| =Text= | | =Text= |
| {{#Wiki_filter:Appendix Scenario Outline Form ES-O-1 Facility: | | {{#Wiki_filter:Appendix 0 Scenario Outline Form ES-O-1 Facility: SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE Examiners: o Silk Operators: T. Mulholland T Fish O. Norgaard Initial Conditions: 100% power, EOL. 2B EOG CIT for governor repair. 21 SGFP governor has small oil leak. |
| SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE o Silk Operators: | | Turnover: Maintain current power Event Malf. No. Event Event Type* |
| T. Mulholland T Fish O. Norgaard Initial Conditions: | | No. Description I |
| 100% power, EOL. 2B EOG CIT for governor repair. 21 SGFP governor has small oil leak. Turnover: | | 1 CRS/RO Power Range NI fails high (Tech Spec) 2 CRS Steam Generator Level Transmitter fails low (Tech Spec) |
| Maintain current power Event No. Malf. No. Event Type* Event Description I 1 CRS/RO Power Range NI fails high (Tech Spec) 2 CRS Steam Generator Level Transmitter fails low (Tech Spec) R 3 ALL SGFP lube oil leak-power reduction MSGTR ALL -C21 AFW pump fails to start on SEC CRS/PO C23 RCP trip during SGTR depressurization CRS/RO 7 C PZR PORV fails to shut after RCS depressurization CRS/RO complete * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39 Appendix D Scenario Outline Form ES-D-1 Facility: | | R 3 ALL SGFP lube oil leak-power reduction M |
| SALEM 1 &2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC Examiners: | | 4 SGTR ALL - |
| DSilk Operators: | | C 5 21 AFW pump fails to start on SEC CRS/PO C |
| T T Fish D Initial Conditions: | | 6 23 RCP trip during SGTR depressurization CRS/RO 7 C PZR PORV fails to shut after RCS depressurization CRS/RO complete |
| Rx power is 70%, EOL. 21 CFCU is Turnover: | | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39 |
| Raise power to 90% power at 10% per Event Malf. No. Event Event Type* No. 1 Power ascension 2 CRS CCW pump trip (Tech 3 PZR Level Channel fails hi (Tech Spec) 4 C Steam I,.eak in | | |
| -M 5 Steamline rupture in containment with MSLI failure 6 Cont Spray I Phase B fail to actuate CRS/RO * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39}}
| | Appendix D Scenario Outline Form ES-D-1 Facility: SALEM 1 & 2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC RETAKE Examiners: DSilk Operators: T Mulholland T Fish D Norgaard Initial Conditions: Rx power is 70%, EOL. 21 CFCU is CfT. |
| | Turnover: Raise power to 90% power at 10% per hour Event Malf. No. Event Event Type* |
| | No. Description N |
| | 1 Power ascension ALL 2 CRS CCW pump trip (Tech Spec) |
| | I 3 PZR Level Channel fails hi (Tech Spec) |
| | CRS/RO 4 C Steam I,.eak in containment - |
| | M 5 Steamline rupture in containment with MSLI failure ALL C |
| | 6 Cont Spray I Phase B fail to actuate CRS/RO |
| | * (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39}} |
Letter Sequence Draft Other |
---|
|
|
|
Similar Documents at Salem |
---|
Category:License-Operator
MONTHYEARML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20279A4372020-10-13013 October 2020 September 9, 2020, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19289C4412019-10-15015 October 2019 September 4, 2019, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19045A3702019-02-12012 February 2019 March 2019 GFE Cover Letter Ri ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18107A2302018-04-12012 April 2018 March 7, 2018, NRC Generic Fundamentals Examination Results for Salem Nuclear Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18086B0252018-02-16016 February 2018 Facility Cover Letter - Ri - March 2018 - GFE ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17278A1702017-10-0505 October 2017 September 6, 2017, NRC Generic Fundamentals Examination for Salem Nuclear Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) ML17156A5622017-06-0505 June 2017 Operator Licensing Retake Examination Approval LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) 2023-08-21
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML23208A2462023-05-23023 May 2023 Final QA Related Forms ML22207B8342022-03-30030 March 2022 Form ES-201-2 (Folder 1) ML22175A2012022-03-30030 March 2022 Final QA Related Forms (Folder 1) ML22116A1822022-02-11011 February 2022 Final Written Examination with Answer Key (Form 401-5 Format) (Folder 3) ML22175A1972021-11-18018 November 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21069A1432021-03-10010 March 2021 Senior Reactor and Reactor Operator Initial License Examinations ML21012A2702021-01-12012 January 2021 Final Qa/Related Forms (Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20301A6322020-10-27027 October 2020 Handouts to Applicants (Folder 3) ML20300A5562020-10-26026 October 2020 Final Qa/Related Form - Form ES-401-6 (Folder 1) ML20297A3062020-10-23023 October 2020 Final Written Examination and