{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Friday, December 10, 2010 11:25 AM To: Crouch, William D Cc: Clark, Mark Steven; Hilmes, St even A; WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                     Poole, Justin Sent:                     Friday, December 10, 2010 11:25 AM To:                       Crouch, William D Cc:                       Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: Updated OI List Attachments:
FW: Updated OI List Attachments:               20101210 Open Item List Master NRC Update 12-10-10.docx See attached Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov
20101210 Open Item List Master NRC Update 12-10-10.docxSee attached  
-----Original Message-----
 
From: Darbali, Samir Sent: Friday, December 10, 2010 11:17 AM To: Poole, Justin Cc: Garg, Hukam
Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission  
 
(301)415-2048  
 
email: Justin.Poole@nrc.gov
  -----Original Message----- From: Darbali, Samir Sent: Friday, December 10, 2010 11:17 AM To: Poole, Justin  
 
Cc: Garg, Hukam  


==Subject:==
==Subject:==
Updated OI List
Updated OI List
: Justin,  
: Justin, Attached is the updated OI list to be sent out to TVA.
 
: Thanks, Samir 1
Attached is the updated OI list to be sent out to TVA.
Thanks, Samir  


Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 215   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7A6403732C)
Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         215 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D7A6403732C)


==Subject:==
==Subject:==
FW: Updated OI List Sent Date:   12/10/2010 11:25:08 AM Received Date: 12/10/2010 11:25:12 AM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "Clark, Mark Steven" <msclark0@tva.gov> Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
FW: Updated OI List Sent Date:             12/10/2010 11:25:08 AM Received Date:         12/10/2010 11:25:12 AM From:                 Poole, Justin Created By:           Justin.Poole@nrc.gov Recipients:
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov> Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None  
"Clark, Mark Steven" <msclark0@tva.gov>
 
Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>
Post Office:   HQCLSTR02.nrc.gov Files     Size     Date & Time MESSAGE   392     12/10/2010 11:25:12 AM 20101210 Open Item List Master NRC Update 12-10-10.docx   410259 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides 1.Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides 2.Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                         Size                 Date & Time MESSAGE                       392                   12/10/2010 11:25:12 AM 20101210 Open Item List Master NRC Update 12-10-10.docx                   410259 Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides 3.Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:
Recipients Received:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g 4.Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
LIC-110 Rev. 1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5.Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2 6.Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 7 7.Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 8 8.Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 9 9.Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 10 10.Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 11 11.Y Closed Closed EICB RAI ML101680598
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 12 12.Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
, 2010 (Enclosure 1
, Item No. 13 13.Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10 14.Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10 15.Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
, if an y, for the solid state p rotection Date: 4/27/10 17.Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10 18.Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10 19.Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10 20.Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10 21.Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10 22.Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10 23.Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a 24.Y Closed Closed  NRC Meetin g N/A - Re q uest for NNC 4/30/10:
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
, verif y that the Date: 4/27/10 25.Y Closed Closed NRC Meetin g ML101230248
,  026    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10 26.Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10 27.Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen 28.Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10 29.Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark 30.Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10 31.Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10 32.Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10 33.Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA 34.Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction 35.Y Close Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  36.Y Close Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  37.Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  38.Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
A ll Other S ystems Re quired for Safet y  39.Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  40.Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark 41.Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10 42.Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10 43.Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                Date: 5/25/10 44.Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10 45.Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10 46.Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010. Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10 Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 For Item 3, Attachment 19contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010. For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
: 1. N Open  Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version.  (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM. Open-NRC Review Due:  (3) 12/3/10  (4) 12/10/10 TVA to docket information indentified in ISG6. NRC Meeting Summary NRC


Meeting Summary
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                            radF7C8C.docx                                                                          Open Items to be Resolved for SER Approval


ML093560019, Item No. 11 TVA Letter dated 6/18/10  
===Response===
SE      FSAR        NRC No.                                                                          Issue                                                    TVA Response(s)                      Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec.        POC                                                                                                                                              Y/N B        (
001      All      All              A        The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency          12/15/2009 Presentation Slides                          1. Y        Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains B        (
002      All      All              A        Are there I&C components and systems that have changed to a          12/15/2009 Presentation Slides                          2. Y        Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains B        (
003      All      All              A        Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides                                3. Y        Closed                        Closed              EICB RAI          3/12/2010          NNC 11/19/09: The FSAR contains
(        B 004      All      All                      Please identify the information that will be submitted for each      Responder: Webb      1/13/10 Public Meeting            4. Y        Closed                        Closed              EICB RAI          January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005    7.1.3.1                              By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb                                            5. Y        Closed                        Closed              EICB RAI          TVA Letter dated D
( ( ( (
006                                          Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2        6. Y        Closed                        Closed              EICB RAI          TVA Letter dated NNC: WCAP-12096 Rev. 7 007    7.1.3.1          a        (        The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7.          Y        Closed                        Closed              EICB RAI          TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008      7.3                G G G G          There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8. Y        Closed                        Closed              EICB RAI          TVA Letter dated r        A 009    7.3.2    5.6,                      Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9.      Y        Closed                        Closed              EICB RAI          3/12/10,
(
010      7.3      7.3                      The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y                Closed                        Closed              EICB RAI          3/12/10, D
a r
(
011    7.3.2    5.6,                      NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y        Closed                        Closed              EICB RAI          ML101680598, D
a r
(
012      7.4      7.4    ( D                The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y                Closed                        Closed              EICB RAI          TVA Letter dated G a r
013    7.1.3.1                              Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not          TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y        Closed                        Closed              EICB RAI          TVA Letter dated TS have been docketed.
014      All      All    (    B            Provide the justification for any hardware and software changes      Date: 4/27/10                                            14. Y        Closed                        Closed              NRC Meeting        TVA Letter dated 015                      D (                Verify that the refurbishment of the power range nuclear              Date: 4/27/10                                            15. Y        Closed                        Closed              NRC Meeting        TVA Letter dated
(
016                      a C  (            Identify the precedents in license amendment requests (LARs), if      Date: 4/27/10                                            16. Y        Closed                        Closed              NRC Meeting        TVA Letter dated G
r a  A 017    7.3.1    7.3.1,                    Identify precedents in LARs, if any, for the solid state protection  Date: 4/27/10                                            17. Y        Closed                        Closed              NRC Meeting        TVA Letter dated
(
018                                          Identify any changes made to any instrumentation and control          Date: 4/27/10                                            18. Y        Closed                        Closed              NRC Meeting        TVA Letter dated 019                                          Verify that the containment purge isolation radiation monitor is the Date: 4/27/10                                            19. Y        Closed                        Closed              NRC Meeting        TVA Letter dated 020                      (  D              Provide environmental qualification information pursuant to Section Date: 4/27/10                                              20. Y        Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
021                7.3      (  ( ( ( (      For the Foxboro Spec 200 platform, identify any changes in            Date: 5/25/10                                            21. Y        Closed                        Closed              NRC Meeting        TVA Letter dated The resolution of this item will be C  a G  G G G G 022    7.3.2    5.6,                      Verify the auxiliary feedwater control refurbishment results in a    Date: 4/27/10                                            22. Y        Closed                        Closed              NRC Meeting        TVA Letter dated a  r 023                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                              23. Y        Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
024                                          Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a        24. Y        Closed                        Closed              NRC Meeting        N/A - Request for NNC 4/30/10: Carte to address
( ( (  (  (  (
025    7.5.2    7.5.1                      For the containment radiation high radiation monitor, verify that the Date: 4/27/10                                            25. Y        Closed                        Closed              NRC Meeting        ML101230248, 026                                          Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10                                              26. Y        Closed                        Closed              NRC Meeting        TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
(      (  (  (
027    7.7.1.4                              For Foxboro I/A provide information regarding safety/non-safety-      Date: 4/27/10                                            27. Y        Closed                        Closed              NRC Meeting        TVA Letter dated 028                                          For the turbine control AEH system, verify that the refurbishment    Responder: Mark Scansen                                  28. Y        Closed                        Closed              NRC Meeting        TVA Letter dated C C C  C  C  S 029                                          For the rod control system, verify that the refurbishment results in a Date: 4/27/10                                          29. Y        Closed                        Closed              NRC Meeting        TVA Letter dated G      G  G  G 030                                          Regarding the refurbishment of I&C equipment, identify any            Responder: Clark                                        30. Y        Closed                        Closed              NRC Meeting        TVA Letter dated 031                                          For the rod position indication system (CERPI), provide information Date: 4/27/10                                              31. Y        Closed                        Closed              NRC Meeting        TVA Letter dated CERPI is non-safety related.
a a a  a  a  i 032                                          For the process computer, need to consider cyber security issues Date: 4/27/10                                                32. Y        Closed                        Closed              NRC Meeting        TVA Letter dated EICB will no longer consider cyber 033                                          For the loose parts monitoring system, provide information            Date: 4/27/10                                            33. Y        Closed                        Closed              NRC Meeting        TVA Letter dated The loose parts monitoring system is 034                                          2/4/2010                                                              Responder: TVA                                          34. Y        Closed                        Closed              N/A                TVA Letter dated 034.1                      (                  Chapter 7.1 - Introduction                                                                                                  35. Y        Close                        Closed              N/A                N/A
(    a 034.2                      D                  Chapter 7.2 - Reactor Trip System                                                                                          36. Y        Close                        Closed              N/A                N/A M  ( r 034.3    7.3      7.3      a                  Chapter 7.3 - ESFAS                                                                                                        37. Y        Closed                        Closed              N/A                N/A a  G g r
034.4 7.5.1.1    7.5.2                        Chapter 7.5 - Instrumentation Systems Important to Safety                                                                  38. Y        Closed                        Closed              N/A                N/A                Closed 034.5 7.5.1.1    7.5.2                        Chapter 7.6 - All Other Systems Required for Safety                                                                        39. Y        Closed                        Closed              N/A                N/A                Closed r
c u
034.6                                          Chapter 7.7 Control Systems                                                                                                40. Y        Closed                        Closed              N/A                N/A n
g h
                          /
035                        (                2/18/2010                                                            Responder: Clark                                        41. Y        Closed                        Closed              RAI No. 1          TVA Letter dated LIC-110 Section 6.2.2 states: Design
( (
M 036    7.5.2    7.5.1      C S            February 18, 2010                                                    Date: 5/25/10                                           42. Y        Closed                        Closed              NRC Meeting                          NNC: Unit 2 FSAR Section 7.5.1, Post a
a i 037    7.5.1.1  7.5.2                      2/18/2010                                                            Responder: Clark                Date: 5/25/10          43. Y        Closed                        Closed              N/A                TVA Letter dated FSAR Amendment 100 provides


TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                          radF7C8C.docx                                                                                          Open Items to be Resolved for SER Approval
042 All All B (AFebruar y 25 , 2010:  Telecom Date: 5/25/10 47.Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information


needed. The shortcomings of the firs t three lines in the matrix are:
===Response===
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed  
SE      FSAR        NRC No.                                                                      Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec.      POC                                                                                                                                                    Y/N 038    7.5.1.1  7.5.2      (              2/18/2010                                                          Responder: Clark            Date: 5/25/10                      44. Y        Closed                            Closed                EICB RAI            TVA Letter dated The slides presented at the December 039                      ( ( M              January 13, 2010                                                    Responder: Clark                      Date: 5/25/10            45. Y        Closed                            Closed                EICB RAI            FSAR amendment The equation for the calculation of the G G a 040                                        January 13, 2010                                                    Responder: Clark                      Date: 5/25/10              46. Y        Closed                            Closed                EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041    7.5.2    7.5.1                      2/19/2010                                                          Responder: WEC                                                  1. N        Open                              Open-NRC Review        NRC Meeting        TVA Letter dated See also Open Item Nos. 226 & 270.
EICB (Carte)
Summary NRC        6/18/10 Please provide the following Westinghouse documents:                Items (1) and (2) were docketed by TVA letter dated April 8,                  Final Response included in        Due:                  Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements              2010.                                                                          letter dated 12/3/10              (3) 12/3/10            ML093560019, Item  TVA Letter dated Specification"                                                                                                                                                                        (4) 12/10/10          No. 11              10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                    Item (3) will be addressed by Revision 2 of the Licensing Specification"                                                      Technical Report. Due 12/3/10                                                  Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                            letter dated 10/5/10.          information indentified Please provide the following Westinghouse documents or pointers    Item (4) will be addressed by Westinghouse developing a                        The SysRS and SRS              in ISG6.
to where the material was reviewed and approved in the CQ TR or    WBN2 Specific Test Plan to compensate for the fact that the                    incorporate requirements from SPM:                                                                NRC disapproved WNA-PT-00058-GEN during the original                          many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q          Common Q review. Due 12/7/10                                                  reference.
Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test                Item (5) Procedures that are listed in the SPM compliance                      NNC 8/25/10: (3) An earlier Procedure"                                                          table in the Licensing Technical Report revision 1 supersede                  version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10                              docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19contains the Westinghouse                            should be no problem to docket document Post-Accident Monitoring System (PAMS)                              this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision                        ML091560352, the testing 2, dated December 2010. Attachment 20 contains the                            process document does not Westinghouse Application for Withholding for the Post-                        address the test plan Accident Monitoring System (PAMS) Licensing Technical                          requirements of the SPM.
Report, WNA-LI-00058-WBT, Revision 2, dated December                          Please provide a test plan that 2010.                                                                          implements the requirements of the SPM.
For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.
B        (
042      All      All              A        February 25, 2010: Telecom                                          Date: 5/25/10                                                    47. Y        Closed                            Closed                EICB RAI            TVA Letter dated The drawing provided did not have the 043    7.5.2    7.5.1                      2/19/2010                                                          Responder: WEC                    Date: 5/25/10                  2. N        Open                              Open-TVA/WEC          EICB RAI            TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
ML102910002        2/5/10          compliance matrix was docketed on: (1)
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to            The PAMS ISG6 compliance matrix supplied as Enclosure 1                      Revised response included in      Due 12/1/10            Item No. 2                          February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the                letter dated 12/22/10.                                                        TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed.                                                                                                                                        5/12/10          expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a     By letter dated April 8, 2010 TVA provided the PAMS                            Response is included in letter                                                TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not       Licensing Technical Report provided additional information.                    dated 10/5/10.                                                                6/18/10          evaluation.
approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that       Attachment 3 contains the revised Common Q PAMS ISG-6                          Revised compliance matrix is                                                  TVA Letter dated NNC 11/23/10: WNA-LI-00045-WT-P TVA should identified what they believe was previously reviewed     Compliance Matrix, dated June 11, 2010, that addresses                        unacceptable.                                                                10/5/10          Rev. 1 Section 7 does not include the and approved.                                                      these items (Reference 13).                                                                                                                                                  RSED documents, and it should. Table NNC 8/12/10: It is not quite                                                                  6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA                                enough to provide all of the                                                                  RSED RTMs.
but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                          documents requested. There SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as          Compliance Matrix."                                                          are two possible routes to being SRP acceptance criteria for PAMS.                                                                                                            review that the NRC can


and approved.  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        radF7C8C.docx                                                                                                  Open Items to be Resolved for SER Approval


Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
===Response===
Responder: WEC                         Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information needed.
SE    FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable        Status/ Current Actions              Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                        Y/N It is TVAs understanding that this comment is focused on                    undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity    the fact that there are documents that NRC has requested                      (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC          that are currently listed as being available for audit at the                TVA response that was noted that this report is applicable for a system in a plant, and the  Westinghouse offices. For those Common Q PAMS                                originally pursued was to follow CQ topical report did no specifically address this PAMS system at      documents that are TVA deliverable documents from                            ISG6, but some of the Watts Bar Unit 2.                                                      Westinghouse, TVA has agreed to provide those to NRC.                        compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will                  addressed by referencing the NRC then concluded that TVA should go through and provide a            be available for audit as                                                    SPM. The NRC approved the more complete and thorough compliance matrix.                          stated above. Requirements Traceability Matrix issues will                    CQ TR and associated SPM; it be tracked under NRC RAI Matrix Items 142 (Software                          may be more appropriate to Requirements Specification) and 145 (System Design                            review the WBN2 PAMS Specification). Commercial Item Dedication issues will be                    application to for adherence to tracked under NRC RAI Matrix Item 138. This item is                          the SPM that to ISG6. In either considered closed.                                                            path chosen, the applicant should provide documents and a (1) While RSED documents are not specifically mentioned,                      justification for the acceptability Section 7 has been revised to be applicable to both                      of any deviation from the path hardware and software. The RSED documents are                            chosen. For example, it listed in Table 6-3, Westinghouse Watts Bar 2                            appears that the Common Q PAMS Documents at Westinghouse                                  Westinghouse's CDIs are Rockville Office.                                                        commercial grade dedication (2) Table 6-1 item 15 reference added for WNA-VR-00280-                       plans, but Westinghouse WBT (RESD)                                                                maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.
( ( ( ( ( (
Attachment 3 contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).
044    7.5.2  7.5.1                  February 25, 2010                                                      Date: 5/25/10                                                  48. Y        Closed                                Closed                      EICB RAI            TVA Letter dated 045                                    February 25, 2010                                                      Date: 5/25/10                                                  49. Y        Closed                                Closed                      EICB RAI            TVA Letter dated C C C C C C 046                                    February 25, 2010                                                      Date: 5/25/10                                                  50. Y        Closed                                Closed                      N/A - Request for   N/A 047    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC/Hilmes              Date: 5/25/10               51. Y        Closed                                Closed                      EICB RAI            TVA Letter dated a a a a a a 048    7.5.2  7.5.1                  April 8, 2010                                                           Date: 5/25/10                                                  52. Y        Closed                                Closed                      EICB RAI            TVA Letter dated 049    7.5.2  7.5.1                  4/8/2010                                                               Responder: WEC            Date: 5/25/10                        53. Y        Closed                                Closed                      EICB RAI            TVA Letter dated 050    7.5.2  7.5.1                  4/8/2010                                                                Responder: WEC                  Date: 5/25/10                  1. N        Open                                  Open-TVA/WEC                EICB RAI            TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."
ML102910002        6/18/10          several Reference 8, however, How should the "shall" statements outside of the bracketed              These sections are descriptive text and not requirements.                     Revised response included in         Due12/22/10                Item No. 8                          Reference 8 has been deleted.
: 2. N Open  Revised response included in letter dated 12/22/10.
requirements in Common Q requirements documents be                      The next revision of the Watts Bar Unit 2 PAMS System                        letter dated 12/22/10.               Discuss at 11/22 phone                          TVA Letter dated interpreted?                                                            Requirements Specification will remove shall from the                                                            call.                                          10/29/10 wording in those sections. A date for completing the next                                                                                                          Enclosure 1 Item revision of the System Requirements Specification will be                    TVA response is inconsistent          This will be corrected in                      No. 1 provided no later than August 31, 2010.                                      (e.g., WNA-DS-01667-WBT              the Revision 3 Rev. 1 page 1-1, Section 1.3.1        document due to TVA The System Requirements Specification will be revised by                      implies that "SysRS Section          12/10/10 September 30, 2010 and submitted within two of receipt from                  ###" has requirements. See Westinghouse.                                                                also SDS4.4.2.1-1 on page 4-32).
Response is included in letter dated 10/5/10.
TVA Revised Response Is there a requirement on the Shall statements within the scope of the System                              shall referenced above??
Revised compliance matrix is unacceptable.
Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The                      Response is provided in letter statements were either relocated to the numbered                              dated 10/29/10.
NNC 8/12/10:
requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by                      TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS                            Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).                    1 Item No. 1 is Acceptable
It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can Open-TVA/WEC Due 12/1/10 EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated  


5/12/10  TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            radF7C8C.docx                                                                                        Open Items to be Resolved for SER Approval


6/18/10 TVA Letter dated 10/5/10 NNC 8/25/10:
===Response===
A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2) March 12, 2010,  
SE    FSAR    NRC No.                                                            Issue                                                    TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                            Y/N A review of the revision 2 requirements documents                            NNC 11/18/10: Revised submitted by Westinghouse in response to use of shall                      Response is not a statement of outside of numbered requirements sections was performed.                      fact. SysRS Rev. 2 (i.e., WNA-The review found at least one instance of an inappropriate                    DS-01617-WBT Rev. 2) shall in the documents. As a result Westinghouse                            contains many shalls that are prepared revision 3 of the impacted requirements documents                    not within numbered to correct this issue as well as the issue with Reference 8 in                requirements sections, for the SysRS.                                                                    example:
& (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.
(1) Page 2-1, Section 2.3.1 -
Attachment 1contains WNA-DS-01617-WBT-P, Revision 3,                          See guidance statement Post Accident Monitoring System- System Requirements                        (2) Page 2-10, top of page 1 -
Specification, dated December 2010. Attachment 2                            See guidance statement contains WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System - System Requirements Specification, dated December 2010. Attachment 3contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3.
Attachment 4 contains WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 5 contains WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01667-WBT-P, Rev. 3.
Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3.
(
051                      G        April 15, 2010                                                  Date: 5/25/10                                                    54. Y        Closed                            Closed              N/A                N/A                Review addressed by another Open
(
052    7.5.2  7.5.1              April 19, 2010                                                  Date: 5/25/10                                                    55. Y        Closed                            Closed              RAI No. 12 S
i
(
053    7.5.2  7.5.1              April 19, 2010                                                  Date: 5/25/10                                                    56. Y        Closed                            Closed              RAI No. 13 S
i
(
054    7.5.2  7.5.1              4/19/2010                                                        Responder: Slifer/Clark            Date: 5/25/10                57. Y        Closed                            Closed              RAI No. 14          TVA Letter dated S
i
(
055    7.5.2  7.5.1              4/19/2010                                                        Responder: Slifer/Clark            Date: 5/25/10                 58. Y        Closed                            Closed              RAI No. 15          TVA Letter dated S
i
(
056                                April 19, 2010                                                  Date: 5/25/10                                                    59. Y        Closed                            Closed              RAI No. 16          TVA Letter dated Sorrento Radiation Monitoring S
i
(
057    7.5.2  7.5.1              4/19/2010                                                        Responder: TVA I&C Staff                Date: 5/25/10           60. Y        Closed                            Closed              RAI No. 17          TVA Letter dated S
i
(
058    7.5.0    7.5                April 19, 2010                                                  Date: 5/25/10                                                   61. Y        Closed                            Closed              RAI No. 18          TVA Letter dated S
i
( ( ( ( ( ( ( (
059    7.5.2  7.5.1              April 19, 2010                                                  Date:                                                            62. Y        Closed                            Closed              RAI No. 19          TVA Letter dated 060    7.5.2  7.5.1              April 19, 2010                                                  Date: 5/25/10                                                    63. Y        Closed                            Closed              N/A                N/A               Addressed by Open Item No. 47 061    7.5.2  7.5.1              April 19, 2010                                                  Date: 5/25/10                                                    64. Y        Closed                            Closed              N/A                N/A                Addressed by Open Item No. 48 C C C C C C C S 062    7.5.2  7.5.1               April 19, 2010                                                  Date: 5/25/10                                                    65. Y        Closed                            Closed              N/A                N/A                Addressed by Open Item No. 49 063    7.5.2  7.5.1              April 19, 2010                                                  Date: 5/25/10                                                    66. Y        Closed                            Closed              N/A                N/A                Addressed by Open Item No. 50 a a a a a a a i 064    7.5.2   7.5.1              By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb    Date: 4/8/2010                            67. Y        Closed                            Closed              N/A - No question  TVA Letter dated 065    7.5.2  7.5.1              By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC          Date: 5/25/10                        68. Y        Closed                            Closed              N/A - No question  TVA Letter dated 066    7.5.2  7.5.1              By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  69. Y        Closed                            Closed              N/A - No question  TVA Letter dated
(
067    7.5.2  7.5.1              By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10                  2. N      Open                              Open-TVA/WEC        N/A - No question  TVA Letter dated C
a


NNC 11/23/10: WNA-LI-00045-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radF7C8C.docx                                                                                     Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at


Watts Bar Unit 2.
===Response===
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix. It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.
SE    FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                               Y/N date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                                                     was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q                             Response included in letter        Due 12/3/10          was opened to track 28, 2010.                                                        PAMS ISG-6 Compliance Matrix submitted in response to                       dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                           made by applicant.
Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be  tracked under NRC RAI Matrix Item 138. This item is considered closed.
This item is addressed in Rev. 2
(1) While RSED documents are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and software. The RSED documents are listed in Table 6-3, "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office."
: a. AI687, AI688 - Scheduled for September 28, 2010                           of the Licensing Technical Report
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD) undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10 48.Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10 49.Y Closed Closed EICB RAI TVA Letter dated 046   (C aFebruar y 25 , 2010 Date: 5/25/10 50.Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10 51.Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10 52.Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10 53.Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010  How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
 
Responder: WEC                        Date: 5/25/10 These sections are descriptive text and not requirements. The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be provided no later than August 31, 2010.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
TVA Revised Response Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
: 1. N Open  Revised response included in letter dated 12/22/10.
TVA response is inconsistent (e.g., WNA-DS-01667-WBT Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See also SDS4.4.2.1-1 on page 4-32). Is there a requirement on the shall referenced above??
Response is provided in letter dated 10/29/10.
TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable Open-TVA/WEC Due12/22/10 Discuss at 11/22 phone call. This will be corrected in the Revision 3 document due to TVA 12/10/10  EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated
 
10/29/10 Enclosure 1 Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments A review of the revision 2 requirements documents submitted by Westinghouse in response to use of "shall" outside of numbered requirements sections was performed. The review found at least one instance of an inappropriate "shall" in the documents. As a result Westinghouse prepared revision 3 of the impacted requirements documents to correct this issue as well as the issue with Reference 8 in the SysRS.
Attachment 1contains WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification", dated December 2010. Attachment 2 contains WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System - System Requirements Specification", dated December 2010. Attachment 3contains the "Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3."
Attachment 4 contains WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 5 contains WNA-DS-01667-WBT-P, Revision 3, "Post Accident Monitoring System - System Design Specification," dated December 2010. Attachment 6contains the "Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01667-WBT-P, Rev. 3."
Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010. Attachment 9 contains the "Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3." NNC 11/18/10:
Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are not within numbered requirements sections, for example:  (1) Page 2-1, Section 2.3.1 - See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 051    (G Ap ril 15 , 2010 Date: 5/25/10 54.Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10 55.Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10 56.Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10 57.Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                  Date: 5/25/10 58.Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10 59.Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10 60.Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10 61.Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  62.Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 63.Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 64.Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 65.Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10 66.Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Webb      Date: 4/8/2010 67.Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res ponder: WEC                Date: 5/25/10 68.Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                          Date: 5/25/10 69.Y Closed Closed N/A - No q uestion TVA Letter dated 067 7.5.2 7.5.1 (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal Responder: WEC                          Date: 5/25/10 2.
N Open  Open-TVA/WEC N/A - No question TVA Letter dated Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit Licensing Technical Report, Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process and uses a description of the AI687 dedication process as an example of how the process is applied.
To be addressed during 9/20-9/21 audit Licensing Technical Report, Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process and uses a description of the AI687 dedication process as an example of how the process is applied.
Response included in letter dated 12/22/10.
068   7.5.2   7.5.1                 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10            3. N      Open                              Open-TVA/WEC        N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                           was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                     Response included in letter        Due 12/3/10          was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                     dated 12/22/10.                                        comm8ittment Item 43:                                                                                                                         made by applicant.
This item is addressed in Rev. 2 of the Licensing Technical Report  Due 12/3/10 was asked. Item was opened to track comm8ittment made by applicant.
: a. AI687, AI688 - Scheduled for September 28, 2010                           This item is addressed in Rev. 2 of the Licensing Technical
6/18/10 068 7.5.2 7.5.1 EICB (Carte)
: b. Upgraded PC node box - Per Westinghouse letter WBT-                       Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was  
 
