ML101100458: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:U.S.NRC Seabrook United States Nuclear Commission Protecting People and the Environment A*pril 20, MEMO FOR THE NRC Slides for April 14,
{{#Wiki_filter:Seabrook                    U.S.NRC United States Nuclear       Commission Protecting People and the Environment A*pril 20, 2010 MEMO FOR THE FILE NRC Slides for AAM April 14, 2010


U.S.NRC NRC Strategic Plan United States Nuclear Commission Protecting People and the Environment Goals " Safety -Ensure adequate protection of public health and safety and the environment " Security -Ensure adequate protection in the secure use and management of radioactive materials
NRC Strategic Plan                        U.S.NRC United States Nuclear     Commission ProtectingPeople and the Environment Goals
" Safety - Ensure adequate protection of public health and safety and the environment
" Security - Ensure adequate protection in the secure use and management of radioactive materials


U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment 2009 Assessment Summary NextEra operated Seabrook safely and in a manner that preserved the public health and safety and protected the environment . .. Regulatory Response column of the Action Matrix . .. Baseline inspections planned for 2010. " IP 95001 supplemental inspection planned for second quarter.
Seabrook                          U.S.NRC United States Nuclear Regulatory Commission 2009 Assessment Summary            Protecting People and the Environment
I nspection Activities at United States Nuclear Commission Protecting People and the Environment Seabt"ook in 2009 " 5618 hours of inspection and related activities
" NextEra operated Seabrook safely and in a manner that preserved the public health and safety and protected the environment .
.. 2 resident inspectors on site .. 12 regional inspections
.. Regulatory Response column of the Action Matrix .
.. 1 team inspection Seabrook U.S.NRC United States Nuclear Commission Protecting People and the Environment Performance Indicator Inspection January 1 through December 31, " All Green Performance Indicators iii Identified 2 Green inspection findings " Identified 1 White inspection finding -failure of the B EDG in February 2009 U.S.NRC United States Nuclear Commission Insoection Protecting People and the Environment
.. Baseline inspections planned for 2010.
* Report 2009-07 B EDG failed to run during February 25, 2009 test EDG shutdown when cooling water gasket failed Gasket was modified during overhaul in January 2009 Gasket design was not of adequate material, thickness
" IP 95001 supplemental inspection planned for second quarter.
& configuration U.S.NRC United Slates NucJea.f Commission Protecting People and the Environment Inadequate Design Control Q suitability of gasket for flange conditions
.. flange performance history Q potential failure modes " impacts of vibrations on flange performance Inadequate Corrective Actions NextEra did not adequately tj. use internal operating experience " correct known flange vibrations Theme: Design Control & U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Corrective Actions I<ey Point: EDG finding in the area of design control, with aspects of inadequate corrective actions Another finding in 2009, unrelated to the EDG, concerned inadequate design control for the failure to verify that service water isolation valve leakage was within design assumptions U.S.NRC United States Nuclear Regulatory Commission NRC Action Matrix Licensee l Regulatory 1\ Degraded Response , All Inputs a Cornerstor Fully Met, Response 1 or 2 White Inputs; Cornerstone Objectives Fully Met Cornerstone
\ 2 White or 1 Yellow Input; Cornerstone jectives Met wi j Moderate egradation in Safety Performance Multiple Multiple Inputs or 1 Input; Objectives Met Degradation Safety Protecting People and t-he Environment Unacceptable Performance Overall Unacceptable Performance; Plants not permitted to Operate wlin this Column; Unacceptable Margin to Safety
.. Increasing safety significance
.. Increasing NRC inspection efforts .. Increasing NRC/Licensee management involvement
.. Increasing regulatory actions 2010 Inspection U.S.NRC United States Nuclear Commission Protecting People atul the Environment for Seabrook Supplemental and Baseline Inspection Baseline inspections planned for 2010. IP 95001 supplemental inspection planned for the second quarter of 2010 U.S.NRC United States Nuclear Commission Protecting People ana the Environment NextEra Energy Response and Seabrook U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment 2009 Assessment Summary "Seabrook was in the Regulatory Response column of the Action Matrix. " Baseline inspections are planned for " IP 95001 supplemental inspection is planned for the second quarter 2010.


