ML070810656: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET Lj I. JPM Title: Evaluate Technical Specifications and Technical Requirements 0 JPM ID Number: NRC SRO A.1 .I Revision:
{{#Wiki_filter:JOB PERFORMANCE MEASURE APPROVAL SHEET Lj   I. JPM Title:     Evaluate Technical Specifications and Technical Requirements JPM ID Number:       NRC SRO A.1.I                         Revision:     0 II. Initiated:
II. Initiated:
D. Minnich                                         12/28/06 Developer                                                           Date II I. Reviewed:
D. Minnich Developer I I I. Reviewed:
4                                                                           //b/7 Technical Reviewer                                                   Date IV. Approved:
4 Technical Reviewer IV. Approved:
N/A Cognizant Plant Supervisor (optional)                               Date Nuclea; Training Supervisor Page 1 of 8
N/A Cognizant Plant Supervisor (optional)
 
Nuclea'; Training Supervisor 12/28/06 Date //b/7 Date Date Page 1 of 8 JOB PERFORMANCE MEASURE APPROVAL SHEET  
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
W Date I ChglRev I Description I Page 2 of 8 JOB PERFORMANCE MEASURE GUIDE Facility : Millstone Unit 3 JPM ID Number: NRCA.1.1 Revision:
W Date I ChglRev I                     Description I
0 Task Title: System: NA Time Critical Task: ( ) YES ( X ) NO ii Evaluate Technical Specifications and Technical Requirements Validated Time (minutes):
Page 2 of 8
10 Task Number(s):
 
119-03-003 Applicable To: SRO X RO PEO WA Number: GEN 2.1.12 WA Rating: 2.9 / 4.0 Method of Testinq: Simulated Performance: Actual Performance:
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 ii JPM ID Number:             NRCA.1.1                           Revision:       0 Task Title:     Evaluate Technical Specifications and Technical Requirements System:         NA Time Critical Task:         (     ) YES     ( X ) NO Validated Time (minutes):               10 Task Number(s):           119-03-003 Applicable To:           SRO         X         RO                     PEO WA Number:           GEN 2.1.12                                           WA Rating:       2.9 / 4.0 Method of Testinq:         Simulated Performance:                     Actual Performance:       X
X .-,' Location:
.-, Location:                   Classroom:       X           Simulator:                 In-Plant:
Classroom:
Task Standards:               Correctly determine applicable Technical Specifications and Technical Requirements.
X Simulator: In-Plant:
Required Materials:             Unit 3 Technical Specifications, Technical Requirements Manual General  
Task Standards: Correctly determine applicable Technical Specifications and Technical Requirements. Required Materials:
Unit 3 Technical Specifications, Technical Requirements Manual General  


==References:==
==References:==
Unit 3 Technical Specifications, Technical Requirements
                                            ***READ TO THE STUDENT***
I will explain t h e initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, t h e objectives for this JPM will be satisfied.
You may use any approved reference material normally available in t h e Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if t h e evolution was actually being performed.
_  _  ~
Page 3 of 8
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:          NRC SRO A . l . l                                    Revision:      0 I
2---.
Simulator Requirements:          None Initial Conditions:                The plant was at 100% power with charging and letdown in a normal lineup. The BCharging pump tripped on overcurrent. The crew is completing the actions in EOP 3506, Loss Of All Charging Pumps. The  Acharging pump is now running. The C charging pump is not yet aligned to the B t rain.
Initiating Cues:                The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition. Keep a rough log of any applicable LCOs.
                                        **** NOTES TO EVALUATOR ****
I.      Critical steps for this JPM are indicated by an XI after the step number. For the student to achieve a satisfactory grade,          critical steps must be completed correctly.
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
: 2.      When the student states what hidher simulated action/observation would be, read the appropriate Cue.
: 3.      If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
i.J Page 4 of 8
PERFORMANCE lNFORMATlON JPM Number:  NRC SRO A.I.1                                        Revision:        0 u
Task Title:  Evaluate Technical Specifications and Technical Requirements Start Time:
STEP        1              Performance Step:        Obtain copy of MP3 Technical Specifications and MP3 Technical Requirements manual.
GRADE                      Standards:              Obtains proper copies.
Grade:                  SAT                  UNSAT STEP        2      X      Performance Step:        Determine the applicable Technical Specifications.
GRADE                      Standards:              Refers to TIS 3.5.2, ECCS Subsystems -
Tavg Greater Than or Equal to 350°F.
GRADE              X      Standards:              Recognizes that T/S 3.5.2 applies and enters LCO 3.5.2, ACTION a. (72 hour a
-.
-
-
allowed outage time)
GRADE                      Standards:              Records applicable LCO in rough log.
Grade:                  SAT                  UNSAT STEP        3      X      Performance Step:        Determine the applicable Technical Requirements.
GRADE                      Standards:              Refers to T/R 3.1.2.2, Boration Systems Flow Paths - Operating.
GRADE              X      Standards:              Recognizes that T/R 3.1.2.2 applies and enters LCO 3.1.2.2, ACTION I.(72 hour allowed outage time)
GRADE                      Standards:              Records applicable LCO in rough log.
Grade:                  SAT                  UNSAT
.L/ G RADE                    Standards:              Refers to T/R 3.1.2.4, Boration Systems -
Charging Pump - Operating.
Page 5 of 8
PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.I                                      Revision:          0 LA Task Title: Evaluate Technical Specifications and Technical Requirements GRADE            X      Standards:              Recognizes that T/R 3.1.2.4 applies and enters LCO 3.1.2.4. (72 hour allowed outage time) .
GRADE                    Standards:              Records applicable LCO in rough log.
Grade:                  SAT                  UNSAT GRADE                    Standards:              Refers to T/R 7.4.1, Fire Related Safe Shutdown Components.
GRADE            X      Standards:              Recognizes that T/R 7.4.1 applies and enters LCO 7.4.1, ACTION a.1 and a.3.
(14 and 30 day allowed outage time respectivefy)
.-...---
    ,
GRADE                    Standards :              Records applicable LCO in rough log.
Grade:                  SAT                  UNSAT STEP                    Performance Step:        Ne GRADE                    Standards:              Candidate informs the SM that all applicable Technical Specifications and Technical Requirements have been entered for current plant conditions.
Grade:                  SAT                  UNSAT CUE:                            aluation for this JP Stop Time:
-    I L-<
Page 6 of 8
VERIFICATION OF JPM COMPLETION JPM Number:            NRC SRO A.1 .I                                  Revision:        0 e
Date Performed:
Student:
    . Evaluator:
For the student to achieve a satisfactory grade,    ALL  critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                        YES                NO      X Validated Time (minutes):                    10
. --
1 Actual Time to Complete (minutes):
Result of JPM:                                      (ISfor satisfactory , U for u nsat isfactory)


Unit 3 Technical Specifications, Technical Requirements
Result of oral questions (if applicable):
***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
__~ Page 3 of 8 JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number: NRC SRO A.l.l I 2---. Revision:
0 Simulator Requirements: None Initial Conditions:
The plant was at 100% power with charging and letdown in a normal lineup. The "B" Charging pump tripped on overcurrent.
The crew is completing the actions in EOP 3506, "Loss Of All Charging Pumps." The "A charging pump is now running. The "C" charging pump is not yet aligned to the " B " t ra in . Initiating Cues: The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition. Keep a rough log of any applicable LCOs.
**** NOTES TO EVALUATOR
**** I. Critical steps for this JPM are indicated by an "XI' after the step number.
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
critical steps must be completed correctly.
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?" or "What are you observing?").
i.J Page 4 of 8 PERFORMANCE lNFORMATlON JPM Number: NRC SRO A.I.1 Revis ion : 0 Task Title: u Evaluate Technical Specifications and Technical Requirements Start Time:
STEP 1 Performance Step: GRADE STEP 2 GRADE GRADE ---.--a GRADE STEP 3 GRADE X X X GRADE X GRADE .L/' G RAD E Standards:
Grade: Performance Step: Standards
: Standards:
Standards:
Grade: Performance Step: Standards
: Standards:
Standards:
Grade: Stan da rds : Page 5 of 8 Obtain copy of MP3 Technical Specifications and MP3 Technical Requirements manual. Obtains proper copies.
SAT UNSAT Determine the applicable Technical Specifications. Refers to TIS 3.5.2, ECCS Subsystems - Tavg Greater Than or Equal to 350&deg;F. Recognizes that T/S 3.5.2 applies and enters LCO 3.5.2, ACTION a. (72 hour allowed outage time) Records applicable LCO in rough log. SAT UNSAT Determine the applicable Technical Requirements . Refers to T/R 3.1.2.2, Boration Systems Flow Paths - Operating.
Recognizes that T/R 3.1.2.2 applies and enters LCO 3.1.2.2, ACTION I. (72 hour allowed outage time)
Records applicable LCO in rough log. SAT UNSAT Refers to T/R 3.1.2.4, Boration Systems - Charging Pump - Operating.
PERFORMANCE INFORMATION JPM Number: NRC SRO A.1 .I Revision:
0 Task Title: LA Evaluate Technical Specifications and Technical Requirements GRADE X Standards:
Recognizes that T/R 3.1.2.4 applies and enters LCO 3.1.2.4. (72 hour allowed outage time) . GRADE Standards:
Records applicable LCO in rough log. Grade: SAT UNSAT GRADE Standards:
Refers to T/R 7.4.1, Fire Related Safe Shutdown Components.
GRADE X Stand a rds : Recognizes that T/R 7.4.1 applies and enters LCO 7.4.1, ACTION a.1 and a.3. (14 and 30 day allowed outage time respect ivef y) ., -...--- GRADE Standards
: Records applicable LCO in rough log. Grade: SAT UNSAT STEP Performance Step: Ne GRADE Stand a rds : Candidate informs the SM that all applicable Technical Specifications and Technical Requirements have been entered for current plant conditions. Grade: SAT UNSAT CUE: aluation for this JP Stop Time: -I L-< Page 6 of 8 VERIFICATION OF JPM COMPLETION JPM Number: Date Performed:
NRC SRO A.1 .I e' Revision:
0 Student: . Evaluator:
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? YES NO X Validated Time (minutes):
10 .1 -- Actual Time to Complete (minutes):
Result of JPM: ('IS " for sat is factory , " U " for u n s a t i sf a ct o ry) Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
Page 7 of 8 STUDENT HANDOUT JPM Number: NRC SRO A.1.1 u Initial Conditions:
Areas for Improvement:
The plant was at 100% power with charging and letdown in a normal lineup. The "B" Charging pump tripped on overcurrent. - _. The crew is completing the actions in EOP 3506, "Loss Of All Charging Pumps."
Page 7 of 8
The "A charging pump is now running. The "C" charging pump is not yet aligned to the "B" train. Initiatinq Cues: The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition.
 
Keep a rough log of any applicable LCOs. Page 8 of 8 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Notifications and Reportability.
STUDENT HANDOUT JPM Number:               NRC SRO A.1.1 u
W' 0 JPM ID Number: NRC SRO A.1.2 Revision:
Initial Conditions:       The plant was at 100% power with charging and letdown in a normal lineup. The B Charging
II. Initiated:
                                                        - _ pump
D. Minnich D eve1 o per I I I. Reviewed: -u' Technical Reviewer IV. Approved:
                                                              . tripped on overcurrent.
N/A Cognizant Plant Supervisor (optional) 1 I1 0107 Date Date Page1 of 12 JOB PERFORMANCE MEASURE APPROVAL SHEET ii
The crew is completing the actions in EOP 3506, Loss Of All Charging Pumps. The Acharging pump is now running. The C charging pump is not yet aligned to the B train.
Initiatinq Cues: The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition. Keep a rough log of any applicable LCOs.
Page 8 of 8
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:   Notifications and Reportability.
W' JPM ID Number:       NRC SRO A.1.2           Revision:     0 II. Initiated:
D. Minnich                             1I1 0107 Deve1oper                                              Date I II. Reviewed:
-u' Technical Reviewer IV. Approved:
N/A Cognizant Plant Supervisor (optional)                 Date Page1 of 12
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S) ii  Date I ChglRev I                   Description I
Date I ChglRev I Description I .. Page 2 of 12 JOB PERFORMANCE MEASURE GUIDE lillstone Unit 3 L.-j JPM ID Number: NRC SRO A.1.2 Revision:
. .
0 Facilitv:
Page 2 of 12
Task Title: Notifications and Reportability.
 
System: N/A Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
JOB PERFORMANCE MEASURE GUIDE Facilitv:        lillstone Unit 3 L.-j JPM ID Number:         NRC SRO A.1.2                       Revision:       0 Task Title:     Notifications and Reportability.
10 Task Number(s): 301-05-366 Applicable To: SRO X RO PEO K/A Number: 2.1.6 Method of Testinq: Simulated Performance:
System:         N/A Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):             10 Task Number(s):         301-05-366 Applicable To:         SRO         X         RO                     PEO K/A Number:         2.1.6                                                 K/A Rating:         4.3 Method of Testinq:        Simulated Performance:                    Actual Performance:         X Location:                 Classroom:     X           Simulator:                 In-Plant:
K/A Rating: 4.3 Actual Performance:
Task Standards:             Determine the proper notifications and event reporting requirements given a particular event.
X Location:
Required Materials:       RAC 14, Non-Emergency Station Events General  
Classroom:
X Simulator:
In-Plant:
Task Standards:
Determine the proper notifications and event reporting requirements given a particular event. Required Materials:
RAC 14, Non-Emergency Station Events General  


==References:==
==References:==
 
RAC 05, Reporfabiky Determinations and Licensee Event Reporfs 10CFR50.72 / .73
RAC 05, Reporfabiky Determinations and Licensee Event Reporfs 10CFR50.72  
                                        ***READ TO THE STUDENT***
/ .73 ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of 12 JOB PERFORMANCE MEASURE GUIDE (Continued)
Page 3 of 12
JPM Number: NRC SRO A.1.2 '.J Revision:
 
0 Simulator Requirements: None Initial Conditions:
JOB PERFORMANCE MEASURE GUIDE (Continued)
The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building.
JPM Number:         NRC SRO A.1.2                                       Revision:     0
The work area has been placed in a safe condition. The worker's injuries are severe and treatment is required at Lawrence and Memorial hospital.
.J Simulator Requirements:         None Initial Conditions:               The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building. The work area has been placed in a safe condition. The workers injuries are severe and treatment is required at Lawrence and Memorial hospital. The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute.
The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute. Initiating Cues: The SM has directed you to determine the NRC and State reporting requirements associated with this event. **** NOTES TO EVALUATOR****
Initiating Cues:                 The SM has directed you to determine the NRC and State reporting requirements associated with this event.
: 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.
                                      **** NOTES TO EVALUATOR****
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
: 1.     Critical steps for this JPM are indicated by an Xafter the step number. For the student to achieve a satisfactory grade,         critical steps must be completed correctly.
or "What are you observing?").
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
Page 4 of 12 PERFORMANCE iNFORMATlON JPM Number: NRC SRO A.1.2 Revision:
: 2.     When the student states what hidher simulated action/observation would be, read the appropriate Cue.
0 "-' Task Title: Notifications and Reportability.
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
Start Time: STEP 1 Performance Step: Obtains proper procedure.
Page 4 of 12
GRADE Standards:
 
Obtains and refers to a copy of RAC 14, Non-Emergency Station Events. Grade: SAT UNSAT STEP 2 Performance Step: Review Precautions.
PERFORMANCE iNFORMATlON JPM Number:   NRC SRO A.1.2                                       Revision:         0
RAG 14, Section 3 GRADE Standards
"
: Applicant reviews precautions 3.1 through 3.8. Grade: SAT UNSAT STEP 3 Performance Step: Initial Event Reportability RAC 14, step 4.1 .I .a Determination IF sufficient cause exists for reporting a non-emergency event, PERFORM the fo II ow i n g : --' a. ANALYZE available information and DEVELOP a general understanding of event in progress.
-'     Task Title:   Notifications and Reportability.
GRADE Standards
Start Time:
: Applicant recognizes that cause exists for reporting this event. Evaluator NOTE: If the applicant requests additional event related information beyond the initial conditions provide the followina cue: Grade: SAT UNSAT Page 5 of 12 PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision:
STEP       1               Performance Step:     Obtains proper procedure.
0 Task Title: Notifications and Reportability.
GRADE                       Standards:             Obtains and refers to a copy of RAC 14, Non-Emergency Station Events.
STEP GRADE STEP GRADE -._-I^ STEP GRADE j. '.-A 6 Performance Step: RAC 14, step 4.1.l.b information.
Grade:                 SAT                   UNSAT STEP       2               Performance Step:     Review Precautions.
ASSIGN staff to collect and track Standards: Applicant requests additional staff Evaluator NOTE: If the applicant requests additional personnel to track the event provide the following cue: Grade: SAT UNSAT Performance Step: RAC 14, step 4.1.l.c IF necessary, REQUEST assistance from any of the following, as applicable, to determine reportability and respond to event: Standards:
RAG 14, Section 3 GRADE                       Standards:             Applicant reviews precautions 3.1 through
Requests assistance as necessary.
 
Evaluator NOTE: If the applicant requests additional assistance provide the following cue:
===3.8. Grade===
Grade: Performance Step: RAC 14, step 4.1.1.d Standards:
SAT                   UNSAT STEP       3               Performance Step:     Initial Event Reportability
Grade: Page 6 of 12 SAT UNSAT As required, REQUEST Station Duty Officer (typically the non-affected unit STA) and Emergency Communicator (typically the non-affected unit WC SRO) report to the Control Room and prepare to send a Non Emergency Event Report. Applicant calls Unit 2 and requests the Station Duty Officer and Emergency Communicator report to the Unit 3 Control Room. SAT UNSAT PERFORMANCE INFORMATION JPM Number: NRC SRO A. 1.2 Revision:
  --'
0 =-' Task Title: Notifications and Reportability.
RAC 14, step 4.1 .I.a Determination IF sufficient cause exists for reporting a non-emergency event, PERFORM the fo IIowing:
STEP 7 X Performance Step:
: a. ANALYZE available information and DEVELOP a general understanding of event in progress.
For all events, Refer To appropriate RAC 14, step 4.1.1.J Attachment 1 through 7 and DETERMINE State and NRC reporting requirements.
GRADE                       Standards:             Applicant recognizes that cause exists for reporting this event.
GRADE X Standards
Evaluator NOTE:       If the applicant requests additional event related information beyond the initial conditions provide the followina cue:
: Applicant refers to Attachments 1 through 7 and determines that Attachment 2, "Radiological Events", is the applicable attachment . Grade: GRADE X Standards:
Grade:                 SAT                   UNSAT Page 5 of 12
--' Grade: GRADE X Standards:
 
Grade: SAT UNSAT Applicant matches the event in progress with the following event description in attachment 2: "An event requiring the transport of a radioactively contaminated person to an offsite medical facility for treatment."
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.1.2                                       Revision:         0 Task Title:   Notifications and Reportability.
SAT UNSAT Applicant correctly determines the NRC Reporting Requirement for the event is as follows: "Within 8 hours via ENS" (1 OCFR50.72(b)(3))
STEP                         Performance Step:     ASSIGN staff to collect and track RAC 14, step 4.1.l.b   information.
SAT UNSAT GRADE Standards
GRADE                        Standards:             Applicant requests additional staff Evaluator NOTE:       If the applicant requests additional personnel to track the event provide the following cue:
: Applicant correctly determines the State posture code for the event is an "Echo" ., .--/' Page 7 of 12 PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision:
Grade:                 SAT                   UNSAT STEP                        Performance Step:     IF necessary, REQUEST assistance from RAC 14, step 4.1.l.c   any of the following, as applicable, to determine reportability and respond to event:
0 --' Task Title: Notifications and Reportability.
Standards:             Requests assistance as necessary.
Grade: SAT UNSAT GRADE X Standards: Applicant correctly determines the State Reporting Requirement for the event is as follows: "Within I hour of report to NRC" (State Reg. 22a-135-1)
        -._-I^
Grade: SAT UNSAT or this Event, Attach , 2 ahd 3 to reference in The Applicant should revi r applicability.
GRADE Evaluator NOTE:       If the applicant requests additional assistance provide the following cue:
STEP 8 Performance Step: Refer To Attachment 15 for additional  
Grade:                 SAT                    UNSAT STEP        6                Performance Step:     As required, REQUEST Station Duty RAC 14, step 4.1.1.d   Officer (typically the non-affected unit STA) and Emergency Communicator (typically the non-affected unit WC SRO) report to the Control Room and prepare to send a Non Emergency Event Report.
--i RAC 14, Att 7 NOTE I notifications.
GRADE                        Standards:            Applicant calls Unit 2 and requests the Station Duty Officer and Emergency Communicator report to the Unit 3 Control j
GRADE Stand a rds : Applicant reviews NOTE 1 and refers to Attachment
A - .
: 15. Grade: GRADE Standards:
              .
SAT UNSAT Applicant determines the following additional notifications are required for Transport of Contaminated Injured Person: Refer To C OP 200.3, "Response to Medical Emergencies" (ContAnjured Person Off-site)
Room.
Grade:                SAT                   UNSAT Page 6 of 12
 
PERFORMANCE INFORMATION JPM Number:   NRC SRO A. 1.2                                     Revision:           0
=-       Task Title:   Notifications and Reportability.
STEP       7       X       Performance Step:     For all events, Refer To appropriate RAC 14, step 4.1.1.J   Attachment 1 through 7 and DETERMINE State and NRC reporting requirements.
GRADE               X       Standards :           Applicant refers to Attachments 1 through 7 and determines that Attachment 2, Radiological Events, is the applicable attachment.
Grade:                 SAT                    UNSAT GRADE               X       Standards:             Applicant matches the event in progress
  --
with the following event description in attachment 2:
An event requiring the transport of a radioactively contaminated person to an offsite medical facility for treatment.
Grade:                SAT                     UNSAT GRADE                X      Standards:            Applicant correctly determines the NRC Reporting Requirement for the event is as follows:
Within 8 hours via ENS (10CFR50.72(b)(3))
Grade:                SAT                     UNSAT GRADE                       Standards :           Applicant correctly determines the State
  .      ,
  .--/                                                      posture code for the event is an Echo Page 7 of 12
 
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.1.2                                           Revision:             0
--' Task Title:   Notifications and Reportability.
Grade:                 SAT                       UNSAT GRADE               X       Standards:             Applicant correctly determines the State Reporting Requirement for the event is as follows:
                                                        "Within Ihour of report to NRC" (State Reg. 22a-135-1)
Grade:                 SAT                       UNSAT or this Event, Attach
                                                            , 2 ahd 3 to reference in The Applicant should revi r applicability.
--i STEP       8               Performance Step:       Refer To Attachment 15 for additional RAC 14, Att 7 NOTE I   notifications.
GRADE                       Standards:             Applicant reviews NOTE 1 and refers to Attachment 15.
Grade:                   SAT                      UNSAT GRADE                       Standards:             Applicant determines the following additional notifications are required for Transport of Contaminated Injured Person:
Refer To C OP 200.3, "Response to Medical Emergencies" (ContAnjured Person Off-site)
Required:
Required:
: a. Site Fire Protection personnel (EMTs)
: a. Site Fire Protection personnel (EMTs)
: b. Health Physics Technician
: b. Health Physics Technician
: c. Security Shift Supervisor
: c. Security Shift Supervisor
: d. Waterford Ambulance (91 1) e. Lawrence and Memorial Hospital List f. Middlesex Hospital List (Alternate)
: d. Waterford Ambulance (911)
Page 8 of 12 PERFORMANCE INFORMATION Revision:
: e. Lawrence and Memorial Hospital List
JPM Number: NRC SRO A.1.2 0 '- Task Title: Notifications and Reportability.
: f. Middlesex Hospital List (Alternate)
Grade: SAT UNSAT STEP 9 Performance Step: RAC 14, Att 7 NOTE 2 In the event of an incident involving a fatality or serious injury, off-site release or contamination, and for planned excercise, a telephone notification within one (1) hour to American Nuclear Insurers (9-561- 3433) is warranted.
Page 8 of 12
Standards:
 