September 28, 2010.
Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit WNA-LI-00045-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" was submitted on TVA letter to NRC dated December 3, 2010 (Reference Error! Reference source not found.). These are the component level EQ/Seismic summar y reports for the documents listed above. The documents are available as described below:
To be addressed during 9/20-9/21 audit WNA-LI-00045-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report was submitted on TVA letter to NRC dated December 3, 2010 (Reference Error! Reference source not found.).
These are the component level EQ/Seismic summary reports for the documents listed above. The documents are available as described below:
(1) AI687, AI688, Available for submittal or placed in the Westinghouse office for audit (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.
(1) AI687, AI688, Available for submittal or placed in the Westinghouse office for audit (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.
: 3. N Open  Response included in letter dated 12/22/10.
This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due 12/3/10


N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (3) Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   radF7C8C.docx                                                                                       Open Items to be Resolved for SER Approval
(4) Power supplies - Per Westinghouse letter WBT-D-2035 (Reference ), these items are available for audit at the Westinghouse Rockville office This item is a carry over from the original ISG6 Compliance Matrix. It is TVA's understanding that there is no longer a need to submit the component level qualification documents.
Rather the NRC has requested that the system level EQ report (minus the seismic portion) be submitted. Attachment Error! Reference source not found.
contains the __EQ Summary Report_____
069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October


2010. Responder: WEC                     Date: 5/25/10 4.
===Response===
N Open Awaiting for document to be docketed by TVA.
SE    FSAR    NRC No.                                                                  Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                    Y/N (3) Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.
Open-TVA/WEC  
(4) Power supplies - Per Westinghouse letter WBT-D-2035 (Reference ), these items are available for audit at the Westinghouse Rockville office This item is a carry over from the original ISG6 Compliance Matrix. It is TVAs understanding that there is no longer a need to submit the component level qualification documents.
 
Rather the NRC has requested that the system level EQ report (minus the seismic portion) be submitted. Attachment Error! Reference source not found. contains the __EQ Summary Report_____
Due 2/18/11 N/A - No question was asked. Item  
069    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                 Date: 5/25/10                     4. N       Open                             Open-TVA/WEC         N/A - No question N/A EICB          date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                                                          was asked. Item (Carte)        2010.                                                                                                                                            Awaiting for document to be      Due 2/18/11          was opened to track docketed by TVA.                                      comm8ittment made by applicant.
 
070   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                  3. N      Open                              Open-TVA/WEC        N/A - No question    TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was                                                                                                                                               was asked. Item      6/18/10          open item does not agree with the due March 31, 2010.                                                     Per Westinghouse letter WBT-D-1961, this document is                         Final Response included in        Due 12/17/10        was opened to track                    dated in Open Item No. 71.
was opened to track comm8ittment made by applicant.
available for audit at the Westinghouse Rockville office.                     letter dated 12/3/10                                  comm8ittment          TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter                         Partial Response is included in to the NRC dated August 20, 2010.                                             letter dated 10/5/10.                                                        TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements                           Regulations require that the Traceability Matrix and did not summarize anomalies. At the                   NRC review be based on September 15th public meeting, Westinghouse agreed to                         docketed material. Awaiting for include the Concept and Definitions Phase Requirements                       document to be docketed by Traceability Matrix (RTM) in the next IV&V report along with                 TVA.
N/A  070 7.5.2 7.5.1 EICB (Carte)
partial Design Phase updates to the RTM.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.
NNC 8/25/10: Requirements TVA Revised Response:                                                         Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in                             letter dated 8/20/10.
Responder: WEC                      Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.
letter dated August 20, 2010 (Reference 6).                                                               NNC 11/23/10: The The next Independent Verification and Validation (IV&V)                       requirements Phase SVVR report will include the Design                                               provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase                     not complete. This report IV&V Report will be submitted                                                 should address the RTM, which to NRC by February 11, 2011.                                                 it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document                               in the next revision.
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.
Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with partial Design Phase updates to the RTM.
TVA Revised Response: TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
Attachment 14contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System,"
dated November 8, 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the
: 3. N Open  Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA. NNC 8/25/10:
Requirements Phase SVVR provided by TVA letter dated 8/20/10.
NNC 11/23/10:  The requirements Phase SVVR provided by TVA on 8/20/10, is not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.
Open-TVA/WEC Due 12/17/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10  TVA Letter dated


8/20/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radF7C8C.docx                                                                                Open Items to be Resolved for SER Approval


TVA Letter dated 10/5/10 NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 71.
===Response===
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
SE     FSAR   NRC No.                                                                 Issue                                                   TVA Response(s)                         Acceptable       Status/ Current Actions     Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                              Y/N Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
071 7.5.2 7.5.1 EICB (Carte)
071   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                4. N      Open                          Open-TVA/WEC        N/A - No question N/A                  NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and                                                                                                                               was asked. Item                        open item does not agree with the due Implementation phases was July 30, 2010.                           Attachment 16 contains the Westinghouse document IV&V                 Response included in letter  Due 12/10/10        was opened to track                    dated in Open Item No. 70.
By letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 2 of the I V&V Report" covering the Design and  
Summary Report for the Post Accident Monitoring System,               dated 12/3/10                                      commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010.                                                                        by applicant.
 
Attachment 17 contains the Westinghouse Application for                 Awaiting for document to be withholding for the IV&V Summary Report for the Post                   docketed by TVA.
Implementation phases was July 30, 2010. Responder: WEC              Date: 5/25/10 Attachment 16 contains the Westinghouse document "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.
Attachment 17 contains the Westinghouse Application for withholding for the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 2, dated November 2010.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.
: 4. N Open  Response included in letter dated 12/3/10 Awaiting for document to be docketed by TVA.
(
Open-TVA/WEC Due 12/10/10 N/A - No question was asked. Item
072   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC               Date: 5/25/10                 70. Y       Closed                       Closed               N/A - No question  N/A C
 
a 073   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10              5. N      Open                          Open-TVA/WEC        N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration                                                                                                                               was asked. Item phase was October 29, 2010.                                         Attachment 10 contains the IV&V Summary Report for the                 Response included in letter  Due 12/22/10        was opened to track Post Accident Monitoring System, WNA-VR-00283-WBT,                     dated 12/3/10                                      commitment made Revision 3, dated December 2010. Attachment 11contains                                                                     by applicant.
was opened to track commitment made by applicant.
the Application For Withholding Proprietary Information               Awaiting for document to be From Public Disclosure WNA-VR-00283- WBT, Revision 3,                   docketed by TVA.
N/A NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 70.
IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.
072 7.5.2 7.5.1 (C a B y letter dated March 12
074    7.5.2   7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                   6. N      Open                          Open-TVA/WEC         N/A - No question N/A EICB         date for the Post FAT IV&V Phase Summary Report was                                                                                                                                           was asked. Item (Carte)        November 30, 2010.                                                                                                                         TVA to provide due date.     Due 2/21/11         was opened to track commitment made by applicant.
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                     Date: 5/25/10 70.Y Closed Closed N/A - No q uestion N/A 073 7.5.2 7.5.1 EICB (Carte)
075   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC              Date: 5/25/10                5. N      Open                          Open-NRC Review      N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was                                                                                                                                     was asked. Item September 30, 2010.                                                 Attachment 12 contains the Westinghouse document                       Response included in letter  Due 12/3/10          was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion                   dated 12/3/10                                      commitment made Program I&C Projects, Post Accident Monitoring System                                                                     by applicant.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration  
Channel Integration Test/Factory Acceptance Test, WNA-                 Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010.                          docketed by TVA.
 
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.
phase was October 29, 2010.
076   7.5.2   7.5.1       ( (         By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark             Date: 5/25/10                 71. Y       Closed                       Closed               N/A - No question  N/A 077   7.5.2   7.5.1   ( (            By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                 Date: 5/25/10             72. Y       Closed                       Closed               N/A - No question  TVA Letter dated C C 078                   G G             4/26/2010                                                         Responder: Clark                 Date: 5/25/10             73. Y       Closed                       Closed               EICB RAI           TVA Letter dated a a 079                                   4/26/2010                                                         Responder: Clark                   Date: 5/25/10           74. Y       Closed                       Closed               EICB RAI           TVA Letter dated Reviewed under Item 154
Responder: WEC                    Date: 5/25/10 Attachment 10 contains the "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT, Revision 3, dated December 2010. Attachment 11contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283- WBT, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010.
(
: 5. N Open   Response included in letter dated 12/3/10 Awaiting for document to be docketed by TVA.
080                                   4/26/2010                                                         Responder: WEC                                               75. Y       Closed                       Closed               RAI No. 2           TVA Letter dated S
Open-TVA/WEC  
i 081   7.5.2   7.5.1   CB (C             5/6/2010                                                         Responder: Merten/WEC                                       7. N       Open                         Open-TVA/WEC         EICB RAI           TVA Letter dated art                                                                                                                                                                                                            ML102910002        6/18/10
 
Due 12/22/10 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A 074 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC                  Date: 5/25/10
: 6. N Open TVA to provide due date.
Open-TVA/WEC
 
Due 2/21/11 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A  075 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was  
 
September 30, 2010. Responder: WEC                  Date: 5/25/10 Attachment 12 contains the Westinghouse document "Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," WNA-TP-02988-WBT, Revision 0, dated November 2010.
Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,"Nuclear Automation Watts Bar Unit 2 NSSS Completion Pro g ram I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test," dated November 2010. 5. N Open  Response included in letter dated 12/3/10 Awaiting for document to be docketed by TVA.
Open-NRC Review Due 12/3/10 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A  076 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Clark Date: 5/25/10 71.Y Closed Closed N/A - No q uestion N/A 077 7.5.2 7.5.1 (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: WEC                           Date: 5/25/10 72.Y Closed Closed N/A - No q uestion TVA Letter dated 078   (G 4/26/2010 Res p onder: Clark                           Date: 5/25/10 73.Y Closed Closed EICB RAI TVA Letter dated 079   (G 4/26/2010 Res p onder: Clark                             Date: 5/25/10 74.Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080   (S i 4/26/2010 Res p onder: WEC 75.Y Closed Closed RAI No. 2 TVA Letter dated 081 7.5.2 7.5.1 CB (C ar t 5/6/2010 Responder: Merten/WEC
: 7. N Open Open-TVA/WEC EICB RAI ML102910002 TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974) However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit
 
2, there is no basis for a comparison review.
Bechtel to develop a matrix and work with Westinghouse to provide justification.
ML101600092 Item No.1:  There are three sets of regulatory criteria that relate to a Common Q application (e.g. WBN2
 
PAMS):
(a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:
 
'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and conceptual design approach for
 
upgrading an existing PAMS
 
based on Common Q components (page 58, Section 4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the


proposed PAMS design (page 56, Section 4.4.1.3, "PAMS Evaluation")-'
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                      radF7C8C.docx                                                                                    Open Items to be Resolved for SER Approval


The NRC did not approve the  
===Response===
SE    FSAR  NRC No.                                                      Issue                                                      TVA Response(s)                    Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                                                      Y/N The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.            The codes and standards documents listed in Section 7 of              ML101600092 Item No.1: There Due 12/22/10                Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards        the Common Q PAMS Licensing Technical Report are the                  are three sets of regulatory applicable to the Common Q PAMS. This list contains references        documents that the Common Q platform was licensed to                  criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example:        when the NRC approved the original topical report and                Q application (e.g. WBN2          requested information.
(1) RG 1.29 - September 1978 vs. March 2007                          issued the approved SER. The WBN Unit 2 Common Q                      PAMS):
(2) RG 1.53 - June 1973 vs. November 2003                            PAMS is designed in accordance with the approved                      (a) Common Q platform (a) IEEE 379-1994 vs. -2000                                          Common Q topical report and approved SER and the codes                components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005                        and standards on which the SER was based. Since the                  (b) Application Development (a) IEEE 384-1992 vs. -1992                                          current versions referenced are not applicable to WBN Unit            Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009                          2, there is no basis for a comparison review.                        (c) Application Specific - current (a) IEEE 344-1987 vs. -2004                                                                                                                regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006                          Bechtel to develop a matrix and work with Westinghouse to            The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                      provide justification.                                                and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                            primarily addressed (a) and (b).
(a) IEEE 1012-1986 vs. -1998                                                                                                                The Common Q SER states:
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                                                                                              Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984                                                                                      Monitoring Systems, provides endorses 323-1974)                                                                                                                          the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"                                                                            conceptual design approach for states: "Design features and administrative programs that are                                                                              upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                            based on Common Q current staff positions." Please identify all differences between the                                                                      components (page 58, Section versions referenced and the current staff positions. Please provide                                                                        4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these                                                                            basis of the above review, the differences.                                                                                                                                staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS


proposed PAMS design.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                radF7C8C.docx                                                                                          Open Items to be Resolved for SER Approval
Section 6, "References," and Section 7, "Codes and


Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical Report contain items that are
===Response===
 
SE     FSAR   NRC No.                                                               Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                  Y/N system.
not the current regulatory
Awaiting TVA Response.
 