U.S.NR C United States Nuclear Regulatory Commission Protecting People and the Environment Contacting the NRC Report a safety concern: -(800) 695-7403 -Allegation@nrc.gov General information or questions:  
Inspection Activities at            U.S.NRC United States Nuclear      Commission Seabt"ook in 2009      Protecting People and the Environment
-Public Affairs Officers:
" 5618 hours of inspection and related activities
* Diane Screnci 610-337-5330
.. 2 resident inspectors on site
* Neil Sheehan 610-337-5331 NRC U.S.NRC United States Nuclear Commission Protecting People and the Envi1''Onment Threshold Summary .. .. Performance Indicators (PI) Baseline Inspection " White Requires additional NRC oversight Requires more NRC oversight ill Red Requires most NRC oversight nspection Findings Very low safety issue " .. White Low to moderate safety issue Substantial safety issue " Red High safety issue I nspection Activities at United States Nuclear Regulatory Commission Protecting People and the Environment Seabrook in Baseline Inspection Performance Indicators (Pis) 5618 hrs inspection 16 Pis per operating unit 2 resident inspectors on site Significance Threshold Across the 7 Cornerstones 17 regional inspections Green Very low safety issue Inspector verified 1 major team inspection White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue X-Cutting Themes 1 Greater-than-Green No Greater-than-Green None 2 Green / SL IV findings Performance Indicators Substantive X-cutting Issues Action Matrix None}}
.. 12 regional inspections
.. 1 team inspection
 
Seabrook                          U.S.NRC United States Nuclear      Commission Performance Indicator and          Protecting People and the Environment Inspection Results January 1 through December 31, 2009
" All Green Performance Indicators iii Identified 2 Green inspection findings
" Identified 1 White inspection finding - failure of the B EDG in February 2009
 
U.S.NRC Insoection
* United States Nuclear      Commission Protecting People and the Environment Report 2009-07 B EDG failed to run during February 25, 2009 test EDG shutdown when cooling water gasket failed Gasket was modified during overhaul in January 2009 Gasket design was not of adequate material, thickness
  & configuration
 
U.S.NRC Inadequate Design Control United Slates NucJea.f      Commission Protecting People and the Environment Q  suitability of gasket for flange conditions
.. flange performance history Q potential failure modes
" impacts of vibrations on flange performance Inadequate Corrective Actions NextEra did not adequately tj. use internal operating experience
" correct known flange vibrations
 
Theme: Design Control &                        U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Corrective Actions I<ey Point: EDG finding in the area of design control, with aspects of inadequate corrective actions Another finding in 2009, unrelated to the EDG, concerned inadequate design control for the failure to verify that service water isolation valve leakage was within design assumptions
 
U.S.NRC NRC Action Matrix                                                          United States Nuclear Regulatory Commission Protecting People and t-he Environment Licensee
 
===Response===
l    Regulatory
 
===Response===
1\    Degraded Cornerstone Multiple Repetitive    Unacceptable
              ,                    \
Degraded Cornerstone Performance All Inputs a e    1 or 2 White      2 White or 1      Multiple Yellow              Overall Green;          Inputs;        Yellow Input;    Inputs or 1 Red        Unacceptable Cornerstor ~      Cornerstone      Cornerstone    Input; Cornerstone      Performance; Objective~        Objectives  O~ jectives Met wi  Objectives Met wi          Plants not Fully Met,        Fully Met      j Moderate            Significant          permitted to egradation in      Degradation in      Operate wlin this Safety      Safety Performance            Column; Performance                              Unacceptable Margin to Safety L--------,J
                .. Increasing safety significance
                .. Increasing NRC inspection efforts
                .. Increasing NRC/Licensee management involvement
                .. Increasing regulatory actions
 
