{{#Wiki_filter:POST-EXAM COMMENTS(GreenPaper)LicenseeSubmitted Post-Exam Comments[xi Attached[]None VIRGINIA ELECTRIC AND POWER COMPANY VIRGINIA 23261April11,2008 Mr.Victor McCreeActingRegional AdministratorUnitedStates Nuclear Regulatory CommissionRegionIISamNunnAtlantaFederal Center61ForsythSt.,SW,Suite23T85Atlanta,Georgia30303-8931 VIRGINIA ELECTRICANDPOWER COMPANY SURRY POWER STATIONUNITS1AND2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTSSerialNo.08-0218 SS&L/T IN RODocketNos.50-280 50-281LicenseNos.DPR-32 DPR-37InaccordancewithNUREG-1021,SectionES-402,thefollowingcommentsaresubmittedconcerningthe ReactorOperatorandSeniorReactorOperatorInitialExaminationsadministeredatSurryinMarchandApril2008.
{{#Wiki_filter:POST-EXAM COMMENTS (Green Paper)
Written Exam:SurryPowerStationdoesnothaveanypostexamcommentsrelatedtothewrittenexamadministeredonApril9,2008.
Licensee Submitted Post-Exam Comments
Operating Exam:ADMINJPMG2.1.7 Quadrant Power Tilt Calculation The numberintheanswerkeyfortheN-44UpperTiltCalculationwaslistedas.9895.Thecorrectanswershouldhavebeen.9858.ThiswasnotacriticaltaskinthisJPM.N-44UpperTiltcalculationhadatranspositionerror.
[xi Attached
Recommendation:Replace.9895with.9858inanswerkeyfortheN-44UpperTiltCalculation.
[ ] None
SerialNo.08-0218DocketNos.50-280 50-281ADMINJPMG2.4.43 Transmit Report of EmergencytoStateand Local GovernmentsItem5ofthetransmittalformhadthecriticaltasklistedas"Unit 1 reactor failed to trip.The reactor is now tripped (or words to this effect)".AfterconferringwiththeEmergencyPreparednessgroup,onlynotifyingtheStatethatthereactorfailedtotripisrequiredtomeettheminimumrequirementsforthistask(Le.thisistheminimumrequiredforasatisfactoryPerformanceIndicator).ThisevaluationcriterionwassubsequentlyidentifiedinDNAP-2605(EmergencyPreparednessPerformanceIndicators).Attachment2ofthisprocedureonlyrequiresadescriptionoftheevent,whichismeanttoindicatethereasonforenteringtheemergencyplan.Assuch,thecriticaltaskshouldstate,ataminimum,"Thereactorfailedtotrip".Recommendation:Replacecriticaltaskforitem#5toreadasfollows: "The reactor failed to trip (or words to this effect)".Ifyoaeanyquestionsorrequireadditionalinformation,pleasecontactMr.BarryA.era(757)365-2725.DonaldJerniganSiteVicePresident Commitmentsmadebythisletter:None cc:Mr.M.T.Widmann,Chief Operations BranchUnitedStatesNuclearRegulatoryCommissionRegionIISamNunnAtlantaFederalCenter 61ForsythStreet,SW,Suite23T85Atlanta,Georgia30303-8931Mr.F.J.Ehrhardt Chief ExaminerUnitedStatesNuclearRegulatoryCommissionRegionIISamNunnAtlantaFederalCenter 61ForsythStreet,SW,Suite23T85Atlanta,Georgia30303-8931 DocumentControlDeskUnitedStatesNuclearRegulatoryCommission Washington,D.C.20555-0001SeniorResident InspectorSurryPowerStationSerialNo.08-0218DocketNos.50-280 50-281}}
 
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 April 11, 2008 Mr. Victor McCree                                                  Serial No. 08-0218 Acting Regional Administrator                                      SS&L/TIN          RO United States Nuclear Regulatory Commission                      Docket Nos. 50-280 Region II                                                                        50-281 Sam Nunn Atlanta Federal Center                                  License Nos. DPR-32 61 Forsyth St., SW, Suite 23T85                                                  DPR-37 Atlanta, Georgia 30303-8931 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTS In accordance with NUREG-1 021, Section ES-402, the following comments are submitted concerning the Reactor Operator and Senior Reactor Operator Initial Examinations administered at Surry in March and April 2008.
Written Exam:
Surry Power Station does not have any post exam comments related to the written exam administered on April 9, 2008.
Operating Exam:
ADMIN JPM G2.1.7 Quadrant Power Tilt Calculation The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The correct answer should have been .9858. This was not a critical task in this JPM.
N-44 Upper Tilt calculation had a transposition error.
Recommendation: Replace .9895 with .9858 in answer key for the N-44 Upper Tilt Calculation.
 