Applicant reviews NOTE 2 and determines it applies. GRADE Grade: Standards:
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.1.2                                         Revision:          0
SAT UNSAT Applicant directs the SDO to notify ANI of the event or the applicant initiates the call. GRADE d Grade: SAT UNSAT STEP 10 Performance Step: RAC 14, Att 7 NOTE 3 Follow-up notification.
-
Telephone notifications made for non-emergency one (I), four (4), eight (8), and 24 hour events will require follow-up notifications . . . .. GRADE Standards
'   Task Title:   Notifications and Reportability.
: Applicant reviews NOTE 3 and determines that follow-up notifications may be required.
Grade:                 SAT                     UNSAT STEP         9               Performance Step:     In the event of an incident involving a RAC 14, Att 7 NOTE 2  fatality or serious injury, off-site release or contamination, and for planned excercise, a
Grade: SAT UNSAT Performance Step: RAC 14, step 4.1.1.k IF required, Refer To and PERFORM Sect i o n 4.7, 'I Rad io p age r N o t if i c a t i o n s . " STEP 11 .d GRADE Standards: Applicant refers to section 4.7 Page 9 of 12 PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision:
telephone notification within one (1) hour to American Nuclear Insurers (9-561-3433) is warranted.
0 LJ Task Title: Notifications and ReDortabilitv.
GRADE                        Standards:             Applicant reviews NOTE 2 and determines it applies.
Grade: SAT UNSAT Stop Time: Page IO of 12 VERIFICATION OF JPM COMPLETION JPM Number:
Grade:                 SAT                    UNSAT GRADE                        Standards:             Applicant directs the SDO to notify ANI of d
NRC SRO A.I.2 .*-' Date Performed:
the event or the applicant initiates the call.
Student: Evaluator:
Grade:                 SAT                     UNSAT STEP         10               Performance Step:     Follow-up notification. Telephone RAC 14,Att 7 NOTE 3   notifications made for non-emergency one (I), four (4), eight (8), and 24 hour events will require follow-up notifications .....
Revision:
GRADE                         Standards:             Applicant reviews NOTE 3 and determines that follow-up notifications may be required.
0 For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
Grade:                 SAT                     UNSAT STEP        11                Performance Step:     IF required, Refer To and PERFORM RAC 14, step 4.1.1.k   Sectio n 4.7, Radiopager Not ific at io ns ."
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? YES NO X Validated Time (minutes):
                                                                        'I
10 --- Actual Time to Complete (minutes):
  .d GRADE                         Standards:             Applicant refers to section 4.7 Page 9 of 12
Result of JPM: Result of oral questions (if applicable):
 
PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2                             Revision:     0 LJ Task Title: Notifications and ReDortabilitv.
Grade:                 SAT         UNSAT Stop Time:
Page I O of 12
 
VERIFICATION OF JPM COMPLETION JPM Number:             NRC SRO A.I.2                                 Revision:        0
-*.
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade, & critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES             NO     X Validated Time (minutes):                   10
    --- Actual Time to Complete (minutes):
Result of JPM:                                     (S for satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
("S" for satisfactory, "U" for unsatisfactory)
Number of Correct Responses:
Number of Correct Responses:
Score: Are as for I m p r ove m en t : Page11 of 22 STUDENT HANDOUT JPM Number: NRC SRO A.1.2 \.-' Initial Conditions: The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building.
Score:
The work area has been placed in a safe condition.
Areas for Improvement :
The worker's injuries are severe and treatment is required at Lawrence and Memorial hospital.
Page11 of 22
The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute. Initiatinq Cues:
 
The SM has directed you to determine the NRC and State reporting requirements associated with this event.
STUDENT HANDOUT JPM Number:             NRC SRO A.1.2
Page 12 of 12 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Response to Door Inoperability.  
\.-
',d JPM ID Number: NRC SRO A.2 Revision:
Initial Conditions:   The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building. The work area has been placed in a safe condition. The workers injuries are severe and treatment is required at Lawrence and Memorial hospital. The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute.
0 II. Initiated:
Initiatinq Cues:   The SM has directed you to determine the NRC and State reporting requirements associated with this event.
Developer  
Page 12 of 12
/ I I I. Reviewed:
 
Technical Reviewer IV. Approved:
JOB PERFORMANCE MEASURE APPROVAL SHEET
N/A Cognizant Plant Supervisor (optional)
',d  I. JPM Title:     Response to Door Inoperability.
Nuclear f raining Supervisor Date Date Date Date Page 1 of 14 JOB PERFORMANCE MEASURE APPROVAL SHEET  
JPM ID Number:       NRC SRO A.2               Revision:   0 II. Initiated:
Developer                 /                           Date I I I. Reviewed:
Technical Reviewer                                     Date IV. Approved:
N/A Cognizant Plant Supervisor (optional)                 Date Nuclear f raining Supervisor                           Date Page 1 of 14
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)  
OF CHANGE(S)
..L.". I Date I ChgIRev 1 Description Page 2 of 14 JOB PERFORMANCE MEASURE GUIDE Facility:
..L.". I Date I ChgIRev 1                     Description Page 2 of 14
Millstone Unit 3 JPM ID Number: NRC SRO A.2 ii Revision:
 
0 Task Title: Response to Door Inoperability. System: NIA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 ii JPM ID Number: NRC SRO A.2                                 Revision:       0 Task Title:     Response to Door Inoperability.
20 Task Number(s):
System:         NIA Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):             20 Task Number(s):         341-01-014 Applicable To:         SRO         X         RO                     PEO WA Number:         2.2.21                                                 WA Rating:     2.3 13.5 Method of Testinq:         Simulated Performance:                     Actual Performance:       X
341-01-014 Applicable To: SRO X RO PEO WA Number: 2.2.21 WA Rating: 2.3 13.5 Method of Testinq: Simulated Performance:
---Location:                 Classroom:     X           Simulator:                 In-Plant:
Actual Performance
Task Standards:             Correctly determine the required actions for an INOPERABLE MP3 door.
: X ---' Location:
Required Materials:         OP 3261, Response to Door lnoperability General  
Classroom:
X Simulator:
In-Plant: Task Standards: Correctly determine the required actions for an INOPERABLE MP3 door. Required Materials:
OP 3261, Response to Door lnoperability General  


==References:==
==References:==
Unit 3 Technical Specifications, Technical Requirements
                                        ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of 14
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:          NRC SRO A.2                                      Revision:      0
*d Simulator Requirements:          None initial Conditions:              The plant is at 100 % power and you are the Work Control SRO on shift. An emergent repair is required on the  A RPCCW Heat Exchanger. Maintenance requires door A-24-4 be blocked open and have its center post removed, to move in equipment and scaffolding.
Initiating Cues:                You are asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the SM.
                                      **** NOTES TO EVALUATOR ****
I.      Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
: 2.      When the student states what hidher simulated action/observation would be, read the appropriate Cue.
: 3.      If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
>
-
Page 4 of 14
PERFORMANCE INFORMATION JPM Number:  NRC SRO A.2                                    Revision:        0 d
Task Title:  Response to Door lnoperability Start Time:
STEP        1              Performance Step:      Obtains copy of OP 3261 Response to Door Inoperability.
GRADE                      Standards:            Obtains proper procedure.
Grade:                SAT                    UNSAT STEP        2      X      Performance Step:      Refer To Attachment 2, Unit 3 Door OP 3261, step 1.1      Attributes, and DETERMINE applicable attributes to door in question.
GRADE              X      Standards:            Applicant refers to Attachment 2 and determines that for door A-24-4, the following attributes apply:
0  TRM Fire Door L-                                                        Locked TRM Fire Door 0  SLCRSDoor Radiation Door Grade:                SAT                    UNSAT STEP        3              Performance Step:      For doors listed as Dual Train Protected OP 3261, step I.2      Door, both trains are potentially impacted.
A door with a D attribute will also have one or more other attributes. IF the compensatory actions of this procedure for the other attributes are met, train separation is not an issue . ..
GRADE                      Standards:            Applicant recognizes that door A-24-4 is NOT a Dual Train Protection Door, and moves on to OP 3261, step 1.3.
Grade:                SAT                    UNSAT Page 5 of 14


Unit 3 Technical Specifications, Technical Requirements ***READ TO THE STUDENT***
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.2                                   Revision:         0
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
'.W'.
Page 3 of 14 JOB PERFORMANCE MEASURE GUIDE (Continued)
Task Title:   Response to Door lnoperability STEP       4     X       Performance Step:     IF one of the following types of doors is OP 3261, step 1.3.1   not capable of performing its intended function, PERFORM the specified actions:
JPM Number: NRC SRO A.2 *d Revision:
IF door is a "TRM Related Fire Door,"
0 Simulator Requirements:
PERFORM the following:
None initial Conditions:
0   Refer To TRM 3.7.13, "Fire Protection Systems, Fire Rated Assemblies," and PERFORM applicable actions.
The plant is at 100 % power and you are the Work Control SRO on shift. An emergent repair is required on the "A RPCCW Heat Exchanger. Maintenance requires door A-24-4 be blocked open and have its center post removed, to move in equipment and scaffolding. Initiating Cues:
0   Refer To the Shift Turnover Log and RECORD door status.
You are asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the SM. **** NOTES TO EVALUATOR
**** I. Critical steps for this JPM are indicated by an "X" after the step number.
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
or "What are you observing?").
: 2. 3. ->-' Page 4 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision:
0 "d Task Title: Response to Door lnoperability Start Time: STEP 1 Performance Step: Obtains copy of OP 3261 "Response to Door In operability".
GRADE Standards:
Obtains proper procedure.
Grade: SAT UNSAT STEP 2 X Performance Step: Refer To Attachment 2, "Unit 3 Door OP 3261, step 1.1 Attributes," and DETERMINE applicable attributes to door in question.
GRADE X Standards:
Applicant refers to Attachment 2 and determines that for door A-24-4, the following attributes apply: 0 TRM Fire Door 0 SLCRSDoor Radiation Door L-' Locked TRM Fire Door Grade: SAT UNSAT STEP 3 Performance Step: For doors listed as "Dual Train Protected OP 3261, step I .2 Door," both trains are potentially impacted.
A door with a D attribute will also have one or more other attributes.
IF the compensatory actions of this procedure for the other attributes are met, train separation is not an issue . .. GRADE Standards:
Grade: Applicant recognizes that door A-24-4 is NOT a Dual Train Protection Door, and moves on to OP 3261 , step 1.3. SAT UNSAT Page 5 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision:
0 '. W'. Task Title:
Response to Door lnoperability STEP 4 X Performance Step: IF one of the following types of doors is OP 3261, step 1.3.1 not capable of performing its intended function, PERFORM the specified actions: IF door is a "TRM Related Fire Door," PERFORM the following:
0 Refer To TRM 3.7.1 3, "Fire Protection Systems, Fire Rated Assemblies," and PERFORM applicable actions.
0 Refer To the Shift Turnover Log and RECORD door status.
NOTIFY the Site Fire Protection Department.
NOTIFY the Site Fire Protection Department.
GRADE X Standards:
GRADE             X       Standards:             Applicant recognizes that door A-24-4 is a TRM Related Fire Door and obtains and refers to TRM 3.7.13, "Fire Protection Systems, Fire Rated Assemblies,"
Grade: GRADE X Standards:
Grade:                SAT                   UNSAT GRADE              X      Standards:              Recognizes that TRM 3.7.13 applies and it will be necessary to enter LCO 3.7.13, ACTION a. (1 hour allowed outage time)
Grade: GRADE Standards:
Grade:                SAT                   UNSAT GRADE                    Standards:              Applicant logs in a rough log or otherwise states that door A-24-4 will be blocked open and needs to be recorded in the Shift Turnover Log.
Applicant recognizes that door A-24-4 is a TRM Related Fire Door and obtains and refers to TRM 3.7.13, "Fire Protection Systems, Fire Rated Assemblies," SAT UNSAT Recognizes that TRM 3.7.1 3 applies and it will be necessary to enter LCO 3.7.13, ACTION a. (1 hour allowed outage time) SAT UNSAT Applicant logs in a rough log or otherwise states that door A-24-4 will be blocked open and needs to be recorded in the Shift Turnover Log. E Grade: SAT UNSAT GRADE Standards:
E Grade:                 SAT                   UNSAT GRADE                     Standards:             Applicant notifies Site Fire Protection Department that door A-24-4 will be
Applicant notifies Site Fire Protection Department that door A-24-4 will be blocked open. Telephone call is adequate for this notification.  
--4 blocked open. Telephone call is adequate for this notification.
--4 Page 6 of 14 PERFORMANCE JPM Number: NRC SRO A.2 NFORMATION Revision:
Page 6 of 14
0 '-LY Task Title:
 
Response to Door lnoperability Grade: STEP 5 Performance Step: OP 3261, step 1.3.2 GRADE Standards:
PERFORMANCE NFORMATION JPM Number:   NRC SRO A.2                                     Revision:       0
Grade: STEP 6 Performance Step: OP 3261, step 1.3.3 GRADE Standards:
-LY Task Title:   Response to Door lnoperability Grade:                 SAT                    UNSAT STEP       5             Performance Step:     IF door is a Locked TRM Related Fire OP 3261, step 1.3.2   Door, PERFORM the following:
Grade: SAT UNSAT IF door is a "Locked TRM Related Fire Door," PERFORM the following:
0  Refer To TRM 3.7.1 3, Fire Protection Systems, Fire Rated Assemblies, and PERFORM applicable actions.
0 Refer To TRM 3.7.1 3, "Fire Protection Systems, Fire Rated Assemblies,"
0  Refer To the Shift Turnover Log and RECORD door status.
IF the only action performed is to unlock door to provide temporary access . ...
0  NOTIFY the Site Fire Protection Department.
GRADE                     Standards:             Applicant recognizes door A-24-4 is a Locked TRM Related Fire Door, and that the door will NOT be just unlocked door to provide temporary access. Also recognizes that the other actions specified are redundant to the previous step.
Grade:                 SAT                    UNSAT STEP       6             Performance Step:       IF door is a non-TRM fire door, NOTIFY OP 3261, step 1.3.3   the Site Fire Protection Department.
GRADE                     Standards:             Applicant recognizes that door A-24-4 is not a non-TRM Fire Door and moves on to OP 3261, step 1.3.4.
Grade:                 SAT                   UNSAT Page 7 of 14
 
PERFORMANCE INFORMATION JPM Number:  NRC SRO A.2                                    Revision:          0 d
Task Title:  ResDonse to Door InoPerabilitv STEP        7      X      Performance Step:    IF door is a SLCRS door, PERFORM the OP 3261, step 1.3.4  following:
: a. Refer To T/S 3.6.6.2, Containment Systems Secondary Conta inment ,
and PERFORM applicable actions.
and PERFORM applicable actions.
0 Refer To the Shift Turnover Log and RECORD door status. IF the only action performed is to unlock door to provide temporary access . . . . 0 NOTIFY the Site Fire Protection Department. Applicant recognizes door A-24-4 is a Locked TRM Related Fire Door, and that the door will NOT be just unlocked door to provide temporary access.
: b. Refer To the Shift Turnover Log and RECORD door status.
Also recognizes that the other actions specified are redundant to the previous step.
: c. IF SLCRS door A-24-6 is inoperable AND crediting stairwell boundaries is desired, Refer To Attachment 3 and PERFORM listed actions to credit alternate barriers.
SAT UNSAT IF door is a non-TRM fire door, NOTIFY the Site Fire Protection Department. Applicant recognizes that door A-24-4 is not a non-TRM Fire Door and moves on to OP 3261, step 1.3.4. SAT UNSAT Page 7 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 'd' Task Title: ResDonse to Door InoPerabilitv Revision:
: d. IF alternate barriers are successfully credited, Refer To T/S 3.6.6.2 , IContainment Systems Secondary Containment, for continued applicability and actions.
0 STEP 7 X Performance Step:
  , GRADE              X      Standards:           Applicant recognizes that door A-24-4 is a
OP 3261, step 1.3.4 , GRADE X Standards: .d GRADE X GRADE STEP 8 U' GRADE Grade: Standards:
.d SLCRS Door and obtains and refers to T/S 3.6.6.2, Containment Systems Secondary Containment.
Grade: Standards:
Grade:                SAT                     UNSAT GRADE              X      Standards:            Recognizes that TIS 3.6.6.2 applies and it will be necessary to enter the LCO 3.6.6.2 ACTION. (24 hour allowed outage time)
Grade: Performance Step:
Grade:                SAT                     UNSAT GRADE                      Standards:            Applicant recognizes that aIternate SLCRS barriers apply only to door A-24-6 and moves on to OP 3261, step 1.3.5.
OP 3261, step 1.3.5 Standards
Grade:               SAT                     UNSAT STEP       8              Performance Step:     IF door is a Control Room habitability OP 3261, step 1.3.door, PERFORM the following:
: Page 8 of 14 IF door is a SLCRS door, PERFORM the following:
U GRADE                     Standards :           Applicant recognizes that door A-24-4 is Page 8 of 14
: a. Refer To T/S 3.6.6.2, "Containment S ys tems Second a ry Con ta in men t , " and PERFORM applicable actions.
: b. Refer To the Shift Turnover Log and RECORD door status. c. IF SLCRS door A-24-6 is inoperable AND crediting stairwell boundaries is desired, Refer To Attachment 3 and PERFORM listed actions to credit alternate barriers.
successfully credited, Refer To T/S 3.6.6.2 , 'IC o n t a in m e n t Systems Secondary Containment,"
for continued applicability and actions.
: d. IF alternate barriers are Applicant recognizes that door A-24-4 is a SLCRS Door and obtains and refers to T/S 3.6.6.2, "Containment Systems Secondary Containment."
SAT UNSAT Recognizes that TIS 3.6.6.2 applies and it will be necessary to enter the LCO 3.6.6.2 ACTION. (24 hour allowed outage time)
SAT UNSAT Applicant recognizes that a Ite rnate SLCRS barriers apply only to door A-24-6 and moves on to OP 3261, step 1.3.5. SAT UNSAT IF door is a Control Room habitability door, PERFORM the following: Applicant recognizes that door A-24-4 is PERFORMANCE INFORMATION JPM Number:
NRC SRO A.2 Revis ion
: 0 i-/ Task Title:
Response to Door lnoperability not a Control Room habitability door and moves on to OP 3261 , step 1.3.6. Grade: SAT UNSAT STEP 9 Performance Step: IF door is a COz boundary door, OP 3261 step 1.3.6 PERFORM the following:
GRADE Standards:
Applicant recognizes that door A-24-4 is not a C02 boundary door and moves on to OP 3261 , step 1.3.7. Grade: SAT UNSAT STEP 10 Performance Step: IF door is,a water and flooding boundary OP 3261 step 1.3.7 door, PERFORM the following:
GRADE Standards: Applicant recognizes that door A-24-4 is not a water and flooding boundary door and moves on to OP 3261 , step 1.3.8. Grade: SAT UNSAT STEP I1 Performance Step: IF door is a high energy line break OP 3261, step 1.3.8 boundary door (HELB), PERFORM the following:
GRADE Standards: Applicant recognizes that door A-24-4 is not a HELB boundary door and moves on to OP 3261, step


====1.3.9. Grade====
PERFORMANCE INFORMATION JPM Number:    NRC SRO A.2                                  Revision:        0 i-/
SAT UNSAT Page 9 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision:
Task Title:    Response to Door lnoperability not a Control Room habitability door and moves on to OP 3261, step 1.3.6.
0 *-4 Task Title: Response to Door lnoperability STEP 12 Performance Step: IF door is a PRA HELB boundary door OP 3261, step 1.3.9 AND IF in MODES 1 through 4, PERFORM the following: GRADE Standards
Grade:                SAT                  UNSAT STEP        9               Performance Step:    IF door is a COz boundary door, OP 3261 step 1.3.6    PERFORM the following:
: Applicant recognizes that door A-24-4 is not a PRA HELB boundary door and moves on to OP 3261, step 1.3.1 0. Grade: SAT UNSAT STEP 13 Performance Step: IF door is a tornado door . . . . OP 3261, step 1.3.10 GRADE Standards: Applicant recognizes that door A-24-4 is not a tornado door and moves on to OP 3261, step 1.3.1 1. Grade: SAT UNSAT STEP 14 X Performance Step: IF door is a radiation boundary door, AND OP 3261, step I .3.11 door is damaged OR to be removed for any reason, NOTIFY Health Physics Department.
GRADE                      Standards:            Applicant recognizes that door A-24-4 is not a C02 boundary door and moves on to OP 3261, step 1.3.7.
GRADE X Standards:
Grade:                SAT                  UNSAT STEP        10              Performance Step:    IF door is,a water and flooding boundary OP 3261 step 1.3.7    door, PERFORM the following:
Applicant recognizes that door A-24-4 is a radiation boundary door and notifies Health Physics Department that door A- 24-4 will be blocked open. Telephone call is adequate for this notification.'
GRADE                      Standards:            Applicant recognizes that door A-24-4 is not a water and flooding boundary door and moves on to OP 3261, step 1.3.8.
Grade: SAT UNSAT Page 10 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision:
Grade:                SAT                  UNSAT STEP        I1              Performance Step:    IF door is a high energy line break OP 3261, step 1.3.8  boundary door (HELB), PERFORM the following:
0 L-1 Task Title: Response to Door lnoperability STEP 15 Performance Step: IF door is a security door, PERFORM the OP 3261, step 1.3.12 following:
GRADE                      Standards:            Applicant recognizes that door A-24-4 is not a HELB boundary door and moves on to OP 3261, step 1.3.9.
Grade:                SAT                   UNSAT Page 9 of 14
 
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.2                                   Revision:           0
*-4 Task Title:   Response to Door lnoperability STEP       12             Performance Step:     IF door is a PRA HELB boundary door OP 3261, step 1.3.9   AND IF in MODES 1 through 4, PERFORM the following:
GRADE                       Standards:             Applicant recognizes that door A-24-4 is not a PRA HELB boundary door and moves on to OP 3261, step 1.3.10.
Grade:                 SAT                   UNSAT STEP       13             Performance Step:     IF door is a tornado door ....
OP 3261, step 1.3.10 GRADE                       Standards:             Applicant recognizes that door A-24-4 is not a tornado door and moves on to OP 3261, step 1.3.1 1.
Grade:                 SAT                   UNSAT STEP       14     X       Performance Step:     IF door is a radiation boundary door, AND OP 3261, step I.3.11   door is damaged OR to be removed for any reason, NOTIFY Health Physics Department.
GRADE               X       Standards:             Applicant recognizes that door A-24-4 is a radiation boundary door and notifies Health Physics Department that door A-24-4 will be blocked open. Telephone call is adequate for this notification.'
Grade:                 SAT                   UNSAT Page 10 of 14
 
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.2                                   Revision:           0 L-1 Task Title:   Response to Door lnoperability STEP       15             Performance Step:     IF door is a security door, PERFORM the OP 3261, step 1.3.12   following:
: a. Refer To Attachme.nt 1 for list of security door number cross references.
: a. Refer To Attachme.nt 1 for list of security door number cross references.
: b. NOTIFY Security Department of problems with doors or expected maintenance.
: b. NOTIFY Security Department of problems with doors or expected maintenance.
GRADE Standards
GRADE                       Standards:             Applicant recognizes that door A-24-4 is a security door and refers to Attachment 1 that the security door number is 306.
: Applicant recognizes that door A-24-4 is a security door and refers to Attachment 1 that the security door number is 306. Grade: SAT UNSAT GRADE Standards:
Grade:                 SAT                   UNSAT GRADE                       Standards:             Applicant notifies Security Department that door 306 will be blocked open. Telephone call is adequate for this notification.
Applicant notifies Security Department that door 306 will be blocked open. Telephone call is adequate for this notification.
CUE:
CUE': Grade: SAT UNSAT STEP 16 Performance Step: IF door is a Fuel Building Integrity OP 3261, step I .3.13 Boundary door PERFORM the following:
Grade:                 SAT                   UNSAT STEP       16             Performance Step:     IF door is a Fuel Building Integrity OP 3261, step I.3.13   Boundary door PERFORM the following:
GRADE Standards
GRADE                       Standards:             Applicant recognizes that door A-24-4 is not a Fuel Building Integrity Boundary door and moves on to OP 3261 step 1.3.14.
: Applicant recognizes that door A-24-4 is not a Fuel Building Integrity Boundary door and moves on to OP 3261 step 1.3.14. Grade: SAT UNSAT STEP 17 Performance Step: IF door is a "Halon Door," PERFORM the OP 3261, step 1.3.14 following:
Grade:                 SAT                   UNSAT STEP       17             Performance Step:     IF door is a Halon Door, PERFORM the OP 3261, step 1.3.14   following:
GRADE Standards
GRADE                       Standards:             Applicant recognizes that door A-24-4 is not a Halon Door and moves on to OP
: Applicant recognizes that door A-24-4 is not a Halon Door and moves on to OP 3261 I step 1.3.15. --' Page 11 of 14 PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision:
--
0 Task Title: Response to Door lnoperability  
3261 step 1.3.15.
'-u; Grade: SAT UNSAT STEP 18 Performance Step: IF door is a "Technical Support Center OP 3261 , step 1.3.15 Habitability Door," PERFORM the following:
I Page 11 of 14
GRADE Standards: Applicant recognizes that door A-24-4 is not a Technical Support Center Habitability Door.
 
