| {{#Wiki_filter:I'. *FE N O CBeaver Valley Power Station FENOCRoute 168 P.O. Box 4 FksVEnergyMNuclea Ca ' Shippingport, PA 15077-0004 June 11, 2007 L-07-083 Mr. Sam Harper Department of Environmental Protection Chief, Operations Section Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Beaver Valley PowerStatioi-(BVPS): | | {{#Wiki_filter:I'. |
| Pipe RUptUre Follow-up Report.Mr. Harper: Pursuant to 25 Pa. Code § 91.33 and § 91.34, this is to provide a written description of an event involving a ruptured discharge pipe. first reported to Ms. Kareen Milcic, Pennsylvania Department of Environmental Protection (PADEP), via telephone at approximately 2:00 PM on June 11, 2007.A corrugated pipe ruptured that channels water discharged from our Unit 2 Emergency Outfall Structure (EOF), NPDES Permit No. PA0025615 Outfall 010, into an Impact Basin to reduce velocity and prevent erosion. That rupture caused the discharging water to create a sinkhole, washing out soil and fill material that slid down the hill towards the Ohio River. Most of the washed-out material appears to have been captured on a flat area between the outfall and the river, and in the Impact Basin itself.. Some material may have made it past the Impact Basin to the river. Note that the materials washed out were sandy and rocky, typical of the fill used during construction of BVPS.BVPS utilizes two containment booms at Outfalls 001 and 010 as a Best Management Practice (BMP) to prevent solids, foam, scum, etc.-from entering the river channel. There was no evidence observed of solids, mud, or other signs of eroded materials reaching the river channel beyond the area of the outfalls. | | * FENOCRoute FE NOCBeaver Valley Power Station 168 P.O. Box 4 |
| In response, BVPS has undertaken the following BMP actions until permanent repairs are made:* Flow from the outfall was reduced from the typical 2,500 -4,000 gallons per minute to 200 -300 gallons per minute.' Note that We cannot reduce flow any lower becauise that is the minimum amount of cooling water heeded fot several nuclear safety systems' E'en if the Unit 2 plant were shutdoWn, that Witter would be needed to ensure decay heat removal from the nuclear reactoi.* Temporary pumps and hos'es wer'e installed in the EOF to rouite the water to the'river (in place of the damaged piping). The hoses were positioned in such a way to prevent erosion.p 'Further BMPs will be implemented as identified. | | *Oa FksVEnergyMNuclea Ca ' Shippingport, PA 15077-0004 June 11, 2007 L-07-083 Mr. Sam Harper Department of Environmental Protection Chief, Operations Section Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Beaver Valley PowerStatioi-(BVPS): Pipe RUptUre Follow-up Report. |
| * Work has commenced to permanently repair or replace the piping.I I f2 ," r;, N L-07-083 June 11, 2007 Page 2* The event is documented, investigated, and tracked with corrective actions in the FENOC Problem Identification and Resolution program under Condition Report CR-07-21637. | | Mr. Harper: |
| | Pursuant to 25 Pa. Code § 91.33 and § 91.34, this is to provide a written description of an event involving a ruptured discharge pipe.first reported to Ms. Kareen Milcic, Pennsylvania Department of Environmental Protection (PADEP), via telephone at approximately 2:00 PM on June 11, 2007. |
| | A corrugated pipe ruptured that channels water discharged from our Unit 2 Emergency Outfall Structure (EOF), NPDES Permit No. PA0025615 Outfall 010, into an Impact Basin to reduce velocity and prevent erosion. That rupture caused the discharging water to create a sinkhole, washing out soil and fill material that slid down the hill towards the Ohio River. Most of the washed-out material appears to have been captured on a flat area between the outfall and the river, and in the Impact Basin itself.. Some material may have made it past the Impact Basin to the river. Note that the materials washed out were sandy and rocky, typical of the fill used during construction of BVPS. |
| | BVPS utilizes two containment booms at Outfalls 001 and 010 as a Best Management Practice (BMP) to prevent solids, foam, scum, etc.-from entering the river channel. There was no evidence observed of solids, mud, or other signs of eroded materials reaching the river channel beyond the area of the outfalls. In response, BVPS has undertaken the following BMP actions until permanent repairs are made: |
| | * Flow from the outfall was reduced from the typical 2,500 - 4,000 gallons per minute to 200 - 300 gallons per minute.' Note that We cannot reduce flow any lower becauise that is the minimum amount of cooling water heeded fot several nuclear safety systems' E'en if the Unit 2 plant were shutdoWn, that Witter would be needed to ensure decay heat removal from the nuclear reactoi. |
| | * Temporary pumps and hos'es wer'e installed in the EOF to rouite the water to the'river (in place of the damaged piping). The hoses were positioned in such a way to prevent erosion. |
| | p 'Further BMPs will be implemented as identified. |
| | * Work has commenced to permanently repair or replace the piping. |
| | I I f2 , |
| | " r;, N |
| | |
| | L-07-083 June 11, 2007 Page 2 |
| | * The event is documented, investigated, and tracked with corrective actions in the FENOC Problem Identification and Resolution program under Condition Report CR-07-21637. |
| Should you have any questions regarding the attached and enclosed documents, please direct them to Mr. Michael Banko, at 724-682-4117. | | Should you have any questions regarding the attached and enclosed documents, please direct them to Mr. Michael Banko, at 724-682-4117. |
