen and the NRC Staff could file an answer in accordance with the requirements of 10 C.F.R. § 2.309(h)(1). See Memorandum and Order, LBP-06-16, 63 N.R.C. 737, 745 (2006). Accordingly, this response is due within 25 days of Citizens' submission, or January 16, 2007, as required by section 2.309(h)(I). Additionally, because this Answer is submitted pursuant to 10 C.F.R.

§ 2.309(h)(1), rather than § 2.323(c) (Answers to Motions), the Board's I0-page limit on responsive pleadings to motions does not apply. See Memorandum and Order (Prehearing Conference Call Summary, Initial Scheduling Order, and Administrative Directives) (Apr. 19, 2006).

I-WA/2681991 lo.

atm=e c -

the applicable requirements regarding untimely petitions, and fails to meet the applicable substantive standards for admissibility contrary to 10 C.F.R. § 2.309.

I. PROCEDURAL HISTORY Citizens are seeking to add two new contentions to this proceeding based on allegedly new and material information disclosed by AmerGen as a result of activities performed during the October 2006 Oyster Creek refueling outage. The proposed contentions concern planned ultrasonic testing ("UT") of the sand bed and embedded regions of the drywell shell.' Because the first proposed contention (regarding the embedded region) is directly related to Citizens' numerous prior failed attempts to expand the scope of the sole contention admitted in this proceeding concerning UT of the shell in the sand bed region, and the second proposed contention is related to that admitted contention, a summary of the relevant procedural history of this matter is warranted here. Doing so highlights the repetitive, duplicative, and non-meritorious nature of Citizens' oft-repeated attempts to expand the scope of this proceeding and introduce delay.

On November 14, 2005, Citizens filed their original Request for Hearing and Petition to Intervene ("Original Petition") in this proceeding. In the Original Petition, Citizens alleged that the Application was deficient:

by failing to adequately and reasonably assure the continued integrity ... [of] the drywell liner or drywell shell, by providing confirmatory ultrasonic testing (UT) measurements at all critical The "embedded region" is that region of the drywell shell that is below the former sand bedregion and is encased in concrete on both sides. The term "embedded," however, refers to any part of the drywell shell that is adjacent to concrete on one or two sides. This includes the "embedded region" as well as the interior of the drywell up to the interior concrete curb. See Ex. ANC 2 at 37 (Figure 5).

I-WA/2681991 j

  • areas of the known degraded component to determine the actual remaining wall thickness ....

Original Petition at 3. On December 12, 2005, AmerGen filed its Answer Opposing

[Citizens'] Request for Hearing and Petition to Intervene, arguing among other things, that Citizens did not define "critical levels" or provide any support for their demand that UT measurements be greatly expanded into areas not previously inspected. AmerGen Answer to Original Petition at 25 (referencing Citizens' Original Petition at 3-4). In the Combined Reply of Petitioners ("Reply Brief'), filed on December 19, 2005, Citizens stated that "all critical levels" included the sand bed region as well as several elevations above the sand bed region, Reply Brief at 6, and that "the steel drywell liner.just below the concrete is obviously another critical level." Id at 14.

AmerGen filed a Motion to Strike new arguments and new supporting information contained in Citizens' Reply Brief on December 29, 2005 ("AmerGen Motion to Strike"). In pertinent part, AmerGen argued that Citizens had not challenged the integrity of the drywell shell below the sand bed region in their Original Petition, and that Citizens were prohibited from amending their contention in their Reply Brief by expanding the bases to cover the area of the drywell shell embedded in concrete below the sand bed region. AmerGen Motion to Strike at 4.

On February 7, 2006, Citizens filed a Motion for Leave to Add Contentions or Supplement the Basis of the Current Contention ("Motion to Add or Supplement"). In it, Citizens attempted to add a new contention regarding the monitoring regime for the inaccessible areas of the drywell, including the embedded area below the concrete floor.

Motion to Add or Supplement at 11-13. In support of the new contention, Citizens cited 3

I -WA/2681991

to exhibits included in their Original Petition that allegedly demonstrated that the concrete floor adjacent to the drywell had "cracks," "crevices," and "craters." Id. at 12.

The Licensing Board granted Citizens' Original Petition, but narrowed the contention to apply only to the aging management program for corrosion in the sand bed region of the drywell shell. Memorandum and Order, LBP-06-07, 63 NR.C; 188, 211 (2006). Importantly, the Board rejected Citizens' assertion "developed for the first time in its Reply Brief' that the original contention should be construed as encompassing the drywell shell below the sand bed region (i.e. the embedded region). Id. at 217 n.28 (holding that Citizens, "having failed to develop this argument in [their Original] Petition,

[are] foreclosed from doing so in the first instance in [their] Reply Brief').

The Licensing Board also denied Citizens' proposed new contention challenging AmerGen's monitoring regime for the embedded region. Memorandum and Order, LBP-06-11, 63 N.R.C. 391 (2006). Specifically, the Board held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.

§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id § 2.309(f)(2)(ii))." LBP-06-11, 63 N.R.C. at 397. The Board also noted that Citizens previously-and unsuccessfully-sought to raise the issue of corrosion in the embedded region in their Reply Brief. Id, On April 25, 2006, AmerGen filed motions seeking, among other things, to dismiss Citizens' admitted contention as moot on the basis of AmerGen's docketed commitment to conduct.periodic UT measurements in the sand bed region of the drywell shell throughout the period of extended operation. AmerGen's Motions to Dismiss 4

I-WA/2681991

Drywell Contention as Moot and to Suspend Mandatory Disclosures, at 2-3. The Board granted AmerGen's Motion, but allowed Citizens to seek leave to file a new contention within 20 days of the Order, the substance of which had to be limited to AmerGen's UT program for the sand bed region. LBP-06-16, 63 N.R.C. at 744.