Serial No. 08-0218 Docket Nos. 50-280 50-281 ADMIN JPM G2.4.43 Transmit Report of Emergency to State and Local Governments Item 5 of the transmittal form had the critical task listed as "Unit 1 reactor failed to trip. The reactor is now tripped (or words to this effect)".
After conferring with the Emergency Preparedness group, only notifying the State that the reactor failed to trip is required to meet the minimum requirements for this task (Le. this is the minimum required for a satisfactory Performance Indicator).
This evaluation criterion was subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators). Attachment 2 of this procedure only requires a description of the event, which is meant to indicate the reason for entering the emergency plan. As such, the critical task should state, at a minimum, "The reactor failed to trip".
Recommendation: Replace critical task for item #5 to read as follows: "The reactor failed to trip (or words to this effect)".
If yo    a e any questions or require additional information, please contact Mr. Barry A.
er a (757) 365-2725.
Donald Jernigan Site Vice President Commitments made by this letter: None
 
Serial No. 08-0218 Docket Nos. 50-280 50-281 cc: Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. F. J. Ehrhardt Chief Examiner United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station}}

Latest revision as of 18:17, 14 November 2019

Feb-March Exam 05000280/2008301 Post-Exam Comments - None Letter Dated April 11, 2008
ML081220322
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/11/2008
From: Jernigan D
Virginia Electric & Power Co (VEPCO)
To: Mccree V
NRC/RGN-II
References
50-280/08-301, 50-281/08-301
Download: ML081220322 (4)


Text

POST-EXAM COMMENTS (Green Paper)

Licensee Submitted Post-Exam Comments

[xi Attached

[ ] None

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 April 11, 2008 Mr. Victor McCree Serial No. 08-0218 Acting Regional Administrator SS&L/TIN RO United States Nuclear Regulatory Commission Docket Nos. 50-280 Region II 50-281 Sam Nunn Atlanta Federal Center License Nos. DPR-32 61 Forsyth St., SW, Suite 23T85 DPR-37 Atlanta, Georgia 30303-8931 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 WRITTEN/OPERATING LICENSE EXAMINATION COMMENTS In accordance with NUREG-1 021, Section ES-402, the following comments are submitted concerning the Reactor Operator and Senior Reactor Operator Initial Examinations administered at Surry in March and April 2008.

Written Exam:

Surry Power Station does not have any post exam comments related to the written exam administered on April 9, 2008.

Operating Exam:

ADMIN JPM G2.1.7 Quadrant Power Tilt Calculation The number in the answer key for the N-44 Upper Tilt Calculation was listed as .9895. The correct answer should have been .9858. This was not a critical task in this JPM.

N-44 Upper Tilt calculation had a transposition error.

Recommendation: Replace .9895 with .9858 in answer key for the N-44 Upper Tilt Calculation.

Serial No. 08-0218 Docket Nos. 50-280 50-281 ADMIN JPM G2.4.43 Transmit Report of Emergency to State and Local Governments Item 5 of the transmittal form had the critical task listed as "Unit 1 reactor failed to trip. The reactor is now tripped (or words to this effect)".

After conferring with the Emergency Preparedness group, only notifying the State that the reactor failed to trip is required to meet the minimum requirements for this task (Le. this is the minimum required for a satisfactory Performance Indicator).

This evaluation criterion was subsequently identified in DNAP-2605 (Emergency Preparedness Performance Indicators). Attachment 2 of this procedure only requires a description of the event, which is meant to indicate the reason for entering the emergency plan. As such, the critical task should state, at a minimum, "The reactor failed to trip".

Recommendation: Replace critical task for item #5 to read as follows: "The reactor failed to trip (or words to this effect)".

If yo a e any questions or require additional information, please contact Mr. Barry A.

er a (757) 365-2725.

Donald Jernigan Site Vice President Commitments made by this letter: None

Serial No. 08-0218 Docket Nos. 50-280 50-281 cc: Mr. M. T. Widmann, Chief Operations Branch United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Mr. F. J. Ehrhardt Chief Examiner United States Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23 T85 Atlanta, Georgia 30303-8931 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station