082   7.5.2   7.5.1                 5/6/2010                                                          Responder: WEC                      Date: 6/18/10              8. N      Open                                Open-TVA/WEC            EICB RAI          TVA Letter dated NNC 11/18/10: See also Open Item No.
criteria.
EICB (Carte)
Please provide an explanation
ML102910002      7/30/10          41, Item No. 3.
 
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.         These components can be found in the Summary                                Revised response included in        Due 12/3/10            Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software     Qualification Report Of Hardware Testing For Common Q                        letter dated 12/3/10 changes to the Common Q PAMS previously reviewed by the           Applications, 00000-ICE-37764, Rev 3 and                                                                    Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not         TWICE Qualification Status Report, WNAQR-00011-SSP                           Regulations require that the    Dedication to be contain activities that address qualification of all changes      Per Westinghouse letter WBT-D-2024, (Reference __) dated                     NRC review be based on          addressed in LTR Rev.
of how the WBN2 PAMS
specifically:                                                      June 9, 2010, these documents are available for audit at the                 docketed material. Awaiting for 2, Westinghouse Rockville Office.                                              document to be docketed by TVA.
 
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.                                 NNC 8/9/10: per telephone conversation on 8/5/10, it is not Revision 1 of the Licensing Technical Report provides                       clear how Westinghouse additional detail on the platform specific to WBN2 and                       Commercial Grade Dedication references to the evaluation documentation.                                 Plans and Reports for Digital I&C. Westinghouse agree to Please see the response to RAI letter dated 12/22/10, item                   present to the NRC in a public 3, NRC Request Item 067.                                                     meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
conforms with the application specific regulatory criteria applicable to the WBN2 PAMS
 
design. For example IEEE Std.
 
603-1991 Clause 5.6.3, "Independence Between Safety Systems and Other Systems,"
 
and Clause 6.3, "Interaction
 
Between the Sense and Command Features and Other Systems," contain application
 
specific requirements that must
 
be addressed by a PAMS Due 12/22/10 TVA to provide requested information.
Item No. 9 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments system. Awaiting TVA Response.
082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.  
 
0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically:
Responder: WEC                                Date: 6/18/10 These components can be found in the Summary Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.
Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and references to the evaluation documentation.
Please see the response to RAI letter dated 12/22/10, item 3, NRC Request Item 067.
: 8. N Open  Revised response included in letter dated 12/3/10 Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA. NNC 8/9/10:
per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 11/18/10:
NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
083   7.5.2   7.5.1   ( (            May 6, 2010                                                       Date: 6/18/10                                                   76. Y       Closed                             Closed                 EICB RAI         TVA Letter dated C C 084   7.5.2   7.5.1   a a           May 6, 2010                                                       Date: 6/18/10                                                   77. Y       Closed                             Closed                 EICB RAI         TVA Letter dated 085   7.5.2   7.5.1                 5/6/2010                                                           Responder: WEC                                                  9. N      Open                                Open-TVA/WEC            EICB RAI EICB (Carte)
Open-TVA/WEC
ML102910002 Please provide a detailed description of the PAMS MTP data link   Is the WEC ISG4 evaluation inadequate?                                      A response will be provided by      Due 12/3/10            Item No. 13 to the plant computer. This description should identify all                                                                                     10/31/10 equipment (model & version) and describe the functions that each   Operation of the MTP as a barrier device. MTP Fails as a                                                        Hardware is in Rev. 1 piece of equipment performs. This description should be of         barrier device. Describe what prevents a MTP failure from                    NNC 8/11/10: Design                of the Licensing sufficient detail for the NRC to independently evaluate the       propagating to the AC160?                                                    information should be available    Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.                                                                                       now. By letter dated July 30,      10/22.
 
Node loss on the bus? Bus loss?                                             2010 (ML102160349) TVA stated that the MTP was            NNC 8/25/10:
Due 12/3/10
Revise the ISG4 section of the Licensing Technical Report                   connected to a Red Hat Linux        Disagree with path (Rev. 2) to provide a more detailed description of the MTP as               Server (see Enclosure 1, Item      forward input by TVA a barrier device.                                                           No. 14 part b.). It is presumed    above. An explanation
 
Commercial Grade Dedication to be
 
addressed in LTR Rev.
 
2,  EICB RAI ML102910002
 
Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.
41, Item No. 3.
083 7.5.2 7.5.1 (C a Ma y 6 , 2010 Date: 6/18/10 76.Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1 (C a May 6, 2010 Date: 6/18/10
: 77. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010 Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.
Responder: WEC Is the WEC ISG4 evaluation inadequate?
 
Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160? 
 
Node loss on the bus?   Bus loss?
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device.
: 9. N Open  A response will be provided by
 
10/31/10 NNC 8/11/10:
Design information should be available


now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                           radF7C8C.docx                                                                                            Open Items to be Resolved for SER Approval


Server (see Enclosure 1, Item No. 14 part b.). It is presumed Open-TVA/WEC Due 12/3/10
===Response===
 
SE     FSAR     NRC No.                                                                     Issue                                                         TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path       RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec. POC                                                                                                                                                        Y/N that this server is not safety-   is about the design is related. IEEE 603-1991 Clause     needed.
Hardware is in Rev. 1 of the Licensing Technical Report due
5.6.3(1) states, "Isolation devices used to affect a safety   FAT test procedure to system boundary shall be           include data storm classified as part of the safety   testing of the MTP system."                           interface Please describe how the MTP       NNC 11/18/10: WEC serves as the isolation device. response states that CQ PAMS LTR Rev. 2 will contain relevant information.
 
086   7.5.2   7.5.1                   5/6/2010                                                                Responder: WEC                      Date: 5/24/10              10. N        Open                              Open-TVA/WEC            EICB RAI            TVA Letter dated EICB (Carte)
10/22.
ML102910002        6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.               The regulatory documents listed in the Common Q PAMS                        TVA to address with item OI        Due 12/22/10            Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the   Licensing Technical Report are the documents that the                        81.
NNC 8/25/10:
Common Q PAMS. This list contains references to old revisions of         Common Q platform was licensed to when the NRC several regulatory documents, for example:                               approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                         SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                                           accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review,"         approved SER and the regulatory documents on which the states: "Design features and administrative programs that are            SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the         not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the   comparison review.
Disagree with path forward input by TVA above. An explanation EICB RAI ML102910002 Item No. 13
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these         Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                            ISG4
 
(
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments that this server is not safety-related. IEEE 603-1991 Clause 5.6.3(1) states, "Isolation devices used to affect a safety  
087   7.5.2   7.5.1                   May 6, 2010                                                             Date: 5/24/10                                                 78. Y         Closed                             Closed                   RAI No. 20         TVA Letter dated S
 
i 088   7.5.2   7.5.1   (               May 6, 2010                                                             Date: 5/24/10                                                 79. Y         Closed                             Closed                   RAI No. 21         TVA Letter dated 089                     D ( ( (         5/6/2010                                                                 Responder: Clark                                               80. Y         Closed                             Closed                   EICB RAI           TVA Letter dated NNC: Docketed response states that 090                     a C C S          5/6/2010                                                                 Responder: Clark                 Date: 5/25/10                 81. Y         Closed                             Closed                   EICB RAI           TVA Letter dated r a a i 091     7.4     7.4                     May 20, 2010                                                             Date: 5/25/10                                                 82. Y         Closed                             Closed                   EICB RAI No.1       TVA Letter dated 092                                     5/20/2010                                                               Responder: Hilmes                                              1. Y        Open                              Open-TVA                                                        Continuous review as items are added DORL (Poole)        TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                                   Due: SER Issue are proprietary.                                                document as a communications tool.
system boundary shall be classified as part of the safety system."
093                     (               May 20, 2010                                                             Date: 5/25/10                                                 83. Y         Closed                             Closed                   N/A                 N/A               Will be reviewed under item 154 D ( (
Please describe how the MTP serves as the isolation device.
094                     a                5/20/2010                                                               Responder: Clark                 Date: 5/25/10               84. Y         Closed                             Closed                   N/A                 N/A               Information was found in FSAR r G G 095   7.8.1,   XX                     May 20, 2010                                                             Date:                                                         85. Y         Closed                             Closed                   EICB RAI No. 2     TVA Letter dated
is about the design is needed. FAT test procedure to include data storm
(
 
096   7.7.5     XX                     5/20/2010                                                               Responder:                                                     86. Y         Closed                             Closed                   EICB RAI No.3       TVA Letter dated D
testing of the MTP interface
a r
 
(
NNC 11/18/10:
097   7.4.2     7.4                     May 20, 2010                                                             Date:                                                         87. Y         Closed                             Closed                   EICB RAI No.4       TVA Letter dated D
WEC response states that CQ PAMS LTR Rev. 2 will contain relevant  
a r
 
(
information.
098   7.4.2     7.4                     May 25, 2010                                                             Date:                                                         88. Y         Closed                             Closed                   EICB RAI No.5       TVA Letter dated D
086 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example: (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)
a r
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
099                     ( (
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
B             April 12, 2010                                                           Date:                                                         89. Y         Closed                             Closed                                                         Closed to Item 129 C a a
Responder: WEC                            Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the
100                                      5/20/2010                                                               Responder: WEC                                                 90. Y         Closed                             Closed                   N/A - No question  N/A 101                                     4/12/2010                                                                Responder: Slifer                                              6. Y        Open                              Open-NRC Review          N/A                                    TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000,                   The documents, and affidavits for withholding for the listed                Documents provided in letter      Due 10/14/10                                                    potential this will slip to 7/14.
 
Containment High Range Post Accident Radiation Monitor                   documents were submitted to the NRC on TVA letter to the                    dated 07/15/10 documents will be provided by June 30, 2010.                            NRC dated July 15, 2010.                                                                                        Confirm receipt.
SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
 
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 10. N Open  TVA to address with item OI
: 81. Open-TVA/WEC Due 12/22/10 EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10  087 7.5.2 7.5.1 (S i Ma y 6 , 2010 Date: 5/24/10 78.Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1 (S i May 6, 2010 Date: 5/24/10
: 79. Y Closed Closed RAI No. 21 TVA Letter dated 089   (C a 5/6/2010 Res p onder: Clark 80.Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed res p onse states that 090   (C a 5/6/2010 Res p onder: Clark                         Date: 5/25/10 81.Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date: 5/25/10 82.Y Closed Closed EICB RAI No.1 TVA Letter dated 092   DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
: 1. Y Open Open-TVA Due: SER Issue  Continuous review as items are added 093   (G Ma y 20 , 2010 Date: 5/25/10 83.Y Closed Closed N/A N/A Will be reviewed under item 154 094   (G 5/20/2010 Res p onder: Clark Date: 5/25/10 84.Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:   85.Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 86.Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:   87.Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:   88.Y Closed Closed EICB RAI No.5 TVA Letter dated 099   (B a April 12, 2010 Date:   89. Y Closed Closed   Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC 90.Y Closed Closed N/A - No q uestion N/A 101   DORL (Poole) 4/12/2010
 
The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM Responder: Slifer
: 2. System Description 04508100-1TM
 
The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
: 6. Y Open Documents provided in letter
 
dated 07/15/10 Open-NRC Review
 
Due 10/14/10
 
Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 102    (C a Ma y 24 , 2010 Date:  5/24/10 91.Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10 92.Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten                    Date: 5/27/10 93.Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105    (G Ap ril 29 , 2010 Date:  94.Y Closed Closed N/A N/A Will be reviewed under item 154.
106    (S i May 6, 2010 Date:  5/25/10
: 95. Y Closed Closed RAI No. 9 TVA Letter dated 107    (S i May 6, 2010 Date:  5/28/10
: 96. Y Closed Closed RAI No. 22 TVA Letter dated 108    (G Ma y 6 , 2010 Date:  5/25/10 97.Y Closed Closed N/A N/A Will be reviewed under OI#154 109.b    (C a 5/6/2010 Res ponder: N/A 98.Y Closed Closed N/A N/A Du plicate of another o p en Item. 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A 99.Y Closed Closed N/A N/A  110    (G Ma y 6 , 2010 Date:  100.Y Closed Closed N/A N/A Information was found.
111    (C a May 6, 2010 Date:  5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112    (G June 1, 2010 Date:  102. Y Closed Closed N/A N/A Information was received 113    (G 6/1/2010 Res p onder: Clark 103.Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2  (G 6/1/2010 Res p onder: WEC 104.Y Close Closed EICB RAI TVA Letter dated 115    (C a 2/25/2010 Res p onder: Clark 105.Y Closed Closed EICB RAI TVA Letter dated 116    (G 6/3/2010 Res p onder: WEC 106.Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1 EICB (Garg) 6/3/2010  Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values.  (RIS2006-7)
Responder: Hilmes Reactor Protection S y stem (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor Trip and
 
ESFAS trip setpoint surveillance tests as described in FSAR amendment 100.
 