Citizens filed their new contention on June 23, 2006 and subsequently supplemented it on July 25, 2006. The Licensing Board admitted only that part of Citizens' new contention pertaining to whether AmerGen's scheduled UT monitoring frequency in the sand bed region is sufficient to maintain an adequate safety margin.

Memorandum and Order, LBP-06-22, slip op. at 9 (Oct. 10, 2006). On December 20, 2006, Citizens filed the instant Motion, seeking admission of two late-filed contentions, as discussed below.

II. LEGAL STANDARDS GOVERNING ADMISSIBILITY OF CITIZENS' NEW CONTENTIONS The standards governing admissibility of Citizens' new contentions are set forth in the Board's March 22, 2006 ruling denying Citizens' Motion to Add or Supplement.

See LBP-06-11, 63 N.R.C. at 395-396. Where, as here, the regulatory time limit has long since expired for filing a petition to intervene, a petitioner may submit a new contention only with leave of the presiding officer upon a showing that:

(i) The information upon which the amended or new contention is based was not previously available; (ii) The information upon which the amended or new contention is based is materially different than information previously available; and (iii) The amended or new contention has been submitted in a timely fashion based on the availability of the subsequent information.

1-WA/2681 991 5

See 10 C.F.R. § 2.309(f)(2)(i)-(iii). If a new contention meets the above three criteria, then it is considered "timely" and the petitioner is not required to satisfy the requirements of 10 C.F.R. § 2.309(c)(1) for non-timely filings. LBP-06-11, 63 N.R.C. at 396 n.3.

If, however, the information underlying the proposed contention is not new or materially different from previously available information, then to be admitted the new contention must satisfy Section 2.309(c)(1) as well. Id. If Citizens are required to address Section 2.309(c) in their filings and fail to do so, then the non-timely aspects of the contention are to be rejected. 4 Additionally, to add a new contention, a petitioner must satisfy the following standard admissibility requirements in 10 C.F.R. § 2.309(f)(1): (1) specify the issue to be raised; (2) briefly explain the basis for the contention; (3) demonstrate that the issue is within the scope of the proceeding; (4) demonstrate that the issue is material to the proceeding; (5) provide a concise statement of the alleged facts or expert opinion that support the petitioner's opinion; and (6) demonstrate that a genuine dispute .exists on a material issue of law or fact, and include specific references to allegedly deficient portions of the application.

II. CITIZENS' CONTENTIONS ARE UNTIMELY AND MUST BE REJECTED A. Proposed Contention 1 is Inadmissible Proposed Contention 1: The proposed UT monitoring program for the embedded region of the drywell shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because the spatial scope of the In this proceeding, the Board, on several occasions, has put Citizens on notice that non-timely contentions must satisfy Section 2.309(c) and that they should address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely. E.g. LBP-06-22, slip op. at 6 n.

7. Failure to do so acts as a waiver, which forecloses Citizens from making an untimely attempt to satisfy Section 2.309(c). Id.

6 I-WA/268199!

monitoring program is too restricted, a reasonable potential corrosion rate has not been developed, the proposed frequency of monitoring is not justified, and the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring.

Motion at 4.

1. The First Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. 8 2.309(f)(2)

As a preliminary matter, the first proposed contention is not based on new information. Citizens have, time and time again, tried and failed to introduce a new contention on the monitoring regime for the portion of the drywell shell embedded in the concrete-first in their December 19, 2005 Reply Brief, and then again in their February 7, 2006 Motion to Add or Supplement. In each case, the Board rejected the proposed new "embedded" contention and noted that the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are "embedded" in concrete, and thus, the allegedly new information underlying Citizens' proposed new contention was in existence when they submitted their Original Petition. LBP I1 63 NRC at 398.

The Board, therefore, already has held that Citizens failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R. § 2.309(f)(2)(i)), nor materially different than information that was previously available'(id § 2.309(f)(2)(ii))."

Id. at 397. That same rationale holds true today.

The fact that AmerGen recently committed to conduct UT monitoring of the embedded shell does not erase the Board's binding legal conclusion that Citizens previously waived their right to address monitoring of the embedded region by not raising it in their Original Petition. As a matter of law and logic, if-as Citizens allege-7 1-WA/2681991

AmerGen's enhanced monitoring program for the embedded region is inadequate, then the absence of a monitoring program in that same region was afortioriinadequate, and Citizens had a regulatory obligation to challenge it in their original petition - which they did not. See LBP-06-22, slip op. at 23. Further, as a matter of policy, AmerGen's decision to improve the existing drywell monitoring program does not confer upon Citizens an automatic opportunity to advance new contentions. Id.

Citizens recite the following pieces of allegedly new and material information as the basis for their proposed first contention. As described below, this information is neither new nor materially different than information previously available.

(a) New Commitments Regarding UT Monitoring: The new information cited by Citizens in support of their first new proposed contention is that "[o]n December 3, 2006, AmerGen committed to taking UT measurements in the trench in Bay 5 in 2008 'at the same locations examined in 2006."' Motion at 3, citing Ex. ANC I Enclosure ("LRA Supplement") at 52-53. They note that "AmerGen further committed to repeating these UT measurements 'at refueling outages during the period of extended operation until the trenches are restored to the original design configuration.. . ." Id., citing LRA Supplement at 53. As this enhanced commitment simply expands upon and augments the existing Aging Management Program, it is not the kind of new information that can support admission of the first late-filed contention. See LBP-06-22, slip op. at 23 (holding that an applicant's decision to improve an existing program to promote health and safety or to boost public support and confidence should not be viewed as conferring Citizens with an automatic opportunity to advance a new contention).

