Retake - Draft - Outlines (Folder 2)
ML102810407
Person / Time
Site: Salem  PSEG icon.png
Issue date: 08/06/2010
From:
Public Service Enterprise Group
To: David Silk
Operations Branch I
Hansell S
Shared Package
ML102080004 List:
References
TAC U01835, 50-272/10-302, 50-311/10-302, ES-D-1 50-272/10-302, 50-311/10-302
Download: ML102810407 (2)


Text

Appendix 0 Scenario Outline Form ES-O-1 Facility:

SALEM 1 & 2 Scenario No.:ESG-1 Op-Test No.: 08-01 NRC RETAKE Examiners:

o Silk Operators: T. Mulholland T Fish O. Norgaard Initial Conditions: 100% power, EOL. 2B EOG CIT for governor repair. 21 SGFP governor has small oil leak.

Turnover: Maintain current power Event No.

Malf. No.

Event Type*

Event Description I

1 CRS/RO Power Range NI fails high (Tech Spec) 2 CRS Steam Generator Level Transmitter fails low (Tech Spec)

R 3

ALL SGFP lube oil leak-power reduction M

4 SGTR ALL C

5 21 AFW pump fails to start on SEC CRS/PO C

6 23 RCP trip during SGTR depressurization CRS/RO 7

C PZR PORV fails to shut after RCS depressurization CRS/RO complete

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility:

SALEM 1 &2 Scenario No.: ESG-2 Op-Test No.: 08-01 NRC RETAKE Examiners:

DSilk Operators: T Mulholland T Fish D Norgaard Initial Conditions: Rx power is 70%, EOL. 21 CFCU is CfT.

Turnover: Raise power to 90% power at 10% per hour Event Malf. No.

Event Event Type*

No.

Description N

1 Power ascension ALL 2

CRS CCW pump trip (Tech Spec)

I 3

PZR Level Channel fails hi (Tech Spec)

CRS/RO 4

C Steam I,.eak in containment M

5 Steamline rupture in containment with MSLI failure ALL C

6 Cont Spray I Phase B fail to actuate CRS/RO

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix 0, Page 38 of 39