| {{#Wiki_filter:POST-EXAM COMMENTS(GreenPaper)LicenseeSubmitted Post-Exam Comments[xi Attached[]None VIRGINIA ELECTRIC AND POWER COMPANY VIRGINIA 23261April11,2008 Mr.Victor McCreeActingRegional AdministratorUnitedStates Nuclear Regulatory CommissionRegionIISamNunnAtlantaFederal Center61ForsythSt.,SW,Suite23T85Atlanta,Georgia30303-8931 VIRGINIA ELECTRICANDPOWER COMPANY SURRY POWER STATIONUNITS1AND2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTSSerialNo.08-0218 SS&L/T IN RODocketNos.50-280 50-281LicenseNos.DPR-32 DPR-37InaccordancewithNUREG-1021,SectionES-402,thefollowingcommentsaresubmittedconcerningthe ReactorOperatorandSeniorReactorOperatorInitialExaminationsadministeredatSurryinMarchandApril2008. | | {{#Wiki_filter:POST-EXAM COMMENTS (Green Paper) |
| Written Exam:SurryPowerStationdoesnothaveanypostexamcommentsrelatedtothewrittenexamadministeredonApril9,2008. | | Licensee Submitted Post-Exam Comments |
| Operating Exam:ADMINJPMG2.1.7 Quadrant Power Tilt Calculation The numberintheanswerkeyfortheN-44UpperTiltCalculationwaslistedas.9895.Thecorrectanswershouldhavebeen.9858.ThiswasnotacriticaltaskinthisJPM.N-44UpperTiltcalculationhadatranspositionerror. | | [xi Attached |
| Recommendation:Replace.9895with.9858inanswerkeyfortheN-44UpperTiltCalculation. | | [ ] None |
| SerialNo.08-0218DocketNos.50-280 50-281ADMINJPMG2.4.43 Transmit Report of EmergencytoStateand Local GovernmentsItem5ofthetransmittalformhadthecriticaltasklistedas"Unit 1 reactor failed to trip.The reactor is now tripped (or words to this effect)".AfterconferringwiththeEmergencyPreparednessgroup,onlynotifyingtheStatethatthereactorfailedtotripisrequiredtomeettheminimumrequirementsforthistask(Le.thisistheminimumrequiredforasatisfactoryPerformanceIndicator).ThisevaluationcriterionwassubsequentlyidentifiedinDNAP-2605(EmergencyPreparednessPerformanceIndicators).Attachment2ofthisprocedureonlyrequiresadescriptionoftheevent,whichismeanttoindicatethereasonforenteringtheemergencyplan.Assuch,thecriticaltaskshouldstate,ataminimum,"Thereactorfailedtotrip".Recommendation:Replacecriticaltaskforitem#5toreadasfollows: "The reactor failed to trip (or words to this effect)".Ifyoaeanyquestionsorrequireadditionalinformation,pleasecontactMr.BarryA.era(757)365-2725.DonaldJerniganSiteVicePresident Commitmentsmadebythisletter:None cc:Mr.M.T.Widmann,Chief Operations BranchUnitedStatesNuclearRegulatoryCommissionRegionIISamNunnAtlantaFederalCenter 61ForsythStreet,SW,Suite23T85Atlanta,Georgia30303-8931Mr.F.J.Ehrhardt Chief ExaminerUnitedStatesNuclearRegulatoryCommissionRegionIISamNunnAtlantaFederalCenter 61ForsythStreet,SW,Suite23T85Atlanta,Georgia30303-8931 DocumentControlDeskUnitedStatesNuclearRegulatoryCommission Washington,D.C.20555-0001SeniorResident InspectorSurryPowerStationSerialNo.08-0218DocketNos.50-280 50-281}}
| | |
| | VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 April 11, 2008 Mr. Victor McCree Serial No. 08-0218 Acting Regional Administrator SS&L/TIN RO United States Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 Sam Nunn Atlanta Federal Center License Nos. DPR-32 61 Forsyth St., SW, Suite 23T85 DPR-37 Atlanta, Georgia 30303-8931 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTS In accordance with NUREG-1 021, Section ES-402, the following comments are submitted concerning the Reactor Operator and Senior Reactor Operator Initial Examinations administered at Surry in March and April 2008. |
| | Written Exam: |
| | Surry Power Station does not have any post exam comments related to the written exam administered on April 9, 2008. |
| | Operating Exam: |
| | ADMIN JPM G2.1.7 Quadrant Power Tilt Calculation The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The correct answer should have been .9858. This was not a critical task in this JPM. |
| | N-44 Upper Tilt calculation had a transposition error. |
| | Recommendation: Replace .9895 with .9858 in answer key for the N-44 Upper Tilt Calculation. |
| | |
| | Serial No. 08-0218 Docket Nos. 50-280 50-281 ADMIN JPM G2.4.43 Transmit Report of Emergency to State and Local Governments Item 5 of the transmittal form had the critical task listed as "Unit 1 reactor failed to trip. The reactor is now tripped (or words to this effect)". |