8 I-WA/2681991

(b) Pathways for Water to Reach the Exterior of the Drywell Shell in the Embedded Region: Another category of purportedly new information identified by Citizens begins with the misstatement--cloaked as a new revelation-that "AmerGen's latest submission to the ACRS reveals that the bottom of the drywell is below the level of the groundwater table." Motion at 3. The depth of the drywell (i.e., 29.6 feet below mean sea level) is by no means new information as it has not changed since original construction of the reactor in the 1960s. In fact, Citizens raised the issue of groundwater intrusion into the embedded region in their presentation to the ACRS license renewal subcommittee on October 3, 2006, clearly demonstrating that this information is not new.

E-mail from M. Junge to D. Ashley at slide 6 (Oct. 3, 2006), availableat ADAMS Accession No. ML063030109 ("Citizens' ACRS Presentation").

In addition, "[tiurning to the potential for water to come from above," Citizens reference a 1992 repair to the epoxy on the concrete floor of the drywell and Exhibit ANC 5, an Engineering Action Request (AR) that AmerGen generated during the 2006 refueling outage to evaluate repair of the epoxy covering the concrete floor in the sand bed region. Motion at 4. The AR states that "since 1996 inspections have found indications of the epoxy separating from the concrete" shield wall. Motion at 4, citing Ex. ANC 5. Citizens go further, however, and seemingly attempt to argue that the AR is somehow germane to their first proposed contention because "[t]he document goes on to note that 'the separated seams could potentially allow some water to get under the epoxy coating [floor] repair." Id.

This information is not materially different than information previously available.

Prior to the floor repair in the early 1990s, water was in contact with the concrete floor in 9

I-WA/2681991

the sand bed region, and likely in contact with the exterior embedded shell. See Letter, M. Gallagher (AmerGen) to NRC (June 20, 2006) at 11-12, available at ADAMS Accession No. ML063490294 ("June 20, 2006 RAI Response")(cited in Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006)). When corrective actions were taken in the late 1980s and early 1990s, the water above the floor was removed while the water below the floor was not.5- See generally id at 12-13 (discussing insignificant impacts from water remaining in contact with the exterior embedded shell). Accordingly, the statement that water "could potentially" get under the epoxy that covers the concrete floor is not materially new information. Motion at 4, citing Ex. ANC 5; see-also id. ("water infiltrated into the exterior sand bed floor at times between 1969 and 1992, and between 1996 and 2006 and may do so again").

Citizens' Exhibit ANC 6 also demonstrates that the presence of water on the sand bed floor, and potentially migrating into the floor, is not new information. That exhibit mentions the results of a March 2006 NRC inspection involving the disposition of water collected from the sand bed floor, and states that the associated NRC Inspection Report was issued on September 21, 2006 (three months before Citizens filed their Motion) and that the Inspection Report was publicly available on ADAMS (Accession No.

ML062650059). See also Motion at 4 ("water infiltrated into the exterior sand bed floor.

and may do so again")(emphasis added). Citizens' first proposed contention is, therefore, untimely.

AmerGen explained in its June 20, 2006 docketed submittal to the NRC that this water is not corrosive. See June 20, 2006 RAI Response at 11-12.

1-WA/268 1991 10

2. Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)

Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted. Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factors for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the first proposed contention should be denied.

3. The First Proposed Contention Also Fails to Satisfy the Requirements in 10 C.F.R. § 2.309(f)(1)

Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for a new contention, Citizens have not demonstrated that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1).

In support of the new contention, Citizens cite the following alleged deficiencies in the embedded region monitoring program: (1) the spatial scope of the monitoring program is too restricted; (2) a reasonable potential corrosion rate has not been developed; (3) the proposed frequency of monitoring is not justified; and (4) the monitoring could cease if AmerGen filled in the trench from which it proposes to do the monitoring. As demonstrated below, Citizens have failed to support these allegations with adequate factual or legal bases and thus, have not satisfied Section 2.309(f)(1).

(a) Potential for Corrosion: Citizens themselves acknowledge that "the measured corrosion in the embedded region in Bay 5 was not very severe .... " Motion at 5.

Nevertheless, they claim that the mere existence of such corrosion "affirms Dr. Hausler's previous assessments that such corrosion is possible." Id. An "assessment" of the I-WA/268 1991 11

possibility of a minute amount of corrosion, however, does not meet the stringent requirements of Section 2.309(f)(1), as it is non-specific, lacks basis, and does not raise a genuine dispute of material fact because the drywell shell can perform its intended functions even if there is a minute amount of ongoing corrosion (see discussion of remaining thickness in Section 3(c) below).

Citizens next jump to the conclusion that the potential for and existence of corrosion "undercuts previous assertions from AmerGen that corrosion in the embedded region was unlikely." Id. Citizens provide no citations to AmerGen documents to support this allegation, thus failing to meet the minimum requirements of 10 C.F.R.

§ 2.309(fJ(1)(vi). In any event, AmerGen has previously stated that "only limited corrosion would be anticipated for the drywell embedded shell." June 20, 2006 RAI Response at 13. The detailed scientific argument supporting this conclusion was provided to the NRC in the June 20, 2006 RAI Response at 12-13.6 Moreover, laboratory analysis of water taken from the Bay 5 trench in October 2006 confirmed that the water in contact with the embedded shell is "non-aggressive" with respect to pH, chlorides and sulfates. LRA Supplement at 18.

Citizens' alleged deficiencies are magnified in their ensuing conclusion that since "water is routinely in contact with the inside of the [embedded] drywell shell ... it is possible that the thinnest areas of the embedded region of the drywell shell have corrosion that is occurring from the inside and the outside." Motion at 5-6 (emphasis added). Citizens correctly note that "when the filler material was removed from the existing trench in Bay 5approximately [sic] 5 inches of standing water was discovered in This information was, of course, available to Citizens last summer.

1-WA/268 1991 12

the bottom of the trench." Id. at 3. Citizens further observe that "[wihen AmerGen pumped water from the trench, it refilled at a slow rate," and conclude by stating that "AmerGen thus decided to assume that under normal operating conditions the interior of

[the] drywell shell at or below the interior floor level is in contact with water." Id.