| cc: Ms. Kareen Milcic Department of Environmental Protection Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Document Control Desk US NRC (NOTE: No new US NRC commitments are contained in this letter.)Central File: Keyword(s): | | cc: Ms. Kareen Milcic Department of Environmental Protection Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Document Control Desk US NRC (NOTE: No new US NRC commitments are containedin this letter.) |
| Written Environmental Report to DEP}} | | Central File: Keyword(s): Written EnvironmentalReport to DEP}} |
|
---|
Category:Letter type:L
MONTHYEARL-23-267, Submittal of Discharge Monitoring Report (Npdes), Permit No. PA00256152023-12-18018 December 2023 Submittal of Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-229, Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports2023-11-29029 November 2023 Request for Additional Information Regarding the Spring 2023 Generic Letter 95-05 Voltage-Based Alternate Repair Criteria and Steam Generator F-Star Reports L-23-247, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-11-17017 November 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-227, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 20232023-10-20020 October 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Third Quarter 2023 L-23-208, Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA00256152023-09-14014 September 2023 Submittal of Discharge Monitoring Report Cnpdes), Permit No. PA0025615 L-23-167, Twenty-Third Refueling Outage Inservice Inspection Summary Report2023-09-13013 September 2023 Twenty-Third Refueling Outage Inservice Inspection Summary Report L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-179, Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-07-18018 July 2023 Submittal of Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-165, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-06-26026 June 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-139, Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report2023-06-13013 June 2023 Response to Request for Additional Information Regarding Fall 2022 180-Day Steam Generator Tube Inspection Report L-23-055, Submittal of the Updated Final Safety Analysis Report, Revision 342023-05-23023 May 2023 Submittal of the Updated Final Safety Analysis Report, Revision 34 L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-137, Discharge Monitoring Report (NPDES) Permit No. PA00256152023-05-18018 May 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-23-125, Cycle 24 Core Operating Limits Report2023-05-17017 May 2023 Cycle 24 Core Operating Limits Report L-23-132, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-10010 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-129, Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations2023-05-0505 May 2023 Response to Request for Additional Information for 10 CFR 50.55a Request 2-TYP-4-RV-06 for Alternative Repair Methods for Reactor Pressure Vessel Head Penetrations L-23-115, Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological2023-04-27027 April 2023 Submittal of 2022 Annual Radioactive Effluent Release Report, 2022 Annual Radiological Environmental Operating Report, and 2022 Annual Environmental Operating Report (Non-Radiological L-23-126, Discharge Monitoring Report (Npdes), Permit No. PA00256152023-04-22022 April 2023 Discharge Monitoring Report (Npdes), Permit No. PA0025615 L-23-053, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-04-14014 April 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-058, 180-Day Steam Generator Tube Inspection Report2023-03-27027 March 2023 180-Day Steam Generator Tube Inspection Report L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-036, Report of Facility Changes, Tests and Experiments2023-03-13013 March 2023 Report of Facility Changes, Tests and Experiments L-23-086, Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0404 March 2023 Response to Request for Additional Information for Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-087, Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027)2023-03-0404 March 2023 Supplement to Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair (L-2023-LLA-0027) L-23-073, Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair2023-03-0101 March 2023 Emergency License Amendment Request for Technical Specification 3.5.2 Regarding One-Time Action for Valve Leak Repair L-23-016, Twenty-Eighth Refueling Outage Inservice Inspection Summary Report2023-02-21021 February 2023 Twenty-Eighth Refueling Outage Inservice Inspection Summary Report L-23-064, Discharge Monitoring Report, (NPDES) Permit No. PA00256152023-02-21021 February 2023 Discharge Monitoring Report, (NPDES) Permit No. PA0025615 L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-22-193, Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H2023-02-14014 February 2023 Request for Exemption from Specific Provisions in 10 CFR 50 Appendix H L-22-286, Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time2023-02-14014 February 2023 Supplement to Request for an Amendment to Consolidate Fuel Decay Time Technical Specifications in a New Limiting Condition for Operation Titled Decay Time L-23-032, Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 20222023-01-23023 January 2023 Discharge Monitoring Report (NPDES) Permit No. PA0025615 for Second Half of 2022 L-22-281, Discharge Monitoring Report (NPDES) Permit No. PA00256152022-12-16016 December 2022 Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-246, Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO2022-12-0707 