Grade: SAT UNSAT STEP I9 Performance Step: Applicant Reports Task Completion.
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.2                                   Revision:       0
GRADE Standards: Applicant reports to the SM that the required compensatory actions necessary to take door A-24-4 out of service have been determined. . L/' Stop Time: Page 12 of 14 VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.2 Date Performed:  
'-u; Task Title:   Response to Door lnoperability Grade:                 SAT                   UNSAT STEP       18             Performance Step:     IF door is a "Technical Support Center OP 3261, step 1.3.15   Habitability Door," PERFORM the following:
.-d Rev is ion : 0 Student: Evaluator:  
GRADE                       Standards:             Applicant recognizes that door A-24-4 is not a Technical Support Center Habitability Door.
~ For the student to achieve a satisfactory grade, &J critical steps must be completed correctly.
Grade:                 SAT                   UNSAT STEP       I9             Performance Step:     Applicant Reports Task Completion.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? YES NO X Validated Time (minutes):
GRADE                       Standards:             Applicant reports to the SM that the required compensatory actions necessary
10 .---' Actual Time to Complete (minutes):
.L/'
Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)
to take door A-24-4 out of service have been determined.
Stop Time:
Page 12 of 14
 
VERIFICATION OF JPM COMPLETION JPM Number:             NRC SRO A.2                                   Revision:         0
.-d Date Performed:
Student:
Evaluator:
                                                                                                ~
For the student to achieve a satisfactory grade, & J critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES               NO     X Validated Time (minutes):                     10
.--- Actual Time to Complete (minutes):
Result of JPM:                                     (S for satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
Page 13 of 14 STUDENT HANDOUT JPM Number: .-..-j NRC SRO A.2 Initial Conditions:
Areas for Improvement:
The plant is at I00 % power and you are the Work Control SRO on shift. An emergent repair is required on the "A" RPCCW Heat Exchanger.
Page 13 of 14
Maintenance requires door A 4 be blocked open and have its center post removed, to move in equipment and scaffolding.
 
Initiatinq Cues: You'are asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the SM. Page 14 of 14 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM Title: Review and Approve a Radioactive Liquid Waste Discharge Permit d JPM ID Number: NRC SRO A.3 Revision:
STUDENT HANDOUT JPM Number:               NRC SRO
0 chg 1 II. Initiated:
.-..-j A.2 Initial Conditions:       The plant is at I 0 0 % power and you are the Work Control SRO on shift. An emergent repair is required on the A RPCCW Heat Exchanger. Maintenance requires door A                               4 be blocked open and have its center post removed, to move in equipment and scaffolding.
Steve Jackson Developer I I I. Reviewed:
Initiatinq Cues:   Youare asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the S M .
Ray Martin Technical Reviewer IV. Approved:  
Page 14 of 14
\ Cognizant Plant Supervisor (optional)  
 
-0, - Nuclear Training Supervisor 11/01/01 Date 11/15/01 Date Date JOB PERFORMANCE MEASURE APPROVAL WORKSHEET  
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET d    I. JPM Title:   Review and Approve a Radioactive Liquid Waste Discharge Permit JPM ID Number:       NRC SRO A.3                           Revision:   0 chg 1 II. Initiated:
Steve Jackson                                                     11/01/01 Developer                                                           Date I II. Reviewed:
Ray Martin                                                       11/15/01 Technical Reviewer                                                 Date IV. Approved:
        \
Cognizant Plant Supervisor (optional)                               Date
                          -0,
                              -
Nuclear Training Supervisor
 
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
Date 1/19/07 ChglRev Description 0 chg 1 Revised JPM to update to revision 018 to OP 3335D, "Radioactive Liquid Waste System." DLM 2 of 7 JOB PERFORMANCE MEASURE GUIDE Facility:
Date   ChglRev                                  Description 1/19/07 0 chg 1 Revised JPM to update to revision 018 to OP 3335D, Radioactive Liquid Waste System. DLM 2 of 7
Millstone Unit 3 i_/' JPM ID Number: NRC SRO A.3 Revision:
 
0 chg 1 Task Title: Review and Approve a Radioactive Liquid Waste Discharge Permit System: Radioactive Liquid Waste System Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 i_/'
IO Task Number(s):
JPM ID Number:         NRC SRO A.3                         Revision:         0 chg 1 Task Title:     Review and Approve a Radioactive Liquid Waste Discharge Permit System:         Radioactive Liquid Waste System Time Critical Task:       (     ) YES   ( X ) NO Validated Time (minutes): I O Task Number(s):         068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Management Program Applicable To:         SRO         X         RO                     PEO WA Number:           GEN- 2.3.6                             WA Rating:       2.1/3.1
068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Ma nag emen t Program Applicable To:
----
SRO X RO PEO WA Number: GEN- 2.3.6 WA Rating: 2.1/3.1 Method of Testing: Simulated Performance:
.-    Method of Testing:         Simulated Performance:         X           Actual Performance:       X Location:                 Classroom:           In-Plant:   - X           Simulator:         X Task Standards:             Review and Approve a Radioactive Liquid Waste Discharge Permit Required Materials:         OP 3335D,Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-I General  
X Actual Performance:
X .- - --- Location: Classroom: In-Plant:
X Simulator:
X - Task Standards:
Review and Approve a Radioactive Liquid Waste Discharge Permit Required Materials:
OP 3335D, Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-I General  


==References:==
==References:==
None  
None
***READ TO THE STUDENT***
                                          ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
JOB PERFORMANCE MEASURE GUIDE (Continued)
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number: NRC SRO A.3 --J Revision:
JPM Number:       NRC SRO A.3                                       Revision:     0 chg 1
0 chg 1 Simulator Requirements: None initial Conditions: The unit is at 100% power with all systems in normal line-ups.
--J Simulator Requirements:       None initial Conditions:           The unit is at 100% power with all systems in normal line-ups.
The "A" and "B" Service Water pumps and all Circulating Water pumps are running. Initiating Cues: The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.
The Aand B Service Water pumps and all Circulating Water pumps are running.
f **** NOTES TO EVALUATOR****
Initiating Cues:             The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the AWaste Test Tank to the Circulating Water discharge tunnel for your approval.
I. Critical steps for this JPM are indicated by an "X after the step number.
Review and approve the permit and report to the examiner when complete.
For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "UJ' for unsatisfactory on each step.
f
When the student states what hidher simulated action/observation would be, read the appropriate "Cue". If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
                                    **** NOTES TO EVALUATOR****
or "What are you observing?").
I. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade,       critical steps must be completed correctly.
critical steps must be completed correctly.
--          The students performance is graded by an S for satisfactory or a UJ unsatisfactory on each step.
-- 2. 3.
for
PERFORMANCE INFORMATION JPM Number: SRO A.3 0 chg 1 Revision:
: 2.      When the student states what hidher simulated action/observation would be, read the appropriate Cue.
Ll' Task Title: Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time: STEP 1 GRADE STEP 2 v' GRADE GRADE GRADE 'u' X X X X X X Performance Step: Go to the correct procedure step, OP3335D, Section 4.21.5.i.
: 3.      If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
Standards:
 
Locates the correct procedure step.
PERFORMANCE INFORMATION JPM Number:     SRO A.3                                     Revision:          0 chg 1 Ll' Task Title:   Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time:
STEP       1       X     Performance Step:     Go to the correct procedure step, OP3335D, Section 4.21.5.i.
GRADE              X      Standards:           Locates the correct procedure step.
Candidate may review previous steps.
Candidate may review previous steps.
Grade: SAT UNSAT Performance Step: Standards
Grade:               SAT                     UNSAT STEP        2      X      Performance Step:     PERFORM Independent Verification of liquid effluent monitor alarm and alert settings. [step 4.21.5.i.l)J v'  GRADE              X      Standards:            Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit.
: Standards
GRADE              X      Standards:            Locates liquid effluent monitor alarm and alert current settings on RMS Console.
: Comments:
Comments:            Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise t h e cue.
PERFORM Independent Verification of liquid effluent monitor alarm and alert settings.
GRADE              X      Standards:           Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing
[step 4.21.5.i.l)J Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit. Locates liquid effluent monitor alarm and alert current settings on RMS Console. Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise the cue. Standards:
'u' RMS to match the permit.
Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing RMS to match the permit.
Initials permit after receiving the cue.
Initials permit after receiving the cue. 50f7 PERFORMANCE INFORMATION JPM Number: SRO A.3 Revision:
50f7
0 chg 1 Task Title:
 
L2' Review and Approve a Radioactive Liquid Waste Discharge Permit Grade: . SAT UNSAT STEP 3 X Performance Step: Refer to CHEM Form 38OOP-001 and CHECK "EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified.
PERFORMANCE INFORMATION JPM Number:       SRO A.3                                     Revision:         0 chg 1 L2 Task Title:   Review and Approve a Radioactive Liquid Waste Discharge Permit Grade:   .           SAT                     UNSAT STEP       3       X     Performance Step:     Refer to CHEM Form 38OOP-001and CHECK EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified. [step 4.21.5.i.2)]
[step 4.21.5.i.2)]
GRADE               X     Standards:           COMPARE CHEM Form 38OOP-001 and CHECK EST Activity this Discharge (Ci) to Discharge permit Estimated activity this discharge (Ci).
GRADE X Standards:
COMPARE CHEM Form 38OOP-001 and CHECK "EST Activity this Discharge (Ci) to Discharge permit "Estimated activity this discharge (Ci)".
Determines that values are below the limits. Initials permit.
Determines that values are below the limits. Initials permit.
Grade: SAT UNSAT STEP 4 X Performance Step: CHECK required dilution flowrate is met. [step 4.21.5.i.4)]
Grade:               SAT                     UNSAT STEP       4       X     Performance Step: CHECK required dilution flowrate is met. [step 4.21.5.i.4)]
GRADE X Standards
GRADE               X     Standards:           COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP.
: COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP. Determines that dilution flow is met. Initials permit. Grade: SAT UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time: L.2 6 of 7 VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.3 Revision:
Determines that dilution flow is met.
0 chg 1 '.e Date Performed:
Initials permit.
Student: Evaluator:
Grade:               SAT                     UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time:
For the student to achieve a satisfactory grade, correctly.
L.2 6 of 7
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Time Critical Task?
 
YES NO X Validated Time (minutes):
VERIFICATION OF JPM COMPLETION JPM Number:           NRC SRO A.3                               Revision:     0 chg 1
10 --i Actual Time to Complete (minutes):
.e Date Performed:
Result of JPM: (S" for satisfactory, "U" for unsatisfactory)
Student:
Evaluator:
For the student to achieve a satisfactory grade,     critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES           NO     X Validated Time (minutes):                   10
--i Actual Time to Complete (minutes):
Result of JPM:                                   (Sfor satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
STUDENT HANDOUT JPM Number: SRO A.3 initial Conditions:
Areas for Improvement:
The unit is at 100% power with all systems in normal line-ups. The "A" and "B" Service Water pumps and all Circulating Water pumps are running. initiating Cues: The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the "A" Waste Test Tank to the Circulating Water discharge tunnel for your approval.
 
Review and approve the permit and report to the examiner when complete.  
STUDENT HANDOUT JPM Number:           SRO A.3 initial Conditions: The unit is at 100% power with all systems in normal line-ups. The A and B Service Water pumps and all Circulating Water pumps are running.
--e- .--.-/'
initiating Cues:   The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the A Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Emergency Plan Classification for General Emergency JPM ID Number: NRC SRO A.4 11. Initiated:
  --e-
Paul Malzahn Developer 111. Reviewed:  
.--.-/
., Barry Pinkowitz  
 
.....--. Technical Reviewer IV. Approved:
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:   Emergency Plan Classification for General Emergency JPM ID Number:       NRC SRO A.4                         Revision:    0 chg 1
T. Butler Cognizant Plant Supervisor (optional)
: 11. Initiated:
Tim Kulterman Nuclear Training Supervisor Revision:
Paul Malzahn                                                     8/3 1/05 Developer                                                         Date 111. Reviewed:
0 chg 1 8/3 1 /05 Date 813 1 /05 Date 8/31 I05 Date 813 I /05 Date Page 1 of IO JOB PERFORMANCE MEASURE APPROVAL SHEET  
.
-..
    ,     Barry Pinkowitz                                               813 1/05 Technical Reviewer                                                 Date IV. Approved:
T. Butler                                       8/31I05 Cognizant Plant Supervisor (optional)                               Date Tim Kulterman                                                 813 I/05 Nuclear Training Supervisor                                        Date Page 1 of I O
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
Date 1/8/07 Chg/Rev Description Rev 0 Revised JPM to correspond to the standard NTP format. DLM I chg 1 I 1 -=-.-- Page 2 of IO JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 JPM ID Number: NRC SRO A.4 Revision:
Date     Chg/Rev                                  Description 1/8/07   Rev 0   Revised JPM to correspond to the standard NTP format. DLM I chg 1 I                                                           1
0 chg 1 .w' Task Title: Emergency Plan Classification for General Emergency System: NIA Time CriticalTask: ( X ) YES ( ) NO Validated Time (minutes): 30 Task Number(s): 301-05-366, 301-05-449 Applicable To: SRO X RO PEO WA Number: 2.4.41 2.4.44 KIA Rating: 4.1  
=
/ 2.3 4.0 12.1 Method of Testing: Simulated Performance: Actual Pe dorm an ce : X Location: . Classroom:
--
X Simulator:
.
In-Plant:
-
Task Standards:
Page 2 of I O
0 Determine the EAL and State Posture Code 'u' 0 Determine the minimum required PAR Required MP-26-EPI-FAP06-003, MILLSTONE UNIT 3 EMERGENCY ACTION LEVELS Materials:
 
MP-26-EPI-FAP-01-001, CONTROL ROOM DIRECTOR OF STATION EMERGENCY OPERATION (CR DSEO) MP-26-EPI-FAPOG, CLASSIFICATION AND PARS MP-26-EPI-FAP06-005, CONTROL ROOM PROTECTIVE ACTION RECOMMENDATIONS MP-26-EPI-FAP-07-001, NUCLEAR INCIDENT REPORT FORM (IRF)
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3
.w JPM ID Number: NRC SRO A.4                                 Revision:       0 chg 1 Task Title:     Emergency Plan Classification for General Emergency System:         NIA Time CriticalTask:         ( X   ) YES     (   ) NO Validated Time (minutes):             30 Task Number(s):         301-05-366, 301-05-449 Applicable To:         SRO         X         RO                     PEO WA Number:                               2.4.41                         KIA Rating:     4.1 / 2.3 2.4.44                                          4.0 12.1 Method of Testing:         Simulated Performance:                     Actual Pedormance:         X Location:     .           Classroom:     X           Simulator:                 In-Plant:
u Task Standards:                 0   Determine the EAL and State Posture Code 0   Determine the minimum required PAR Required                     MP-26-EPI-FAP06-003, MILLSTONE UNIT 3 EMERGENCY ACTION LEVELS Materials:                   MP-26-EPI-FAP-01-001, CONTROL ROOM DIRECTOR OF STATION EMERGENCY OPERATION (CR DSEO)
MP-26-EPI-FAPOG, CLASSIFICATION AND PARS MP-26-EPI-FAP06-005, CONTROL ROOM PROTECTIVE ACTION RECOMMENDATIONS MP-26-EPI-FAP-07-001, NUCLEAR INCIDENT REPORT FORM (IRF)
General  
General  


==References:==
==References:==


***READ TO THE STUDENT***
                                        ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of 10 JOB PERFORMANCE MEASURE GUIDE (Continued)
Page 3 of 10
JPM Number: NRC SRO A.4 ~.u' .- v Revision:
 
0 cha I Simulator Requirements: None Initial Conditions: You are the Shift Manager at Millstone. The time is 02:45. The plant has been on-line for 200 days. The "A RHR pump is tagged out for an oil change. All other major plant equipment is in service. The following events occur:
JOB PERFORMANCE MEASURE GUIDE (Continued)
: 1. (0245) A severe earthquake (0.1Og ZPA) occurs. 2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure.
JPM Number:       NRC SRO A.4                                   Revision:   0 cha I
The "B" RHR pump does not start; all other ESF equipment operates norma I ly . 3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs. 4. (0255) The following plant conditions exist: RCS Subcooling is O&deg;F RMS*REOQA/O5A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19% Initiating Cues: The current wind speed is five (5) miles per hour.
~.u Simulator Requirements:     None Initial           You are the Shift Manager at Millstone. The time is 02:45. The plant has Conditions:        been on-line for 200 days. The A RHR pump is tagged out for an oil change. All other major plant equipment is in service.
The current wind direction is from 040 and into 220. DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATIONS.
The following events occur:
: 1. (0245) A severe earthquake (0.1Og ZPA) occurs.
: 2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure.
The B RHR pump does not start; all other ESF equipment operates normaI ly.
: 3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs.
: 4. (0255) The following plant conditions exist:
RCS Subcooling is O&deg;F RMS*REOQA/O5A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19%
.v -                    The current wind speed is five (5) miles per hour. The current wind direction is from 040 and into 220.
Initiating Cues:            DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATIONS.
This is a time critical task.
This is a time critical task.
ARE THERE ANY QUESTIONS? YOU MAY BEGIN. .W' **** NOTES TO EVALUATOR****
ARE THERE ANY QUESTIONS? YOU MAY BEGIN.
Page4 of 10 JOB PERFORMANCE MEASURE GUIDE (Continued)
.W
: 1. Critical steps for this JPM are indicated by an "X" after the step number.
                                    **** NOTES TO EVALUATOR****
For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Page4 of 10
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. 2. When the student states what hidher simulated action/observation would be, read the appropriate 'Cue".
 
: 3. If necessary, question the student for details of simulated actiondobservations (i.e. "What are you looking at?"
JOB PERFORMANCE MEASURE GUIDE (Continued)
or "What are you observing?").
: 1. Critical steps for this JPM are indicated by an Xafter the step number. For the student to achieve a satisfactory grade, ALL   critical steps must be completed correctly.
Page 5 of 10 PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision:
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
0 chg 1 Task Title: Emergency Plan Classification for General Emergency  
: 2. When the student states what hidher simulated action/observation would be, read t h e appropriate Cue.
'u' Start Time:
: 3. If necessary, question the student for details of simulated actiondobservations (i.e. What are you looking at? or What are you observing?).
STEP 1 Performance Step: Obtain Proper procedure.
Page 5 of 10
GRADE Standards: Applicant obtains or requests copy of MP- 26-EPI-FAP06-003, MP3 Emergency Action Levels.
 
Evaluator NOTE: Applicant may also request copies of: 0 MP-26-EPI-FAP-01-001, CR-DSEO Checklist MP-26-EPI-FAPO6, Classification and PARS MP-26-EPI-FAP07, Notifications  
PERFORMANCE INFORMATION JPM Number:   NRC SRO A.4                                     Revision:         0 chg 1
& Comms 0 MP-26-EPI-FAP07-001, Incident Report Form MP-26-EPI-FAP06-005, CR PARS The CR DSEO Notebook contains all these procedures.
'uTask
Grade: SAT UNSAT *_-- STEP 2 X Performance Step: Classify the Event.
    ' Title:
GRADE X Standards: Applicant recognizes a potential loss of the Fuel Clad Barrier, based on RVLMS 1. 19% (plenum) (FCB4).
Emergency Plan Classification for General Emergency Start Time:
Grade: SAT UNSAT GRADE X Standards
STEP       1             Performance Step:         Obtain Proper procedure.
: Applicant recognizes a loss of the RCS Barrier based on RCS Subcooling  
GRADE                     Standards:               Applicant obtains or requests copy of MP-26-EPI-FAP06-003, MP3 Emergency Action Levels.
< 32OF Due to RCS Leak (RCB2). Grade: SAT UNSAT GRADE X Standards: Applicant recognizes a loss of the CTMT Barrier based on No CTMT Pressure Increase when Expectation exists. (CNB3) Grade: SAT UNSAT GRADE X Standards
Evaluator NOTE: Applicant may also request copies of:
: Applicant reviews MP-26-EPI-FAP06-003 Page 6 of 10 PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision:
0 MP-26-EPI-FAP-01-001,CR-DSEO Checklist MP-26-EPI-FAPO6, Classification and PARS MP-26-EPI-FAP06-005, CR PARS MP-26-EPI-FAP07, Notifications & Comms 0 MP-26-EPI-FAP07-001,Incident Report Form The CR DSEO Notebook contains all these procedures.
0 chg 1 '.-l Task Title: Emergency Plan Classification for General Emergency and determines that a NRC EAL of GENERAL EMERGENCY, BGI exists. Fuel Clad Barrier (P), RCS Barrier (L) and CTMT Barrier (L) Grade: SAT UNSAT STEP 3 X Performance Step: Determine State Posture Code GRADE X Standards
Grade:                   SAT                   UNSAT
: Applicant reviews MP-26-EPI-FAP06-003 and determines that the block for BGI is the same color as State Posture ALPHA Tables are color coded to reflect the State Posture. Evaluator NOTE: Grade: SAT UNSAT NOTE: Record the ti class'ificatiori ie STEP 4 --- GRADE X GRADE X GRADE GRADE -L+' X X Performance Step: Determine the State Protective Action Recommendation Standards
*_-- STEP       2     X     Performance Step:         Classify the Event.
: Applicant uses MP-26-EPI-FAP06-005, Section B, Control Room PAR Process Flowchart.
GRADE             X     Standards:               Applicant recognizes a potential loss of the Fuel Clad Barrier, based on RVLMS 1.
to determine the PAR. Grade: SAT UNSAT Standards
19% (plenum) (FCB4).
: Reviews flowchart and diagnoses that all 3 barriers are NOT lost and transitions over to "CTMT Radiation''
Grade:                   SAT                   UNSAT GRADE             X     Standards:               Applicant recognizes a loss of the RCS Barrier based on RCS Subcooling < 32OF Due to RCS Leak (RCB2).
Grade: SAT UNSAT Standards:
Grade:                   SAT                   UNSAT GRADE             X     Standards:               Applicant recognizes a loss of the CTMT Barrier based on No CTMT Pressure Increase when Expectation exists. (CNB3)
Reviews flowchart and determines that CTMT radiation does NOT exceed Table 1 values. Transitions over to "5 Mile Doses" Grade: SAT UNSAT Standards:
Grade:                   SAT                   UNSAT GRADE             X     Standards:               Applicant reviews MP-26-EPI-FAP06-003 Page 6 of 10
Reviews flowchart and determines that 5 Page 7 of 10 PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision:
 
0 chg 1 '.-,,/ Task Title: Emergency Plan Classification for General Emergency Mile Doses do NOT exceed Table 2 values. Evaluator NOTE: When applicant requests dose projections, Provide the followina cue: Grade: SAT UNSAT GRADE X Standards: Applicant indicates the minimum required PAR is to evacuate a 5 mile radius. (The IRF will serve as the necessary PAR notification to the state so no additional DEP communication is required.)
PERFORMANCE INFORMATION JPM Number:     NRC SRO A.4                                     Revision:     0 chg 1
Grade: SAT UNSAT CUE: The evaluation for this JPM is Page 8 of 10 VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.4 Date Performed:
 
i/ Revision:
.
0 chg I Student: Evaluator:
-l Task Title:   Emergency Plan Classification for General Emergency and determines that a NRC EAL of GENERAL EMERGENCY, BGI exists.
For the student to achieve a satisfactory grade, correctly.
Fuel Clad Barrier (P), RCS Barrier (L) and CTMT Barrier (L)
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed i YES X NO 30 Time Critical Task? Validated Time (minutes):  
Grade:                   SAT                   UNSAT STEP         3     X     Performance Step:         Determine State Posture Code GRADE               X     Standards:               Applicant reviews MP-26-EPI-FAP06-003 and determines that the block for BGI is the same color as State Posture ALPHA Evaluator NOTE:          Tables are color coded to reflect the State Posture.
'i-' Actual Time to Complete (minutes):
Grade:                   SAT                   UNSAT NOTE:     Record the ti     classificatiori          ie
Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)
--
STEP       4       X     Performance Step:         Determine the State Protective Action Recommendation GRADE                      Standards:               Applicant uses MP-26-EPI-FAP06-005, Section B, Control Room PAR Process Flowchart. to determine the PAR.
Grade:                   SAT                   UNSAT GRADE              X      Standards:               Reviews flowchart and diagnoses that all 3 barriers are NOT lost and transitions over to CTMT Radiation Grade:                   SAT                   UNSAT GRADE              X      Standards:               Reviews flowchart and determines that CTMT radiation does NOT exceed Table 1 values. Transitions over to 5 Mile Doses Grade:                   SAT                   UNSAT
-L+
GRADE              X      Standards:               Reviews flowchart and determines that 5 Page 7 of 10
 