Operating Test Outlines (Folder 3) ML20297A2792020-10-23023 October 2020 Draft Written Examination and Operating Test Outlines (Folder 2) ML20296A4322020-10-22022 October 2020 Draft Written Examination (Folder 2) ML20296A4302020-10-22022 October 2020 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML20240A3182020-08-27027 August 2020 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML20240A3222020-08-27027 August 2020 Final Operating Test (Sections a, B, and C) (Folder 3) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19211C2552019-07-30030 July 2019 Senior Reactor and Reactor Operator Initial License Examinations ML19004A1222019-01-0303 January 2019 Initial Operator Licensing Operating Test Approval ML18135A2482018-05-21021 May 2018 Draft Written Examination (Folder 2) ML18135A2162018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Written Exam (Folder 2) ML18135A3012018-05-15015 May 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) NTD-18-043, Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-26026 April 2018 Response to RIS 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18135A2252018-03-20020 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18074A0542018-03-0909 March 2018 Handouts to Applicants (Folder 3) ML18074A0552018-03-0909 March 2018 Final Operating Test (Section a, B, and C) (Folder 3) ML18074A0522018-03-0909 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18074A0532018-03-0909 March 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18134A1282018-03-0909 March 2018 Final Qa/Related Forms (Forms 1) ML18149A4942018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 RO (Folder 1) ML18134A1372018-03-0909 March 2018 Final Qa/Related Forms - Form ES-401-6 SRO (Folder 1) ML18025A8582018-01-22022 January 2018 Initial Operator Licensing Written Examination Approval ML18017A8212018-01-17017 January 2018 Initial Operator Licensing Test Approval ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML18135A3332017-12-11011 December 2017 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML17201A0612017-07-19019 July 2017 Senior Reactor and Reactor Operator Initial License Examinations - Salem Nuclear Generating Station IR 05000272/20173022017-06-29029 June 2017 Senior Reactor Operator Retake License Examination Report 05000272/2017302 and 05000311/2017302 ML17249A1322017-06-0707 June 2017 Final Qa/Related Forms (Folder 1) ML17174B2102017-06-0606 June 2017 Final Outlines (Folder 3) ML17174B2112017-06-0606 June 2017 Final Operating Test (Section C) (Folder 3) LR-N17-0099, Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0505 May 2017 Response to RIS-2017-03, Preparation and Scheduling of Operator Licensing Examinations ML17249A1342017-04-20020 April 2017 Draft Operating Exam (Section C) (Folder 2) ML17249A1332017-04-20020 April 2017 Draft - Outlines (Folder 2) ML17102B2082017-04-11011 April 2017 Senior Reactor Operator Retake License Examination: Salem Nuclear Generating Station, Units 1 and 2 ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17031A3372016-12-19019 December 2016 Handouts to Applicants (Folder 3) ML17031A3472016-12-12012 December 2016 Final Operating Test (Sections a, B, and C) (Folder 3) ML17031A2942016-12-12012 December 2016 Final Outlines (Folder 3) ML17109A3512016-12-12012 December 2016 Final Qa/Related Forms (Folder 1) ML17109A3522016-12-12012 December 2016 Final Qa/Related Forms - Form ES-401-6 (Folder 1) 2023-05-23
[Table view] |
Text
Appendix 0 Scenario Outline Form ES-O-1 Facility: SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE Examiners: o Silk Operators: T. Mulholland T Fish O. Norgaard Initial Conditions: 100% power, EOL. 2B EOG CIT for governor repair. 21 SGFP governor has small oil leak.
Turnover: Maintain current power Event Malf. No. Event Event Type*
No. Description I
1 CRS/RO Power Range NI fails high (Tech Spec) 2 CRS Steam Generator Level Transmitter fails low (Tech Spec)
R 3 ALL SGFP lube oil leak-power reduction M
4 SGTR ALL -
C 5 21 AFW pump fails to start on SEC CRS/PO C
6 23 RCP trip during SGTR depressurization CRS/RO 7 C PZR PORV fails to shut after RCS depressurization CRS/RO complete
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39
Appendix D Scenario Outline Form ES-D-1 Facility: SALEM 1 & 2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC RETAKE Examiners: DSilk Operators: T Mulholland T Fish D Norgaard Initial Conditions: Rx power is 70%, EOL. 21 CFCU is CfT.
Turnover: Raise power to 90% power at 10% per hour Event Malf. No. Event Event Type*
No. Description N
1 Power ascension ALL 2 CRS CCW pump trip (Tech Spec)
I 3 PZR Level Channel fails hi (Tech Spec)
CRS/RO 4 C Steam I,.eak in containment -
M 5 Steamline rupture in containment with MSLI failure ALL C
6 Cont Spray I Phase B fail to actuate CRS/RO
- (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39