| | After conferring with the Emergency Preparedness group, only notifying the State that the reactor failed to trip is required to meet the minimum requirements for this task (Le. this is the minimum required for a satisfactory Performance Indicator). |
| | This evaluation criterion was subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators). Attachment 2 of this procedure only requires a description of the event, which is meant to indicate the reason for entering the emergency plan. As such, the critical task should state, at a minimum, "The reactor failed to trip". |
| | Recommendation: Replace critical task for item #5 to read as follows: "The reactor failed to trip (or words to this effect)". |
| | If yo a e any questions or require additional information, please contact Mr. Barry A. |
| | er a (757) 365-2725. |
| | Donald Jernigan Site Vice President Commitments made by this letter: None |
| | |
| | Serial No. 08-0218 Docket Nos. 50-280 50-281 cc: Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. F. J. Ehrhardt Chief Examiner United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station}} |
Similar Documents at Surry |
---|
Category:License-Operator
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML20007F7572020-01-0707 January 2020 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2020 ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18086B0442018-02-16016 February 2018 Facility Cover Letter - Rii - March 2018 - GFE ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16190A4202016-07-0505 July 2016 June 2016 - Surry NRC Generic Fundamentals Examination Results Cover Letter ML16089A3972016-03-22022 March 2016 301 Section 13 ML16089A3942016-03-22022 March 2016 301 Section 12 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3862016-03-22022 March 2016 301 Section 6 ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML16007A4652016-01-0707 January 2016 301 Draft JPMs ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents ML16007A5182016-01-0707 January 2016 301 General Correspondence ML16007A5162016-01-0707 January 2016 301 Post Exam Comments 2023-05-31
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23151A6612023-05-31031 May 2023 ES-2.1-1, Surry 2023-301 Corporate Notification Letter (Revised) ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21350A0452021-12-16016 December 2021 2A-2 Final Exam Surry 2021-301(2 Yr Delay) ML21350A0362021-12-16016 December 2021 2B Exam Admin Items Surry 2021-301 (Normal Release) ML21350A0502021-12-16016 December 2021 2A-3 Exam Admin Items Surry 2021-301 (2 Year Delay) ML21302A2142021-10-29029 October 2021 301 Post Exam Comments ML21225A7452021-08-13013 August 2021 301 Exam Approval Letter ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20322A4362020-11-16016 November 2020 Notification of Licensed Operator Initial Examination 05000280/2021301 and 05000281/2021301 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19101A3582019-04-11011 April 2019 Operator Licensing Examination Approval 05000280/2019301 and 05000281/2019301 ML18137A4682018-05-17017 May 2018 301 Exam Final Items (ADAMS-2B) Delay Release 2 Years ML18137A4692018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2C) Delay Release 2 Years ML18137A4702018-05-17017 May 2018 301 Exam Administrative Items (ADAMS-2D) ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML18128A3762018-04-25025 April 2018 Notification of Licensed Operator Initial Examination (05000280/2019301 and 05000281/2019301) ML17354B2872017-12-20020 December 2017 05000280/2017301 05000281/2017301 Final Exam - Post Exam Comments ML17354B2952017-12-20020 December 2017 281/2017-301 Final SRO Written Exam - Delay Release 2 Yrs ML17354B2892017-12-20020 December 2017 05000280/2017301, 05000281/2017301 Final RO Written Exam - Delay Release 2 Yrs ML17299A1112017-10-23023 October 2017 Operator Licensing Written Examination Approval 05000280/2017301 and 05000281/2017301 ML17188A4572017-07-0707 July 2017 Exam Administrative Items 2C - Delay Release 2 Yrs ML17188A4562017-07-0707 July 2017 Exam Final Items 2B - Delay Release 2 Yrs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17090A4562017-03-31031 March 2017 Notification of Licensed Operator