ML080810241: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:March 21, 2008  
{{#Wiki_filter:March 21, 2008 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   G. Edward Miller, Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:   G. Edward Miller, Project Manager /ra/ Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)  
SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)
 
The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael OKeefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.
The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael O'Keefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee
The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.
=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.  
 
The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.    
 
The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.  
Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
 
Docket No. 50-443
Docket No. 50-443  


==Enclosure:==
==Enclosure:==
Draft RAI  
Draft RAI


March 21, 2008  
March 21, 2008 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:                   G. Edward Miller, Project Manager /ra/
 
Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:   G. Edward Miller, Project Manager /ra/ Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation  


==SUBJECT:==
==SUBJECT:==
SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)  
SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)
 
The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael OKeefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.
The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael O'Keefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee
The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.
=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.  
 
The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.    
 
The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.
Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensee's request.  
Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.
 
Docket No. 50-443
Docket No. 50-443  


==Attachment:==
==Attachment:==
Draft RAI  
Draft RAI DISTRIBUTION PUBLIC                 RidsNrrDorlLpl1-2 PDI-2 Reading           RidsNrrPMGMiller RidsNrrDorlDpr ACCESSION NO.: ML080810241 LPI-2/PM         LPLI-2/BC OFFICE H. Chernoff NAME         G. E. Miller     w/Comments DATE         3/21/08         3/21/08 OFFICIAL RECORD COPY
 
DISTRIBUTION PUBLIC RidsNrrDorlLpl1-2 PDI-2 Reading RidsNrrPMGMiller RidsNrrDorlDpr
 
ACCESSION NO.: ML080810241 OFFICE LPI-2/PM LPLI-2/BC NAME G. E. Miller H. Chernoff w/Comments DATE 3/21/08 3/21/08 OFFICIAL RECORD COPY ENCLOSURE DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENTS SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443
 
By letter dated March 7, 2008, FPL Energy Seabrook, LLC (FPLE) submitted an amendment request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would revise the Seabrook Technical Specifications Surveillance Require ments related to Nuclear Instrumentation.   


DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENTS SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated March 7, 2008, FPL Energy Seabrook, LLC (FPLE) submitted an amendment request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.
The Nuclear Regulatory Commission staff has reviewed the information provided in support of the proposed amendment and finds that the following information is required to complete its review:
The Nuclear Regulatory Commission staff has reviewed the information provided in support of the proposed amendment and finds that the following information is required to complete its review:
: 1. The proposed Surveillance Requirement would r equire measurement of the initial plateau curves within 24 hours of reaching steady state operation at 100% of rated thermal power. Please identify what is considered steady state operation for Seabrook and where this definition is located and by what mechanism is it controlled. Additionally, how long after reaching appropriate conditions to perform the test is needed for collection of the plateau curves.}}
: 1.     The proposed Surveillance Requirement would require measurement of the initial plateau curves within 24 hours of reaching steady state operation at 100% of rated thermal power. Please identify what is considered steady state operation for Seabrook and where this definition is located and by what mechanism is it controlled. Additionally, how long after reaching appropriate conditions to perform the test is needed for collection of the plateau curves.
ENCLOSURE}}

Latest revision as of 18:30, 14 November 2019

Draft Request for Additional Information
ML080810241
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/21/2008
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Chernoff H
NRC/NRR/ADRO/DORL/LPLI-2
Miller G, NRR/DORL, 415-2481
References
TAC MD8247
Download: ML080810241 (3)


Text

March 21, 2008 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: G. Edward Miller, Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)

The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael OKeefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.

The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.

The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.

Docket No. 50-443

Enclosure:

Draft RAI

March 21, 2008 MEMORANDUM TO: Harold K. Chernoff, Chief Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM: G. Edward Miller, Project Manager /ra/

Plant Licensing Branch I-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SEABROOK STATION, UNIT NO. 1, DRAFT REQUEST FOR ADDITIONAL INFORMATION (TAC NO. MD8247)

The attached draft request for information (RAI) was transmitted on March 21, 2008, to Mr. Michael OKeefe of FPL Energy Seabrook, LLC (FPLE). This information was transmitted to facilitate an upcoming conference call in order to clarify the licensee=s amendment request for Seabrook Station, Unit No. 1 (Seabrook), dated March 7, 2008.

The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.

The draft questions were sent to ensure that the questions were understandable, the regulatory basis for the questions was clear, and to determine if the information was previously docketed.

Additionally, review of the draft RAI would allow FPLE to determine and agree upon a schedule to respond to the RAI. This memorandum and the attachment do not convey or represent an NRC staff position regarding the licensees request.

Docket No. 50-443

Attachment:

Draft RAI DISTRIBUTION PUBLIC RidsNrrDorlLpl1-2 PDI-2 Reading RidsNrrPMGMiller RidsNrrDorlDpr ACCESSION NO.: ML080810241 LPI-2/PM LPLI-2/BC OFFICE H. Chernoff NAME G. E. Miller w/Comments DATE 3/21/08 3/21/08 OFFICIAL RECORD COPY

DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING PROPOSED LICENSE AMENDMENT NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENTS SEABROOK STATION, UNIT NO. 1 DOCKET NO. 50-443 By letter dated March 7, 2008, FPL Energy Seabrook, LLC (FPLE) submitted an amendment request for Seabrook Station, Unit No. 1 (Seabrook). The proposed amendment would revise the Seabrook Technical Specifications Surveillance Requirements related to Nuclear Instrumentation.

The Nuclear Regulatory Commission staff has reviewed the information provided in support of the proposed amendment and finds that the following information is required to complete its review:

1. The proposed Surveillance Requirement would require measurement of the initial plateau curves within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of reaching steady state operation at 100% of rated thermal power. Please identify what is considered steady state operation for Seabrook and where this definition is located and by what mechanism is it controlled. Additionally, how long after reaching appropriate conditions to perform the test is needed for collection of the plateau curves.

ENCLOSURE