December 2022 Response to Request for Additional Information Regarding a Request to Consolidate Fuel Decay Time Technical Specifications to New LCO L-22-217, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-11-21021 November 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-226, Emergency Preparedness Plan2022-11-0404 November 2022 Emergency Preparedness Plan L-22-222, Cycle 29-1 Core Operating Limits Report2022-10-31031 October 2022 Cycle 29-1 Core Operating Limits Report L-22-228, Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2022-10-26026 October 2022 Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-22-200, Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage2022-10-21021 October 2022 Response to Request for Additional Information Regarding a 180-Day Steam Generator Tube Inspection Report Fall 2021 Refueling Outage L-22-232, Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes2022-10-21021 October 2022 Withdrawal of a License Amendment Request Associated with Fire Protection Program Changes L-22-238, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-10-20020 October 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-227, Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins2022-10-0303 October 2022 Revised August 2022 Outfall 003 & 004 NPDES Discharge Monitoring Report (Dmr), Revised Daily Effluent Monitoring Report Forms for Outfalls 003 & 004 and Corrective Action Letter from Eurofins L-22-219, Submittal of Discharge Monitoring Report (NPDES) Permit No. PA00256152022-09-26026 September 2022 Submittal of Discharge Monitoring Report (NPDES) Permit No. PA0025615 L-22-204, Submittal of Evacuation Time Estimates2022-09-0707 September 2022 Submittal of Evacuation Time Estimates L-22-137, Request for Fire Protection Program Changes2022-09-0606 September 2022 Request for Fire Protection Program Changes L-21-238, License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident2022-08-31031 August 2022 License Amendment Request for Addition of Analytical Methodology to the Core Operating Limits Report for a Full Spectrum Loss of Coolant Accident L-22-188, Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage2022-08-22022 August 2022 Response to Request for Additional Information Regarding Steam Generator Inspection Report- Fall 2021 Refueling Outage L-22-191, Spent Fuel Storage Cask Registration2022-08-17017 August 2022 Spent Fuel Storage Cask Registration 2023-09-14
[Table view] Category:Licensee 30-Day Written Event Report
[Table view] |
Text
I'.
- FENOCRoute FE NOCBeaver Valley Power Station 168 P.O. Box 4
- Oa FksVEnergyMNuclea Ca ' Shippingport, PA 15077-0004 June 11, 2007 L-07-083 Mr. Sam Harper Department of Environmental Protection Chief, Operations Section Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Beaver Valley PowerStatioi-(BVPS): Pipe RUptUre Follow-up Report.
Mr. Harper:
Pursuant to 25 Pa. Code § 91.33 and § 91.34, this is to provide a written description of an event involving a ruptured discharge pipe.first reported to Ms. Kareen Milcic, Pennsylvania Department of Environmental Protection (PADEP), via telephone at approximately 2:00 PM on June 11, 2007.
A corrugated pipe ruptured that channels water discharged from our Unit 2 Emergency Outfall Structure (EOF), NPDES Permit No. PA0025615 Outfall 010, into an Impact Basin to reduce velocity and prevent erosion. That rupture caused the discharging water to create a sinkhole, washing out soil and fill material that slid down the hill towards the Ohio River. Most of the washed-out material appears to have been captured on a flat area between the outfall and the river, and in the Impact Basin itself.. Some material may have made it past the Impact Basin to the river. Note that the materials washed out were sandy and rocky, typical of the fill used during construction of BVPS.
BVPS utilizes two containment booms at Outfalls 001 and 010 as a Best Management Practice (BMP) to prevent solids, foam, scum, etc.-from entering the river channel. There was no evidence observed of solids, mud, or other signs of eroded materials reaching the river channel beyond the area of the outfalls. In response, BVPS has undertaken the following BMP actions until permanent repairs are made:
- Flow from the outfall was reduced from the typical 2,500 - 4,000 gallons per minute to 200 - 300 gallons per minute.' Note that We cannot reduce flow any lower becauise that is the minimum amount of cooling water heeded fot several nuclear safety systems' E'en if the Unit 2 plant were shutdoWn, that Witter would be needed to ensure decay heat removal from the nuclear reactoi.
- Temporary pumps and hos'es wer'e installed in the EOF to rouite the water to the'river (in place of the damaged piping). The hoses were positioned in such a way to prevent erosion.
p 'Further BMPs will be implemented as identified.
- Work has commenced to permanently repair or replace the piping.
I I f2 ,
" r;, N
L-07-083 June 11, 2007 Page 2
- The event is documented, investigated, and tracked with corrective actions in the FENOC Problem Identification and Resolution program under Condition Report CR-07-21637.
Should you have any questions regarding the attached and enclosed documents, please direct them to Mr. Michael Banko, at 724-682-4117.
cc: Ms. Kareen Milcic Department of Environmental Protection Bureau of Water Quality Management 400 Waterfront Drive Pittsburgh, PA 15222 Document Control Desk US NRC (NOTE: No new US NRC commitments are containedin this letter.)
Central File: Keyword(s): Written EnvironmentalReport to DEP