TVA Revised Response:
For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR
 
Amendment 102 that reflects this change.
: 1. Y Open  Revised response is included in
 
letter dated 10/29/10 Open-TVA/A102 Pending FSAR
 
Amendment 102


submittal Due 12/17/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    radF7C8C.docx                                                                                              Open Items to be Resolved for SER Approval


TVA needs to address that trip setpoint and allowable value  
===Response===
SE    FSAR        NRC No.                                                                    Issue                                                  TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date      RAI Resp. Date                  Comments Sec. Sec.        POC                                                                                                                                              Y/N
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR
(
102                    D (                  May 24, 2010                                                    Date: 5/24/10                                                91. Y        Closed                        Closed                      N/A                  TVA Letter dated Request for schedule not information.
a C r a 103    7.4      7.4                        5/27/2010                                                      Responder: Ayala              Date: 5/27/10                  92. Y        Closed                        Closed                      EICB RAI No.1        TVA Letter dated Submittal date is based on current
(
104    7.4      7.4  ( D                  5/27/2010                                                      Responder: Merten              Date: 5/27/10                  93. Y        Closed                        Closed                      EICB RAI No.1        TVA Letter dated Submittal date is based on current G a r
105                                        April 29, 2010                                                  Date:                                                        94. Y        Closed                        Closed                      N/A                  N/A              Will be reviewed under item 154.
106                                        May 6, 2010                                                    Date: 5/25/10                                                95. Y        Closed                        Closed                      RAI No. 9            TVA Letter dated
(
S i
107                                        May 6, 2010                                                    Date: 5/28/10                                                96. Y        Closed                        Closed                      RAI No. 22            TVA Letter dated
(
108                                        May 6, 2010                                                    Date: 5/25/10                                                97. Y        Closed                        Closed                      N/A                  N/A                Will be reviewed under OI#154 109.b                                      5/6/2010                                                        Responder: N/A                                                98. Y        Closed                        Closed                      N/A                  N/A                Duplicate of another open Item.
(      (  D (  (
109.a  7.8      XX                        5/6/2010                                                        Responder: N/A                                                99. Y        Closed                        Closed                      N/A                  N/A
(  ( ( (  (    (
110                                        May 6, 2010                                                    Date:                                                        100. Y        Closed                        Closed                      N/A                  N/A              Information was found.
111                                        May 6, 2010                                                    Date: 5/28/10                                                101. Y        Closed                        Closed                      N/A                  TVA Letter dated Request to help find, not a request for C      C  a C  S 112                                        June 1, 2010                                                    Date:                                                        102. Y        Closed                        Closed                      N/A                  N/A                Information was received G  G G G  G    G 113                                        6/1/2010                                                        Responder: Clark                                              103. Y        Closed                        Closed                      EICB RAI              TVA Letter dated a      a  r a  i 114    7.2      7.2                        6/1/2010                                                        Responder: WEC                                                104. Y        Close                        Closed                      EICB RAI              TVA Letter dated 115                                        2/25/2010                                                      Responder: Clark                                              105. Y        Closed                        Closed                      EICB RAI              TVA Letter dated 116                                        6/3/2010                                                        Responder: WEC                                                106. Y        Closed                        Closed                      EICB RAI              TVA Letter dated Letter sent to Westinghouse requesting 117    7.1      7.1                        6/3/2010                                                        Responder: Hilmes                                            1. Y        Open                          Open-TVA/A102              EICB RAI              TVA Letter dated EICB (Garg)
ML102910008          10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip                  Revised response is included in Pending FSAR              Item#21              Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7)      (RPS) and Engineered Safety Features Actuation System                      letter dated 10/29/10          Amendment 102                                  No. 7 (ESFAS)) setpoint values are monitored by periodic                                                          submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-                                                    Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR                                              TVA needs to address amendment 100.                                                                                            that trip setpoint and allowable value TVA Revised Response:                                                                                    uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double                                                      reduction factor for the sided correction factors. Attachment 3 contains the revised                                              single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR                                                      factor. TVA response Amendment 102 that reflects this change.                                                                  not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
(
118    7.4      7.4                        6/8/2010                                                        Responder: Merten                                            107. Y        Closed                        Closed                      EICB RAI No.1        TVA Letter dated Submittal date is based on current D
a r
119                    (                    June 10, 2010                                                  Date:                                                        108. Y        Closed                        Closed                      RAI No. 23            TVA Letter dated 120                                        5/6/2010                                                        Responder: Hilmes/Merten/Costley                              109. Y        Closed                        Closed                      EICB RAI              TVA Letter dated D ( ( ( (
121                                        5/6/2010                                                        Responder: Webb/Webber                                        110. Y        Closed                        Closed                      EICB RAI              TVA Letter dated a C C C S 122                                        June 14, 2010                                                  Date:                                                        111. Y        Closed                        Closed                      N/A - Request for    N/A r a a a i 123    7.7.3  7.4.1,                      6/14/2010                                                      Responder:                                                    112. Y        Closed                        Closed                      ML101720589,          TVA Letter dated


uncertainties are not
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radF7C8C.docx                                                                                    Open Items to be Resolved for SER Approval


reduced by the reduction factor for the single sided reduction
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                  TVA Response(s)                Acceptable      Status/ Current Actions            Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                      Y/N
(
124    7.7.5      XX                        6/14/2010                                                          Responder:                                        113. Y        Closed                            Closed                    ML101720589, Item TVA Letter dated D
a r
(
125    7.7.8    7.7.1.12                    6/14/2010                                                          Responder:                                        114. Y        Closed                            Closed                    ML101720589, Item TVA Letter dated D
a r
126    7.8      7.8        (              June 14, 2010                                                      Date:                                            115. Y        Closed                            Closed                    ML101720589, Item TVA Letter dated
( ( D 127    7.2      7.2        a              6/16/2010                                                          Responder: WEC/Clark                              116. Y        Closed                            Closed                    EICB RAI            TVA Letter dated G G r 128    7.2      7.2                      6/18/2010                                                          Responder: WEC Drake /TVA Craig                  117. Y        Closed                            Closed                    EICB RAI            TVA Letter dated Track through SE open item
(
129                                        6/12/2010                                                          Responder: WEC                                    118. Y        Closed                            Closed                    N/A                TVA Letter dated P
o
(
130                                        6/28/2010                                                          Responder: Clark                                  119. Y        Closed                            Closed                    N/A                TVA Letter dated P
o
(
131                                        6/28/2010                                                          Responder: Clark                                  120. Y        Closed                            Closed                    N/A                TVA Letter dated P
o
(
132                                        6/28/2010                                                          Responder: Clark                                  121. Y        Closed                            Closed                    N/A                TVA Letter dated P
o
(
133                                        6/28/2010                                                          Responder: Clark                                  122. Y        Closed                            Closed                                        TVA Letter dated P
o 134                        ( (              6/28/2010                                                          Responder: Clark                                  123. Y        Closed                            Closed                                        TVA Letter dated 135    7.3.1    7.3.1  ( D D (            6/30/2010                                                          Responder: Clark                                  124. Y        Closed                            Closed                    RAI not necessary TVA Letter dated 136    7.3.2,  7.4, 5.6,C a a P            6/30/2010                                                          Responder: Clark                                  125. Y        Closed                            Closed                    RAI not necessary TVA Letter dated a r r o 137                                        Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                        126. Y        Closed                            Closed                    ML101650255, Item TVA Letter dated 138                                        By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                      11. N        Open                              Open-TVA/WEC              ML101650255, Item EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                  No. 2 This item is used to track all Commercial Grade                  TVA agreed to include a            Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                              description of the generic should be provided with an application for a Tier 2 review.                                                                        Westinghouse hardware              To be addressed by commercial grade dedication        Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial                                                                  process in the PAMS licensing      Technical Report.
grade dedication plan was included in the Common Q Topical                                                                        technical report. (see Report Section 11, Commercial Grade Dedication Program.                                                                          ML102920031 Item No 1)
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is                                                                  TVA agreed to include (in the developed for each Common Q hardware or software component                                                                        PAMS licensing technical report) that requires commercial grade dedication.                                                                                        an evaluation of WBN2 critical characteristics for commercial Please provide the commercial grade dedication plans for each                                                                      Westinghouse hardware Common Q hardware or software component that has not been                                                                          components against the generic previously reviewed and approved by the NRC.                                                                                      critical characteristics. (see ML102920031 Item No 2)
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval                                                                  TVA agreed to include a for a Tier 2 review.                                                                                                              description of the generic Westinghouse software (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade                                                                      commercial grade dedication Dedication Report for the QNX Operating System for Common Q                                                                        process in the PAMS licensing Applications.                                                                                                                    technical report. (see ML102920031 Item No 3)
(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.                                                                        TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)
(
139                                        The WBN2 PAMS System Requirements Specification (WBN2              Responder: WEC                                    127. Y        Closed                            Closed                    ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements C
a 140                        CB (C              The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)        Responder: Clark                                  12. N        Open                              Open-TVA/WEC              ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements art            states: The PAMS shall be capable of operation during normal                                                                                                                                  No. 4            10/29/10        Specification


factor. TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                radF7C8C.docx                                                                                          Open Items to be Resolved for SER Approval
EICB RAI ML102910008 Item#21 TVA Letter dated 10/29/10 Enclosure 1 Item


No. 7 118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten 107.Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119    (S i June 10 , 2010 Date:   108.Y Closed Closed RAI No. 23 TVA Letter dated 120    (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y 109.Y Closed Closed EICB RAI TVA Letter dated 121    (C a 5/6/2010 Res p onder: Webb/Webber 110.Y Closed Closed EICB RAI TVA Letter dated 122    (C a June 14 , 2010 Date:   111.Y Closed Closed N/A - Re quest for N/A  123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: 112.Y Closed Closed ML101720589
===Response===
, TVA Letter dated
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                  Y/N and abnormal environments and plant operating modes. The            WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post                      NNC 11/3/10: The origin of the      Due 12/3/10                                Enclosure 1 Item rational for this requirement is that it is necessary to meet        Accident Monitoring System (PAMS) specifies the Reg.                     requirements in the SysRS are                                                  No. 10            TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97.                                          Guide 1.97 variables implemented in the Common Q based                    not clearly document. Rev. 1 of    TVA to docket PAMS                                            Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS                                                            the Common Q PAMS Licensing        Licensing Technical                                          Completion Program I&C Projects Post What document specifies which RG 1.97 variables are                                                                                            Technical Report contains an        Report Rev. 2.                                                Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS?                                                                                                    open item that will be addressed                                                                  Requirements Specification, dated in Rev. 2; this open item is to                                                                  December 2009.
include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.
(
141                                  Deleted by DORL                                                      Date:                                                         128. Y       Closed                             Closed                 ML101650255, Item                      WBN2 PAMS System Requirements C
a 142                                  The applicable regulatory guidance for reviewing the WBN2 PAMS      Responder: WEC                                                13. N        Open                                Open-TVA/WEC          ML101650255, Item                      WBN2 PAMS System Requirements EICB (Carte)
SysRS would be IEEE 830 as endorsed by Regulatory Guide                                                                                                                                                    No. 6                                 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -        This item is used to track all traceability issues with the                TVA/Westinghouse agreed to          Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section        Software Requirements Specification (SRS).                                include the V&V evaluation of                                                                    TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is                                                                                  their reusable software element    To be addressed by                                            Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear      At the September 15 public meeting in Rockville, the                      development process in the          Revision of the RTM,                                          Completion Program I&C Projects Post following actions were agreed to. These items address the                  V&V design phase summary            SRS, SysRS, and                                              Accident Monitoring System- System
: 1. How did TVA ensure the traceability of each requirement in      traceability concerns with the Software Requirements                      report. This evaluation would      SysDS.                                                        Requirements Specification, dated the WBN2 PAMS SysRS.                                            Specification.                                                            include an evaluation against                                                                    December 2009.
the development process
: 2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the                  requirements. This evaluation Accident Monitoring Systems Software Requirements                  Requirements Traceability Matrix(RT), using the issues                would also include an evaluation Specification. To clarify, many documents have                      identified at the 9/15 public meeting as a guide                      of how the WBN2 specific requirements that are incorporated by reference into the            (documented below) and update the RTM as required.                    requirements were addressed SRS, but what served to direct the author to include those                                                                                by the reusable software various documents in the SRS or, if the requirement is based 2.      The next issue of the IV&V report will include the                    elements. (see ML102920031 on the System Requirements Specification, what directed the          Requirements phase review of the RTM and a partial                    Item No 5) author to include the requirement there?                            review for the Design phase.
: 3. Clarify whether the unnumbered paragraphs in the Post          3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements                  Requirements Traceability Matrix (RTM) to address Specification, such as in the section headings, or are all such      items not in the SRS or SysRS.
sections simply considered to be informative?
: 4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS?              in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program                  information.
Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                    5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the                    remove these requirements.
requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems                  6. Westinghouse will perform and document an evaluation (reference 5).]                                                      of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental          have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were              at the revisions reviewed by V&V. Have these been verified.                                                            addressed? Yes. The next revisions of the SDS and SRS address these issues.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements        8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or          instead of the System Design Specification (SDS).
by reference, all the requirements that were used in the            These will be removed from the SRS and incorporated design phase for the application specific software, or do            into the next revision of the SDS.
software design phase activities use requirements found in


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 124 7.7.5 XX (D a r 6/14/2010 Res p onder: 113.Y Closed Closed ML101720589
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                         radF7C8C.docx                                                                               Open Items to be Resolved for SER Approval
, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: 114.Y Closed Closed ML101720589
, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date:  115.Y Closed Closed ML101720589
, Item TVA Letter dated 127 7.2 7.2  (G 6/16/2010 Res p onder: WEC/Clar k 116.Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2  (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g 117.Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129    (P o 6/12/2010 Res p onder: WEC 118.Y Closed Closed N/A TVA Letter dated 130    (P o 6/28/2010 Res p onder: Clark 119.Y Closed Closed N/A TVA Letter dated 131    (P o 6/28/2010 Res p onder: Clark 120.Y Closed Closed N/A TVA Letter dated 132    (P o 6/28/2010 Res p onder: Clark 121.Y Closed Closed N/A TVA Letter dated 133    (P o 6/28/2010 Res p onder: Clark 122.Y Closed Closed  TVA Letter dated 134    (P o 6/28/2010 Res p onder: Clark 123.Y Closed Closed  TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark 124.Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark 125.Y Closed Closed RAI not necessar y TVA Letter dated 137    (C aSeveral WBN2 PAMS documents contain a table titled
, "Document Res p onder: WEC 126.Y Closed Closed ML101650255
, Item TVA Letter dated 138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.