PERFORMANCE INFORMATION JPM Number: NRC SRO A.4                                     Revision:       0 chg 1
'.-,,/
Task Title: Emergency Plan Classification for General Emergency Mile Doses do NOT exceed Table 2 values.
Evaluator NOTE:         When applicant requests dose projections, Provide the followina cue:
Grade:                   SAT                   UNSAT GRADE           X     Standards:               Applicant indicates the minimum required PAR is to evacuate a 5 mile radius. (The IRF will serve as the necessary PAR notification to the state so no additional DEP communication is required.)
Grade:                   SAT                   UNSAT CUE:       The evaluation for this JPM is Page 8 of 10
 
VERIFICATION OF JPM COMPLETION JPM Number:             NRC SRO A.4                                     Revision:     0 chg I i/
Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade,         critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
i Time Critical Task?                         YES        X      NO Validated Time (minutes):                   30 i-Actual Time to Complete (minutes):
Result of JPM:                                       (Sfor satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
Page 9 of IO STUDENT HANDOUT  
Areas for Improvement:
'-4 JPM Number: NRC SRO A.4 Initial Conditions:
Page 9 of I O
You are the Shift Manager at Millstone. The time is 02:45. The plant has been on-line for 200 days. The "A RHR pump is tagged out for an oil change. All other-major plant equipment is in service. The foflowing events occur:
 
I. (0245) A severe earthquake (0.1Og ZPA) occurs. 2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure. The "B" RHR pump does not start; all other ESF equipment operates normally.
STUDENT HANDOUT
: 3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs. 4. (0255) The following plant conditions exist:
-4 JPM Number:                 NRC SRO A.4 Initial Conditions: You are the Shift Manager at Millstone. The time is 02:45. The plant has been on-line for 200 days. The A RHR pump is tagged out for an oil change. All other-majorplant equipment is in service.
RCS Subcooling is O&deg;F RMS*RE04A/05A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19% The current wind speed is five (5) miles per hour. The current wind direction is from 040 and into 220. Initiatinq Cues: DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATION.
The foflowing events occur:
This is a time'critical task. Page 10 of 10 JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Determine the maximum rate of power increase and control rod withdrawal restrictions.  
I.(0245) A severe earthquake (0.1Og ZPA) occurs.
'd JPM ID Number: NRC RO A.l.l II. Initiated: Nuclear Regulatory Commission Developer I I I. Reviewed:
: 2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure. The B RHR pump does not start; all other ESF equipment operates normally.
m& Technical Reviewer IV. Approved:
: 3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs.
N/A Cognizant Plant Supervisor (optional)
: 4. (0255) The following plant conditions exist:
____ - - - (;hbfi. Nuclear Training Supervisor Revision:
RCS Subcooling is O&deg;F RMS*RE04A/05A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19%
0 chg 1 12 May 2004 Date 124 / /7 Date Date Page 1 of 9 JOB PERFORMANCE MEASURE APPROVAL SHEET  
The current wind speed is five (5) miles per hour. The current wind direction is from 040 and into 220.
Initiatinq Cues:   DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATION.
This is a timecriticaltask.
Page 10 of 10
 
JOB PERFORMANCE MEASURE APPROVAL SHEET d I. JPM Title:       Determine the maximum rate of power increase and control rod withdrawal restrictions.
JPM ID Number:         NRC RO A . l . l                 Revision:    0 chg 1 II. Initiated:
Nuclear Regulatory Commission                               12 May 2004 Developer                                                       Date II I. Reviewed:
m&                                                       /
1 2 4/7 Technical Reviewer                                               Date IV. Approved:
N/A Cognizant Plant Supervisor (optional)                             Date
____ - -
                -       (;hbfi.
Nuclear Training Supervisor Page 1 of 9
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)  
OF CHANGE(S)
'd' -~ Date ChglRev Description 1/3/06 0 chg 1 Revised JPM to correspond to the standard NTP format. Made minor modifications to the initial conditions and initiatina cue for claritv. DLM Page 2 of 9 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 JPM ID Number: NRC RO A.I.l Revision:
  -~
0 chg 1 'V Task Title: Determine the maximum rate of power increase and control rod withdrawal restrictions.
'd' Date   ChglRev                                     Description 1/3/06 0 chg 1 Revised JPM to correspond to the standard NTP format. Made minor modifications to the initial conditions and initiatina cue for claritv. DLM Page 2 of 9
System: NA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
 
15 Task Number(s):
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 V
Applicable To: SRO X RO X PEO WA Number: 2.1.25 WA Rating: 3.1 / 2.8 Method of Testinq: Simulated Performance: Actual Performance:
JPM ID Number: NRC RO A.I.l                                           Revision:         0 chg 1 Task Title:     Determine the maximum rate of power increase and control rod withdrawal restrictions.
X Location:
System:         NA Time Critical Task:       (       ) YES       ( X ) NO Validated Time (minutes):               15 Task Number(s):
Classroom:
Applicable To:         SRO           X             RO             X             PEO WA Number:         2.1.25                                                             WA Rating:     3.1 / 2.8 Method of Testinq:         Simulated Performance:                                 Actual Performance:       X Location:                 Classroom:         X               Simulator:                     In-Plant:
X Simulator:
..    
In-Plant:  
  ----   Task Standards:             Applicant recognizes the Fuel Condition Category as Partially Conditioned up to power level, P, of 80% and rod position, N, of 218 steps on CBD.
.. ' ---- Task Standards:
Applicant correctly identifies the following limits:
Applicant recognizes the Fuel Condition Category as "Partially Conditioned" up to power level, P, of 80% and rod position, N, of 218 steps on CBD. Applicant correctly identifies the following limits:  
                                      + 10% per hour to power level Pwhere P=80%.
+ + + 10% per hour to power level "P" where P=80%. 4% over any 1 hour period, 7% over any 2 hour period, 10% over any 3 hour period to achieve a nominal 3% full power per hour rate, and Control Rod Withdrawal restricted to 3 steps per hour above 218 steps on CBD. Applicant correctly applies the limits to determine that schedule adherence is possible without exceeding authorized fuel condition load increase restrictions. Required Materials:
                                      + 4% over any 1 hour period, 7% over any 2 hour period, 10% over any 3 hour period to achieve a nominal 3% full power per hour rate, and
Operating Procedure OP 3204, At Power Operations. Attachment 4 of OP 3204 General  
                                      + Control Rod Withdrawal restricted to 3 steps per hour above 218 steps on CBD.
Applicant correctly applies the limits to determine that schedule adherence is possible without exceeding authorized fuel condition load increase restrictions.
Required Materials:               Operating Procedure OP 3204, At Power Operations.
Attachment 4 of OP 3204 General  


==References:==
==References:==
 
Operating Procedure OP 3204, At Power Operations.
Operating Procedure OP 3204, At Power Operations.  
                                            ***READ TO THE CANDIDATE***
***READ TO THE CANDIDATE***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of 9 JOB PERFORMANCE MEASURE GUIDE (Continued)
Page 3 of 9
JPM Number: NRC RO A.l.l Simulator Requirements: None i-c.' Revision:
 
0 chg 1 Initial Conditions:
JOB PERFORMANCE MEASURE GUIDE (Continued)
You are the Reactor Operator currently on shift. The plant has recently completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004. On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50% power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50% power with CBD at 218 steps. Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete.
JPM Number:           NRC RO A.l.l                                       Revision:     0 chg 1 i-c.
The plant is ready to begin its return to full power. According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours. Initiating Cues: Based on fuel conditioning, determine whether the plant can achieve 100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.
Simulator Requirements:           None Initial               You are the Reactor Operator currently on shift. The plant has recently Conditions:          completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004.
On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50% power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50%
power with CBD at 218 steps.
Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete. The plant is ready to begin its return to full power.
According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours.
Initiating Cues:     Based on fuel conditioning, determine whether the plant can achieve
.----
  .                        100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.
ARE THERE ANY QUESTIONS?
ARE THERE ANY QUESTIONS?
YOU MAY BEGIN. .. ---- **** NOTESTO EVALUATOR  
YOU MAY BEGIN.
**** 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.
                                          **** NOTESTO EVALUATOR ****
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue".
: 1.     Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade,         critical steps must be completed correctly.
: 3. If necessary, question the student for details of simulated actions/observations (i.e. "What are you looking at?"
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
or "What are you observing?").
: 2.     When the student states what hidher simulated action/observation would be, read the appropriate Cue.
Page 4 of 9 PERFORMANCE INFORMATION JPM Number: NRC RO A.I.1 Revision:
: 3.     If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).
0 chg 1 .ij .Task Title: Determine the maximum rate of power increase Start Time: STEP 1 GRADE STEP 2 STEP 3 GRADE STEP 4 GRADE X X Performance Step: Standards:
Page 4 of 9
Grade: Performance Step: Standards:
 
Grade: Performance Step: Standards:
PERFORMANCE INFORMATION JPM Number:   NRC RO A.I.1                                   Revision:     0 chg 1
Grade: Performance Step: Standards:
.ij
Grade: Applicant obtaindrequests a copy of OP 3204, "At Power Operation."
  .Task Title:   Determine the maximum rate of power increase Start Time:
Obtains OP 3204. SAT UNSAT NA Applicant reviews the initial conditions to determine recent power history SAT UNSAT Determine the correct attachment to determine load increase restrictions based on fuel condition.
STEP       1             Performance Step:     Applicant obtaindrequests a copy of OP 3204, At Power Operation.
Applicant finds and refers to Attachment 4, "Fuel Condition Load Increase Restrictions."
GRADE                      Standards:            Obtains OP 3204.
SAT UNSAT Determine Fuel Condition category. Applicant recognizes that the Fuel Condition Category is "Partially Conditioned".
Grade:                SAT                   UNSAT STEP        2              Performance Step:      NA Standards:            Applicant reviews the initial conditions to determine recent power history Grade:                SAT                   UNSAT STEP        3              Performance Step:    Determine the correct attachment to determine load increase restrictions based on fuel condition.
SAT UNSAT Page 5 of 9 PERFORMANCE INFORMATION JPM Number:
GRADE                      Standards:            Applicant finds and refers to Attachment 4, Fuel Condition Load Increase Restrictions.
NRC RO A.l.l Revision:
Grade:                SAT                   UNSAT STEP        4      X      Performance Step:    Determine Fuel Condition category.
0 chg 1 Task Title:
GRADE              X      Standards:            Applicant recognizes that the Fuel Condition Category is Partially Conditioned.
Determine the maximum rate of power increase \---,' STEP 5 GRADE GRADE STEP 6 GRADE .+' STEP 7 GRADE X Performance Step: Standards:
Grade:                SAT                   UNSAT Page 5 of 9
X X X X X Standards:
 
Grade: Performance Step: Standards:
PERFORMANCE INFORMATION JPM Number:   NRC RO A . l . l                                 Revision:         0 chg 1
Grade: Determine Applicable Range of Power Level Applicant determines that the Applicable Range of Power change for current plant conditions is 50% to 100% power. Applicant correctly determines that the plant has been at 80% power ("P") and CBD at 218 steps ("N") for at least 72 hours. SAT UNSAT Determine Maximum Rate of Power Increase.
\---,
Applicant recognizes the maximum rate of power increase as 'unlimited' to 80% and 3% per hour to 100%. SAT UNSAT Performance Step: Determine Time Required for the Power Ascension.
Task Title:   Determine the maximum rate of power increase STEP       5       X         Performance Step:   Determine Applicable Range of Power Level GRADE                        Standards:            Applicant determines that the Applicable Range of Power change for current plant conditions is 50% to 100% power.
Standards: Applicant applies the identified limits to determine the following times: 0 0 3 hours to raise power 30% (from 50% to 6 hours, 40 minutes to raise power 20% (from 80%). 80% to 100%). Total time = 9 hours: 40 minutes. NO Page 6 of 9 PERFORMANCE INFORMATION JPM Number: NRC RO A.l.l Revision:
GRADE              X        Standards:            Applicant correctly determines that the plant has been at 80% power (P) and CBD at 218 steps (N) for at least 72 hours.
0 chg I ''LJ Task Title: Determine the maximum rate of power increase Grade: SAT UNSAT STEP 8 X Performance Step: Determine If 100% Power Can Be Reached By Shift End. GRADE X Standards:
Grade:                SAT                     UNSAT STEP        6      X        Performance Step:    Determine Maximum Rate of Power Increase.
Applicant recognizes and reports that there are 10 hours scheduled to complete the power ascension and based on fuel conditioning alone, it is possible to reach full power by 18:OO (or similar words). Grade: SAT UNSAT Stop Time: Page 7 of 9 VERIFICATION OF JPM COMPLETION  
GRADE              X        Standards:            Applicant recognizes the maximum rate of power increase as unlimited to 80% and
~ For the student to achieve a satisfactory grade, correctly.
.+
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed JPM Number: NRC RO A.l.l bi Revision:
3% per hour to 100%.
0 chg I Date Performed:
Grade:                SAT                     UNSAT STEP        7      X        Performance Step:     Determine Time Required for the Power Ascension.
Student: Evaluator:
GRADE              X        Standards:           Applicant applies the identified limits to determine the following times:
Time Critical Task?
0 3 hours to raise power 30% (from 50% to 80%).
YES NO X Validated Time (minutes):
6 hours, 40 minutes to raise power 20% (from 80% to 100%).
IO 'L-1' Actual Time to Complete (minutes):
0      Total time = 9 hours: 40 minutes.
Result of JPM: ("S" for satisfactory, "U" for unsatisfactory)
NO Page 6 of 9
 
PERFORMANCE INFORMATION JPM Number:   NRC RO A . l . l                               Revision:       0 chg I LJ Task Title:   Determine the maximum rate of power increase Grade:               SAT                   UNSAT STEP       8       X       Performance Step:   Determine If 100% Power Can Be Reached By Shift End.
GRADE               X       Standards:           Applicant recognizes and reports that there are 10 hours scheduled to complete the power ascension and based on fuel conditioning alone, it is possible to reach full power by 18:OO (or similar words).
Grade:               SAT                   UNSAT Stop Time:
Page 7 of 9
 
VERIFICATION OF JPM COMPLETION JPM Number:              NRC RO A . l . l                              Revision:    0 chg I bi Date Performed:
Student:
Evaluator:
                                                                                                      ~
For the student to achieve a satisfactory grade,         critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES               NO     X Validated Time (minutes):                   IO L-1 Actual Time to Complete (minutes):
Result of JPM:                                     (S for satisfactory, U for unsatisfactory)
Result of oral questions (if applicable):
Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
Page 8 of 9 STUDENT HANDOUT JPM Number: NRC RO A.I.1 L.---,' Initial Conditions: You are the Reactor Operator currently on shift. The plant has recently completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004. On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50% power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50% power with CBD at 218 steps. Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete. The plant is ready to begin its return to full power. According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours. L- Initiatinq Cues: Based on fuel conditioning, determine whether the plant can achieve 100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.
Areas for Improvement:
Page 9 of 9 JOB PERFORMANCE MEASURE APPROVAL SHEET I I. JPM Title: Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.
Page 8 of 9
d JPM ID Number: NRC RO A.1.2 Revision:
 
0 II. Initiated: D. Minnich Developer I I I. Reviewed: Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional) a&*- Nuclear Training Supervisor 1 /3/06 Date Date Date Date Page 1 of 10 !
STUDENT HANDOUT JPM Number:                   NRC RO A.I.1 L.---,'
JOB PERFORMANCE MEASURE APPROVAL SHEET .+=
Initial Conditions: You are the Reactor Operator currently on shift. The plant has recently completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004.
On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50%
power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50% power with CBD at 218 steps.
Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete. The plant is ready to begin its return to full power.
According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours.
L-Initiatinq Cues:   Based on fuel conditioning, determine whether the plant can achieve 100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.
Page 9 of 9
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I
I. JPM Title:   Determine the Required Boration Time and Final Control Rod Height d                    For a Rapid Downpower.
JPM ID Number:       NRC RO A.1.2                         Revision:     0 II. Initiated:
D. Minnich                                         1/3/06 Developer                                                         Date III. Reviewed:
Technical Reviewer                                                 Date IV. Approved:
Cognizant Plant Supervisor (optional)                             Date a&*-
Nuclear Training Supervisor                                       Date Page 1 of 10
  !
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
Date I Chg/Rev I Description I I I I --,/- Page 2 of 10 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 JPM ID Number: NRC RO A.1.2 Revision:
.+=    Date I I
0 --* Task Title: Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.
Chg/Rev II                  Description I
System: NA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
I
IO Task Number(s):
  --,/-
009-01-004 Applicable To: SRO X RO X PEO WA Number: 2.1 20 KIA Rating: 4.3 / 4.2 Method of Testing: Simulated Performance: Act u a I P e tfo rm an ce : X .. --- Location:
Page 2 of 10
Classroom:
 
X Simulator:
JOB PERFORMANCE MEASURE GUIDE Facility:     Millstone Unit 3
In-Plant: Task Standards:
*--
Correctly Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.
JPM ID Number: NRC RO A.1.2                                 Revision:       0 Task Title:     Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.
Required Materials:
System:         NA Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):             IO Task Number(s):         009-01-004 Applicable To:         SRO         X         RO         X           PEO WA Number:         2.1 2 0                                                KIA Rating:     4.3 / 4.2 Method of Testing:         Simulated Performance:                     Act uaI Petformance :       X
AOP 3575, Rapid Downpower, and Cycle 11 End of Life RE Curve and Data Book with the January 2007 Monthly Reactivity Data Sheet General  
  .
    ---Location:
    .
Classroom:     X           Simulator:                   In-Plant:
Task Standards:             Correctly Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.
Required Materials:         AOP 3575, Rapid Downpower, and Cycle 11 End of Life RE Curve and Data Book with the January 2007 Monthly Reactivity Data Sheet General  


==References:==
==References:==


***READ TO THE STUDENT***
                                          ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of 10 JOB PERFORMANCE MEASURE GUIDE (Continued)
Page 3 of 10
JPM Number: NRC RO A. 1.2 u Revision:
 
0 Simulator Requirements:
JOB PERFORMANCE MEASURE GUIDE (Continued)
None Initial Conditions:
JPM Number:           NRC RO A. 1.2                                     Revision:     0 u
The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 Mwe (I200 to 720 Mwe). Initiating Cues: The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower.
Simulator Requirements:         None Initial Conditions:             The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 Mwe (I200 to 720 Mwe).
Use the Cycle 1 I End of Life RE Curve and Data Book, and use curves when possible.  
Initiating Cues:                 The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower. Use the Cycle 1IEnd of Life RE Curve and Data Book, and use curves when possible.
**** NOTES TO EVALUATOR  
                                    **** NOTES TO EVALUATOR ****
**** 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. critical steps must be completed correctly.
: 1.     Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade,         critical steps must be completed correctly.
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/obsetvations (i.e. "What are you looking at?"
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
or "What are you observing?").
: 2.     When the student states what hidher simulated action/observation would be, read the appropriate Cue.
Page 4 of 10 PERFORMANCE INFORMATION JPM Number:
: 3.     If necessary, question the student for details of simulated actions/obsetvations (i.e. What are you looking at? or What are you observing?).
NRC RO A.1.2 Revision:
Page 4 of 10
0 ~'4 Task Title: Determine Boration Time  
 
/ Final Control Rod Height For Rapid Down power.
PERFORMANCE INFORMATION JPM Number:   NRC RO A.1.2                                     Revision:           0 4~ Task Title:   Determine Boration Time / Final Control Rod Height For Rapid Downpower.
Start Time: STEP 1 Performance Step: Obtain proper Abnormal Operating Procedure and Curve Book. GRADE Standards: Applicant obtains a copy of AOP 3575, Rapid Downpower and MP3 Cycle 1 1 EOL RE Curve and Data Book. Grade: SAT UNSAT STEP 2 X Performance Step: Determine required boration time.
Start Time:
AOP 3575 Step 5.j GRADE X Standards: Applicant correctly determines the total power change: GRADE 0 480 Mwe / I2 Mwe per % power = 40% Evaluator NOTE: The applicant may question the US what to assume for a boration flowrate.
STEP       1             Performance Step:       Obtain proper Abnormal Operating Procedure and Curve Book.
X Stand a rds : Applicant correctly determines the required boration time using the following formula:
GRADE                     Standards:               Applicant obtains a copy of AOP 3575, Rapid Downpower and MP3 Cycle 11 EOL RE Curve and Data Book.
Grade: Total Power Change
Grade:                   SAT                   UNSAT STEP       2       X     Performance Step:       Determine required boration time.
(%) x 15 = Time (min) BA Ffow Rate [40% X I51 / 80 gpm = 7.5 minutes SAT UNSAT STEP 3 X Performance Step: Determine the total power defect associated with the 40% power change.
AOP 3575 Step 5.j GRADE               X     Standards:         Applicant correctly determines the total power change:
GRADE X Standards: Applicant refers to the "Total Power Defect I vs Percent Power" curves (RE-E-01)
0   480 Mwe / I 2 Mwe per % power = 40%
Page 5 of 10 PERFORMANCE INFORMATION JPM Number: NRC RO A.1.2 Revision:
Evaluator NOTE:           The applicant may question the US what to assume for a boration flowrate.
0 Task Title: Determine Boration Time  
GRADE              X     Standa rds :       Applicant correctly determines the required boration time using the following formula:
/ Final Control Rod Height For Rapid Downpower.
Total Power Change (%) x 15 = Time (min)
X Standards: Applicant selects the 300 ppm curve and determines the power defect associated with a power change from 100% to 60% power. - GRADE -2800 - (-1 725) = 1075 pcm Grade: SAT UNSAT STEP 4 X Performance Step: - GRADE X Standards:
BA Ffow Rate
11 GRADE X Standards:
[40% X I51 / 80 gpm = 7.5 minutes Grade:                    SAT                   UNSAT STEP       3     X     Performance Step:         Determine the total power defect associated with the 40% power change.
Grade: Determine boron concentration change associated with the boration. Applicant calculates the volume of boric acid added: 0 Power Change
GRADE             X     Standards:               Applicant refers to the Total Power Defect I
(%) x 15 = 600 gal Applicant refers to the monthly reactivity data sheet for the guideline value for "Gallons boric acid per ppm RCS (B) increase" (9.1 gal BA / ppm) and calculates RCS boron concentration change: 0 600 gal / 9.1 gal per ppm  
vs Percent Power curves (RE-E-01)
.. 66 ppm SAT UNSAT STEP 5 X Performance Step: Determine the negative reactivity added as a result of the boration.
Page 5 of 10
GRADE X Standards:
 
Applicant refers to the "Differential Boron Worth vs Burnup" curves (RE-F-02).
PERFORMANCE INFORMATION JPM Number:   NRC RO A.1.2                                     Revision:         0 Task Title:   Determine Boration Time / Final Control Rod Height For Rapid Downpower.
GRADE X Standards: Applicant selects the HFP DBW curve and determines differential boron worth for 17,000 MWD/MTU. --J - 6.96 pcm / ppm Page 6 of 10 PERFORMANCE INFORMATION JPM Number: NRC RO A. 1.2 Revision:
GRADE            - X     Standards:             Applicant selects the 300 ppm curve and determines the power defect associated with a power change from 100% to 60%
0 'iJ Task Title: Determine Boration Time / Final Control Rod Height For Rapid Downpower.
power.
GRADE STEP 6 GRADE L.1 STEP 7 GRADE X - X X X X Standards:
                                                              -2800 - (-1725) = 1075 pcm Grade:                   SAT                   UNSAT STEP       4     - X     Performance Step:       Determine boron concentration change associated with the boration.
Grade: Performance Step: Standards
GRADE              X      Standards:              Applicant calculates the volume of boric acid added:
: Grade: Performance Step: Standards
11 0 Power Change (%) x 15 = 600 gal GRADE              X      Standards:              Applicant refers to the monthly reactivity data sheet for the guideline value for Gallons boric acid per ppm RCS (B) increase (9.1 gal BA / ppm) and calculates RCS boron concentration change:
: GRADE X Standards
0 600 gal / 9.1 gal per ppm ..66 ppm Grade:                  SAT                   UNSAT STEP       5       X     Performance Step:       Determine the negative reactivity added as a result of the boration.
: Eva Grade: Applicant calculates the negative reactivity added: 0 66 ppm x (- 6.96 pcm / ppm) - 459 Pcm SAT UNSAT Determine the negative reactivity added as a result of rod insertion.
GRADE               X     Standards:               Applicant refers to the Differential Boron Worth vs Burnup curves (RE-F-02).
Applicant calculates the negative reactivity due to rod insertion by subtracting the reactivity change due to boron from the reactivity change for total power defect: 1075 pcm - 459 pcm = 616 pcrn SAT UNSAT Determine the predicted final control rod height. Applicant refers to the "Integral Rod Worth versus Steps Withdrawn" curve for control banks D and C in overlap, EOL, HFP, equilibrium Xe (RE-D-02). Applicant determines the predicted final control rod height for an integral rod worth of 616 pcm: 0 CB D at 90 steps SAT UNSAT Page 7 of 10 PERFORMANCE INFORMATION JPM Number: NRC RO A.1.2 R visi n: 0 L-=' Task Title: Determine Boration Time  
GRADE               X     Standards:               Applicant selects the HFP DBW curve and determines differential boron worth for
/ Final Control Rod Height For Rapid Down power. STEP 8 GRADE Performance Step: Applicant Reports Task Completion.
--J 17,000 MWD/MTU.
Standards:
                                                                - 6.96 pcm / ppm Page 6 of 10
Applicant reports to the US that the required boration time and final control rod height has been determined.
 