(emphasis added).

Citizens' initial correct characterization of AmerGen's assumption later devolves into the incorrect pronouncement that "AmerGen established during the recent outage that water is routinely in contact with the inside of the drywell shell." Id. at 5 (emphasis added). This latter statement cannot serve as the factual basis for admission of a contention, because it is false on its face. Moreover, this statement does not raise a genuine issue of material fact because, even if true, the water is not corrosive and, as demonstrated by UT measurements, will not affect the intended functions of the drywell shell during the period of extended operation.

Similarly, Citizens speculate that "AmerGen has also recently revealed its assessment that water could have infiltrated into the floor at the bottom of the sandbed region for all but four of the thirty seven years that the reactor has been operating." Id. at

6. This speculation is fraught with errors. First, there is no such "recent" revelation, as demonstrated by a discussion of water collected from the sand bed drains in Exhibit ANC 6, dated November 9, 2006, and of which Citizens were aware in September 2006.

Second, and more importantly, there is no "assessment" that water could have affected the drywell shell, since Exhibit ANC 5 clearly explains that seams/voids in the epoxy coating on the drywell floor in the sand bed region are located "awayfirom the domwell vessel" and near the concrete shield wall. Emphasis added.

1-WA/2681991 13

Finally, Citzens' assertions about groundwater affecting the embedded shell do not satisfy Section 2.309(f)(1) because they are based on a misreading of publicly-available documents. Such a misreading does not raise a genuine dispute on a material issue of law or fact. Specifically, Citizens boldly assert that "[t]o respond to the concern that groundwater could contribute to corrosion in the embedded region, AmerGen claims that groundwater could not seep onto the exterior of the shell, but fails to provide any back up information." Motion at 3, citing Ex. ANC 2 at 7-4. Yet, as plainly stated in the cited Exhibit ANC 2:

The Reactor Building Foundation floor is a 10 ft thick reinforced concrete slab. The bottom elevation of the slab is minus 29' 6" and its top elevation is minus 19' 6". There is a waterproof membrane at the bottom of the mat that extends up the outside of the exterior walls to an Elevation of 5' 0".... In order for ground water to reach the lowest point of the containment shell it would need to penetrate the waterproof membrane then migrate through the 10 ft concrete mat then migrate through the pedestal concrete.

Since there is no waterproofing on this interior concrete pedestal ... any water contained or migrating in the pedestal would seek the path of least resistance and flow into the Torus Room. If water was able to make its way along the path outlined above... the Torus Room would be flooded. There are sumps in the basement of the Reactor Building that collect any water in leakage and would prevent significant accumulation of water in the Torus Room (emphasis added).

Ex. ANC 2 at 7-4 to 7-5.

AmerGen also provided in that Package a figure showing the waterproof membrane (including a label pointing to the membrane) and the orientation of the torus room with respect to the drywell on page 3-6 of Exhibit ANC 2. This figure clearly shows why the torus room would need to be flooded for groundwater to reach the embedded region. AmerG en has established that design features prevent groundwater leakage onto the exterior of the shell. Apparently, Citizens simply failed to read the 14 1-WA/2681991

ACRS Information Package that they cite in their Motion. 2 Such an oversight does not support admissibility of the contention.

(b) Monitoring Program: Citizens claim that they have identified "many deficiencies in the proposed monitoring regime." Motion at 6. First, and according to Citizens-'"most glaring"-is the accusation that "AmerGen did not choose to monitor the embedded region in a bay where the lower sandbed region is highly corroded." Id Further to this charge, Citizens attribute material importance to the fact that "AmerGen has failed to even discuss whether the results in Bay 5 represent worst case conditions in the embedded region." Id. There is no such material import stemming from Citizens' claim, because they fail to recognize that there is no statutory, regulatory, or precedential requirement for such a "worst case" analysis. See 10 C.F.R. § 54.29, Standards for Issuance of a Renewed License (requiring only "reasonableassurance" that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB (emphasis added)).

Furthermore, the corrosion in the shell exposed in the Bay 5 trench would be expected to be greater than in Bay 17 because only the Bay 5 trench contained standing water when the filler material was first removed during the 2006 refueling outage.8 Citizens further complain that AmerGen did not provide any figures for the rate at which water is being pumped from sumps in the Torus room. As noted above, groundwater cannot credibly contribute to Corrosion in the embedded region and groundwater leakage into the Torus room has not been a problem at Oyster Creek. Thus, there is no rational reason to provide any Torus room pump rate figures.

AmerGen decided to further excavate the Bay 5 trench because its base was at elevation 8'9",

while the Bay 17 trench base was at elevation 9'3". See Ex. ANC 2 at 8-1. The exterior embedded region starts at approximately elevation 8' 11". Id. Accordingly, excavating the Bay 5 trench required removing only sufficient concrete to expose six additional inches of the drywell shell, while excavating the Bay 17 trench would have required removing more concrete than Bay 5.

15 I-WA/2681991

Thus, there is no material dispute of fact that the Bay 5 data are, at a minimum, representative of corrosion caused by water that might be in contact with the interior embedded shell.

Relying on final Interim Staff Guidance (ISG), 2 Citizens next attempt to argue that it creates some sort of binding "requirement" that license renewal applicants "develop or establish a corrosion rate from past UT measurements or representative samples and then 'demonstrate that the shell will have sufficient wall thickness to perform its function through the period of extended operation."' Motion at 6, citing 71 Fed. Reg. 67,923 (Nov. 24, 2006). The ISG, however, has no binding regulatory effect:

the ISG includes "recommended actions" only and does not have the force of law unlike the regulations in 10 C.F.R. Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plans." As a result, Citizens have yet again failed to articulate a material dispute of fact stemming from the ISG.