(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
===Response===
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."  Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
SE    FSAR    NRC No.                                                       Issue                                                       TVA Response(s)                         Acceptable     Status/ Current Actions     Resolution Path     RAI No. & Date   RAI Resp. Date             Comments Sec. Sec. POC                                                                                                                                         Y/N any other source or document? If so, what are these             9. RTM item R4.2-2 protection class software set to 0.
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
sources or documents?                                                Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification        10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element.                that are performed with the function enable (FE) switch in the ENABLE position.
(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
These references are used in the body of the SRS, for example:                                                       11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR    12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software    (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference    documents are used. Describe in 1.1 of the SysRS.
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications."
12]).]                                                    Need a good write up of how the process works.
Responder: WEC This item is used to track all Commercial Grade Dedication issues.
They are also included via tables such as found in              13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1                                                for document submittals and provide it to the NRC no later than 9/30/10
: 11. N Open  TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]    14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include            design meets the contract requirements.
 
requirements not explicitly stated in the SRS? If so what is their origin?                                                              15. Westinghouse to add the Software Design Descriptions to the RTM
technical report.  (see
 
ML102920031 Item No 1)
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see ML102920031 Item No 2)
 
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing
 
technical report.  (see ML102920031 Item No 3)
 
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial
 
software components against the generic critical
 
characteristics. (see ML102920031 Item No 4)
Open-TVA/WEC Due 12/3/10
 
To be addressed by Rev. 2 of the Licensing Technical Report.
 
ML101650255, Item No. 2  139    (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC 127.Y Closed Closed ML101650255
, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 140  CB (C ar tThe first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal Responder: Clark
: 12. N Open  Open-TVA/WEC ML101650255, Item No. 4 TVA Letter dated 10/29/10 WBN2 PAMS System Requirements Specification Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and abnormal environments and plant operating modes."  The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97. 
 
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS? WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg. Guide 1.97 variables implemented in the Common Q  based WBN Unit 2 PAMS NNC 11/3/10:
The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an
 
open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.
Due 12/3/10 TVA to docket PAMS Licensing Technical Report Rev. 2.
 
Enclosure 1 Item No. 10  TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
141    (C a Deleted b y DORL Date:  128.Y Closed Closed ML101650255
, Item  WBN2 PAMS S y stem Re q uirements 142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is
 
traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?  Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in Responder: WEC
 
This item is used to track all traceability issues with the Software Requirements Specification (SRS). 
 
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.
: 4. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this information.
: 5. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to remove these requirements.
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Re
: g. Guide 1.172 and justify any deviations.
: 7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the revisions reviewed by V&V. Have these been
 
addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). 
 
These will be removed from the SRS and incorporated into the next revision of the SDS.
: 13. N Open TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element
 
development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software
 
elements. (see ML102920031 Item No 5)
Open-TVA/WEC
 
Due 12/22/10 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS.
ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments any other source or document?   If so, what are these sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for
 
example:"
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
 
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their
 
origin? 9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
: 10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 15. Westinghouse to add the Software Design Descriptions to the RTM
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 17. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to  
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
 
ensure that all requirements are captured and clearly identified.
: 18. Westinghouse to resolve the following questions concerning SDDs
: 18. Westinghouse to resolve the following questions concerning SDDs
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified  
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.
 
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.
usin g the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
 
143                   CB (C   The WBN2 PAMS Software Requirements Specification (WBN2         Responder: WEC                                                     14. N       Open                         Open-TVA/WEC       ML101650255, Item                   WBN2 PAMS System Requirements art  PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                   No. 7                                Specification
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
143   CB (C ar tThe WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, Responder: WEC
: 14. N Open Open-TVA/WEC ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document
 
describes requirements for the major software components -"
 
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.
 
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
 
(c) What other documents contain the requirements for the other software components?
 
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SysRS was
 
created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"
 
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
 
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. A detailed explanation will be provided.
Due 12/22/10 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems").
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS.
Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design


and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    radF7C8C.docx                                                                                            Open Items to be Resolved for SER Approval


the design and implementation processes for the application  
===Response===
SE    FSAR    NRC No.                                                                Issue                                                        TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date  RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                      Y/N Document Traceability & Compliance, which states that the    Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                                                          Due 12/22/10 WBN2 PAMS SRS was created to support the three documents      A detailed explanation will be provided.                                                                                                                                            TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                      To be addressed by                                            Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document                                                                                                                              Revision of the RTM,                                          Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                          SRS, SysRS, and                                                Accident Monitoring System- System SysDS.                                                        Requirements Specification, dated (a) Please list and describe each of the major software                                                                                                                                                                                            December 2009.
components. Please include a description of any NRC review for each of these components.
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
(c) What other documents contain the requirements for the other software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability
                                    & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
144                                  The WBN2 PAMS Software Requirements Specification (WBN2              Responder: WEC                                                  15. N        Open                            Open-TVA/WEC              ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)
PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                                    No. 8            10/5/10          Specification Traceability & Compliance, which states that the WBN2 PAMS          (a) The purpose of NABU-DP-00014-GEN document is to                          Response provided in letter      Due 12/3/10 SRS was created to support the three documents identified (two of    define the process for system level design, software design                  dated 10/5/10                                                                                  By letter dated April 8, 2010 these documents have been provided on the docket).                    and implementation, and hardware design and                                                                    Responses to items a                                          (ML10101050203), TVA docketed implementation for Common Q safety system development.                        NRC Review and WEC to            and e provided.                                                WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-          This document supplements the Common Q SPM, WCAP-                            complete response.                                                                              "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety                  16096-NP-A. The scope of NABU-DP-00014-GEN includes                                                          NNC 11/18/10:                                                  Program I&C Projects, Software Systems).                                                            the design and implementation processes for the application                   b-d to be addressed at public  (1) Items b-d closed to                                        Requirements Specification for the Post development. For a fuller description of the design process                  meeting and audit. Will require other Open Item nos.                                            Accident Monitoring System, dated (b) Please describe the flow of information between these three      described in NABU-DP-00014-GEN please refer to the                            information to be docketed.    (2) The point of these                                          February 2010 (ML101050202).
documents.                                                            Design Process for AP1000 Common Q Safety Systems,                                                            questions was to WCAP-15927 on the AP1000 docket. Since this is a                                                              understand how the (c) Does the PAMS SRS implement the requirements in these            Westinghouse process document that is not specifically                                                        origin of the three documents?                                                      referenced in the SRS, it will be removed in the next revision                                                requirements in the of the document.                                                                                              requirements (d) Please describe if and how these three documents are used in                                                                                                                    specifications were the development of the PAMS Software Design Description.              (b) - Closed to items 142 and 145                                                                            documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the          (c) - Closed 142                                                                                              the requirements would requirements of these three documents have been incorporated                                                                                                                        be demonstrated in into the WBN2 PAMS SRS.                                              (d) - Closed to Item 142                                                                                      Rev. 2 of the CQ PAMS LTR.
(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident


development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                             radF7C8C.docx                                                                                         Open Items to be Resolved for SER Approval
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident
: 15. N Open  Response provided in letter dated 10/5/10
 
NRC Review and WEC to complete response.
 
b-d to be addressed at public
 
meeting and audit. Will require information to be docketed.
Open-TVA/WEC Due 12/3/10
 
Responses to items a
 
and e provided.
NNC 11/18/10:
(1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the
 
origin of the
 
requirements in the requirements specifications were
 
documented. TVA
 
stated that the origin of the requirements would be demonstrated in
 
Rev. 2 of the CQ PAMS LTR. ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, ""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1). 
 
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0. 


===Response===
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                              Y/N Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
145   EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
145                                 The WBN2 PAMS System Design Specification (WBN2 PAMS               Responder: WEC                                              16. N        Open                                Open-TVA/WEC          ML101650255, Item                    WBN2 PAMS System Design EICB (Carte)
& Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                     No. 9                                Specification
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
                                    & Compliance, which states that the WBN2 PAMS SDS was             This item is used to track all traceability issues with the              During the September 20-21,        Due 12/22/10 created to support the WBN2 PAMS SysRS.                             System Design Specification (SDS).                                      2010 audit at Westinghouse, it                                                                  TVA docketed WNA-DS-01667-WBT was acknowledged that              To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware           At the September 15 public meeting in Rockville, the                     TVA/Westinghouse had                Revision of the RTM,                                        Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                following actions were agreed to. These items partially                 previously (in September 15,        SRS, SysRS, and                                            Accident Monitoring System- System address the traceability concerns with the System                       2010 public meeting) stated:        SysDS.                                                      Design Specification, dated December (b) Please briefly describe all of the documents that implement the Design Specification. This item will be updated with the                                                                                                                 2009.
 
hardware requirements of the WBN2 PAMS SysRS.                      results of the September 20 and 21 Commercial Grade                     TVA would provide the RSED Dedication and SDS RTM audit.                                           RTM. (see ML102920031 Item No 6)
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues               TVA would revise and resubmit identified at the 9/15 public meeting as a guide                     the PAMS RTM to address all (documented below) and update the RTM as required.                   types of issues identified in the public meeting. (see
Responder: WEC
: 2. Some hardware requirements are contained in the SRS                   ML102920031 Item No 7) instead of the System Design Specification (SDS).
 
These will be removed from the SRS and incorporated                   TVA would revise and resubmit into the next revision of the SDS.                                   the Software Verification and Validation phase summary
This item is used to track all traceability issues with the System Design Specification (SDS).
: 3. 25 issues identified by V&V where some requirements                  report for the requirements have not been included in the SDS (14) and SRS (11)                   phase to document the at the revisions reviewed by V&V. Have these been                     completion of the requirements addressed? Yes. The next revisions of the SDS and                     phase review. (see SRS address these issues.                                             ML102920031 Item No 8)
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).
 
These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract  
 
requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial
: 16. N Open During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
TVA would provide the RSED RTM. (see ML102920031 Item
No 6)  TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)
TVA would revise and resubmit
the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8)
Open-TVA/WEC


Due 12/22/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                            radF7C8C.docx                                                                                      Open Items to be Resolved for SER Approval


To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. ML101650255, Item No. 9  WBN2 PAMS System Design Specification
===Response===
 
SE   FSAR     NRC No.                                                                   Issue                                                           TVA Response(s)                           Acceptable       Status/ Current Actions       Resolution Path         RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                          Y/N review for the Design phase.
TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.
Need a good write up of how the process works.
Need a good write up of how the process works.
146   (C a 6/17/2010 Res p onder: 129.Y Closed Closed ML101650255
( ( (
, Item PAMS S ystem Re q uirements 147   (C a 6/17/2010 Res p onder: 130.Y Closed Closed ML101650255
146                                   6/17/2010                                                                 Responder:                                                       129. Y       Closed                       Closed                     ML101650255, Item                   PAMS System Requirements 147                                   6/17/2010                                                                 Responder:                                                       130. Y       Closed                       Closed                     ML101650255, Item                   PAMS System Requirements
, Item PAMS S ystem Re q uirements 148   (C a 6/17/2010 Res p onder: 131.Y Closed Closed ML101650255
( ( ( ( (
, Item PAMS S ystem Re q uirements 149 7.2 7.2 (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell 132.Y Close Closed ML101720589
148                                   6/17/2010                                                                 Responder:                                                       131. Y       Closed                       Closed                     ML101650255, Item                   PAMS System Requirements C C C 149   7.2     7.2                   FSAR Section 7.1.1.2(2), Overtemperature delta T and                       Responder: Tindell                                               132. Y       Close                         Closed                     ML101720589, Item TVA Letter dated G G G G G 150   7.2     7.2                   Many of the changes were based on the Westinghouse document Responder: Clark                                                               133. Y       Close                         Closed                     ML101720589, Item TVA Letter dated a a a 151   7.2     7.2                   Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark                                                             134. Y       Close                         Closed                     ML101720589, Item TVA Letter dated 152   7.2     7.2                   Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR               Responder: Merten/Clark                                         135. Y       Close                         Closed                     ML101720589, Item TVA Letter dated 153   7.2     7.2                   FSAR section 7.2.1.1.7 added the reference to FSAR section                 Responder: Craig/Webb                                           136. Y       Close                         Closed                     ML101720589, Item TVA Letter dated 154   7.2     7.2                   FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS               Responder: Craig/Webb                                            2. Y      Open                          Open-TVA/A102              ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the                                                                                                                                                         No. 6 and EICB RAI 10/5/10 instrument setpoint methodology which complies with 10 CFR                 (Q1) Refer to the response to letter item 13, RAI Matrix Item                Response is not acceptable. A Due 12/17/10              ML102861885 Item 50.36 requirements. Provide the information on how the WBN2               51.                                                                          revised response will be                                No. 8              TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and                                                                                               submitted in the letter dated Pending FSAR                                  10/29/10 include this discussion in this section. Also, by letter dated May         (Q2) EEB-TI-28's single sided methodology conforms with                      10/29/10.                    Amendment 102                                Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff         WBN's design basis commitment to ensure that 95% of the                                                    submittal.                                    No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction           analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that     limits as defined in NRC Reg Guide 1.105, Revision 2, 1986                                                  FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for         that was in affect during WBN Unit 1 licensing. The single                                                  all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified   sided methodology is not used for any TSTF-493 setpoints                                                    allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met.             that use TI-28 methodology.                                                                                2 is calculated and Therefore, either remove this reduction factor for single sided                                                                                                                       added to TS, TVA uncertainties or justify how you meet the 95/95 criteria given in RG       TVA Revised Response:                                                                                       needs to address the 1.105.                                                                                                                                                                                 latest criteria and that In order to respond to other NRC comments on the setpoint                                                   include 95/95 criteria.
, Item TVA Letter dated 150 7.2 7.2 (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark 133.Y Close Closed ML101720589
methodology discussion in FSAR Amendment 100, TVA                                                           Why the last sentence reviewed the previous response to this RAI. This resulted in                                               has been modified by a complete rewrite of the responses to this question as                                                     adding TI-28. It was shown below. As a result, the response does not specifically                                               NRCs understanding address the NRC Follow-up Request. However, the overall                                                     that all setpoints have responses to all of the NRC RAIs on setpoint methodology                                                   to meet TI-28 addresses this item.
, Item TVA Letter dated 151 7.2 7.2 (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark 134.Y Close Closed ML101720589
(Q1)       WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
, Item TVA Letter dated 152 7.2 7.2 (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark 135.Y Close Closed ML101720589
(Q2)       Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated
, Item TVA Letter dated 153 7.2 7.2 (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb 136.Y Close Closed ML101720589
, Item TVA Letter dated 154 7.2 7.2 EICB (Garg) FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and include this discussion in this section. Also, by letter dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided uncertainties or justify how you m eet the 95/95 criteria given in RG 1.105. Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item
: 51.  (Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.
TVA Revised Response:
In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request. However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.
(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated
: 2. Y Open  Response is not acceptable. A


revised response will be submitted in the letter dated 10/29/10.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radF7C8C.docx                                                                                         Open Items to be Resolved for SER Approval
Open-TVA/A102 Due 12/17/10
 
Pending FSAR Amendment 102 submittal.
 