Stop Time: Page 8 of 10 VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.1.2 iJ Date Performed:
PERFORMANCE INFORMATION JPM Number:   NRC RO A. 1.2                                   Revision:         0 iJ Task Title:   Determine Boration Time / Final Control Rod Height For Rapid Downpower.
Student: Evaluator:
GRADE             - X     Standards:               Applicant calculates the negative reactivity added:
Revision:
0  66 ppm x (- 6.96 pcm / ppm) 459 -
0 For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.
Pcm Grade:                  SAT                   UNSAT STEP        6      X      Performance Step:        Determine the negative reactivity added as a result of rod insertion.
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task? YES NO X Validated Time (minutes):
GRADE              X      Standards:              Applicant calculates the negative reactivity due to rod insertion by subtracting the reactivity change due to boron from the reactivity change for total power defect:
IO ., ---' Actual Time to Complete (minutes):
L.1 1075 pcm - 459 pcm = 616 pcrn Grade:                  SAT                   UNSAT STEP        7      X      Performance Step:        Determine the predicted final control rod height.
Result of JPM: ('I S " f o r sat i sf acto ry , " U " f o r u n sa t i sf a ct o ry ) Result of oral questions (if applicable):
GRADE              X      Standards:              Applicant refers to the Integral Rod Worth versus Steps Withdrawn curve for control banks D and C in overlap, EOL, HFP, equilibrium Xe (RE-D-02).
Number of Questions: Number of Correct Responses:
GRADE              X      Standards:              Applicant determines the predicted final control rod height for an integral rod worth of 616 pcm:
Score: Areas for Improvement:
0   CB D at 90 steps Eva Grade:                  SAT                   UNSAT Page 7 of 10
Page9 of 10 STUDENT HANDOUT JPM Number: NRC RO A.I.2 LJ Initial Conditions:
 
The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 MWe (1200 to 720 MWe). Initiating Cues: The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower.
PERFORMANCE INFORMATION JPM Number:   NRC RO A.1.2                                     R visi n:         0 L-= Task Title:   Determine Boration Time / Final Control Rod Height For Rapid Downpower.
Use the Cycle 11 End of Life RE Curve and Data Book, and use curves when possible.
STEP       8             Performance Step:       Applicant Reports Task Completion.
Page 10 of 10 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET I. JPM Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.  
GRADE                      Standards:               Applicant reports to the US that the required boration time and final control rod height has been determined.
'd JPM ID Number: NRC RO A.2 II. Initiated:
Stop Time:
Steve Jackson Developer Ill. Reviewed:
Page 8 of 10
Ray Martin Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional)
 
Nuclear Training Supkrvisor Revision 0 chg 1 10/31/01 Date 11/15/01 Date Date 1 of6 JOB PERFORMANCE MEASURE APPROVAL WORKSHEET Date 1/23/06
VERIFICATION OF JPM COMPLETION JPM Number:           NRC RO A.1.2                                       Revision:          0 iJ Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade,   ALL     critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES                 NO     X Validated Time (minutes):                   IO
.---, Actual Time to Complete (minutes):
Result of JPM:                                     (I S f or sati sfactory, U for unsat isfactory)
Result of oral questions (if applicable):
Number of Questions:
Number of Correct Responses:
Score:
Areas for Improvement:
Page9 of 10
 
STUDENT HANDOUT JPM Number:               NRC RO A.I.2 LJ Initial Conditions: The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 MWe (1200 to 720 MWe).
Initiating Cues:   The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower. Use the Cycle 11 End of Life RE Curve and Data Book, and use curves when possible.
Page 10 of 10
 
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET d I. JPM Title:     Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
JPM ID Number:       NRC RO                                 Revision  0 chg 1 A.2 II. Initiated:
Steve Jackson                                                   10/31/01 Developer                                                         Date Ill. Reviewed:
Ray Martin                                                       11/15/01 Technical Reviewer                                                 Date IV. Approved:
Cognizant Plant Supervisor (optional)                             Date Nuclear Training Supkrvisor 1 of6
 
JOB PERFORMANCE MEASURE APPROVAL WORKSHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
Chg/Rev Description 0 chg 1 Revised JPM to update to revision 007-00 to WC 2, Tagging. Also modified initial conditions and cue to correspond to a maintenance team lead request instead of a recommendation to add realism. Removed tagging the pump control switch from the critical nature of the electrical tagout step. DLM ..--- 2of6 JOB PERFORMANCE MEASURE GUIDE Facility : Millstone Unit 3 JPM ID Number: '*i/ NRC RO A.2 Revision:
Date  Chg/Rev                                   Description 1/23/06 0 chg 1 Revised JPM to update to revision 007-00 to WC 2, Tagging. Also modified initial conditions and cue to correspond to a maintenance team lead request instead of a recommendation to add realism. Removed tagging the pump control switch from the critical nature of the electrical tagout step. DLM
0 chg 1 Task Title: System: Tagging and Clearance Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
..---
10 min Task Number(s): Given a maintenance repair recommendation and reference material, recommend a clearance boundary. 341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements Applicable To:
2of6
SRO RO X PEO WA Number: GEN.2.2.13, Knowledge of Tagging and WA Rating: 3.6i3.8 Method of Testing: Simulated Performance: Actual Performance:
 
X Clearance Procedures Location:
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3
Classroom:
'*i/
X Simulator: In-Plant:  
JPM ID Number:         NRC RO A.2                           Revision:       0 chg 1 Task Title:     Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
'.J' Task Standards: Develop and review a tag clearance Required Materials:
System:         Tagging and Clearance Time Critical Task:       (     ) YES     ( X ) NO Validated Time (minutes):       10 min Task Number(s):         341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements Applicable To:         SRO                     RO         X           PEO WA Number:           GEN.2.2.13, Knowledge of Tagging and                     WA Rating:       3.6i3.8 Clearance Procedures Method of Testing:         Simulated Performance:                     Actual Performance:       X Location:                 Classroom:     X           Simulator:                 In-Plant:
Team Lead Tagout Request P&IDs, EM-1 09A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System OP 3250, Removing Equipment from Service for Maintenance General  
J
.'' Task Standards:             Develop and review a tag clearance Required Materials:         Team Lead Tagout Request P&IDs, EM-109A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System General  


==References:==
==References:==
WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance
                                        ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
3 of 6
JOB PERFORMANCE MEASURE GUIDE (Continued)
JPM Number:          NRC RO A.2                                      Revision      0 chg 1 Simulator Requirements:          NONE Initial Conditions:              The pump impeller on the B Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.
Initiating Cues:                Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisors request.
                                      **** NOTES TO EVALUATOR ****
: 1.      Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
The students performance is graded by an S for satisfactory or a Ufor unsatisfactory on each step.
: 2.      When the student states what hidher simulated action/observation would be, read the appropriate Cue.
: 3.      If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
W 4of6


WC 2, Tagging ***READ TO THE STUDENT***
PERFORMANCE INFORMATION JPM Number:   NRC RO A.2                                           Revision:     Ochgl i /
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied. You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Task Title:   Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
3 of 6 JOB PERFORMANCE MEASURE GUIDE (Continued)
Start Time:
JPM Number: NRC RO A.2 Revision 0 chg 1 Simulator Requirements:
Comments:           Electrical and mechanical isolation of the pump can be done in any order STEP       1       X       Performance Step: Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE               X       Standards:         Uses P&ID EM-I 09A or OP3337-001 and other appropriate references and identifies the correct boundary:
Initial Conditions:
0   Pump Discharge WlO) CLOSED 0   Pump Suction (V6)CLOSED 0   Casing Drain (V107) OPEN 0   Discharge Vent (V972) OPEN Grade:             SAT                     UNSAT L-f STEP       2       X       Performance Step:   Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE               X       Standards:         Uses OP3337-004,electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:
Initiating Cues: NONE The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.
At MCC 32-3H(ZM)         OFF 0  Pump Control Switch OFF Evaluator NOTE:     Tagging the pump control switch is not required to meet the critical nature of this step.
Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisor's request. **** NOTES TO EVALUATOR
Grade:             SAT                     UNSAT Comments:           Submits completed tagout to examiner as the Shift Manager. Tagout should substantially match the JPM attachment (filled out WC 2, attachment 6).
**** 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
5 of 6
The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step. 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
 
or "What are you observing?").
PERFORMANCE INFORMATION JPM Number:   NRC RO A.2                                         Revision:   Ochgl LJ Task Title:   Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
W' 4of6 PERFORMANCE INFORMATION JPM Number:
NRC RO A.2 Revision:
Ochgl Task Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
i/ Start Time:
Comments:
Electrical and mechanical isolation of the pump can be done in any order STEP 1 X Performance Step: Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE X Standards
: Uses P&ID EM-I 09A or OP3337-001 and other appropriate references and identifies the correct boundary:
0 Pump Discharge WlO) CLOSED 0 Pump Suction (V6) CLOSED 0 Casing Drain (V107) OPEN 0 Discharge Vent (V972) OPEN Grade: SAT UNSAT L-f STEP 2 X Performance Step: Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE X Standards:
Uses OP3337-004, electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:
0 Pump Control Switch OFF At MCC 32-3H(ZM)
OFF Evaluator NOTE: Tagging the pump control switch is not required to meet the critical nature of this step. Grade: SAT UNSAT Comments : Submits completed tagout to examiner as the Shift Manager.
Tagout should substantially match the JPM attachment (filled out WC 2, attachment 6). 5 of 6 PERFORMANCE INFORMATION JPM Number: NRC RO A.2 Revision:
Ochgl 'LJ Task Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.
Termination Cue: The Evaluation For This JPM is Complete.
Termination Cue: The Evaluation For This JPM is Complete.
Stop Time: 6 of 6 VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.2 'u" Date Performed:
Stop Time:
Student: Evaluator:
6 of 6
Revision 0 chg 1 For the student to achieve a satisfactory grade, & critical steps must be completed correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. Time Critical Task?
VERIFICATION OF JPM COMPLETION JPM Number:           NRC RO A.2                                     Revision    0 chg 1 u
YES NO X Validated Time (minutes):
Date Performed:
10 ., ---- Actual Time to Complete (minutes):
Student:
Result of JPM: ('IS " for sat i sf a ct o ry , I' U " for u n sa t i sf a ct o ry ) Result of oral questions (if applicable):
Evaluator:
For the student to achieve a satisfactory grade, & critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES             NO       X Validated Time (minutes):                   10
.   ,
----
Actual Time to Complete (minutes):
Result of JPM:                                     (ISfor satisf acto ry, U for un sat isfacto ry)
I Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
N urn ber of Correct Responses:
Nurnber of Correct Responses:
Score: Areas for Improvement:
Score:
7 of 6 JPM Number: 'd' Initial Conditions:
Areas for Improvement:
Initiating Cues: STUDENT HANDOUT NRC RO A.2 The pump impeller on the "B" Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.
7 of 6
Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisor's request. 8 of 6 
'd Attachment 6 Tagout Request (Sheet I of 1) -~ ~ NOTE: When this request is used, all sections should be filled out in detail. c73eyk d& 3rid Job


== Description:==
STUDENT HANDOUT JPM Number:         NRC RO A.2 d
Initial Conditions: The pump impeller on the B Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.
Initiating Cues:    Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisors request.
8 of 6


Attachment 6 Tagout Request (Sheet I of 1)
'd                        -~    ~
NOTE: When this request is used, all sections should be filled out in detail.
3 r i d JobDescription:
c73eyk                    d      &
4mplifying Instructions:
4mplifying Instructions:
ragging@ IS NOT required for personal protection (circle one). dlsolate, vent and drain 3 Isolate and depressurize 3 Isolate flawpath through a Other Recommended Tags Color Isolation Point Position(t  
ragging@ IS NOT required for personal protection (circle one).
')For Blue Tans indicate initial position or if initial position is not required enter N/A. Zontact Person (for multiple shifts, Contact Person is required for each shift) ipproved By: Date: Phone: KL. S? 9/23 Phone: Team Leader / Planner / Engineering wc 2 71 of 82 Level of Use nformation THINK ACT REVIEW Rev. 007 STOP Attachment 6 Tagout Request (Sheet 1 of 1) NOTE: When this request is used, all sections should be filled out in detail. 3tpk d& Brief Job
d l s o l a t e , vent and drain 3 Isolate and depressurize 3 Isolate flawpath through a     Other Recommended Tags Color                                 Isolation Point                                     Position(t
  ')For Blue Tans indicate initial position or if initial position is not required enter N/A.
Zontact Person (for multiple shifts, Contact Person is required for each shift)                 Phone:
KL.         S                       ?                                         9/23 ipproved By:                                                                                Date:
Phone:
Team Leader / Planner / Engineering Level of Use wc 2 STOP          THINK             ACT       REVIEW       Rev. 007 nformation                                                                          71 of 82
 
Attachment 6 Tagout Request (Sheet 1 of 1)
NOTE: When this request is used, all sections should be filled out in detail.
Brief Job


== Description:==
== Description:==


3 t p k                    d      &
Amplifying Instructions:
Amplifying Instructions:
Tagging@'
Tagging@' IS NOT required for personal protection (circle one).
IS NOT required for personal protection (circle one). &Isolate, vent and drain 5 Isolate and depressurize Isolate flowpath through a Other Recommended Tags Color I Isolation Point  
&Isolate, vent and drain 5 Isolate and depressurize Isolate flowpath through a   Other Recommended Tags Color     I                           Isolation Point             '
' ")For Blue Tags indicate initial position or if initial position is not required enter N/A. Contact Person (for multiple shifts, Contact Person is required for each shift) 6L. sw Approved By: Phone: Team Leader / Planner / Engineering Phone: 95/23 Date: wc 2 71 of 82 Level of Use nformation THINK ACT REVIEW Rev. 007 STOP JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Actions and Expected Response for RMS Equipment failure Alarms d JPM ID Number: NRC RO A.3 Revision:
")For Blue Tags indicate initial position or if initial position is not required enter N/A.
0 II. Initiated:
Contact Person (for multiple shifts, Contact Person is required for each shift)                 Phone:
d I I I. Reviewed : \ Technical Reviewer IV. Approved: Cognizant Plant Supervisor (optional) . Nuclear Training Supervisor 1/5/07 Date / // 2.4 7 Date Date Page 1 of 11 JOB PERFORMANCE MEASURE APPROVAL SHEET Date I Chg/Rev 1 Description I I
6 L .         s                      w                                            95/23 Approved By:                                                                               Date:
Phone:
Team Leader / Planner / Engineering Level of Use                                                                         wc2 STOP          THINK           ACT         REVIEW       Rev. 007 nformation 71 of 82
 
JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title:   Actions and Expected Response for RMS Equipment failure Alarms JPM ID Number:         NRC RO A.3                       Revision:       0 II. Initiated:
1/5/07 Date III. Reviewed :
                    \
                                                                        / //
2.4 7 d      Technical Reviewer                                               Date IV. Approved:
Cognizant Plant Supervisor (optional)                           Date
                              .
Nuclear Training Supervisor Page 1 of 11
 
JOB PERFORMANCE MEASURE APPROVAL SHEET


==SUMMARY==
==SUMMARY==
OF CHANGE(S)
OF CHANGE(S)
Page 2 of 11 JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 JPM ID Number: NRC RO A.3 Revision:
Date I Chg/Rev 1                    Description I        I Page 2 of 11
0 ij Task Title: Actions and Expected Response for RMS Equipment failure Alarms System: NIA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes):
 
10 Task Number(s):
JOB PERFORMANCE MEASURE GUIDE Facility:       Millstone Unit 3 i j JPM ID Number:         NRC RO A.3                             Revision:     0 Task Title:     Actions and Expected Response for RMS Equipment failure Alarms System:         NIA Time Critical Task:         (     ) YES     ( X ) NO Validated Time (minutes):             10 Task Number(s):         073-Ot-043 Applicable To:           SRO                     RO         X           PEO WA Number:       2.3.1                                                   K/A Rating:     2.6 f 3.0 Method of Testing:         Simulated Performance:                     Actual Performance:       X Location:                 Classroom:       X           Simulator:                 In-Plant:
073-O't-043 Applicable To: SRO RO X PEO WA Number: 2.3.1 K/A Rating: 2.6 f 3.0 Method of Testing: Simulated Performance: Actual Performance:
- . d Task Standards:               Correctly determines the required actions for an RMS Equipment failure Alarm.
X Location:
Required Materials:         OP 3362, Radiation Monitor System Display and Control System (rev. 007-06)
Classroom:
X Simulator:
In-Plant:  
-.d Task Standards: Correctly determines the required actions for an RMS Equipment failure Alarm. Required Materials:
OP 3362, Radiation Monitor System Display and Control System (rev. 007-06)
General  
General  


==References:==
==References:==


***READ TO THE STUDENT***
                                        ***READ TO THE STUDENT***
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.
Page 3 of I1 JOB PERFORMANCE MEASURE GUIDE (Continued)
Page 3 of I 1
JPM Number: NRC RO A.3 Revision:
 
0 Simulator Requirements: None Initial Conditions: The plant is at 100% power and you are the Extra Licensed Operator on shift. MB2B 2-9 "RMS TROUBLE" alarms.
JOB PERFORMANCE MEASURE GUIDE (Continued)
At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, 'filter step' is in alarm. Initiating Cues: The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm. **** NOTES TO EVALUATOR  
JPM Number:             NRC RO A.3                                       Revision:       0 Simulator Requirements:         None Initial Conditions:             The plant is at 100% power and you are the Extra Licensed Operator on shift. MB2B 2-9 RMS TROUBLE alarms. At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, filter step is in alarm.
**** 1. Critical steps for this JPM are indicated by an "X" after the step number. For the student to achieve a satisfactory grade, The students performance is graded by an "S" for satisfactory or a "U" for unsatisfactory on each step.
Initiating Cues:                 The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm.
critical steps must be completed correctly.
                                  **** NOTES TO EVALUATOR ****
: 2. When the student states what hidher simulated action/observation would be, read the appropriate "Cue". 3. If necessary, question the student for details of simulated actions/observations (Le. "What are you looking at?"
: 1.     Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade,         critical steps must be completed correctly.
or "What are you observing?").
The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.
Page 4 of 11 JPM Number: NRC RO A.3 PERFORMANCE INFORMATION Revision:
: 2.     When the student states what hidher simulated action/observation would be, read the appropriate Cue.
0 Task Title: Actions and Expected Response for RMS Equipment failure Alarms L/' Start Time: STEP 1 Performance Step: Obtain proper Annunciator Response Procedure.
: 3.     If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).
GRADE Standards:
Page 4 of 11
Obtains OP 3353.MB2B and refers to "RMS TROUBLE" (2-9).
 
Grade: SAT UNSAT STEP 2 Performance Step: IF alarm is due to equipment failure, Refer OP 3353.MB2B 2-9 Step 2 To OP 3362, "Radiation Monitor System Display and Control," and TAKE required actions for equipment failure alarms. .I GRADE Standards: Applicant obtains and refers to OP 3362, Section 4.13, Equipment Failure Alarms.  
PERFORMANCE INFORMATION JPM Number:   NRC RO A.3                                     Revision:           0 L/
=.---- Grade: SAT UNSAT STEP 3 X Performance Step: Refer To Attachment 6 and PERFORM OP 3362, Section 4.13 Step 4.13.1.a the following:
Task Title:   Actions and Expected Response for RMS Equipment failure Alarms Start Time:
CHECK monitor number is listed. GRADE X Standards:
STEP       1             Performance Step:       Obtain proper Annunciator Response Procedure.
Applicant refers to OP 3362, Attachment 6 and verifies that 3CMS*RE22 is listed. Grade: SAT UNSAT STEP 4 X Performance Step: IF monitor is listed, DETERMINE OP 3362, Section 4.13 Step 4.13.1.b applicable "Trouble Response(s)."
GRADE                     Standards:               Obtains OP 3353.MB2B and refers to RMS TROUBLE (2-9).
GRADE X Standards: Applicant refers to Attachment 6 and determines that for 3CMS*22, trouble 'u-l responses 1, 2, 3, 6, 7, IO, and I2 are required.
Grade:                   SAT                   UNSAT STEP       2             Performance Step:       IF alarm is due to equipment failure, Refer OP 3353.MB2B 2-9         To OP 3362, Radiation Monitor System Step 2                  Display and Control, and TAKE required actions for equipment failure alarms.
Page 5 of I1 PERFORMANCE INFORMATION JPM Number: NRC RO A.3 Revision:
.       I   GRADE                     Standards:               Applicant obtains and refers to OP 3362,
0 'LJ Task Title: Actions and Expected ResPonse for RMS EauiDment failure Alarms Grade: SAT UNSAT STEP 5 Performance Step: PERFORM applicable Trouble OP 3362, Section 4.1 3 Step 4.13. 1 .c Response(s)" listed.
=.----
GRADE Standards
Section 4.13, Equipment Failure Alarms.
: Applicant refers to Attachment 6 begins to Derform the identified remonses.
Grade:                   SAT                   UNSAT STEP       3       X     Performance Step:       Refer To Attachment 6 and PERFORM OP 3362, Section 4.13   the following:
Grade: SAT UNSAT STEP 6 Performance Step: NOTIFY Instrument and Control -Ll OP 3362, Att 6 Action 1. Department to check monitor. GRADE Standards
Step 4.13.1.a CHECK monitor number is listed.
: Applicant notifies I &C that 3CMS*RE22 has an equipment failure alarm and to check the monitor. Telephone call is adequate for this notification.
GRADE               X     Standards:               Applicant refers to OP 3362, Attachment 6 and verifies that 3CMS*RE22 is listed.
Grade: SAT UNSAT STEP 7 Performance Step: NOTIFY Health Physics Department for OP 3362, Att 6 Action 2. area monitoring and sampling.
Grade:                   SAT                   UNSAT STEP       4       X     Performance Step:       IF monitor is listed, DETERMINE OP 3362, Section 4.13   applicable Trouble Response(s).
GRADE Standards:
Step 4.13.1.b GRADE              X     Standards:               Applicant refers to Attachment 6 and determines that for 3CMS*22, trouble u   -l responses 1, 2, 3, 6, 7, I O , and I 2 are required.
Applicant notifies Health Physics that 3CMS*RE22 has an equipment failure alarm and to conduct necessary monitoring and sampling. Telephone call is adequate for this notification.
Page 5 of I 1
Page 6 of 11 PERFORMANCE JPM Number: NRC RO A.3 NFORMATION Revision:
 