(c) Proposed Monitoring Frequency: Next, Citizens argue that the "one set of measurements of corrosion in the embedded region from the trench in Bay 5... is insufficient to establish a corrosion rate because there is no way of knowing over which time period the corrosion occurred." Motion at 6. Citizens note that during the October 2006 outage, "AmerGen deepened an existing trench in Bay 5 by six inches to expose a limited area of the embedded region." Motion at 2. AmerGen then took "42 UT 2 License Renewal Interim Staff Guidance LR-ISG-2006-01: Plant-Specific Aging Management Program for Inaccessible Areas of Boiling Water Reactor Mark I Steel Containment Drywell Shell, (Nov. 16, 2006). Citizens have been involved in the development of this ISG, are knowledgeable of its content, and even used the draft in a prior attempt to support a new contention. Motion to Add or Supplement, at 3-4.

16 1-WA/2681991

measurements in the newly exposed area," which showed that "the average thickness had decreased from a nominal 1.154 inches to 1.113 inches, a loss of 0.041 inches." Id.

What Citizens fail to do, however, is demonstrate why this information, even if it is accurate, is material or raises a genuine dispute of fact or law. UT measurements had never been taken from the embedded drywell shell prior to 2006, so any measurements, at first glance, could reflect loss of metal at any time between 1969 and 2006. But Citizens fail to appreciate that trained and qualified AmerGen personnel were able to look-with their eyes-at the interior surface of the drywell shell when the concrete'was removed for the first time in 2006, and these personnel identified "no recordable (significant) corrosion on the inner surface of [sic] shell." LRA Supplement at 19. Thus, the loss of 41 mils of metal measured by UT in 2006 is properly attributed to loss from the embedded exterior of the shell. And AmerGen has further concluded that essentially all of the loss of metal from the exterior would have occurred prior to 1992, when the sand, water, and corrosion byproducts were removed from the sand bed region, the concrete floor in the sand bed region was covered with an epoxy coating, and caulk was applied to seal the joint between the exterior drywell shell and the concrete floor.

The real crux of Citizens' argument-that AmerGen cannot establish a corrosion rate for the embedded region-appears to be that water in contact with the embedded shell on either side can cause significant corrosion. This concern, however, is undermined by simple logic. Citizens argue that water has been in contact with the exterior and interior surfaces of the embedded drywell shell since 1969. Motion at 4

("water infiltrated into the exterior sand bed floor at times between 1969 and 1992, and between 1996 and 2006") and at 5 ("water is routinely in contact with the inside of the 17 I-WA/2681991

drywell shell"). If the condition of water in contact with tile embedded drywell shell results in significant corrosion, then the UT measurements in the trench in Bay 5 in 2006 would have identified it. Yet only 41 mils total loss of metal was measured in 2006, representing the loss of material between 1969 and 2006. Assuming that Citizens are correct-that water has been in contact with the embedded drywell shell since 1969, and the corrective actions in the sand bed region had no positive effect on the underlying external embedded region-then the corrosion of 41 mils would be equally spread over those 37 years resulting in a corrosion rate of slightly over I mil per year.

Even if the Board accepts Citizens' speculation, it does not rise to the level of a genuine issue of material fact for purposes of license renewal. Simple math demonstrates that there are 377 mils of margin remaining before the 0.736 inch "general area" acceptance criterion is surpassed (1.113 - 0.736), and 623 mils of margin remaining before the 0.490 inch "very local area" acceptance criterion is surpassed (1.113 - 0.490 inches). See LRA Supplement at 20.- Thus, approximately 15 milsperyear of future corrosion would need to occur to surpass the 0.736 inch acceptance criteria, and almost twice that amount would need to occur to surpass the 0.490 inch acceptance criterion.

There simply is no evidence of this kind of corrosion in the embedded region.1 1 The UT data demonstrate only insignificant corrosion in the embedded region. Moreover, tile LO AmerGen conservatively has assumed that another 41 mils of corrosion will occur before the current license term expires in 2009 in order to conclude that 336 mils remains at the start of the period of extended operation. See Ex. ANC I at 20 (listing 336 mils).

L Citizens state that AmerGen "boldly concludes" that there will be 0.336 inches remaining at end of renewed life, and that AmerGen has "scant knowledge" about con'osion of the embedded shell.

Motion at 8. As discussed above, this is not the case.

I-WA/2681991 18

water in contact with the concrete and the drywell shell is alkaline and not corrosively aggressive. See June 20, 2006 RAI Response at 12-13; LRA Supplement at 18.

Making a leap of logic-and on the basis of their unfounded supposition that corrosion in the embedded portions of the drywell shell is of concern-Citizens posit that

"[tio establish the frequency of monitoring in the embedded region, AmerGen should establish the current smallest margin and apply a worst case corrosion rate and a projection of uncertainty to determine how quickly the region could lose margin."

Motion at 6 (emphasis added). They cite no regulatory authority in support of this "worst case" projection demand, and this Board does not have the authority to amend existing NRC rules and regulations to impose Citizens' wishes upon AmerGen.-

Based on their desire for a "worst case" analysis, and nothing more, Citizens reach the untenable and unsupported conclusion-contrary to established fact and definitive analysis-that "AmerGen is unable to determine what would be an appropriate monitoring frequency." Motion at 6. As discussed above, AmerGen does not need to perform any UT monitoring of the embedded region to demonstrate that the embedded drywell shell will perform its intended functions through the period of extended operation. Nevertheless, AmerGen has committed to perform at least one more round of UT measurements in the embedded region in the Bay 5 trench in 2008 to confirm that corrosion in the embedded region of the drywell shell is, indeed, "insignificant." LRA Supplement at 14, 21.

