Text
Appendix D Scenario Outline Form ES-D-1 Facility:
SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE Examiners:
DSilk Operators: T. Mulholland T Fish D. Norgaard Initial Conditions: 100% power, EOL. 28 EDG crr for governor repair. 21 SGFP governor has small oil leak.
Turnover: Maintain current power Event No.
Malf. No.
Event Type*
Event Description I
1 CRS/RO Power Range NI fails high (Tech Spec)
I
?
CRS Steam Generator Level Transmitter fails low (Tech Spec)
R 3
ALL SGFP lube oil leak-power reduction M
4 SGTR ALL C
5 21 AFW pump fails to start on SEC CRS/PO C
6 23 RCP trip during SGTR depressurization CRS/RO 7
C PZR PORV fails to shut after RCS depressurization CRS/RO complete
- (N)ormal, (R)eactlvity, (I)nstrument, (C)omponent,
{M)ajor Appendix D, Page 38 of 39
Appendix D Scenario Outline Form ES-D-1 Facility:
SALEM 1 & 2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC RETAKE Examiners:
DSilk Operators: T Mulholland T Fish D Norgaard Initial Conditions: Rx power is 70%, EOL. 21 CFCU is CIT.
Turnover: Raise power to 90% power at 10% per hour Event Malf. No.
Event Event Type*
No.
Description N
1 Power ascension ALL 2
I 3
PZR Level Channel fails hi (Tech Spec)
CRS/RO 4
C Steam Leak leading to ATWT M
5 Steam line rupture in containment with MSLI failure ALL C
6 Cont Spray I Phase B fail to actuate CRS/RO
- (N)ormal,
{R)eactlVlty, (I)nstrument, (C}omponent, (M)aJor Appendix D, Page 38 of 39