Tec Specs to Amendment 118, License No. NPF-086, for Seabrook, Unit 1
ML081200061
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/29/2008
From:
NRC/NRR/ADRO/DORL/LPLI-2
To:
Miller G, NRR/DORL, 415-2481
Shared Package
ml081200044 List:
References
TAC MD8247
Download: ML081200061 (2)


Text

(4). FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to receive, possess, and use at any time any byproduct, source, and special nuclear material as sealed neutron sources for reactor startup, sealed sources for reactor instrumentation and radiation monitoring equipment calibration, and as fission detectors in amounts as required; (5) FPL Enirgy.

Il Ener. Seabrook, LLC,Ir SU1nt to. the Act and 10 CFR 30, 40, and 70, to receive, possess, and use in amounts as required any byproduct, source, or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (6) FPL Energy Seabrook, LLC, pursuant to the Act and 10 CFR 30, 40, and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility authorized herein; and (7) DELETED C. This license shall be deemed to contain and is subject to the conditions specified in the Commission's regulations set forth in 10 CFR Chapter I and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; is subject to the additional conditions specified or incorporated below:

(1) Maximum Power Level FPL Energy Seabrook, LLC, is authorized to operate the facility at reactor core power levels not in excess of 3648 megawatts thermal (100% of rated power).

(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 118*, and the Environmental Protection Plan contained in Appendix B are incorporated into the Facility License No. NPF-86.

FPL Energy Seabrook, LLC shall operate the facility in accordance with the Technical Specifications and -the Environmental Protection Plan.

(3) License Transfer to FPL Energy Seabrook, LLC

a. On the closing date(s) of the transfer of any ownership interests in Seabrook Station covered by the Order approving the transfer, FPL Energy Seabrook, LLC, shall obtain from each respective transferring owner all of the accumulated decommissioning trust funds for the facility, and ensure the deposit of such funds and additional funds, if necessary, into a decommissionin6 trust or trusts for Seabrook Station established by FPL Energy Seabrook, LLC, such that the amount of such funds deposited meets or exceeds the amount required under 10 CFR 50.75 with respect to the interest in Seabrook Station FPL Energy Seabrook, LLC, acquires on such dates(s).
  • Implemented AMENDMENT NO. 118

TABLE 4.3-1 (Continued)

TABLE NOTATIONS

  • Only if the Reactor Trip System breakers happen to be closed and the Control Rod Drive System is capable of rod withdrawal.
    • Below P-6 (Intermediate Range Neutron Flux Interlock) Setpoint.
      • Below P-1 0 (Low Setpoint Power Range Neutron Flux Interlock) Setpoint.

(1) If not performed in previous 92 days.

(2) Comparison of calorimetric to excore power indication above 15% of RATED THERMAL POWER. Adjust excore channel gains consistent with calorimetric power if absolute difference is greater than 2%. The provisions of Specification 4.0.4 are not applicable to entry into MODE 2 or 1.

(3) Single point comparison of incore to excore AXIAL FLUX DIFFERENCE above 50%

of RATED THERMAL POWER. Recalibrate if the absolute difference is greater than or equal to 3%. The provisions of Specification 4.0.4 are not applicable for entry into MODE 2 or 1. For the purposes of this surveillance requirement, monthly shall mean at least once per 31 EFPD.

(4) Neutron detectors may be excluded from CHANNEL CALIBRATION.

(5) Initial plateau curves shall be measured for each detector. Subsequent plateau curves shall be obtained, evaluated and compared to the initial curves. The plateau curves for the Intermediate Range and Power Range detectors are required to be measured or obtained within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 100% of RATED THERMAL POWER. For the Intermediate Range and Power Range Neutron Flux channels the provisions of Specification 4.0.4 are not applicable for entry into MODE 2 or 1.

(6) Incore - Excore Calibration, above 75% of RATED THERMAL POWER. The provisions of Specification 4.0.4 are not applicable for entry into MODE 2 or 1. For' the purposes of this surveillance requirement, quarterly shall mean at least once per 92 EFPD.

(7) Each train shall be tested at least every 62 days on a STAGGERED TEST BASIS.

(8) If not performed in previous 31 days.

(9) Surveillance in MODES 3*, 4*, and 5* shall also include verification that permissives P-6 and P-10 are in their required state for existingplant conditions by observation of the permissive annunciator window.

(10) Setpoint verification is not applicable.

(11) The TRIP ACTUATING DEVICE OPERATIONAL TEST shall independently verify the OPERABILITY of the undervoltage and shunt trip attachments of the Reactor Trip Breakers.

SEABROOK - UNIT 1 3/4 3-12 Amendment No. 3,-9-I4118