0 Task Title:
PERFORMANCE INFORMATION JPM Number:   NRC RO A.3                                   Revision:           0
Actions and Expected Response for RMS Equipment failure Alarms STEP 8 GRADE STEP 9 GRADE Grade: SAT UNSAT Performance Step: OP 3362, Att 6 Action 3. NOTIFY Chemistry Department for sampling medium. Standards
'LJ Task Title:   Actions and Expected ResPonse for RMS EauiDment failure Alarms Grade:                   SAT                   UNSAT STEP       5             Performance Step:       PERFORM applicable Trouble OP 3362, Section 4.13   Response(s)" listed.
: Applicant notifies Chemistry Department that 3CMS*RE22 has an equipment failure alarm and to ready appropriate sampling medium. Telephone call is adequate for  
Step 4.13. 1.c GRADE                     Standards:               Applicant refers to Attachment 6 begins to Derform the identified remonses.
%*%I &.W<\w4 4 -. - J"\-"-? a*? this notification.
Grade:                   SAT                   UNSAT
CUE: Chemistry ark+cfm p I Grade: SAT UNSAT X Performance Step: IF a filter step alarm is recorded, OP 3362, Att 6 Action 6. ATTEMPT to step the filter as follows: Safety related Monitor (CMS*22):
-Ll STEP       6             Performance Step:       NOTIFY Instrument and Control OP 3362, Att 6           Department to check monitor.
: 1. At the appropriate KERIC, TURN the keyswitch to "ENABLE."
Action 1.
: 3. TURN keyswitch to "DISABLE."
GRADE                     Standards:               Applicant notifies I &C that 3CMS*RE22 has an equipment failure alarm and to check the monitor. Telephone call is adequate for this notification.
: 2. PRESS "STP -2 ENT." X Standards:
Grade:                   SAT                   UNSAT STEP       7             Performance Step:       NOTIFY Health Physics Department for OP 3362, Att 6           area monitoring and sampling.
Informs the US that an attempt must be made to step the 3CMS*22 filter at the 'RIC'. Grade: SAT UNSAT Page7 of 11 PERFORMANCE INFORMATION JPM Number: NRC RO A.3 Revision:
Action 2.
0 *'LJ Task Title: Actions and ExPected ResDonse for RMS Eaubment failure Alarms STEP 10 X Performance Step: IF the filter step alarm clears, the monitor may be considered OPERABLE with respect to the filter paper.
GRADE                     Standards:               Applicant notifies Health Physics that 3CMS*RE22 has an equipment failure alarm and to conduct necessary monitoring and sampling. Telephone call is adequate for this notification.
IF another filter step alarm is recorded, the particulate channel is not OPERABLE.
Page 6 of 11
REQUEST t&C to repair. OP 3362, Att 6 Action 6. GRADE X Standards:
 
Informs the US that the particulate channel of 3CMS*22 must be considered INOPERABLE  
PERFORMANCE NFORMATION JPM Number:   NRC RO A.3                                   Revision:               0 Task Title:   Actions and Expected Response for RMS Equipment failure Alarms Grade:               SAT                       UNSAT STEP        8              Performance Step:     NOTIFY Chemistry Department for OP 3362, Att 6       sampling medium.
.. Grade: SAT UNSAT STEP 11 Performance Step: IF a radiation monitor indicates "OFF- OP 3362, Att 6 . LINE," DECLARE the radiation monitor Action 7. INOPERABLE and LOG into all applicable LCOS. -.--f GRADE Standards
Action 3.
: Applicant informs the US that 3CMS*22 does not indicate "OFF-LINE". Grade: SAT UNSAT P STEP 12 X Performance Step: Refer To TIS 3.3.3.1 and Table 3.3-6, "Radiation Monitoring instrumentation for Plant Operations," and PERFORM applicable actions.
GRADE                      Standards:           Applicant notifies Chemistry Department that 3CMS*RE22 has an equipment failure alarm and to ready appropriate sampling medium. Telephone call is adequate for CUE:
OP 3362, Att 6 Action IO. GRADE X Standards: Applicant informs the US that T/S 3.3.3.1, "Radiation Monitoring Instrumentation for Plant Operations," must be referred to. Page 8 of 11 PERFORMANCE tNFORMATION JPM Number: NRC RO A.3 Revision:
this notification.  %*%I &.W<\w4 4 Chemistry ark+cfm
0 i-/ Task Title: Actions and Expected Response for RMS Equipment failure Alarms Grade: SAT UNSAT STEP 13 X Performance Step: Refer To TIS 3.4.6.1, "Reactor Coolant OP 3362, Att 6 Action 12. System Leakage Detection Systems," and PERFORM applicable actions.
                                                                                      -. - J\--? a*?
GRADE X Standards
pI Grade:               SAT                       UNSAT STEP        9      X     Performance Step:     IF a filter step alarm is recorded, OP 3362, Att 6       ATTEMPT to step the filter as follows:
: Applicant informs the US that "T/S 3.4.6.1, "Reactor Coolant System Leakage Detection Svstems."
Action 6.            Safety related Monitor (CMS*22):
must be referred to. Grade: SAT UNSAT STEP 14 Performance Step: Applicant Reports Task Completion.
: 1. At the appropriate KERIC, TURN the keyswitch to ENABLE.
GRADE Standards
: 2. PRESS STP -2 ENT.
: Applicant reports to the US that the l/-. applicable trouble responses have been performed . Stop Time: Page 9 of 11 VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.3 Date Performed:
: 3. TURN keyswitch to DISABLE.
Student: Evaluator:
GRADE              X     Standards:           Informs the US that an attempt must be made to step the 3CMS*22 filter at the RIC.
Revision:
Grade:               SAT                     UNSAT Page7 of 11
0 For the student to achieve a satisfactory grade, correctly.
 
If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade. critical steps must be completed Result of JPM: YES NO X 10 Time Critical Task? Validated Time (minutes):  
PERFORMANCE INFORMATION JPM Number:   NRC RO A.3                                       Revision:         0 LJ'*   Task Title:   Actions and ExPected ResDonse for RMS Eaubment failure Alarms STEP       10       X     Performance Step:         IF the filter step alarm clears, the monitor OP 3362, Att 6            may be considered OPERABLE with Action 6.                respect to the filter paper. IF another filter step alarm is recorded, the particulate channel is not OPERABLE. REQUEST t&C to repair.
GRADE                X      Standards:               Informs the US that the particulate channel of 3CMS*22 must be considered INOPERABLE
                                                                                                            ..
Grade:                   SAT                   UNSAT STEP       11             Performance Step:         IF a radiation monitor indicates "OFF-OP 3362, Att 6 .         LINE," DECLARE the radiation monitor Action 7.                 INOPERABLE and LOG into all applicable
    -.--f                                                   LCOS.
GRADE                       Standards:               Applicant informs the US that 3CMS*22 does not indicate "OFF-LINE".
Grade:                   SAT                   UNSAT       P STEP       12       X     Performance Step:         Refer To TIS 3.3.3.1 and Table 3.3-6, OP 3362, Att 6            "Radiation Monitoring instrumentation Action I O .              for Plant Operations," and PERFORM applicable actions.
GRADE               X     Standards:               Applicant informs the US that T/S 3.3.3.1, "Radiation Monitoring Instrumentation for Plant Operations," must be referred to.
Page 8 of 11
 
PERFORMANCE tNFORMATION JPM Number:   NRC RO A.3                                     Revision:       0 i-/ Task Title:   Actions and Expected Response for RMS Equipment failure Alarms Grade:                 SAT                   UNSAT STEP       13       X     Performance Step:       Refer To TIS 3.4.6.1, Reactor Coolant OP 3362, Att 6         System Leakage Detection Systems, Action 12.              and PERFORM applicable actions.
GRADE               X     Standards:             Applicant informs the US that T/S 3.4.6.1, Reactor Coolant System Leakage Detection Svstems. must be referred to.
Grade:                 SAT                   UNSAT STEP       14             Performance Step:       Applicant Reports Task Completion.
l/-.
GRADE                       Standards:             Applicant reports to the US that the applicable trouble responses have been performed.
Stop Time:
Page 9 of 11
 
VERIFICATION OF JPM COMPLETION JPM Number:             NRC RO A.3                                     Revision:      0 Date Performed:
Student:
Evaluator:
For the student to achieve a satisfactory grade,         critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.
Time Critical Task?                         YES              NO      X Validated Time (minutes):                     10
.--- Actual Time to Complete (minutes):
.--- Actual Time to Complete (minutes):
('IS" for satisfactory, "U" for unsatisfactory)
Result of JPM:                                          for satisfactory, Ufor unsatisfactory)
Result of oral questions (if applicable):
(IS Result of oral questions (if applicable):
Number of Questions:
Number of Questions:
Number of Correct Responses:
Number of Correct Responses:
Score: Areas for Improvement:
Score:
Page 10 of 11 STUDENT HANDOUT JPM Number: NRC RO A.3 -4 Initial Conditions:
Areas for Improvement:
The plant is at 100% power and you are the Extra Licensed Operator on shift. M62B 2-9 "RMS TROUBLE" alarms. At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, 'filter step' is in alarm. Initiating Cues: The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm. Page11 of 11}}
Page 10 of 11
 
STUDENT HANDOUT JPM Number:               NRC RO A.3
-4 Initial Conditions:   The plant is at 100% power and you are the Extra Licensed Operator on shift. M62B 2-9 "RMS TROUBLE" alarms. At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, 'filter step' is in alarm.
Initiating Cues:   The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm.
Page11 of 11}}

Revision as of 08:08, 23 November 2019

Draft - Section a Operating Exam (Folder 2)
ML070810656
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/09/2007
From:
Dominion Nuclear Connecticut
To: David Silk
Operations Branch I
Sykes, Marvin D.
Shared Package
ML060800095 List:
References
Download: ML070810656 (92)


Text

JOB PERFORMANCE MEASURE APPROVAL SHEET Lj I. JPM Title: Evaluate Technical Specifications and Technical Requirements JPM ID Number: NRC SRO A.1.I Revision: 0 II. Initiated:

D. Minnich 12/28/06 Developer Date II I. Reviewed:

4 //b/7 Technical Reviewer Date IV. Approved:

N/A Cognizant Plant Supervisor (optional) Date Nuclea; Training Supervisor Page 1 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

W Date I ChglRev I Description I

Page 2 of 8

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 ii JPM ID Number: NRCA.1.1 Revision: 0 Task Title: Evaluate Technical Specifications and Technical Requirements System: NA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 10 Task Number(s): 119-03-003 Applicable To: SRO X RO PEO WA Number: GEN 2.1.12 WA Rating: 2.9 / 4.0 Method of Testinq: Simulated Performance: Actual Performance: X

.-, Location: Classroom: X Simulator: In-Plant:

Task Standards: Correctly determine applicable Technical Specifications and Technical Requirements.

Required Materials: Unit 3 Technical Specifications, Technical Requirements Manual General

References:

Unit 3 Technical Specifications, Technical Requirements

      • READ TO THE STUDENT***

I will explain t h e initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, t h e objectives for this JPM will be satisfied.

You may use any approved reference material normally available in t h e Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if t h e evolution was actually being performed.

_ _ ~

Page 3 of 8

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC SRO A . l . l Revision: 0 I

2---.

Simulator Requirements: None Initial Conditions: The plant was at 100% power with charging and letdown in a normal lineup. The BCharging pump tripped on overcurrent. The crew is completing the actions in EOP 3506, Loss Of All Charging Pumps. The Acharging pump is now running. The C charging pump is not yet aligned to the B t rain.

Initiating Cues: The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition. Keep a rough log of any applicable LCOs.

        • NOTES TO EVALUATOR ****

I. Critical steps for this JPM are indicated by an XI after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).

i.J Page 4 of 8

PERFORMANCE lNFORMATlON JPM Number: NRC SRO A.I.1 Revision: 0 u

Task Title: Evaluate Technical Specifications and Technical Requirements Start Time:

STEP 1 Performance Step: Obtain copy of MP3 Technical Specifications and MP3 Technical Requirements manual.

GRADE Standards: Obtains proper copies.

Grade: SAT UNSAT STEP 2 X Performance Step: Determine the applicable Technical Specifications.

GRADE Standards: Refers to TIS 3.5.2, ECCS Subsystems -

Tavg Greater Than or Equal to 350°F.

GRADE X Standards: Recognizes that T/S 3.5.2 applies and enters LCO 3.5.2, ACTION a. (72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> a

-.

-

-

allowed outage time)

GRADE Standards: Records applicable LCO in rough log.

Grade: SAT UNSAT STEP 3 X Performance Step: Determine the applicable Technical Requirements.

GRADE Standards: Refers to T/R 3.1.2.2, Boration Systems Flow Paths - Operating.

GRADE X Standards: Recognizes that T/R 3.1.2.2 applies and enters LCO 3.1.2.2, ACTION I.(72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed outage time)

GRADE Standards: Records applicable LCO in rough log.

Grade: SAT UNSAT

.L/ G RADE Standards: Refers to T/R 3.1.2.4, Boration Systems -

Charging Pump - Operating.

Page 5 of 8

PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.I Revision: 0 LA Task Title: Evaluate Technical Specifications and Technical Requirements GRADE X Standards: Recognizes that T/R 3.1.2.4 applies and enters LCO 3.1.2.4. (72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> allowed outage time) .

GRADE Standards: Records applicable LCO in rough log.

Grade: SAT UNSAT GRADE Standards: Refers to T/R 7.4.1, Fire Related Safe Shutdown Components.

GRADE X Standards: Recognizes that T/R 7.4.1 applies and enters LCO 7.4.1, ACTION a.1 and a.3.

(14 and 30 day allowed outage time respectivefy)

.-...---

,

GRADE Standards : Records applicable LCO in rough log.

Grade: SAT UNSAT STEP Performance Step: Ne GRADE Standards: Candidate informs the SM that all applicable Technical Specifications and Technical Requirements have been entered for current plant conditions.

Grade: SAT UNSAT CUE: aluation for this JP Stop Time:

- I L-<

Page 6 of 8

VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.1 .I Revision: 0 e

Date Performed:

Student:

. Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

. --

1 Actual Time to Complete (minutes):

Result of JPM: (ISfor satisfactory , U for u nsat isfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page 7 of 8

STUDENT HANDOUT JPM Number: NRC SRO A.1.1 u

Initial Conditions: The plant was at 100% power with charging and letdown in a normal lineup. The B Charging

- _ pump

. tripped on overcurrent.

The crew is completing the actions in EOP 3506, Loss Of All Charging Pumps. The Acharging pump is now running. The C charging pump is not yet aligned to the B train.

Initiatinq Cues: The SM has directed you to determine the applicable Technical Specifications and Technical Requirements for the present plant condition. Keep a rough log of any applicable LCOs.

Page 8 of 8

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Notifications and Reportability.

W' JPM ID Number: NRC SRO A.1.2 Revision: 0 II. Initiated:

D. Minnich 1I1 0107 Deve1oper Date I II. Reviewed:

-u' Technical Reviewer IV. Approved:

N/A Cognizant Plant Supervisor (optional) Date Page1 of 12

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S) ii Date I ChglRev I Description I

. .

Page 2 of 12

JOB PERFORMANCE MEASURE GUIDE Facilitv: lillstone Unit 3 L.-j JPM ID Number: NRC SRO A.1.2 Revision: 0 Task Title: Notifications and Reportability.

System: N/A Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 10 Task Number(s): 301-05-366 Applicable To: SRO X RO PEO K/A Number: 2.1.6 K/A Rating: 4.3 Method of Testinq: Simulated Performance: Actual Performance: X Location: Classroom: X Simulator: In-Plant:

Task Standards: Determine the proper notifications and event reporting requirements given a particular event.

Required Materials: RAC 14, Non-Emergency Station Events General

References:

RAC 05, Reporfabiky Determinations and Licensee Event Reporfs 10CFR50.72 / .73

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of 12

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC SRO A.1.2 Revision: 0

.J Simulator Requirements: None Initial Conditions: The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building. The work area has been placed in a safe condition. The workers injuries are severe and treatment is required at Lawrence and Memorial hospital. The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute.

Initiating Cues: The SM has directed you to determine the NRC and State reporting requirements associated with this event.

        • NOTES TO EVALUATOR****
1. Critical steps for this JPM are indicated by an Xafter the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).

Page 4 of 12

PERFORMANCE iNFORMATlON JPM Number: NRC SRO A.1.2 Revision: 0

"

-' Task Title: Notifications and Reportability.

Start Time:

STEP 1 Performance Step: Obtains proper procedure.

GRADE Standards: Obtains and refers to a copy of RAC 14, Non-Emergency Station Events.

Grade: SAT UNSAT STEP 2 Performance Step: Review Precautions.

RAG 14, Section 3 GRADE Standards: Applicant reviews precautions 3.1 through

3.8. Grade

SAT UNSAT STEP 3 Performance Step: Initial Event Reportability

--'

RAC 14, step 4.1 .I.a Determination IF sufficient cause exists for reporting a non-emergency event, PERFORM the fo IIowing:

a. ANALYZE available information and DEVELOP a general understanding of event in progress.

GRADE Standards: Applicant recognizes that cause exists for reporting this event.

Evaluator NOTE: If the applicant requests additional event related information beyond the initial conditions provide the followina cue:

Grade: SAT UNSAT Page 5 of 12

PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision: 0 Task Title: Notifications and Reportability.

STEP Performance Step: ASSIGN staff to collect and track RAC 14, step 4.1.l.b information.

GRADE Standards: Applicant requests additional staff Evaluator NOTE: If the applicant requests additional personnel to track the event provide the following cue:

Grade: SAT UNSAT STEP Performance Step: IF necessary, REQUEST assistance from RAC 14, step 4.1.l.c any of the following, as applicable, to determine reportability and respond to event:

Standards: Requests assistance as necessary.

-._-I^

GRADE Evaluator NOTE: If the applicant requests additional assistance provide the following cue:

Grade: SAT UNSAT STEP 6 Performance Step: As required, REQUEST Station Duty RAC 14, step 4.1.1.d Officer (typically the non-affected unit STA) and Emergency Communicator (typically the non-affected unit WC SRO) report to the Control Room and prepare to send a Non Emergency Event Report.

GRADE Standards: Applicant calls Unit 2 and requests the Station Duty Officer and Emergency Communicator report to the Unit 3 Control j

A - .

.

Room.

Grade: SAT UNSAT Page 6 of 12

PERFORMANCE INFORMATION JPM Number: NRC SRO A. 1.2 Revision: 0

=- Task Title: Notifications and Reportability.

STEP 7 X Performance Step: For all events, Refer To appropriate RAC 14, step 4.1.1.J Attachment 1 through 7 and DETERMINE State and NRC reporting requirements.

GRADE X Standards : Applicant refers to Attachments 1 through 7 and determines that Attachment 2, Radiological Events, is the applicable attachment.

Grade: SAT UNSAT GRADE X Standards: Applicant matches the event in progress

--

with the following event description in attachment 2:

An event requiring the transport of a radioactively contaminated person to an offsite medical facility for treatment.

Grade: SAT UNSAT GRADE X Standards: Applicant correctly determines the NRC Reporting Requirement for the event is as follows:

Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> via ENS (10CFR50.72(b)(3))

Grade: SAT UNSAT GRADE Standards : Applicant correctly determines the State

. ,

.--/ posture code for the event is an Echo Page 7 of 12

PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision: 0

--' Task Title: Notifications and Reportability.

Grade: SAT UNSAT GRADE X Standards: Applicant correctly determines the State Reporting Requirement for the event is as follows:

"Within Ihour of report to NRC" (State Reg. 22a-135-1)

Grade: SAT UNSAT or this Event, Attach

, 2 ahd 3 to reference in The Applicant should revi r applicability.

--i STEP 8 Performance Step: Refer To Attachment 15 for additional RAC 14, Att 7 NOTE I notifications.

GRADE Standards: Applicant reviews NOTE 1 and refers to Attachment 15.

Grade: SAT UNSAT GRADE Standards: Applicant determines the following additional notifications are required for Transport of Contaminated Injured Person:

Refer To C OP 200.3, "Response to Medical Emergencies" (ContAnjured Person Off-site)

Required:

a. Site Fire Protection personnel (EMTs)
b. Health Physics Technician
c. Security Shift Supervisor
d. Waterford Ambulance (911)
e. Lawrence and Memorial Hospital List
f. Middlesex Hospital List (Alternate)

Page 8 of 12

PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision: 0

-

' Task Title: Notifications and Reportability.

Grade: SAT UNSAT STEP 9 Performance Step: In the event of an incident involving a RAC 14, Att 7 NOTE 2 fatality or serious injury, off-site release or contamination, and for planned excercise, a

telephone notification within one (1) hour to American Nuclear Insurers (9-561-3433) is warranted.

GRADE Standards: Applicant reviews NOTE 2 and determines it applies.

Grade: SAT UNSAT GRADE Standards: Applicant directs the SDO to notify ANI of d

the event or the applicant initiates the call.

Grade: SAT UNSAT STEP 10 Performance Step: Follow-up notification. Telephone RAC 14,Att 7 NOTE 3 notifications made for non-emergency one (I), four (4), eight (8), and 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> events will require follow-up notifications .....

GRADE Standards: Applicant reviews NOTE 3 and determines that follow-up notifications may be required.

Grade: SAT UNSAT STEP 11 Performance Step: IF required, Refer To and PERFORM RAC 14, step 4.1.1.k Sectio n 4.7, Radiopager Not ific at io ns ."

'I

.d GRADE Standards: Applicant refers to section 4.7 Page 9 of 12

PERFORMANCE INFORMATION JPM Number: NRC SRO A.1.2 Revision: 0 LJ Task Title: Notifications and ReDortabilitv.

Grade: SAT UNSAT Stop Time:

Page I O of 12

VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.I.2 Revision: 0

-*.

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, & critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

--- Actual Time to Complete (minutes):

Result of JPM: (S for satisfactory, U for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement :

Page11 of 22

STUDENT HANDOUT JPM Number: NRC SRO A.1.2

\.-

Initial Conditions: The plant is at 100% power, and you are the Extra Senior Licensed Operator on shift. 10 minutes ago, a maintenance technician was injured while working in a contaminated area in the Waste Disposal Building. The work area has been placed in a safe condition. The workers injuries are severe and treatment is required at Lawrence and Memorial hospital. The worker is also contaminated. The worker is stabilized, ready for transport and the ambulance is enroute.

Initiatinq Cues: The SM has directed you to determine the NRC and State reporting requirements associated with this event.

Page 12 of 12

JOB PERFORMANCE MEASURE APPROVAL SHEET

',d I. JPM Title: Response to Door Inoperability.

JPM ID Number: NRC SRO A.2 Revision: 0 II. Initiated:

Developer / Date I I I. Reviewed:

Technical Reviewer Date IV. Approved:

N/A Cognizant Plant Supervisor (optional) Date Nuclear f raining Supervisor Date Page 1 of 14

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

..L.". I Date I ChgIRev 1 Description Page 2 of 14

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 ii JPM ID Number: NRC SRO A.2 Revision: 0 Task Title: Response to Door Inoperability.

System: NIA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 20 Task Number(s): 341-01-014 Applicable To: SRO X RO PEO WA Number: 2.2.21 WA Rating: 2.3 13.5 Method of Testinq: Simulated Performance: Actual Performance: X

---Location: Classroom: X Simulator: In-Plant:

Task Standards: Correctly determine the required actions for an INOPERABLE MP3 door.

Required Materials: OP 3261, Response to Door lnoperability General

References:

Unit 3 Technical Specifications, Technical Requirements

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of 14

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC SRO A.2 Revision: 0

  • d Simulator Requirements: None initial Conditions: The plant is at 100 % power and you are the Work Control SRO on shift. An emergent repair is required on the A RPCCW Heat Exchanger. Maintenance requires door A-24-4 be blocked open and have its center post removed, to move in equipment and scaffolding.

Initiating Cues: You are asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the SM.

        • NOTES TO EVALUATOR ****

I. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).

>

-

Page 4 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0 d

Task Title: Response to Door lnoperability Start Time:

STEP 1 Performance Step: Obtains copy of OP 3261 Response to Door Inoperability.

GRADE Standards: Obtains proper procedure.

Grade: SAT UNSAT STEP 2 X Performance Step: Refer To Attachment 2, Unit 3 Door OP 3261, step 1.1 Attributes, and DETERMINE applicable attributes to door in question.

GRADE X Standards: Applicant refers to Attachment 2 and determines that for door A-24-4, the following attributes apply:

0 TRM Fire Door L- Locked TRM Fire Door 0 SLCRSDoor Radiation Door Grade: SAT UNSAT STEP 3 Performance Step: For doors listed as Dual Train Protected OP 3261, step I.2 Door, both trains are potentially impacted.