2010 Inspection Plan                  ~-      U.S.NRC United States Nuclear        Commission for Seabrook                  Protecting People atul the Environment Supplemental and Baseline Inspection
'it Baseline inspections planned for 2010.
" IP 95001 supplemental inspection planned for the second quarter of 2010
 
U.S.NRC United States Nuclear        Commission Protecting People  ana the Environment NextEra Energy Seabrook Response and Remarks
 
Seabrook                          U.S.NRC United States Nuclear Regulatory Commission 2009 Assessment Summary        Protecting People and the Environment "Seabrook was in the Regulatory Response column of the Action Matrix.
" Baseline inspections are planned for 2010.
" IP 95001 supplemental inspection is planned for the second quarter 2010.
 
                                      ~"\~      U.S.NRC United States Nuclear Regulatory Commission Contacting the NRC                 Protecting People and the Environment
* Report a safety concern:
  - (800) 695-7403
  - Allegation@nrc.gov
* General information or questions:
  - Public Affairs Officers:
* Diane Screnci     610-337-5330
* Neil Sheehan     610-337-5331
 
NRC Significance                            U.S.NRC United States Nuclear       Commission Threshold Summary                    Protecting People and the Envi1''Onment Performance Indicators (PI)
  .          Baseline Inspection
  " White   Requires additional NRC oversight
  .          Requires more NRC oversight ill Red   Requires most NRC oversight Inspection Findings
  ~          Very low safety issue
.. White   Low to moderate safety issue Substantial safety issue
"" Red     High safety issue
 
Inspection Activities at                                                                     U.S.NRC United States Nuclear Regulatory Commission Seabrook in 2009                                                            Protecting People and the Environment Baseline Inspection                                                                   Performance Indicators (Pis) 5618 hrs inspection                                                                   16 Pis per operating unit 2 resident inspectors on site       Significance Threshold                         Across the 7 Cornerstones 17 regional inspections             Green         Very low safety issue             Inspector verified 1 major team inspection             White         Low to moderate safety issue Yellow       Substantial safety issue Red           High safety issue X-Cutting Themes           1 Greater-than-Green               No Greater-than-Green None               2 Green / SL IV findings           Performance Indicators Substantive X-cutting Issues Action Matrix None}}

Revision as of 20:43, 13 November 2019

NRC Slides for Seabrook Annual Assessment Meeting, April 14, 2010
ML101100458
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/20/2010
From:
Division Reactor Projects I
To:
BURRITT al
References
Download: ML101100458 (17)


Text

Seabrook U.S.NRC United States Nuclear Commission Protecting People and the Environment A*pril 20, 2010 MEMO FOR THE FILE NRC Slides for AAM April 14, 2010

NRC Strategic Plan U.S.NRC United States Nuclear Commission ProtectingPeople and the Environment Goals

" Safety - Ensure adequate protection of public health and safety and the environment

" Security - Ensure adequate protection in the secure use and management of radioactive materials

Seabrook U.S.NRC United States Nuclear Regulatory Commission 2009 Assessment Summary Protecting People and the Environment

" NextEra operated Seabrook safely and in a manner that preserved the public health and safety and protected the environment .

.. Regulatory Response column of the Action Matrix .

.. Baseline inspections planned for 2010.

" IP 95001 supplemental inspection planned for second quarter.