FSAR AMD 100. Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA needs to address the latest criteria and that
 
include 95/95 criteria.
Why the last sentence has been modified by adding TI-28. It was NRC's understanding that all setpoints have to meet TI-28 ML101720589, Item No. 6 and EICB RAI ML102861885 Item
 
No. 8 TVA Letter dated 10/5/10 TVA Letter dated
 
10/29/10 Enclosure 1 Item No. 13 EICB RAI ML102861885 sent to DORL Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where onl y 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as "high."
. 155 7.2 7.2  (G Summar y of FSAR chan ge document section 7.2 states that Date:  137.Y Closed Closed ML101720589
, Item  156 7.2 7.2 EICB (Garg) FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1--designed to prevent exceeding 121% of power--.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change.
Responder: WEC
 
Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment. 


===Response===
SE    FSAR    NRC No.                                                                    Issue                                                        TVA Response(s)                            Acceptable      Status/ Current Actions        Resolution Path        RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                          Y/N tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
(
155    7.2    7.2      G              Summary of FSAR change document section 7.2 states that                Date:                                                            137. Y      Closed                          Closed                  ML101720589, Item 156    7.2    7.2                      FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-        Responder: WEC                                                  17. Y        Open                            Open-TVA/WEC            ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The                                                                                                                                                          No. 8            10/5/10          Westinghouse review.
value of 121% is changed from 118%. The justification for this          Per Westinghouse letter WBT-D-2340, TENNESSEE                                Revised response included in    Due 12/22/10 change states that this was done to bring the text of this section in  VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT                                      letter dated 12/22/10.
agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1.            UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and                                                          Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as    Correction to RAI Response SNPB 4.3.2-7, (Reference 17)                      Response is included in letter  Submitted 10/29/10.
118%. Justify the change.                                              the 118% value should be 121%. Depending on the use in                        dated 10/5/10 the FSAR either 118% or 121% are the correct values. As a                                                      TVA needs to justify result of the question, Westinghouse reviewed all locations                                                    why some places 121%
where either 118% or 121% are used and the context of use                                                      is used and other and provided a FSAR markup to reflect the correct value at                                                    places 118% is used .
the specific location. These changes will be incorporated in                                                  What does 121% or a future FSAR amendment.                                                                                      118% means.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 "Follow Up -NRC Request on 118% and 121 % FSAR Power Levels
The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 Follow Up -NRC Request on 118% and 121 % FSAR Power Levels, dated December 6, 2010 (Reference 2).
", dated December 6, 2010 (Reference 2).
A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Range High Neutron Flux, High Setting, the value of 118% is correct. In the context of the peak core power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, Limiting Power Distributions.
A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Ran g e Hi gh Neutron Flux, Hi g h Settin g , the value of 118% is correct. In the context of the peak core power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, "Limiting Power Distributions."
( ( ( ( ( ( (
: 17. Y Open  Revised response included in letter dated 12/22/10.  
157    7.2    7.2                      FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell                                                    138. Y      Close                            Closed                  ML101720589, Item TVA Letter dated 158    7.2    7.2                      FSAR section 7.2.2.1.1, paragraph six was changed to state that        Responder: Tindell                                              139. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated 159    7.2    7.2                      FSAR section 7.2.2.1.2 discusses reactor coolant flow                  Responder: Craig                                                140. Y       Close                            Closed                  ML101720589, Item TVA Letter dated 160    7.2    7.2                      FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell                                                      141. Y      Close                            Closed                  ML101720589, Item TVA Letter dated G G G G G G G 161    7.2    7.2                      FSAR section 7.2.2.3 states that changes to the control function        Responder: Clark                                                142. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated 162    7.2    7.2                      FSAR section 7.2.2.2(14) states that bypass of a protection            Responder: Tindell                                              143. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated 163    7.2    7.2                      Deleted by DORL                                                        Date:                                                            144. Y      Closed                          Closed                  ML101720589, Item 164    7.2    7.2          a          FSAR section 7.2.2.2(20) has been revised to include the plant          Responder: Perkins                                              145. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165    7.2    7.2                      FSAR section 7.2.2.3.2, last paragraph of this section has been        Responder: Clark                                                146. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated r
166    7.2    7.2  ( ( ( (            Changes to FSAR section 7.2.2.2(20) are justified based on the          Responder: Clark                                                147. Y      Closed                          Closed                  ML101720589, Item TVA Letter dated g
167    7.2    7.2  G G G G            FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark                                                      148. Y      Close                            Closed                  ML101720589, Item TVA Letter dated l
168    7.2    7.2                      FSAR table 7.2-4, item 9 deleted loss of offsite power to station      Responder: Clark                                                149. Y      Close                            Closed                  ML101720589, Item TVA Letter dated


Response is included in letter
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radF7C8C.docx                                                                                       Open Items to be Resolved for SER Approval
 
dated 10/5/10 Open-TVA/WEC Due 12/22/10 Amendment 101
 
Submitted 10/29/10.
 
TVA needs to justify wh y some places 121% is used and other places 118% is used . What does 121% or 118% means.
ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.
157 7.2 7.2  (GFSAR section 7.2.2.1.1
, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell 138.Y Close Closed ML101720589
, Item TVA Letter dated 158 7.2 7.2  (GFSAR section 7.2.2.1.1
, p ara g ra p h six was chan g ed to state that Res ponder: Tindell 139.Y Closed Closed ML101720589
, Item TVA Letter dated 159 7.2 7.2  (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g 140.Y Close Closed ML101720589
, Item TVA Letter dated 160 7.2 7.2  (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell 141.Y Close Closed ML101720589
, Item TVA Letter dated 161 7.2 7.2  (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark 142.Y Closed Closed ML101720589
, Item TVA Letter dated 162 7.2 7.2  (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell 143.Y Closed Closed ML101720589
, Item TVA Letter dated 163 7.2 7.2  (G Deleted b y DORL Date:  144.Y Closed Closed ML101720589
, Item  164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins 145.Y Closed Closed ML101720589
, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2  (GFSAR section 7.2.2.3.2
, last p ara g ra p h of this section has been Res p onder: Clark 146.Y Closed Closed ML101720589
, Item TVA Letter dated 166 7.2 7.2  (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark 147.Y Closed Closed ML101720589
, Item TVA Letter dated 167 7.2 7.2  (GFSAR section 7.2.2.4
, p rovide an anal y sis or reference to cha p ter Res p onder: Clark 148.Y Close Closed ML101720589
, Item TVA Letter dated 168 7.2 7.2  (G FSAR table 7.2-4
, item 9 deleted loss of offsite p ower to station Res p onder: Clark 149.Y Close Closed ML101720589
, Item TVA Letter dated
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 169    (G 6/18/2010 Res p onder: Clark 150.Y Closed Closed    170    (G 6/17/2010 Res p onder: Clark 151.Y Closed Closed    171 7.2 7.2  (G 6/17/2010 Res p onder: Crai g 152.Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172    (G 6/17/2010 Res p onder: Crai g 153.Y Closed Closed EICB RAI  173 7.1 7.1  (G 6/17/2010 Res p onder: Crai g/Webb/Powers 154.Y Closed Closed  EICB RAI  174    (G 6/28/2010 Res p onder: Hilmes/Crai g 155.Y Closed Closed EICB RAI  175    (G June 28 , 2010 Res p onder:  156.Y Closed Closed EICB RAI  176 7.1 7.1  (G 6/28/2010 Res p onder: Crai g/Webb 157.Y Closed Closed  EICB RAI  177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 158.Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 159.Y Closed Closed N/A TVA Letter dated RAI not re q uired 179    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 160.Y Closed  Closed N/A - Closed to NA  180    (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC 161.Y Closed Closed N/A - Closed to NA  181    (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 162.Y Closed Closed N/A - Closed to NA  182    (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC 163.Y Closed Closed N/A - Closed to NA  183  EICB (Carte) 7/15/2010 An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS
 
must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document"  referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?


===Response===
SE      FSAR        NRC No.                                                                            Issue                                                  TVA Response(s)                      Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.        POC                                                                                                                                                Y/N
( (
169                                            6/18/2010                                                            Responder: Clark                                        150. Y      Closed                        Closed 170                                            6/17/2010                                                            Responder: Clark                                        151. Y      Closed                        Closed
( ( ( (
171    7.2      7.2                          6/17/2010                                                            Responder: Craig                                        152. Y      Closed                        Closed                    EICB RAI            TVA Letter dated Closed to SE Open Item 172                                            6/17/2010                                                            Responder: Craig                                        153. Y      Closed                        Closed                    EICB RAI M M ( ( ( ( ( ( ( (
173    7.1      7.1                          6/17/2010                                                            Responder: Craig/Webb/Powers                            154. Y      Closed                        Closed                    EICB RAI 174                                            6/28/2010                                                            Responder: Hilmes/Craig                                  155. Y      Closed                        Closed                    EICB RAI C C C C 175                                            June 28, 2010                                                        Responder:                                              156. Y      Closed                        Closed                    EICB RAI 176    7.1      7.1                          6/28/2010                                                            Responder: Craig/Webb                                    157. Y      Closed                        Closed                    EICB RAI a a G G G G G G G G 177    7.5.2.1  7.5.1                          7/15/2010                                                            Responder: Clark                                        158. Y      Closed                        Closed                    N/A                TVA Letter dated RAI not required 178    7.5.2.1  7.5.1                          7/15/2010                                                            Responder: Clark                                        159. Y      Closed                        Closed                    N/A                TVA Letter dated RAI not required a a a a 179                                            An emphasis is placed on traceability in System Requirements        Responder: WEC                                          160. Y      Closed                        Closed                    N/A - Closed to    NA 180                                            The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC                                                161. Y      Closed                        Closed                    N/A - Closed to    NA 181                                            An emphasis is placed on traceability in System Requirements        Responder: WEC                                          162. Y      Closed                        Closed                    N/A - Closed to    NA 182                                            Characteristics that the SRP states that a Software Requirements Responder: WEC                                              163. Y      Closed                        Closed                    N/A - Closed to    NA 183                                            7/15/2010                                                            Responder: WEC                                          18. Y        Open                          Open-TVA/WEC              EICB RAI        TVA Letter dated EICB (Carte)
ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements      The generic Software Requirements Specification applies                Response provided in letter  Due 12/3/10              No. 9            Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements                  dated 10/21/10                                                          No. 4 and even more so given the modifications to the standard listed in Specification.                                                                                        NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                        point behind this open word should to say Each identifiable requirement in an SRS                                                                                                            item was that TVA must must be traceable backwards to the system requirements and the                                                                                                          demonstrate that the design bases or regulatory requirements that is satisfies                                                                                                              origin of each requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                            WEC requirements Requirements Specification in the background section, is the                                                                                                            specification is known sentence Those sections of the above references that require                                                                                                            and documented. TVA modification from the generic PAMS are defined in the document                                                                                                          stated that this referring purely to the changes from WNA-DS-01617-WBT Post                                                                                                              information would be in Accident Monitoring System-System Requirements Specification                                                                                                            CQ PAMS LTR Rev. 2.
or is it saying that there are additional changes beyond those and that the SRS defines them?
If there are additional changes, what is their origin?
If there are additional changes, what is their origin?
Responder: WEC The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.
(
: 18. Y Open  Response provided in letter
184                                            7/15/2010                                                            Responder: WEC                                          164. Y      Closed                        Closed                    N/A - Closed to    N/A C
a 185                                            7/15/2010                                                            Responder: WEC                                           19. N        Open                          Open-TVA/WEC              EICB RAI EICB (Carte)
ML102980066 Item An emphasis is placed on the traceability of requirements in      Steve Clark to look at how to combine traceability items.                                              Due (1) 12/3/10          No. 17 Software Requirements Specifications in the SRP, in the                                                                                                                      (2) _________
unmodified IEEE std 830-1993, and even more so given the          Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172,  audit.                                                                                                 NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say                                                                                                            point behind this open Each identifiable requirement in an SRS must be traceable                                                                                                              item was that TVA must backwards to the system requirements and the design bases or                                                                                                            demonstrate that the regulatory requirements that is satisfies Also the NRC considers                                                                                                        origin of each that the SRS is the complete set of requirements used for the                                                                                                            requirement in the design of the software, whether it is contained within one                                                                                                              WEC requirements document or many. In order to evaluate an SRS against the                                                                                                                specification is known guidance in the SRP the staff needs access to all the                                                                                                                    and documented. TVA requirements.                                                                                                                                                           stated that this information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring                                                                                                        CQ PAMS LTR Rev. 2.


dated 10/21/10 Open-TVA/WEC Due 12/3/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                            radF7C8C.docx                                                                                          Open Items to be Resolved for SER Approval


NNC 11/18/10: The point behind this open item was that TVA must
===Response===
 
SE      FSAR        NRC No.                                                                        Issue                                                      TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date        RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                                  Y/N Systems Software Requirements Specification are various types                                                                                                                  (2) TVA also said it of Reusable Software Element.                                                                                                                                                would provide a RTM for the RSED These references are used in the body of the SRS, for example:
demonstrate that the  
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
 
They are also included via tables such as found in requirement R7.1.2-1
origin of each requirement in the WEC requirements specification is known
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
 
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
(
EICB RAI ML102980066 Item No. 9 TVA Letter dated 10/21/10 Enclosure 1 Item  
186    7.7.8    7.7.1.12                    7/15/2010                                                            Responder: Perkins/Clark                                    165. Y      Closed                            Closed                EICB RAI No.6          TVA Letter dated D
 
a r
No. 4  184    (C a 7/15/2010 Res p onder: WEC 164.Y Closed Closed N/A - Closed to N/A  185  EICB (Carte) 7/15/2010 An emphasis is placed on the traceability of requirements in Software Requirements Specifications  in the SRP, in the
187                                          By letter dated June 18, 2010, TVA docketed responses to NRC          Responder: Merten                                          20. N        Open                              Open-TVA/WEC          ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information.                                                                                                                                                                              No. 1 & 2        10/5/10         docketed?
 