2 As-noted previously, NRC's license renewal regulations require only "reasonableassurance"that the activities authorized by the renewed license will continue to be conducted in accordance with the CLB - not worst case projections. See 10 C.F.R. § 54.29. If Citizens wish to amend this regulation to require worst case analyses, they must submit a petition for rulemaking under 10 C.F.R. § 2.802(a).

19 1-WA/2681991

For all of these reasons, the first proposedcontention should be rejected in its entirety.

B. Proposed Contention 2 is Also Inadmissible Proposed Contention 2: The proposed UT monitoring program for monitoring the lower portion of the sand bed region from the outside of the shell is inadequate to ensure that safety margins will be maintained for any extended licensing period because it fails to provide systematic monitoring of potential corrosion occurring from the inside of the drywell shell in the sand bed region.

Motion at 4-5. This proposed contention is focused on a portion of the sand bed region.

Specifically, it is limited to a 3.5-foot vertical section of the drywell shell that is embedded in concrete inside the drywell, and that corresponds with the (unembedded) sand bed region outside the drywell. See Ex. ANC 2 at 3-7 (Figure 5). Identification of this 3.5-foot section is derived from the fact that the embedded shell inside the drywell has a top elevation of 12'3" (the top of the interior concrete curb) and a bottom elevation of approximately 8'l1" (the floor in the sand bed region). See, e.g., id. at 8-1. The top of the interior concrete curb is stepped-down to elevation 11 '0" where there is interference from torus vent-header penetrations. See Ex. ANC 4 ("Hausler Memorandum") at 10. It is above this lower curb elevation that UT grid measurements are taken (i.e., at elevation 11'3"). Id.

Some background is required to place this contention further in context. Prior to coating the external surface of the drywell shell in the sand bed region in 1992 with a multi-layer epoxy coating system, OCNGS identified approximately 125 "points" on the shell that were the thinnest points in each bay, based on visual observations and micrometer readings. See Ex. ANC 2 at 6-2, 6-11. Prior to coating, a small area surrounding these 125 points was ground to create a smooth surface upon which the UT probe could be placed. See, e.g., Ex. ANC 2, Reference Material, Vol. 4 (Dec. 8, 2006),

20

!-WA/268 1991

Document No. C-1302-187-5320-024, OC Drywell Ext. UT Evaluation in Sandbed, Rev.

1 (Apr. 14, 2006), at 44, available at ADAMS Accession No. ML063490294. Single UT measurements of the shell were then taken at these 125 points. Ex. ANC 2 at 6-2, 6-11.

These points were not measured between 1992 and 2006, and AmerGen was able to locate and take UT measurements at only 106 of those points during the 2006 outage.13 Id. at 6-12 n.1. Although each of the 106 points are between elevations 12'3" and 8'11",

about half correspond to areas above the low interior concrete curb, and thus, are not embedded.

These point measurements are not the only UT measurements of the drywell shell in the sand bed region. AmerGen also took UT measurements during the 2006 refueling outage from 19 "grid" locations on the interior of the drywell shell that correspond with the historical "bath tub" ring of corrosion on the exterior sand bed region (i.e., between elevation 11 '0" and 12'0")., Id. at 6-17. UT measurements were previously taken from these grid locations in 1992, 1994, and 1996. Id.

1. The Second Proposed Contention Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(2)

As with the first proposed contention discussed above, the second proposed contention also is based on information that is neither new nor materially different than information that was previously available, and for that reason, must be dismissed per 10 C.F.R. § 2.309(f)(2).

Citizens are attempting to re-litigate the spatial scope of UT measurements in the sand bed region. They specifically state that there is a "newly identified corrosion L; New equipment allows UT measurements to be taken through the epoxy coating, while not including the coating in the thickness measurement.

21 I-WA/2681991

mechanism" that requires AmerGen to expand "the spatial scope of the UT monitoring from the outside of the sand bed region." Motion at 8. This Licensing Board,

...

however, already ruled that spatial scope of UT measurements in the sand bed region cannot form the basis of a new contention when the UT measurement locations were previously known. LBP-06-22, slip op. at 28-30. The UT measurement points on the outside of the drywell shell in the sand bed region are the same locations as measured in 1992. See Ex. ANC 2 at 6-18.

Moreover, the new "mechanism" Citizens identify is purported to be corrosion of the interior embedded shell between elevations 12'3" and 8'11". Id. at 3, 7. Yet this mechanism is the same one that Citizens raised in multiple attempts to litigate the embedded region beginning more than a year ago. See, e.g., Reply Brief at 13.

Moreover, the NRC's request for information about potential corrosion in this interior embedded region, and the elements of AmerGen' s Aging Management Program for this area have been public information since April 2006 (7 months before Citizens filed their now very-late-filed contention). See AMR-164, "Inaccessible Portion of the Drywell" (Oct. 31, 2005), attached to e-mail from J. Hufnagel (AmerGen) to D. Ashley (Apr. 3, 2006) available at ADAMS Accession No. ML060940146.

In addition, as the Board has previously recognized, the NRC Staff's first revision to the GALL Report, which was published in September 2005, addresses potential corrosion of inaccessible areas of the drywell shell that are embedded in concrete. See LBP-06-11, 63 NRC at 398. Accordingly, any challenges to the embedded shell inside the drywell could have been raised a long time ago.

Finally, Citizens raised this very concern in their presentation to the ACRS 22 I -WA/2681991

Subcommittee on October 3, 2006. Citizens' ACRS Presentation at Slide 15. Their presentation specifically argues that "[m]uch of the sandbed is inaccessible from the inside [of the drywell]," and that the "spatial scope" of UT thickness measurements is inadequate. Id. Accordingly, Citizens had developed this argument about three months before they filed this second proposed contention, Their attempt to raise this argument now before the Board comes too late.

For these reasons, the Board should once again rule that Citizens have failed "to satisfy the regulatory requirements for admitting a new contention based on previously unavailable information, because the information is neither new (10 C.F.R.