A door with a D attribute will also have one or more other attributes. IF the compensatory actions of this procedure for the other attributes are met, train separation is not an issue . ..

GRADE Standards: Applicant recognizes that door A-24-4 is NOT a Dual Train Protection Door, and moves on to OP 3261, step 1.3.

Grade: SAT UNSAT Page 5 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0

'.W'.

Task Title: Response to Door lnoperability STEP 4 X Performance Step: IF one of the following types of doors is OP 3261, step 1.3.1 not capable of performing its intended function, PERFORM the specified actions:

IF door is a "TRM Related Fire Door,"

PERFORM the following:

0 Refer To TRM 3.7.13, "Fire Protection Systems, Fire Rated Assemblies," and PERFORM applicable actions.

0 Refer To the Shift Turnover Log and RECORD door status.

NOTIFY the Site Fire Protection Department.

GRADE X Standards: Applicant recognizes that door A-24-4 is a TRM Related Fire Door and obtains and refers to TRM 3.7.13, "Fire Protection Systems, Fire Rated Assemblies,"

Grade: SAT UNSAT GRADE X Standards: Recognizes that TRM 3.7.13 applies and it will be necessary to enter LCO 3.7.13, ACTION a. (1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowed outage time)

Grade: SAT UNSAT GRADE Standards: Applicant logs in a rough log or otherwise states that door A-24-4 will be blocked open and needs to be recorded in the Shift Turnover Log.

E Grade: SAT UNSAT GRADE Standards: Applicant notifies Site Fire Protection Department that door A-24-4 will be

--4 blocked open. Telephone call is adequate for this notification.

Page 6 of 14

PERFORMANCE NFORMATION JPM Number: NRC SRO A.2 Revision: 0

-LY Task Title: Response to Door lnoperability Grade: SAT UNSAT STEP 5 Performance Step: IF door is a Locked TRM Related Fire OP 3261, step 1.3.2 Door, PERFORM the following:

0 Refer To TRM 3.7.1 3, Fire Protection Systems, Fire Rated Assemblies, and PERFORM applicable actions.

0 Refer To the Shift Turnover Log and RECORD door status.

IF the only action performed is to unlock door to provide temporary access . ...

0 NOTIFY the Site Fire Protection Department.

GRADE Standards: Applicant recognizes door A-24-4 is a Locked TRM Related Fire Door, and that the door will NOT be just unlocked door to provide temporary access. Also recognizes that the other actions specified are redundant to the previous step.

Grade: SAT UNSAT STEP 6 Performance Step: IF door is a non-TRM fire door, NOTIFY OP 3261, step 1.3.3 the Site Fire Protection Department.

GRADE Standards: Applicant recognizes that door A-24-4 is not a non-TRM Fire Door and moves on to OP 3261, step 1.3.4.

Grade: SAT UNSAT Page 7 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0 d

Task Title: ResDonse to Door InoPerabilitv STEP 7 X Performance Step: IF door is a SLCRS door, PERFORM the OP 3261, step 1.3.4 following:

a. Refer To T/S 3.6.6.2, Containment Systems Secondary Conta inment ,

and PERFORM applicable actions.

b. Refer To the Shift Turnover Log and RECORD door status.
c. IF SLCRS door A-24-6 is inoperable AND crediting stairwell boundaries is desired, Refer To Attachment 3 and PERFORM listed actions to credit alternate barriers.
d. IF alternate barriers are successfully credited, Refer To T/S 3.6.6.2 , IContainment Systems Secondary Containment, for continued applicability and actions.

, GRADE X Standards: Applicant recognizes that door A-24-4 is a

.d SLCRS Door and obtains and refers to T/S 3.6.6.2, Containment Systems Secondary Containment.

Grade: SAT UNSAT GRADE X Standards: Recognizes that TIS 3.6.6.2 applies and it will be necessary to enter the LCO 3.6.6.2 ACTION. (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> allowed outage time)

Grade: SAT UNSAT GRADE Standards: Applicant recognizes that aIternate SLCRS barriers apply only to door A-24-6 and moves on to OP 3261, step 1.3.5.

Grade: SAT UNSAT STEP 8 Performance Step: IF door is a Control Room habitability OP 3261, step 1.3.5 door, PERFORM the following:

U GRADE Standards : Applicant recognizes that door A-24-4 is Page 8 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0 i-/

Task Title: Response to Door lnoperability not a Control Room habitability door and moves on to OP 3261, step 1.3.6.

Grade: SAT UNSAT STEP 9 Performance Step: IF door is a COz boundary door, OP 3261 step 1.3.6 PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a C02 boundary door and moves on to OP 3261, step 1.3.7.

Grade: SAT UNSAT STEP 10 Performance Step: IF door is,a water and flooding boundary OP 3261 step 1.3.7 door, PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a water and flooding boundary door and moves on to OP 3261, step 1.3.8.

Grade: SAT UNSAT STEP I1 Performance Step: IF door is a high energy line break OP 3261, step 1.3.8 boundary door (HELB), PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a HELB boundary door and moves on to OP 3261, step 1.3.9.

Grade: SAT UNSAT Page 9 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0

  • -4 Task Title: Response to Door lnoperability STEP 12 Performance Step: IF door is a PRA HELB boundary door OP 3261, step 1.3.9 AND IF in MODES 1 through 4, PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a PRA HELB boundary door and moves on to OP 3261, step 1.3.10.

Grade: SAT UNSAT STEP 13 Performance Step: IF door is a tornado door ....

OP 3261, step 1.3.10 GRADE Standards: Applicant recognizes that door A-24-4 is not a tornado door and moves on to OP 3261, step 1.3.1 1.

Grade: SAT UNSAT STEP 14 X Performance Step: IF door is a radiation boundary door, AND OP 3261, step I.3.11 door is damaged OR to be removed for any reason, NOTIFY Health Physics Department.

GRADE X Standards: Applicant recognizes that door A-24-4 is a radiation boundary door and notifies Health Physics Department that door A-24-4 will be blocked open. Telephone call is adequate for this notification.'

Grade: SAT UNSAT Page 10 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0 L-1 Task Title: Response to Door lnoperability STEP 15 Performance Step: IF door is a security door, PERFORM the OP 3261, step 1.3.12 following:

a. Refer To Attachme.nt 1 for list of security door number cross references.
b. NOTIFY Security Department of problems with doors or expected maintenance.

GRADE Standards: Applicant recognizes that door A-24-4 is a security door and refers to Attachment 1 that the security door number is 306.

Grade: SAT UNSAT GRADE Standards: Applicant notifies Security Department that door 306 will be blocked open. Telephone call is adequate for this notification.

CUE:

Grade: SAT UNSAT STEP 16 Performance Step: IF door is a Fuel Building Integrity OP 3261, step I.3.13 Boundary door PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a Fuel Building Integrity Boundary door and moves on to OP 3261 step 1.3.14.

Grade: SAT UNSAT STEP 17 Performance Step: IF door is a Halon Door, PERFORM the OP 3261, step 1.3.14 following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a Halon Door and moves on to OP

--

3261 step 1.3.15.

I Page 11 of 14

PERFORMANCE INFORMATION JPM Number: NRC SRO A.2 Revision: 0

'-u; Task Title: Response to Door lnoperability Grade: SAT UNSAT STEP 18 Performance Step: IF door is a "Technical Support Center OP 3261, step 1.3.15 Habitability Door," PERFORM the following:

GRADE Standards: Applicant recognizes that door A-24-4 is not a Technical Support Center Habitability Door.

Grade: SAT UNSAT STEP I9 Performance Step: Applicant Reports Task Completion.

GRADE Standards: Applicant reports to the SM that the required compensatory actions necessary

.L/'

to take door A-24-4 out of service have been determined.

Stop Time:

Page 12 of 14

VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.2 Revision: 0

.-d Date Performed:

Student:

Evaluator:

~

For the student to achieve a satisfactory grade, & J critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

.--- Actual Time to Complete (minutes):

Result of JPM: (S for satisfactory, U for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page 13 of 14

STUDENT HANDOUT JPM Number: NRC SRO

.-..-j A.2 Initial Conditions: The plant is at I 0 0 % power and you are the Work Control SRO on shift. An emergent repair is required on the A RPCCW Heat Exchanger. Maintenance requires door A 4 be blocked open and have its center post removed, to move in equipment and scaffolding.

Initiatinq Cues: Youare asked to determine any compensatory actions necessary before blocking open door A-24-4, and then to brief the S M .

Page 14 of 14

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET d I. JPM Title: Review and Approve a Radioactive Liquid Waste Discharge Permit JPM ID Number: NRC SRO A.3 Revision: 0 chg 1 II. Initiated:

Steve Jackson 11/01/01 Developer Date I II. Reviewed:

Ray Martin 11/15/01 Technical Reviewer Date IV. Approved:

\

Cognizant Plant Supervisor (optional) Date

-0,

-

Nuclear Training Supervisor

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET

SUMMARY

OF CHANGE(S)

Date ChglRev Description 1/19/07 0 chg 1 Revised JPM to update to revision 018 to OP 3335D, Radioactive Liquid Waste System. DLM 2 of 7

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 i_/'

JPM ID Number: NRC SRO A.3 Revision: 0 chg 1 Task Title: Review and Approve a Radioactive Liquid Waste Discharge Permit System: Radioactive Liquid Waste System Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): I O Task Number(s): 068-01-064, Discharge the contents of a Low Level Waste Drain Tank 068-03-001, Adhere to the requirements of the Radwaste Management Program Applicable To: SRO X RO PEO WA Number: GEN- 2.3.6 WA Rating: 2.1/3.1


.- Method of Testing: Simulated Performance: X Actual Performance: X Location: Classroom: In-Plant: - X Simulator: X Task Standards: Review and Approve a Radioactive Liquid Waste Discharge Permit Required Materials: OP 3335D,Radioactive Liquid Waste System Liquid Discharge Permit Screen Print of Rad Monitor LWS70-I General

References:

None

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC SRO A.3 Revision: 0 chg 1

--J Simulator Requirements: None initial Conditions: The unit is at 100% power with all systems in normal line-ups.

The Aand B Service Water pumps and all Circulating Water pumps are running.

Initiating Cues: The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the AWaste Test Tank to the Circulating Water discharge tunnel for your approval.

Review and approve the permit and report to the examiner when complete.

f

        • NOTES TO EVALUATOR****

I. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

-- The students performance is graded by an S for satisfactory or a UJ unsatisfactory on each step.

for

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).

PERFORMANCE INFORMATION JPM Number: SRO A.3 Revision: 0 chg 1 Ll' Task Title: Review and Approve a Radioactive Liquid Waste Discharge Permit Start Time:

STEP 1 X Performance Step: Go to the correct procedure step, OP3335D, Section 4.21.5.i.

GRADE X Standards: Locates the correct procedure step.

Candidate may review previous steps.

Grade: SAT UNSAT STEP 2 X Performance Step: PERFORM Independent Verification of liquid effluent monitor alarm and alert settings. [step 4.21.5.i.l)J v' GRADE X Standards: Locates liquid effluent monitor alarm and alert settings on Liquid Discharge Permit.

GRADE X Standards: Locates liquid effluent monitor alarm and alert current settings on RMS Console.

Comments: Since this JPM is done in a classroom setting the RMS Console is not available. When candidate requests information and specifies that he would access the RMS screen for LWS70-1, Liquid Waste discharge process radiation monitor, exercise t h e cue.

GRADE X Standards: Compares permit settings and RMS information and identifies that RMS is incorrect. Recommends changing

'u' RMS to match the permit.

Initials permit after receiving the cue.

50f7

PERFORMANCE INFORMATION JPM Number: SRO A.3 Revision: 0 chg 1 L2 Task Title: Review and Approve a Radioactive Liquid Waste Discharge Permit Grade: . SAT UNSAT STEP 3 X Performance Step: Refer to CHEM Form 38OOP-001and CHECK EST Activity this Discharge (Ci) on Liquid Discharge Permit is less than action level specified. [step 4.21.5.i.2)]

GRADE X Standards: COMPARE CHEM Form 38OOP-001 and CHECK EST Activity this Discharge (Ci) to Discharge permit Estimated activity this discharge (Ci).

Determines that values are below the limits. Initials permit.

Grade: SAT UNSAT STEP 4 X Performance Step: CHECK required dilution flowrate is met. [step 4.21.5.i.4)]

GRADE X Standards: COMPARES permit requirement of 2 SWP and 3 CWP to actual plant condition of 2 SWP and 6 CWP.

Determines that dilution flow is met.

Initials permit.

Grade: SAT UNSAT Termination Cue: The Evaluation of this JPM is Complete Stop Time:

L.2 6 of 7

VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.3 Revision: 0 chg 1

.e Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

--i Actual Time to Complete (minutes):

Result of JPM: (Sfor satisfactory, U for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

STUDENT HANDOUT JPM Number: SRO A.3 initial Conditions: The unit is at 100% power with all systems in normal line-ups. The A and B Service Water pumps and all Circulating Water pumps are running.

initiating Cues: The Radwaste PEO has presented OP 3335D sign off copy and a Liquid Discharge Permit for discharging the A Waste Test Tank to the Circulating Water discharge tunnel for your approval. Review and approve the permit and report to the examiner when complete.

--e-

.--.-/

JOB PERFORMANCE MEASURE APPROVAL SHEET I. JPM Title: Emergency Plan Classification for General Emergency JPM ID Number: NRC SRO A.4 Revision: 0 chg 1

11. Initiated:

Paul Malzahn 8/3 1/05 Developer Date 111. Reviewed:

.

-..

, Barry Pinkowitz 813 1/05 Technical Reviewer Date IV. Approved:

T. Butler 8/31I05 Cognizant Plant Supervisor (optional) Date Tim Kulterman 813 I/05 Nuclear Training Supervisor Date Page 1 of I O

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

Date Chg/Rev Description 1/8/07 Rev 0 Revised JPM to correspond to the standard NTP format. DLM I chg 1 I 1

=

--

.

-

Page 2 of I O

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3

.w JPM ID Number: NRC SRO A.4 Revision: 0 chg 1 Task Title: Emergency Plan Classification for General Emergency System: NIA Time CriticalTask: ( X ) YES ( ) NO Validated Time (minutes): 30 Task Number(s): 301-05-366, 301-05-449 Applicable To: SRO X RO PEO WA Number: 2.4.41 KIA Rating: 4.1 / 2.3 2.4.44 4.0 12.1 Method of Testing: Simulated Performance: Actual Pedormance: X Location: . Classroom: X Simulator: In-Plant:

u Task Standards: 0 Determine the EAL and State Posture Code 0 Determine the minimum required PAR Required MP-26-EPI-FAP06-003, MILLSTONE UNIT 3 EMERGENCY ACTION LEVELS Materials: MP-26-EPI-FAP-01-001, CONTROL ROOM DIRECTOR OF STATION EMERGENCY OPERATION (CR DSEO)

MP-26-EPI-FAPOG, CLASSIFICATION AND PARS MP-26-EPI-FAP06-005, CONTROL ROOM PROTECTIVE ACTION RECOMMENDATIONS MP-26-EPI-FAP-07-001, NUCLEAR INCIDENT REPORT FORM (IRF)

General

References:

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of 10

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC SRO A.4 Revision: 0 cha I

~.u Simulator Requirements: None Initial You are the Shift Manager at Millstone. The time is 02:45. The plant has Conditions: been on-line for 200 days. The A RHR pump is tagged out for an oil change. All other major plant equipment is in service.

The following events occur:

1. (0245) A severe earthquake (0.1Og ZPA) occurs.
2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure.

The B RHR pump does not start; all other ESF equipment operates normaI ly.

3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs.
4. (0255) The following plant conditions exist:

RCS Subcooling is O°F RMS*REOQA/O5A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19%

.v - The current wind speed is five (5) miles per hour. The current wind direction is from 040 and into 220.

Initiating Cues: DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATIONS.

This is a time critical task.

ARE THERE ANY QUESTIONS? YOU MAY BEGIN.

.W

        • NOTES TO EVALUATOR****

Page4 of 10

JOB PERFORMANCE MEASURE GUIDE (Continued)

1. Critical steps for this JPM are indicated by an Xafter the step number. For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read t h e appropriate Cue.
3. If necessary, question the student for details of simulated actiondobservations (i.e. What are you looking at? or What are you observing?).

Page 5 of 10

PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision: 0 chg 1

'uTask

' Title:

Emergency Plan Classification for General Emergency Start Time:

STEP 1 Performance Step: Obtain Proper procedure.

GRADE Standards: Applicant obtains or requests copy of MP-26-EPI-FAP06-003, MP3 Emergency Action Levels.

Evaluator NOTE: Applicant may also request copies of:

0 MP-26-EPI-FAP-01-001,CR-DSEO Checklist MP-26-EPI-FAPO6, Classification and PARS MP-26-EPI-FAP06-005, CR PARS MP-26-EPI-FAP07, Notifications & Comms 0 MP-26-EPI-FAP07-001,Incident Report Form The CR DSEO Notebook contains all these procedures.

Grade: SAT UNSAT

  • _-- STEP 2 X Performance Step: Classify the Event.

GRADE X Standards: Applicant recognizes a potential loss of the Fuel Clad Barrier, based on RVLMS 1.

19% (plenum) (FCB4).

Grade: SAT UNSAT GRADE X Standards: Applicant recognizes a loss of the RCS Barrier based on RCS Subcooling < 32OF Due to RCS Leak (RCB2).

Grade: SAT UNSAT GRADE X Standards: Applicant recognizes a loss of the CTMT Barrier based on No CTMT Pressure Increase when Expectation exists. (CNB3)

Grade: SAT UNSAT GRADE X Standards: Applicant reviews MP-26-EPI-FAP06-003 Page 6 of 10

PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision: 0 chg 1

.

-l Task Title: Emergency Plan Classification for General Emergency and determines that a NRC EAL of GENERAL EMERGENCY, BGI exists.

Fuel Clad Barrier (P), RCS Barrier (L) and CTMT Barrier (L)

Grade: SAT UNSAT STEP 3 X Performance Step: Determine State Posture Code GRADE X Standards: Applicant reviews MP-26-EPI-FAP06-003 and determines that the block for BGI is the same color as State Posture ALPHA Evaluator NOTE: Tables are color coded to reflect the State Posture.

Grade: SAT UNSAT NOTE: Record the ti classificatiori ie

--

STEP 4 X Performance Step: Determine the State Protective Action Recommendation GRADE Standards: Applicant uses MP-26-EPI-FAP06-005, Section B, Control Room PAR Process Flowchart. to determine the PAR.

Grade: SAT UNSAT GRADE X Standards: Reviews flowchart and diagnoses that all 3 barriers are NOT lost and transitions over to CTMT Radiation Grade: SAT UNSAT GRADE X Standards: Reviews flowchart and determines that CTMT radiation does NOT exceed Table 1 values. Transitions over to 5 Mile Doses Grade: SAT UNSAT

-L+

GRADE X Standards: Reviews flowchart and determines that 5 Page 7 of 10

PERFORMANCE INFORMATION JPM Number: NRC SRO A.4 Revision: 0 chg 1

'.-,,/

Task Title: Emergency Plan Classification for General Emergency Mile Doses do NOT exceed Table 2 values.

Evaluator NOTE: When applicant requests dose projections, Provide the followina cue:

Grade: SAT UNSAT GRADE X Standards: Applicant indicates the minimum required PAR is to evacuate a 5 mile radius. (The IRF will serve as the necessary PAR notification to the state so no additional DEP communication is required.)

Grade: SAT UNSAT CUE: The evaluation for this JPM is Page 8 of 10

VERIFICATION OF JPM COMPLETION JPM Number: NRC SRO A.4 Revision: 0 chg I i/

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

i Time Critical Task? YES X NO Validated Time (minutes): 30 i-Actual Time to Complete (minutes):

Result of JPM: (Sfor satisfactory, U for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page 9 of I O

STUDENT HANDOUT

-4 JPM Number: NRC SRO A.4 Initial Conditions: You are the Shift Manager at Millstone. The time is 02:45. The plant has been on-line for 200 days. The A RHR pump is tagged out for an oil change. All other-majorplant equipment is in service.

The foflowing events occur:

I.(0245) A severe earthquake (0.1Og ZPA) occurs.

2. (0246) Reactor trip and Safety Injection on low Pressurizer pressure. The B RHR pump does not start; all other ESF equipment operates normally.
3. (0247) The RO reports RCS pressure is 65 psia and stops all RCPs.
4. (0255) The following plant conditions exist:

RCS Subcooling is O°F RMS*RE04A/05A read 4 R/hr, as confirmed by RMS*RE41/42 Containment Pressure is 15 psia RVLMS (Plenum) is 19%

The current wind speed is five (5) miles per hour. The current wind direction is from 040 and into 220.

Initiatinq Cues: DETERMINE THE APPLICABLE EMERGENCY ACTION LEVEL AND MAKE ANY APPROPRIATE PROTECTIVE ACTION RECOMMENDATION.

This is a timecriticaltask.

Page 10 of 10

JOB PERFORMANCE MEASURE APPROVAL SHEET d I. JPM Title: Determine the maximum rate of power increase and control rod withdrawal restrictions.

JPM ID Number: NRC RO A . l . l Revision: 0 chg 1 II. Initiated:

Nuclear Regulatory Commission 12 May 2004 Developer Date II I. Reviewed:

m& /

1 2 4/7 Technical Reviewer Date IV. Approved:

N/A Cognizant Plant Supervisor (optional) Date

____ - -

- (;hbfi.

Nuclear Training Supervisor Page 1 of 9

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

-~

'd' Date ChglRev Description 1/3/06 0 chg 1 Revised JPM to correspond to the standard NTP format. Made minor modifications to the initial conditions and initiatina cue for claritv. DLM Page 2 of 9

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 V

JPM ID Number: NRC RO A.I.l Revision: 0 chg 1 Task Title: Determine the maximum rate of power increase and control rod withdrawal restrictions.

System: NA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 15 Task Number(s):

Applicable To: SRO X RO X PEO WA Number: 2.1.25 WA Rating: 3.1 / 2.8 Method of Testinq: Simulated Performance: Actual Performance: X Location: Classroom: X Simulator: In-Plant:

..


Task Standards: Applicant recognizes the Fuel Condition Category as Partially Conditioned up to power level, P, of 80% and rod position, N, of 218 steps on CBD.

Applicant correctly identifies the following limits:

+ 10% per hour to power level Pwhere P=80%.

+ 4% over any 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> period, 7% over any 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> period, 10% over any 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> period to achieve a nominal 3% full power per hour rate, and

+ Control Rod Withdrawal restricted to 3 steps per hour above 218 steps on CBD.

Applicant correctly applies the limits to determine that schedule adherence is possible without exceeding authorized fuel condition load increase restrictions.

Required Materials: Operating Procedure OP 3204, At Power Operations.

Attachment 4 of OP 3204 General

References:

Operating Procedure OP 3204, At Power Operations.

      • READ TO THE CANDIDATE***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of 9

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC RO A.l.l Revision: 0 chg 1 i-c.

Simulator Requirements: None Initial You are the Reactor Operator currently on shift. The plant has recently Conditions: completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004.

On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50% power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50%

power with CBD at 218 steps.

Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete. The plant is ready to begin its return to full power.

According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours.

Initiating Cues: Based on fuel conditioning, determine whether the plant can achieve

.----

. 100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.

ARE THERE ANY QUESTIONS?

YOU MAY BEGIN.

        • NOTESTO EVALUATOR ****
1. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (i.e. What are you looking at? or What are you observing?).

Page 4 of 9

PERFORMANCE INFORMATION JPM Number: NRC RO A.I.1 Revision: 0 chg 1

.ij

.Task Title: Determine the maximum rate of power increase Start Time:

STEP 1 Performance Step: Applicant obtaindrequests a copy of OP 3204, At Power Operation.

GRADE Standards: Obtains OP 3204.

Grade: SAT UNSAT STEP 2 Performance Step: NA Standards: Applicant reviews the initial conditions to determine recent power history Grade: SAT UNSAT STEP 3 Performance Step: Determine the correct attachment to determine load increase restrictions based on fuel condition.

GRADE Standards: Applicant finds and refers to Attachment 4, Fuel Condition Load Increase Restrictions.

Grade: SAT UNSAT STEP 4 X Performance Step: Determine Fuel Condition category.

