Appendix D Scenario Outline Form ES-D-1 Facility:

SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE Examiners:

DSilk Operators: T. Mulholland T Fish D. Norgaard Initial Conditions: 100% power, EOL. 28 EDG crr for governor repair. 21 SGFP governor has small oil leak.

Turnover: Maintain current power Event No.

Malf. No.

Event Type*

Event Description I

1 CRS/RO Power Range NI fails high (Tech Spec)

I

?

CRS Steam Generator Level Transmitter fails low (Tech Spec)

R 3

ALL SGFP lube oil leak-power reduction M

4 SGTR ALL C

5 21 AFW pump fails to start on SEC CRS/PO C

6 23 RCP trip during SGTR depressurization CRS/RO 7

C PZR PORV fails to shut after RCS depressurization CRS/RO complete

  • (N)ormal, (R)eactlvity, (I)nstrument, (C)omponent,

{M)ajor Appendix D, Page 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility:

SALEM 1 & 2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC RETAKE Examiners:

DSilk Operators: T Mulholland T Fish D Norgaard Initial Conditions: Rx power is 70%, EOL. 21 CFCU is CIT.

Turnover: Raise power to 90% power at 10% per hour Event Malf. No.

Event Event Type*

No.

Description N

1 Power ascension ALL 2

CRS CCW pump trip {Tech Spec}

I 3

PZR Level Channel fails hi (Tech Spec)

CRS/RO 4

C Steam Leak leading to ATWT M

5 Steam line rupture in containment with MSLI failure ALL C

6 Cont Spray I Phase B fail to actuate CRS/RO

  • (N)ormal,

{R)eactlVlty, (I)nstrument, (C}omponent, (M)aJor Appendix D, Page 38 of 39