§ 2.309(f)(2)(i)), nor materially different than information that was previously available (id. § 2.309(f)(2)(ii))." LBP-06-11, 63 NRC at 397.

2. Citizens Failed to Address 10 C.F.R. § 2.309(c)(1)

Because the information underlying the proposed new contention is not new or materially different from previously available information, the new contention must satisfy Section 2.309(c)(1) to be admitted. Since Citizens have completely ignored the Board's explicit instructions to address the Section 2.309(c) factoirs for any contention that reasonably might be viewed as non-timely, see LBP-06-22, slip op. at 6 n.7, they have waived their right to demonstrate compliance with Section 2.309(c)(1), and accordingly, the second proposed contention should be denied.

3. The Second Proposed Contention Also Fails to Satisfy the Requirements for a New Contention in 10 C.F.R. § 2.309(f)(1)

Even if the Board finds that Citizens have satisfied the requirements of Section 2.309(f)(2) for this second proposed contention, they have again failed to demonstrate I-WA/2681991

that a genuine dispute exists on a material issue of law or fact as required by Section 2.309(f)(1), and this contention should therefore be rejected.

Citizens' first argument that the proposed UT monitoring of the sand bed region from the outside of the shell is deficient is that the 106 points were selected in 1992, based on the visual inspection of corrosion on the exterior of the shell, not on where "interior corrosion would be most likely." Motion at 7. Citizens' only basis as to why this is a deficiency is their reliance on Dr. Hausler's opinion, that "interior corrosion would more likely occur as a 'bathtub ring' below the [interior] concrete curb." Id. citing Ex. ANC 4 at 4. Dr. Hausler elaborates that:

[I]f in fact water had entered the gap [between the drywell shell and the concrete curb] the same type of differential aeration cell would have formed and would have lead [sic] to corrosion rates comparable to the rates found in the sandbed. In fact a new bathtub ring might have formed afew inches below the top of the curb.

The dangers of such a ring, we suggest are significant and AmerGen must conduct further UT testing to discover whether interiorcorrosionbelow the concrete curb is significant.

Ex. ANC 4 at 4 (emphasis added).

This argument does not raise a genuine issue of material fact that supports admitting Citizens' second proposed contention because it ignores reality. Dr. Hausler is concerned that there may be a bathtub ring of corrosion on the inside of the drywell shell a "few inches" below the concrete curb. His concern thus focuses onl the interior drywell shell at approximately elevation 12'0" because, as discussed above, the top of the interior concrete curb is located at elevation 12'3". There cannot be a bath tub ring at elevation 12'0" because water cannot collect at this elevation. The lower curb at 11'0" would allow any water behind the curb above 11 '0" to drain out and not remain behind the upper part of the curb. Also, because the curb was totally removed at the two trenches in l -WA/2681!991 24

1986, water could not remain above elevation 10'3" (the concrete floor) after 1986. See Ex. ANC 2 at 3-7 (Figure 5); Ex. ANC 4 at 10.

Citizens and Dr. Hausler apparently fail to appreciate that because the concrete curb, was entirely removed when the two trenches were excavated 1986, that it would be plain to the naked eye if there was a bathtub ring of corrosion below the former concrete curb at elevation 12'0" (or at any other excavated internal elevation). No such ring was identified. UT measurements from the exterior of the shell, therefore, are simply not necessary to identify an alleged bathtub ring of corrosion on the inside, when such a ring would be obvious to the naked eye.

Citizens also ignore the scientific analysis discussed in AmerGen's June 20, 2006 RAI Response, which explains why only insignificant corrosion would be expected in any embedded region; namely, that the water becomes alkaline from the concrete, creating a non-aggressive envirornent that essentially protects the metal in the drywell shell. June 20, 2006 RAI Response, at 12-13; Ex. ANC 2 at 7-5 to 7-6. And if that was not enough, Citizens ignore the very important fact that the interiorof the drywell "'is inerted with nitrogen during operations." Ex. ANC 2 at 8-3. Accordingly, the amount of oxygen that is available in a normal atmosphere is not present on the inside of the drywell except when the drywell is open during outages. See id.

In an attempt to ground their concern in reality, Citizens once again grasp at the final ISG for support that "when ultrasonic thickness measurements are performed, one foot square grids must be used, unless justified otherwise." Motion at 7, citing 71 Fed.

Reg. 67,923. Citizens therefore conclude that AlnerGen's UT monitoring program is deficient because it includes only single points rather than grids as discussed in the ISG.

I -WA/268 1991 25

As explained above in response to the first proposed contention, the final ISG has no binding regulatory effect; it includes "recommended actions" only and does not have the force of law as do the NRC's regulations. In addition, one foot grids are only specified by the ISG "unless justified otherwise." 71 Fed. Reg. at 67,925. A grid can only be used where the metal surface is essentially flat. Yet the exterior surface of the shell is not flat; a condition caused by the historical corrosion. Ex. ANC 2 at 6-17. As explained above, a small area surrounding each of the 106 points was ground to create a smooth surface upon which the UT probe could be placed before the shell in the sand bed region was coated in 1992. Accordingly, these points are the only locations where UT measurements can be taken on the exterior shell between elevations 12'3" and 8'11".

Thus, even if the final ISG applied here, AmerGen would have an adequate justification to limit UT to point measurements.

Citizens also argue that their contention raises a material dispute because "AmerGen does not explicitly state that the proposed monitoring regime will ensure that margins will be maintained for any extended period of licensed operation." Motion at 8.

There is, however, no requirement that AmerGen demonstrate that the "margins will be maintained" to the end of the period of extended operation. Rather, NRC regulations require that AmerGen have an Aging Management Program ("AMP") that provides "reasonable assurance" that it can manage the effects of aging during the period of extended operation prior to the loss of intended function. 10 C.F.R. § 54.29(a).'

