Individual Notice of Consideration of Issuance of Amendment Concerning the Revision of Nuclear Instrumentation Surveillance Requirement
ML080710040
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 03/12/2008
From: Geoffrey Miller
NRC/NRR/ADRO/DORL/LPLI-2
To: Peschel J, St.Pierre G
Florida Power & Light Energy Seabrook
Miller G, NRR/DORL, 415-2481
Shared Package
ML080710034 List:
References
TAC MD8247
Download: ML080710040 (4)


Text

March 12, 2008 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT CONCERNING THE REVISION OF NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENT (TAC NO. MD8247)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, to the Office of the Federal Register for publication.

The proposed amendment would revise Technical Specification Table 4.3-1, Reactor Trip System Instrumentation Surveillance Requirements to require the initial plateau curves to be measured within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 100 percent stead-state power. Currently, initial plateau curves are required to be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entry into Mode 2.

If you have any questions, please contact me at 301-415-2481.

Sincerely

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operatig Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Notice of Consideration cc w/encls: See next page

March 12, 2008 Mr. Gene F. St. Pierre, Site Vice President c/o James M. Peschel Seabrook Station FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874

SUBJECT:

SEABROOK STATION, UNIT NO. 1 - INDIVIDUAL NOTICE OF CONSIDERATION OF ISSUANCE OF AMENDMENT CONCERNING THE REVISION OF NUCLEAR INSTRUMENTATION SURVEILLANCE REQUIREMENT (TAC NO. MD8247)

Dear Mr. St. Pierre:

The Nuclear Regulatory Commission (NRC) has forwarded the enclosed Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing, to the Office of the Federal Register for publication.

The proposed amendment would revise Technical Specification Table 4.3-1, Reactor Trip System Instrumentation Surveillance Requirements to require the initial plateau curves to be measured within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after attaining 100 percent stead-state power. Currently, initial plateau curves are required to be taken within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entry into Mode 2.

If you have any questions, please contact me at 301-415-2481.

Sincerely

/ra/

G. Edward Miller, Project Manager Plant Licensing Branch 1-2 Division of Operatig Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-443

Enclosure:

Notice of Consideration Cc w/encls: See next page DISTRIBUTION:

PUBLIC RidsNrrDorlLpl1-2 Lpl1-2 r/f RidsOgcRp RidsNrrPMGMiller RidsAcrsAcnwMailCenter RidNrrLAABaxter RidsNrrDorlDpr RidsRgn1MailCenter ADAMS Accession Nos: Package: ML080710034; Letter: ML080710040; Notice: ML080710043 OFFICE NRR/LPL1-2/PM NRR/LPL1-2/LA NRR/LPL1-2/BC NAME GEMiller ABaxter HChernoff DATE 3/12/08 3/11/08 3/12/08 Official Record Copy

Seabrook Station, Unit No. 1 cc:

Mr. J. A. Stall Mr. Tom Crimmins Senior Vice President, Nuclear and Polestar Applied Technology Chief Nuclear Officer One First Street, Suite 4 Florida Power & Light Company Los Altos, CA 94019 P.O. Box 14000 Juno Beach, FL 33408-0420 John Giarrusso Massachusetts Emergency Management Agency Mr. Peter Brann 400 Worcester Road Assistant Attorney General Framingham, MA 01702-5399 State House, Station #6 Augusta, ME 04333 Ms. Kelly Ayotte, Attorney General Mr. Orvil Fitch, Deputy Attorney General Resident Inspector 33 Capitol Street U.S. Nuclear Regulatory Commission Concord, NH 03301 Seabrook Nuclear Power Station P.O. Box 1149 Mr. Christopher M. Pope, Director Seabrook, NH 03874 Homeland Security & Emergency Mgmt.

New Hampshire Department of Safety Town of Exeter Bureau of Emergency Management 10 Front Street 33 Hazen Drive Exeter, NH 03823 Concord, NH 03301 Regional Administrator, Region I Mr. M. S. Ross, Managing Attorney U.S. Nuclear Regulatory Commission Florida Power & Light Company 475 Allendale Road P.O. Box 14000 King of Prussia, PA 19406 Juno Beach, FL 33408-0420 Office of the Attorney General Mr. Rajiv S. Kundalkar One Ashburton Place, 20th Floor Vice President - Nuclear Technical Services Boston, MA 02108 Florida Power & Light Company P.O. Box 14000 Board of Selectmen Juno Beach, FL 33408-0420 Town of Amesbury Town Hall James M. Peschel Amesbury, MA 01913 Regulatory Programs Manager FPL Energy Seabrook, LLC Mr. Robert Poole PO Box 300 Federal Emergency Management Agency Seabrook, NH 03874 Region I 99 High Street, 6th Floor Ms. Marjan Mashhadi Boston, MA 02110 Senior Attorney Florida Power & Light Company 801 Pennsylvania Ave., NW Suite 220 Washington, DC 20004

Seabrook Station, Unit No. 1 cc:

Mr. Mark E. Warner Vice President, Nuclear Operations, North Region (Seabrook & Duane Arnold Plants)

Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Gene F. St. Pierre Site Vice President c/o James M. Peschel FPL Energy Seabrook, LLC P.O. Box 300 Seabrook, NH 03874 Mr. Joseph Roy Director of Operations Massachusetts Municipal Wholesale Electric Company Moody Street Ludlow, MA 01056