ML080710040
| ML080710040 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 03/12/2008 |
| From: | Geoffrey Miller NRC/NRR/ADRO/DORL/LPLI-2 |
| To: | Peschel J, St.Pierre G Florida Power & Light Energy Seabrook |
| Miller G, NRR/DORL, 415-2481 | |
| Shared Package | |
| ML080710034 | List: |
| References | |
| TAC MD8247 | |
| Download: ML080710040 (4) | |
Text
March 12, 2008 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT CONCERNING THE REVISION OF NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENT (TAC NO. MD8247)
Dear Mr. St. Pierre:
The Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, to the Office of the Federal Register for publication.
The proposed amendment would revise Technical Specification Table 4.3-1, Reactor Trip System Instrumentation Surveillance Requirements to require the initial plateau curves to be measured within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 100 percent stead-state power. Currently, initial plateau curves are required to be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entry into Mode 2.
If you have any questions, please contact me at 301-415-2481.
Sincerely
/ra/
G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operatig Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Notice of Consideration cc w/encls: See next page
March 12, 2008 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874
SUBJECT:
SEABROOK STATION, UNIT NO. 1 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT CONCERNING THE REVISION OF NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENT (TAC NO. MD8247)
Dear Mr. St. Pierre:
The Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, to the Office of the Federal Register for publication.
The proposed amendment would revise Technical Specification Table 4.3-1, Reactor Trip System Instrumentation Surveillance Requirements to require the initial plateau curves to be measured within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 100 percent stead-state power. Currently, initial plateau curves are required to be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entry into Mode 2.
If you have any questions, please contact me at 301-415-2481.
Sincerely
/ra/
G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operatig Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443
Enclosure:
Notice of Consideration Cc w/encls: See next page DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1-2 Lpl1-2 r/f RidsOgcRp RidsNrrPMGMiller RidsAcrsAcnwMailCenter RidNrrLAABaxter RidsNrrDorlDpr RidsRgn1MailCenter ADAMS Accession Nos: Package: ML080710034; Letter: ML080710040; Notice: ML080710043 OFFICE NRR/LPL1-2/PM NRR/LPL1-2/LA NRR/LPL1-2/BC NAME GEMiller ABaxter HChernoff DATE 3/12/08 3/11/08 3/12/08 Official Record Copy
Seabrook Station, Unit No. 1 cc:
Mr. J. A. Stall Senior Vice President, Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Peter Brann Assistant Attorney General State House, Station #6 Augusta, ME 04333 Resident Inspector U.S. Nuclear Regulatory Commission Seabrook Nuclear Power Station P.O. Box 1149 Seabrook, NH 03874 Town of Exeter 10 Front Street Exeter, NH 03823 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Office of the Attorney General One Ashburton Place, 20th Floor Boston, MA 02108 Board of Selectmen Town of Amesbury Town Hall Amesbury, MA 01913 Mr. Robert Poole Federal Emergency Management Agency Region I 99 High Street, 6th Floor Boston, MA 02110 Mr. Tom Crimmins Polestar Applied Technology One First Street, Suite 4 Los Altos, CA 94019 John Giarrusso Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 01702-5399 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General 33 Capitol Street Concord, NH 03301 Mr. Christopher M. Pope, Director Homeland Security & Emergency Mgmt.
New Hampshire Department of Safety Bureau of Emergency Management 33 Hazen Drive Concord, NH 03301 Mr. M. S. Ross, Managing Attorney Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Rajiv S. Kundalkar Vice President - Nuclear Technical Services Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 James M. Peschel Regulatory Programs Manager FPL Energy Seabrook, LLC PO Box 300 Seabrook, NH 03874 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004
Seabrook Station, Unit No. 1 cc:
Mr. Mark E. Warner Vice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)
Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Gene F. St. Pierre Site Vice President c/o James M. Peschel FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056