AmerGen credits pressure testing in accordance with 10 C.F.R. Part 50, Appendix J I-WA/2681991

(Type A test) and ASME Section XI for managing aging effects of inaccessible portions of the drywell shell consistent with NUREG-1801 (the GALL Report). 4 In conclusion, the insignificant loss of metal in the embedded region measured by UT to date, coupled with the scientific analysis demonstrating the insignificance of any posited loss of metal, and the pressure testing performed by AmerGen in accordance with 10 C.F.R. Part 50, Appendix J, provide reasonable assurance that the embedded drywell shell will perform its intended function as required by 10 C.F.R. Part 54 throughout the requested period of extended operation. Accordingly, Citizens' second proposed contention does not raise a genuine issue of material fact or law, and thus, should be dismissed.

L4 See AMR-164, "Inaccessible Portion of the Drywell" (April 3, 2006) at 15, available a/ ADAMS Accession No. ML060940146. The embedded portion of the drywell shell-whether it is embedded on both sides or just one-is exempt firom visual examination in accordance with IWE-1232. Id.

27 I -WA/2681991

IV. CONCLUSION Citizens' two new late-filed contentions have no substantive merit and lack legal foundation. Because the new contentions lack an adequate basis and fail to meet the requirements of 10 C.F.R. §§ 2.309(c), (f)(1), and (f)(2), they should be dismissed by the Board.

Respectfully submitted, Donald J. Silverman, Kathryn M. Sutton, Esq.

Alex S. Polonsky, Esq.

MORGAN, LEWIS & BOCKIUS, LLP 1111 Pennsylvania Avenue, N.W.

Washington, DC 20004 Phone: (202) 739-5502 E-mail: dsilvermana,,morganlewis.com E-mail: ksuttoni(morganlewis.com E-mail: apolonskyvmorganlewis.com J. Bradley Fewell Associate General Counsel Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 Phone: (630) 657-3769 E-mail: Bradley.Fewell@exeloncolnp.con COUNSEL FOR AMERGEN ENERGY COMPANY, LLC Dated in Washington, D.C.

this 16th day of January 2007 28 I -WA/2681991

UNITED STATES OF AMERICA NUCLEAR REGULATORY, COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: ) January 16, 2007

)

AmerGen Energy Company, LLC )

) Docket No. 50-219 (License Renewal for Oyster Creek Nuclear )

Generating Station) )

AMENDED NOTICE OF APPEARANCE The undersigned attorney hereby amends his Notice of Appearance in this proceeding. In accordance with 10 C.F.R. § 2.314(b), the following information is provided:

Name: J. Bradley Fewell Address: Exelon Corporation 4300 Warrenville Road Warrenville, IL 60555 E-Mail: bradley.fewell @exeloncorp.com Telephone: (630) 657-3769 Facsimile: (630) 657-4335 Admissions: Pennsylvania Court of Appeals New Jersey Supreme Court Name of Party: AmerGen Energy Company, LLC Respectfully submitted, 1-WA/2686009

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

)

In the Matter of: ) January 16, 2007

)

AmerGen Energy Company, LLC )

) Docket No. 50-219 (License Renewal for Oyster Creek Nuclear )

Generating Station) )

)

)

CERTIFICATE OF SERVICE I hereby certify that copies of the "AmerGen's Answer to Citizens' Motion for Leave to Add Contentions and Motion to Add Contentions" and J. Bradley Fewell's Amended Notice of Appearance were served this day upon the persons listed below, by E-mail and first class mail, unless otherwise noted.

Secretary of the Commission* Administrative Judge U.S. Nuclear Regulatory Commission E. Roy Hawkens, Chair Attn: Rulemakings and Adjudications Staff Atomic Safety and Licensing Board Panel One White Flint North Mail Stop - T-3 F23 11555 Rockville Pike U.S. Nuclear Regulatory Commission Rockville, Maryland 20852-2738 Washington, D.C. 20555-0001 (E-mail: HEARINGDOCKETanrc.gov) (E-mail: erhanrc.gov)

Administrative Judge Administrative Judge Paul B. Abramson Anthony J. Baratta Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop - T-3 F23 Mail Stop - T-3 F23 U.S. Nuclear Regulatory, Commnission U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Washington, D.C. 20555-0001 (E-mail: pba nrc.gov ) (E-mail: aib5Wnrc.gov)

I-W A/2686002

John A. Covino Office of Commission Appellate Ellen Barney Balint Adjudication**

Valerie Anne Gray U.S. Nuclear Regulatory Commission Caroline Stahl Washington, DC 20555-0001 Division of Law Environmental Permitting and Counseling Section P.O. Box 093 Hughes Justice Complex Richard Webster Trenton, NJ 08625 Rutgers Environmental Law Clinic (E-mail: johln.covino'dol.lps.state.nj.us) 123 Washington Street (E-mail:, Ellen. Balintalps.state.ni . us) Newark, NJ 07102-5695 (E-mail: Valerie.Graykdol.lps.state.ni .us) (E-mail: rwebster()kinoy.rutgers.edu)

(E-mail: Caroline.Stahl@Ips.state.ni.us)

Suzanne Leta Paul Gunter NJPIRG Nuclear Information and Resource Service 11 N. Willow Street 1424 16th Street, NW Trenton, NJ 08608 Suite 404 (E-mail: sletaanipirg.org) Washington, DC 20036 (E-mail: pgunteranirs.org)

Mitzi A. Young Debra Wolf Steven C. Hamrick Law Clerk Jody C. Martin Atomic Safety and Licensing Board Office of the General Counsel, 0-15D21 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Washington, DC 20555-0001 (E-mail: may aqnrc.gov) (E-mail: dawl @nrc.gov)

(E-mail: sch I@nrc.gov)

(E-mail: icm5@nrc.gov)

  • Original and 2 copies
    • First Class Mail only Pphael P/./uyler 2