Inspection Activities at U.S.NRC United States Nuclear Commission Seabt"ook in 2009 Protecting People and the Environment

" 5618 hours0.065 days <br />1.561 hours <br />0.00929 weeks <br />0.00214 months <br /> of inspection and related activities

.. 2 resident inspectors on site

.. 12 regional inspections

.. 1 team inspection

Seabrook U.S.NRC United States Nuclear Commission Performance Indicator and Protecting People and the Environment Inspection Results January 1 through December 31, 2009

" All Green Performance Indicators iii Identified 2 Green inspection findings

" Identified 1 White inspection finding - failure of the B EDG in February 2009

U.S.NRC Insoection

  • United States Nuclear Commission Protecting People and the Environment Report 2009-07 B EDG failed to run during February 25, 2009 test EDG shutdown when cooling water gasket failed Gasket was modified during overhaul in January 2009 Gasket design was not of adequate material, thickness

& configuration

U.S.NRC Inadequate Design Control United Slates NucJea.f Commission Protecting People and the Environment Q suitability of gasket for flange conditions

.. flange performance history Q potential failure modes

" impacts of vibrations on flange performance Inadequate Corrective Actions NextEra did not adequately tj. use internal operating experience

" correct known flange vibrations

Theme: Design Control & U.S.NRC United States Nuclear Regulatory Commission Protecting People and the Environment Corrective Actions I<ey Point: EDG finding in the area of design control, with aspects of inadequate corrective actions Another finding in 2009, unrelated to the EDG, concerned inadequate design control for the failure to verify that service water isolation valve leakage was within design assumptions

U.S.NRC NRC Action Matrix United States Nuclear Regulatory Commission Protecting People and t-he Environment Licensee

Response

l Regulatory

Response

1\ Degraded Cornerstone Multiple Repetitive Unacceptable

, \

Degraded Cornerstone Performance All Inputs a e 1 or 2 White 2 White or 1 Multiple Yellow Overall Green; Inputs; Yellow Input; Inputs or 1 Red Unacceptable Cornerstor ~ Cornerstone Cornerstone Input; Cornerstone Performance; Objective~ Objectives O~ jectives Met wi Objectives Met wi Plants not Fully Met, Fully Met j Moderate Significant permitted to egradation in Degradation in Operate wlin this Safety Safety Performance Column; Performance Unacceptable Margin to Safety L--------,J

.. Increasing safety significance

.. Increasing NRC inspection efforts

.. Increasing NRC/Licensee management involvement

.. Increasing regulatory actions

2010 Inspection Plan ~- U.S.NRC United States Nuclear Commission for Seabrook Protecting People atul the Environment Supplemental and Baseline Inspection

'it Baseline inspections planned for 2010.

" IP 95001 supplemental inspection planned for the second quarter of 2010

U.S.NRC United States Nuclear Commission Protecting People ana the Environment NextEra Energy Seabrook Response and Remarks

Seabrook U.S.NRC United States Nuclear Regulatory Commission 2009 Assessment Summary Protecting People and the Environment "Seabrook was in the Regulatory Response column of the Action Matrix.

" Baseline inspections are planned for 2010.

" IP 95001 supplemental inspection is planned for the second quarter 2010.

~"\~ U.S.NRC United States Nuclear Regulatory Commission Contacting the NRC Protecting People and the Environment

  • Report a safety concern:

- (800) 695-7403

- Allegation@nrc.gov

  • General information or questions:

- Public Affairs Officers:

NRC Significance U.S.NRC United States Nuclear Commission Threshold Summary Protecting People and the Envi1Onment Performance Indicators (PI)

. Baseline Inspection

" White Requires additional NRC oversight

. Requires more NRC oversight ill Red Requires most NRC oversight Inspection Findings

~ Very low safety issue

.. White Low to moderate safety issue Substantial safety issue

"" Red High safety issue

Inspection Activities at U.S.NRC United States Nuclear Regulatory Commission Seabrook in 2009 Protecting People and the Environment Baseline Inspection Performance Indicators (Pis) 5618 hrs inspection 16 Pis per operating unit 2 resident inspectors on site Significance Threshold Across the 7 Cornerstones 17 regional inspections Green Very low safety issue Inspector verified 1 major team inspection White Low to moderate safety issue Yellow Substantial safety issue Red High safety issue X-Cutting Themes 1 Greater-than-Green No Greater-than-Green None 2 Green / SL IV findings Performance Indicators Substantive X-cutting Issues Action Matrix None