GRADE X Standards: Applicant recognizes that the Fuel Condition Category is Partially Conditioned.

Grade: SAT UNSAT Page 5 of 9

PERFORMANCE INFORMATION JPM Number: NRC RO A . l . l Revision: 0 chg 1

\---,

Task Title: Determine the maximum rate of power increase STEP 5 X Performance Step: Determine Applicable Range of Power Level GRADE Standards: Applicant determines that the Applicable Range of Power change for current plant conditions is 50% to 100% power.

GRADE X Standards: Applicant correctly determines that the plant has been at 80% power (P) and CBD at 218 steps (N) for at least 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

Grade: SAT UNSAT STEP 6 X Performance Step: Determine Maximum Rate of Power Increase.

GRADE X Standards: Applicant recognizes the maximum rate of power increase as unlimited to 80% and

.+

3% per hour to 100%.

Grade: SAT UNSAT STEP 7 X Performance Step: Determine Time Required for the Power Ascension.

GRADE X Standards: Applicant applies the identified limits to determine the following times:

0 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> to raise power 30% (from 50% to 80%).

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 40 minutes to raise power 20% (from 80% to 100%).

0 Total time = 9 hour1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />s: 40 minutes.

NO Page 6 of 9

PERFORMANCE INFORMATION JPM Number: NRC RO A . l . l Revision: 0 chg I LJ Task Title: Determine the maximum rate of power increase Grade: SAT UNSAT STEP 8 X Performance Step: Determine If 100% Power Can Be Reached By Shift End.

GRADE X Standards: Applicant recognizes and reports that there are 10 hours1.157407e-4 days <br />0.00278 hours <br />1.653439e-5 weeks <br />3.805e-6 months <br /> scheduled to complete the power ascension and based on fuel conditioning alone, it is possible to reach full power by 18:OO (or similar words).

Grade: SAT UNSAT Stop Time:

Page 7 of 9

VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A . l . l Revision: 0 chg I bi Date Performed:

Student:

Evaluator:

~

For the student to achieve a satisfactory grade, critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): IO L-1 Actual Time to Complete (minutes):

Result of JPM: (S for satisfactory, U for unsatisfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page 8 of 9

STUDENT HANDOUT JPM Number: NRC RO A.I.1 L.---,'

Initial Conditions: You are the Reactor Operator currently on shift. The plant has recently completed a refueling outage and subsequent plant startup, which started on Monday, 12 July 2004.

On Wednesday, 14 July 2004 at 09:00, the plant reached 80% reactor power with CBD at 218 steps. The plant remained at 80% power until Saturday, 17 July 2004 at 13:OO when a Turbine Driven Feedwater Pump malfunctioned and had to be shutdown for repairs. The plant reached 50%

power on Saturday, 17 July 2004 at 19:30. Since then the plant has been operating steady at 50% power with CBD at 218 steps.

Now the time is Wednesday, 21 July 2004 at 08:OO hours. Turbine Driven Feedwater Pump repairs and testing are complete. The plant is ready to begin its return to full power.

According to the current schedule, the plant should be at full (100%) power by the end of shift today, Wednesday, 21 July 2004 at 18:OO hours.

L-Initiatinq Cues: Based on fuel conditioning, determine whether the plant can achieve 100% power by the end of shift without exceeding any maneuvering limits. Assume that control rods will remain at CBD step 218 throughout the power ascension and that the power ascension begins immediately.

Page 9 of 9

JOB PERFORMANCE MEASURE APPROVAL SHEET I

I. JPM Title: Determine the Required Boration Time and Final Control Rod Height d For a Rapid Downpower.

JPM ID Number: NRC RO A.1.2 Revision: 0 II. Initiated:

D. Minnich 1/3/06 Developer Date III. Reviewed:

Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date a&*-

Nuclear Training Supervisor Date Page 1 of 10

!

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

.+= Date I I

Chg/Rev II Description I

I

--,/-

Page 2 of 10

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3

  • --

JPM ID Number: NRC RO A.1.2 Revision: 0 Task Title: Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.

System: NA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): IO Task Number(s): 009-01-004 Applicable To: SRO X RO X PEO WA Number: 2.1 2 0 KIA Rating: 4.3 / 4.2 Method of Testing: Simulated Performance: Act uaI Petformance : X

.

---Location:

.

Classroom: X Simulator: In-Plant:

Task Standards: Correctly Determine the Required Boration Time and Final Control Rod Height For a Rapid Downpower.

Required Materials: AOP 3575, Rapid Downpower, and Cycle 11 End of Life RE Curve and Data Book with the January 2007 Monthly Reactivity Data Sheet General

References:

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of 10

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC RO A. 1.2 Revision: 0 u

Simulator Requirements: None Initial Conditions: The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 Mwe (I200 to 720 Mwe).

Initiating Cues: The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower. Use the Cycle 1IEnd of Life RE Curve and Data Book, and use curves when possible.

        • NOTES TO EVALUATOR ****
1. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/obsetvations (i.e. What are you looking at? or What are you observing?).

Page 4 of 10

PERFORMANCE INFORMATION JPM Number: NRC RO A.1.2 Revision: 0 4~ Task Title: Determine Boration Time / Final Control Rod Height For Rapid Downpower.

Start Time:

STEP 1 Performance Step: Obtain proper Abnormal Operating Procedure and Curve Book.

GRADE Standards: Applicant obtains a copy of AOP 3575, Rapid Downpower and MP3 Cycle 11 EOL RE Curve and Data Book.

Grade: SAT UNSAT STEP 2 X Performance Step: Determine required boration time.

AOP 3575 Step 5.j GRADE X Standards: Applicant correctly determines the total power change:

0 480 Mwe / I 2 Mwe per % power = 40%

Evaluator NOTE: The applicant may question the US what to assume for a boration flowrate.

GRADE X Standa rds : Applicant correctly determines the required boration time using the following formula:

Total Power Change (%) x 15 = Time (min)

BA Ffow Rate

[40% X I51 / 80 gpm = 7.5 minutes Grade: SAT UNSAT STEP 3 X Performance Step: Determine the total power defect associated with the 40% power change.

GRADE X Standards: Applicant refers to the Total Power Defect I

vs Percent Power curves (RE-E-01)

Page 5 of 10

PERFORMANCE INFORMATION JPM Number: NRC RO A.1.2 Revision: 0 Task Title: Determine Boration Time / Final Control Rod Height For Rapid Downpower.

GRADE - X Standards: Applicant selects the 300 ppm curve and determines the power defect associated with a power change from 100% to 60%

power.

-2800 - (-1725) = 1075 pcm Grade: SAT UNSAT STEP 4 - X Performance Step: Determine boron concentration change associated with the boration.

GRADE X Standards: Applicant calculates the volume of boric acid added:

11 0 Power Change (%) x 15 = 600 gal GRADE X Standards: Applicant refers to the monthly reactivity data sheet for the guideline value for Gallons boric acid per ppm RCS (B) increase (9.1 gal BA / ppm) and calculates RCS boron concentration change:

0 600 gal / 9.1 gal per ppm ..66 ppm Grade: SAT UNSAT STEP 5 X Performance Step: Determine the negative reactivity added as a result of the boration.

GRADE X Standards: Applicant refers to the Differential Boron Worth vs Burnup curves (RE-F-02).

GRADE X Standards: Applicant selects the HFP DBW curve and determines differential boron worth for

--J 17,000 MWD/MTU.

- 6.96 pcm / ppm Page 6 of 10

PERFORMANCE INFORMATION JPM Number: NRC RO A. 1.2 Revision: 0 iJ Task Title: Determine Boration Time / Final Control Rod Height For Rapid Downpower.

GRADE - X Standards: Applicant calculates the negative reactivity added:

0 66 ppm x (- 6.96 pcm / ppm) 459 -

Pcm Grade: SAT UNSAT STEP 6 X Performance Step: Determine the negative reactivity added as a result of rod insertion.

GRADE X Standards: Applicant calculates the negative reactivity due to rod insertion by subtracting the reactivity change due to boron from the reactivity change for total power defect:

L.1 1075 pcm - 459 pcm = 616 pcrn Grade: SAT UNSAT STEP 7 X Performance Step: Determine the predicted final control rod height.

GRADE X Standards: Applicant refers to the Integral Rod Worth versus Steps Withdrawn curve for control banks D and C in overlap, EOL, HFP, equilibrium Xe (RE-D-02).

GRADE X Standards: Applicant determines the predicted final control rod height for an integral rod worth of 616 pcm:

0 CB D at 90 steps Eva Grade: SAT UNSAT Page 7 of 10

PERFORMANCE INFORMATION JPM Number: NRC RO A.1.2 R visi n: 0 L-= Task Title: Determine Boration Time / Final Control Rod Height For Rapid Downpower.

STEP 8 Performance Step: Applicant Reports Task Completion.

GRADE Standards: Applicant reports to the US that the required boration time and final control rod height has been determined.

Stop Time:

Page 8 of 10

VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.1.2 Revision: 0 iJ Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, ALL critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): IO

.---, Actual Time to Complete (minutes):

Result of JPM: (I S f or sati sfactory, U for unsat isfactory)

Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page9 of 10

STUDENT HANDOUT JPM Number: NRC RO A.I.2 LJ Initial Conditions: The plant is at 100% power, core burnup is 17,000 MWD / MTU and current boron concentration is 300 ppm. You are the Extra Licensed Operator on shift. CONVEX has requested MP3 conduct an emergency load reduction of 480 MWe (1200 to 720 MWe).

Initiating Cues: The US has directed you to calculate the required boration time in accordance with AOP 3575. Assume a boration flowrate of 80 gpm. You are also directed to determine the final control rod height for the rapid downpower. Use the Cycle 11 End of Life RE Curve and Data Book, and use curves when possible.

Page 10 of 10

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET d I. JPM Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

JPM ID Number: NRC RO Revision 0 chg 1 A.2 II. Initiated:

Steve Jackson 10/31/01 Developer Date Ill. Reviewed:

Ray Martin 11/15/01 Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date Nuclear Training Supkrvisor 1 of6

JOB PERFORMANCE MEASURE APPROVAL WORKSHEET

SUMMARY

OF CHANGE(S)

Date Chg/Rev Description 1/23/06 0 chg 1 Revised JPM to update to revision 007-00 to WC 2, Tagging. Also modified initial conditions and cue to correspond to a maintenance team lead request instead of a recommendation to add realism. Removed tagging the pump control switch from the critical nature of the electrical tagout step. DLM

..---

2of6

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3

'*i/

JPM ID Number: NRC RO A.2 Revision: 0 chg 1 Task Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

System: Tagging and Clearance Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 10 min Task Number(s): 341-01-079, Develop and/or modify, review, authorize, install, verify, and clear a tag clearance in accordance with plant and/or site procedural and safety requirements Applicable To: SRO RO X PEO WA Number: GEN.2.2.13, Knowledge of Tagging and WA Rating: 3.6i3.8 Clearance Procedures Method of Testing: Simulated Performance: Actual Performance: X Location: Classroom: X Simulator: In-Plant:

J

. Task Standards: Develop and review a tag clearance Required Materials: Team Lead Tagout Request P&IDs, EM-109A EE One-Line diagrams OP 3337, Radioactive Gaseous Waste System General

References:

WC 2, Tagging OP 3250, Removing Equipment from Service for Maintenance

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

3 of 6

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC RO A.2 Revision 0 chg 1 Simulator Requirements: NONE Initial Conditions: The pump impeller on the B Degasifier Recirculation Pump, 3GWS-PI B, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.

Initiating Cues: Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisors request.

        • NOTES TO EVALUATOR ****
1. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, & critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a Ufor unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).

W 4of6

PERFORMANCE INFORMATION JPM Number: NRC RO A.2 Revision: Ochgl i /

Task Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

Start Time:

Comments: Electrical and mechanical isolation of the pump can be done in any order STEP 1 X Performance Step: Identifies correct piping isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE X Standards: Uses P&ID EM-I 09A or OP3337-001 and other appropriate references and identifies the correct boundary:

0 Pump Discharge WlO) CLOSED 0 Pump Suction (V6)CLOSED 0 Casing Drain (V107) OPEN 0 Discharge Vent (V972) OPEN Grade: SAT UNSAT L-f STEP 2 X Performance Step: Identifies correct electrical isolation boundary for the "B" Degasifier Recirculation Pump, 3GWS-PI B GRADE X Standards: Uses OP3337-004,electrical line-up, or EE-1AC and other appropriate references and identifies the correct boundary:

At MCC 32-3H(ZM) OFF 0 Pump Control Switch OFF Evaluator NOTE: Tagging the pump control switch is not required to meet the critical nature of this step.

Grade: SAT UNSAT Comments: Submits completed tagout to examiner as the Shift Manager. Tagout should substantially match the JPM attachment (filled out WC 2, attachment 6).

5 of 6

PERFORMANCE INFORMATION JPM Number: NRC RO A.2 Revision: Ochgl LJ Task Title: Given a maintenance repair recommendation and reference material, recommend a clearance boundary.

Termination Cue: The Evaluation For This JPM is Complete.

Stop Time:

6 of 6

VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.2 Revision 0 chg 1 u

Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, & critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

. ,


Actual Time to Complete (minutes):

Result of JPM: (ISfor satisf acto ry, U for un sat isfacto ry)

I Result of oral questions (if applicable):

Number of Questions:

Nurnber of Correct Responses:

Score:

Areas for Improvement:

7 of 6

STUDENT HANDOUT JPM Number: NRC RO A.2 d

Initial Conditions: The pump impeller on the B Degasifier Recirculation Pump, 3GWS-PIB, has seized. Repair efforts are planned and the maintenance first line supervisor has made a work package tagout request for the repair. The request includes the need to isolate, vent and drain, and to tagout electrically.

Initiating Cues: Your task is to develop a clearance boundary for this repair activity based on the maintenance first line supervisors request.

8 of 6

Attachment 6 Tagout Request (Sheet I of 1)

'd -~ ~

NOTE: When this request is used, all sections should be filled out in detail.

3 r i d JobDescription:

c73eyk d &

4mplifying Instructions:

ragging@ IS NOT required for personal protection (circle one).

d l s o l a t e , vent and drain 3 Isolate and depressurize 3 Isolate flawpath through a Other Recommended Tags Color Isolation Point Position(t

')For Blue Tans indicate initial position or if initial position is not required enter N/A.

Zontact Person (for multiple shifts, Contact Person is required for each shift) Phone:

KL. S  ? 9/23 ipproved By: Date:

Phone:

Team Leader / Planner / Engineering Level of Use wc 2 STOP THINK ACT REVIEW Rev. 007 nformation 71 of 82

Attachment 6 Tagout Request (Sheet 1 of 1)

NOTE: When this request is used, all sections should be filled out in detail.

Brief Job

Description:

3 t p k d &

Amplifying Instructions:

Tagging@' IS NOT required for personal protection (circle one).

&Isolate, vent and drain 5 Isolate and depressurize Isolate flowpath through a Other Recommended Tags Color I Isolation Point '

")For Blue Tags indicate initial position or if initial position is not required enter N/A.

Contact Person (for multiple shifts, Contact Person is required for each shift) Phone:

6 L . s w 95/23 Approved By: Date:

Phone:

Team Leader / Planner / Engineering Level of Use wc2 STOP THINK ACT REVIEW Rev. 007 nformation 71 of 82

JOB PERFORMANCE MEASURE APPROVAL SHEET d I. JPM Title: Actions and Expected Response for RMS Equipment failure Alarms JPM ID Number: NRC RO A.3 Revision: 0 II. Initiated:

1/5/07 Date III. Reviewed :

\

/ //

2.4 7 d Technical Reviewer Date IV. Approved:

Cognizant Plant Supervisor (optional) Date

.

Nuclear Training Supervisor Page 1 of 11

JOB PERFORMANCE MEASURE APPROVAL SHEET

SUMMARY

OF CHANGE(S)

Date I Chg/Rev 1 Description I I Page 2 of 11

JOB PERFORMANCE MEASURE GUIDE Facility: Millstone Unit 3 i j JPM ID Number: NRC RO A.3 Revision: 0 Task Title: Actions and Expected Response for RMS Equipment failure Alarms System: NIA Time Critical Task: ( ) YES ( X ) NO Validated Time (minutes): 10 Task Number(s): 073-Ot-043 Applicable To: SRO RO X PEO WA Number: 2.3.1 K/A Rating: 2.6 f 3.0 Method of Testing: Simulated Performance: Actual Performance: X Location: Classroom: X Simulator: In-Plant:

- . d Task Standards: Correctly determines the required actions for an RMS Equipment failure Alarm.

Required Materials: OP 3362, Radiation Monitor System Display and Control System (rev. 007-06)

General

References:

      • READ TO THE STUDENT***

I will explain the initial conditions, which step(s) to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objectives for this JPM will be satisfied.

You may use any approved reference material normally available in the Control Room, including logs. Make all written reports, oral reports, alarm acknowledgements, and log entries as if the evolution was actually being performed.

Page 3 of I 1

JOB PERFORMANCE MEASURE GUIDE (Continued)

JPM Number: NRC RO A.3 Revision: 0 Simulator Requirements: None Initial Conditions: The plant is at 100% power and you are the Extra Licensed Operator on shift. MB2B 2-9 RMS TROUBLE alarms. At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, filter step is in alarm.

Initiating Cues: The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm.

        • NOTES TO EVALUATOR ****
1. Critical steps for this JPM are indicated by an X after the step number. For the student to achieve a satisfactory grade, critical steps must be completed correctly.

The students performance is graded by an S for satisfactory or a U for unsatisfactory on each step.

2. When the student states what hidher simulated action/observation would be, read the appropriate Cue.
3. If necessary, question the student for details of simulated actions/observations (Le. What are you looking at? or What are you observing?).

Page 4 of 11

PERFORMANCE INFORMATION JPM Number: NRC RO A.3 Revision: 0 L/

Task Title: Actions and Expected Response for RMS Equipment failure Alarms Start Time:

STEP 1 Performance Step: Obtain proper Annunciator Response Procedure.

GRADE Standards: Obtains OP 3353.MB2B and refers to RMS TROUBLE (2-9).

Grade: SAT UNSAT STEP 2 Performance Step: IF alarm is due to equipment failure, Refer OP 3353.MB2B 2-9 To OP 3362, Radiation Monitor System Step 2 Display and Control, and TAKE required actions for equipment failure alarms.

. I GRADE Standards: Applicant obtains and refers to OP 3362,

=.----

Section 4.13, Equipment Failure Alarms.

Grade: SAT UNSAT STEP 3 X Performance Step: Refer To Attachment 6 and PERFORM OP 3362, Section 4.13 the following:

Step 4.13.1.a CHECK monitor number is listed.

GRADE X Standards: Applicant refers to OP 3362, Attachment 6 and verifies that 3CMS*RE22 is listed.

Grade: SAT UNSAT STEP 4 X Performance Step: IF monitor is listed, DETERMINE OP 3362, Section 4.13 applicable Trouble Response(s).

Step 4.13.1.b GRADE X Standards: Applicant refers to Attachment 6 and determines that for 3CMS*22, trouble u -l responses 1, 2, 3, 6, 7, I O , and I 2 are required.

Page 5 of I 1

PERFORMANCE INFORMATION JPM Number: NRC RO A.3 Revision: 0

'LJ Task Title: Actions and Expected ResPonse for RMS EauiDment failure Alarms Grade: SAT UNSAT STEP 5 Performance Step: PERFORM applicable Trouble OP 3362, Section 4.13 Response(s)" listed.

Step 4.13. 1.c GRADE Standards: Applicant refers to Attachment 6 begins to Derform the identified remonses.

Grade: SAT UNSAT

-Ll STEP 6 Performance Step: NOTIFY Instrument and Control OP 3362, Att 6 Department to check monitor.

Action 1.

GRADE Standards: Applicant notifies I &C that 3CMS*RE22 has an equipment failure alarm and to check the monitor. Telephone call is adequate for this notification.

Grade: SAT UNSAT STEP 7 Performance Step: NOTIFY Health Physics Department for OP 3362, Att 6 area monitoring and sampling.

Action 2.

GRADE Standards: Applicant notifies Health Physics that 3CMS*RE22 has an equipment failure alarm and to conduct necessary monitoring and sampling. Telephone call is adequate for this notification.

Page 6 of 11

PERFORMANCE NFORMATION JPM Number: NRC RO A.3 Revision: 0 Task Title: Actions and Expected Response for RMS Equipment failure Alarms Grade: SAT UNSAT STEP 8 Performance Step: NOTIFY Chemistry Department for OP 3362, Att 6 sampling medium.

Action 3.

GRADE Standards: Applicant notifies Chemistry Department that 3CMS*RE22 has an equipment failure alarm and to ready appropriate sampling medium. Telephone call is adequate for CUE:

this notification.  %*%I &.W<\w4 4 Chemistry ark+cfm

-. - J\--? a*?

pI Grade: SAT UNSAT STEP 9 X Performance Step: IF a filter step alarm is recorded, OP 3362, Att 6 ATTEMPT to step the filter as follows:

Action 6. Safety related Monitor (CMS*22):

1. At the appropriate KERIC, TURN the keyswitch to ENABLE.
2. PRESS STP -2 ENT.
3. TURN keyswitch to DISABLE.

GRADE X Standards: Informs the US that an attempt must be made to step the 3CMS*22 filter at the RIC.

Grade: SAT UNSAT Page7 of 11

PERFORMANCE INFORMATION JPM Number: NRC RO A.3 Revision: 0 LJ'* Task Title: Actions and ExPected ResDonse for RMS Eaubment failure Alarms STEP 10 X Performance Step: IF the filter step alarm clears, the monitor OP 3362, Att 6 may be considered OPERABLE with Action 6. respect to the filter paper. IF another filter step alarm is recorded, the particulate channel is not OPERABLE. REQUEST t&C to repair.

GRADE X Standards: Informs the US that the particulate channel of 3CMS*22 must be considered INOPERABLE

..

Grade: SAT UNSAT STEP 11 Performance Step: IF a radiation monitor indicates "OFF-OP 3362, Att 6 . LINE," DECLARE the radiation monitor Action 7. INOPERABLE and LOG into all applicable

-.--f LCOS.

GRADE Standards: Applicant informs the US that 3CMS*22 does not indicate "OFF-LINE".

Grade: SAT UNSAT P STEP 12 X Performance Step: Refer To TIS 3.3.3.1 and Table 3.3-6, OP 3362, Att 6 "Radiation Monitoring instrumentation Action I O . for Plant Operations," and PERFORM applicable actions.

GRADE X Standards: Applicant informs the US that T/S 3.3.3.1, "Radiation Monitoring Instrumentation for Plant Operations," must be referred to.

Page 8 of 11

PERFORMANCE tNFORMATION JPM Number: NRC RO A.3 Revision: 0 i-/ Task Title: Actions and Expected Response for RMS Equipment failure Alarms Grade: SAT UNSAT STEP 13 X Performance Step: Refer To TIS 3.4.6.1, Reactor Coolant OP 3362, Att 6 System Leakage Detection Systems, Action 12. and PERFORM applicable actions.

GRADE X Standards: Applicant informs the US that T/S 3.4.6.1, Reactor Coolant System Leakage Detection Svstems. must be referred to.

Grade: SAT UNSAT STEP 14 Performance Step: Applicant Reports Task Completion.

l/-.

GRADE Standards: Applicant reports to the US that the applicable trouble responses have been performed.

Stop Time:

Page 9 of 11

VERIFICATION OF JPM COMPLETION JPM Number: NRC RO A.3 Revision: 0 Date Performed:

Student:

Evaluator:

For the student to achieve a satisfactory grade, critical steps must be completed correctly. If task is Time Critical, it MUST be completed within the specified time to achieve a satisfactory grade.

Time Critical Task? YES NO X Validated Time (minutes): 10

.--- Actual Time to Complete (minutes):

Result of JPM: for satisfactory, Ufor unsatisfactory)

(IS Result of oral questions (if applicable):

Number of Questions:

Number of Correct Responses:

Score:

Areas for Improvement:

Page 10 of 11

STUDENT HANDOUT JPM Number: NRC RO A.3

-4 Initial Conditions: The plant is at 100% power and you are the Extra Licensed Operator on shift. M62B 2-9 "RMS TROUBLE" alarms. At the RMS Console you determine that an equipment failure alarm is in for 3CMS*RE22. Specifically, 'filter step' is in alarm.

Initiating Cues: The US has directed you to determine and perform required actions as a result of the 3CMS*RE22 equipment failure alarm.

Page11 of 11