Initial Examination (05000280/2017301 and 05000281/2017301) ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16089A3882016-03-22022 March 2016 301Section 7 ML16089A3782016-03-22022 March 2016 301 Section 5 ML16089A3922016-03-22022 March 2016 301 Section 11 ML16089A3892016-03-22022 March 2016 301 Section 10 ML16089A2392016-03-22022 March 2016 301 Draft SRO Written Exam ML16089A3572016-03-22022 March 2016 301 Section 4 ML16089A2252016-03-22022 March 2016 301 Draft RO Written Examination ML16089A3942016-03-22022 March 2016 301 Section 12 ML16089A3862016-03-22022 March 2016 301 Section 6 ML16088A3942016-03-22022 March 2016 301 Section 1 ML16089A3972016-03-22022 March 2016 301 Section 13 ML16007A4712016-01-0707 January 2016 301 Draft Admin JPMs ML16007A4382016-01-0707 January 2016 301 Draft RO Written Examination ML16007A4432016-01-0707 January 2016 301 Draft SRO Written Examination ML16007A5162016-01-0707 January 2016 301 Post Exam Comments ML16007A5182016-01-0707 January 2016 301 General Correspondence ML16007A4302016-01-0707 January 2016 301 Draft Administrative Documents ML16007A4732016-01-0707 January 2016 301 Final Administrative Documents ML16007A4592016-01-0707 January 2016 301 Draft Simulator Scenarios ML16007A4892016-01-0707 January 2016 301 Final Scenarios ML16007A4922016-01-0707 January 2016 301 Final Sim and in Plant JPMs ML16007A5052016-01-0707 January 2016 301 Final Admin JPMs ML15293A0722015-10-20020 October 2015 301 RO as Given Written Exam Answer Key Reference List ML15293A0752015-10-20020 October 2015 301 SRO as Given Written Exam Answer Key Reference List ML14224A6302014-08-12012 August 2014 301 Final RO Exam with Key 2023-05-31
[Table view] |
Text
POST-EXAM COMMENTS (Green Paper)
Licensee Submitted Post-Exam Comments
[xi Attached
[ ] None
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 April 11, 2008 Mr. Victor McCree Serial No. 08-0218 Acting Regional Administrator SS&L/TIN RO United States Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 Sam Nunn Atlanta Federal Center License Nos. DPR-32 61 Forsyth St., SW, Suite 23T85 DPR-37 Atlanta, Georgia 30303-8931 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTS In accordance with NUREG-1 021, Section ES-402, the following comments are submitted concerning the Reactor Operator and Senior Reactor Operator Initial Examinations administered at Surry in March and April 2008.
Written Exam:
Surry Power Station does not have any post exam comments related to the written exam administered on April 9, 2008.
Operating Exam:
ADMIN JPM G2.1.7 Quadrant Power Tilt Calculation The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The correct answer should have been .9858. This was not a critical task in this JPM.
N-44 Upper Tilt calculation had a transposition error.
Recommendation: Replace .9895 with .9858 in answer key for the N-44 Upper Tilt Calculation.
Serial No. 08-0218 Docket Nos. 50-280 50-281 ADMIN JPM G2.4.43 Transmit Report of Emergency to State and Local Governments Item 5 of the transmittal form had the critical task listed as "Unit 1 reactor failed to trip. The reactor is now tripped (or words to this effect)".
After conferring with the Emergency Preparedness group, only notifying the State that the reactor failed to trip is required to meet the minimum requirements for this task (Le. this is the minimum required for a satisfactory Performance Indicator).
This evaluation criterion was subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators). Attachment 2 of this procedure only requires a description of the event, which is meant to indicate the reason for entering the emergency plan. As such, the critical task should state, at a minimum, "The reactor failed to trip".
Recommendation: Replace critical task for item #5 to read as follows: "The reactor failed to trip (or words to this effect)".
If yo a e any questions or require additional information, please contact Mr. Barry A.
er a (757) 365-2725.
Donald Jernigan Site Vice President Commitments made by this letter: None
Serial No. 08-0218 Docket Nos. 50-280 50-281 cc: Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. F. J. Ehrhardt Chief Examiner United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station