: 1) Please refer to the revised response to letter dated                    Partial Response provided in      Due 12/22/10
unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115).                                      letter dated 10/5/10 did not identify any connection from the PAMS Operator Modules                                                                                                                  Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45.                                NNC 8/25/10: Why did TVA not WBT Rev. 1 - ML101680578) shows a TCP connection from the                                                                                      catch this on the review of the OMs to the plant computer and printer. Please explain.                                                                                        PAMS SysRS or SRS? Does TVA check that the CQ PAMS
 
: 2) Please clarify whether any digital safety-related systems or                                                                                system meets the requirements components have a digital communications path to non-safety-                                                                                  in its purchase specifications?
"Each identifiable requirement in an SRS must be traceable
related systems or with safety related systems in another division.
 
If so, NRC staff will need these paths identified on the docket.
backwards to the system requirements and the design bases or regulatory requirements that is satisfies"   Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the requirements.  
(
 
188                                          By letter dated June 30, 2010, TVA docketed, Tennessee Valley        Responder: Clark                                            166. Y      Closed                            Closed                ML101970033, Item TVA Letter dated C
References 12, 27, 29, and 31-44 in the Post Accident Monitoring Responder: WEC Steve Clark to look at how to combine traceability items.  
a
 
(
Was addressed to during the 9/15 meeting and 9/20 - 9/21 audit. 19. N Open Open-TVA/WEC Due (1) 12/3/10 (2) _________
189              7.6.7                      7/20/2010                                                            Responder: Clark                                            167. Y      Closed                            Closed                RAI No. 3              TVA Letter dated S
NNC 11/18/10
i
:  (1)The point behind this open
( ( ( ( (
190    7.9                                  FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981            Responder: Clark                                            168. Y      Closed                            Closed                RAI No. 4              TVA Letter dated Closed to OI-331.
( (
191    7.9                                  NUREG-0800 Chapter 7, Section 7.9, "Data Communication                Responder: Jimmie Perkins                                  169. Y      Closed                            Closed                ML10197016, Item TVA Letter dated M M M M M 192    7.5.1.1   7.5.2                      The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section            Responder: Clark                                            170. Y      Closed                            Closed                Item No. 1 sent to     TVA Letter dated EICB RAI ML1028618855 sent to C S 193    7.5.1.1    7.5.2                      The WBU2 FSAR, Section 7.5.2, Plant Computer System,               Responder: Clark                                            171. Y      Closed                            Closed                Item No. 2 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194    7.5.1.1  7.5.2.1                      The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display              Responder: Costley/Norman                                  172. Y      Closed                            Closed                Item No. 3 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a i 195    7.5.1.1  7.5.2.2                      Bypassed and Inoperable Status Indication (BISI)                      Responder: Costley/Norman                                  173. Y      Closed                            Closed                Item No. 4 sent to     TVA Letter dated EICB RAI ML1028618855 sent to 196    7.5.1.1  7.5.2.2                      Bypassed and Inoperable Status Indication (BISI)                      Responder: Costley/Norman                                  174. Y      Closed                            Closed                Item No. 5 sent to    TVA Letter dated EICB RAI ML1028618855 sent to 197                        ( (              Open Item 197 was never issued.                                                                                                  175. Y      Closed                            Closed 198    7.5.1.1  7.5.2.2    M M X            SRP Section 7.5, Subsection III, Review Procedures states:          Responder: Costley/Norman                                  176. Y      Closed                            Closed                Item No. 6 sent to    TVA Letter dated EICB RAI ML1028618855 sent to a a 199    7.5.1.1  7.5.2.3                      The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                                            177. Y      Closed                            Closed                Item No. 7 sent to    TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200    7.2                                  7/21/2010                                                            Responder: Clark                                            178. Y      Closed                            Closed                EICB RAI              TVA Letter dated
(
201    7.7.1.1  7.7.11                      7/21/2010                                                            Responder: Webb                                            179. Y      Closed                            Closed                EICB RAI              TVA Letter dated C
a 202    7.5.2                                  7/22/2010                                                            Responder: WEC                                              21. N       Open                             Open-TVA/WEC           EICB RAI        TVA Letter dated EICB                                                                                                                                                                                                                  ML102980066 Item 10/5/10 (Carte)          The letter (ML0003740165) which transmitted the Safety                Revision 1 of the Licensing Technical Report will provide                Partial Response provided in      Due 12/3/10           No. 4 Evaluation for the Common Q topical report to Westinghouse            more detailed information on the changes to the platform.                letter dated 10/5/10


item was that TVA must
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                           radF7C8C.docx                                                                                         Open Items to be Resolved for SER Approval
 
demonstrate that the origin of each requirement in the WEC requirements specification is known
 
and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
EICB RAI ML102980066 Item No. 17 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for example:"
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).] 
 
They are also included via tables such as found in requirement R7.1.2-1
 
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
 
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin? (2) TVA also said it would provide a RTM for the RSED 186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark 165.Y Closed Closed EICB RAI No.6 TVA Letter dated 187  EICB (Carte)
By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket. Responder: Merten
: 1) Please refer to the revised response to letter dated 10/5/10 Item 18 (RAI Matrix item 115).
: 2) This is a duplicate of closed RAI Matrix Item 45.
: 20. N Open Partial Response provided in letter dated 10/5/10
 
NNC 8/25/10: Why did TVA not catch this on the review of the PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Open-TVA/WEC
 
Due 12/22/10 Revise Response
 
ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
188    (C a B y letter dated June 30
, 2010 , TVA docketed
, "Tennessee Valle y Res p onder: Clark 166.Y Closed Closed  ML101970033
, Item TVA Letter dated 189  7.6.7  (S i 7/20/2010 Res p onder: Clark 167.Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9  (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133
, Ma y 1981 Res p onder: Clark 168.Y Closed Closed  RAI No. 4 TVA Letter dated Closed to OI-331.
191 7.9  (C aNUREG-0800 Cha p ter 7 , Section 7.9
, "Data Communication Res p onder: Jimmie Perkins 169.Y Closed  Closed ML10197016
, Item TVA Letter dated 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800
) Cha p ter 7 Section Res p onder: Clark 170.Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR
, Section 7.5.2
, "Plant Com p uter S y stem ," Res p onder: Clark 171.Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1
, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman 172.Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 173.Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 174.Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197  X O pen Item 197 was never issued.
175.Y Closed Closed    198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5
, Subsection III
, "Review Procedures" states:
Res p onder: Costle y/Norman 176.Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3
, "Technical Su pport Center and Res p onder: Costle y/Norman 177.Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2  7/21/2010 Res p onder: Clark 178.Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11  (C a 7/21/2010 Res p onder: Webb 179.Y Closed Closed EICB RAI TVA Letter dated 202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
: 21. N Open  Partial Response provided in
 
letter dated 10/5/10 Open-TVA/WEC Due 12/3/10
 
EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Rev. 2 of the Licensing Technical Report will include the applicability of guidance. Licensing Technical Report R2 203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark 180.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman 181.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205    (G 7/26/2010 Res p onder: Clark 182.Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark 183.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207    (C a Jul y 27 , 2010 Date:  184.Y Closed Closed    208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 185.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 186.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 187.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1  (C a 7/27/2010 Res p onder: Clark 188.Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:
212 7.5.2  EICB (Carte) 7/27/2010
 
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer
 
Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.


===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions        Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                                      Y/N stated: "Should our criteria or regulations change so that our                                                                                                                      Licensing Technical conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the                                                    Report R2 Nuclear Power and/or the applicant referencing the topical report applicability of guidance.
will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
( ( (  (  ( (
203    7.5.1.1  7.5.2                      7/26/2010                                                            Responder: Clark                                                180. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 204    7.5.1.1  7.5.2                      7/26/2010                                                            Responder: Costley/Norman                                      181. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL
(      (
205                                        7/26/2010                                                            Responder: Clark                                                182. Y      Closed                          Closed                    EICB RAI          TVA Letter dated Question B related to prior NRC M M M  M ( M M 206    7.5.1.1  7.5.2                      7/27/2010                                                            Responder: Clark                                                183. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL C      C 207                                        July 27, 2010                                                        Date:                                                          184. Y      Closed                          Closed a a a  a G a a 208    7.5.2.1  7.5.1                      7/27/2010                                                            Responder: Clark                                                185. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL a      a 209    7.5.2.1  7.5.1                      7/27/2010                                                            Responder: Clark                                                186. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 210    7.5.2.1  7.5.1                      7/27/2010                                                            Responder: Clark                                                187. Y      Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL 211    7.5.1.1                              7/27/2010                                                            Responder: Clark                                                188. Y      Closed                          Closed                    EICB RAI          TVA Letter dated Relates to SE Sections:
212    7.5.2                                7/27/2010                                                            Responder: WEC                                                  22. N        Open                            Open-TVA/WEC              EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated                Application specific requirements for testing. This cannot be                                                Due 12/22/10              No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system          addressed in a topical report. Evaluation of how the design specification and software requirements specification          hardware meets the regulatory requirements.                                                                  To be addressed by contain information to address the "Design Report on Computer                                                                                                                      WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these      WEC to provide the information and determine where the documents, and it is not clear how this is the case.                  information will be located.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Responder: WEC  
213    7.5.2                                7/27/2010                                                            Responder: WEC                                                 7. N       Open                             Open-NRC Review          EICB RAI EICB (Carte)
 
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated               Conformance with IEEE 603 is documented in the revised                      Response is included in letter  Due 12/31/10.            No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system         Common Q PAMS Licensing Technical Report and the                            dated 10/25/10 design specification and software requirements specification         Common Q PAMS System Design Specification.
Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements. 
contain information to address the "Theory of Operation                                                                                           NNC to review and revise this Description." The staff has reviewed these documents, and it is      Attachment 1 contains the proprietary version of                            question after LTR R2 is not clear how this is the case. The docketed material does not       Westinghouse document Tennessee Valley Authority                            received.
 
appear to contain the design basis information that is required to   (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603.                     System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604         WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.
WEC to provide the information and determine where the information will be located.
(2) Please provide a regulatory evaluation of how the PAMs           Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory   Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                         NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the         Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents     DS-01667-WBT, Rev. 2 dated September 2010.
: 22. N Open Open-TVA/WEC 
identified demonstrate compliance with this clause?
 
(
Due 12/22/10
214                                         7/27/2010                                                             Responder: WEC                                                 189. Y       Closed                           Closed                   EICB RAI           TVA Letter dated C
 
a 215                       (               7/29/2010                                                             Responder: WEC                                                 190. Y       Closed                           Closed
To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item
(
 
( M 216   7.5.1.1   7.5.2       P              7/29/2010                                                             Responder: Clark                                               191. Y       Closed                           Closed                   EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL G a o
No. 10  213 7.5.2  EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603. (1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS.
217                                         7/6/2010                                                             Responder: Clark                                               192. Y       Close                           Closed                   EICB RAI           TVA Letter dated
(2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory of operation.
For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
Responder: WEC Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
Attachment 1 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
: 7. N Open  Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
Open-NRC Review Due 12/31/10.
EICB RAI ML102980066 Item No. 18  214   (C a 7/27/2010 Res p onder: WEC 189.Y Closed Closed EICB RAI TVA Letter dated 215   (P o 7/29/2010 Res p onder: WEC 190.Y Closed Closed    216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark 191.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217   (G 7/6/2010 Res p onder: Clark 192.Y Close Closed EICB RAI TVA Letter dated  
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 218    (G 7/6/2010 Res p onder: Clark 193.Y Closed Closed EICB RAI TVA Letter dated 219    (G 8/4/2010 Res ponder: TVA Licensin g 194.Y Closed Closed EICB RAI  220    (G 8/4/2010 Res p onder: A y ala 195.Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease 196.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222    (G 8/4/2010 Res p onder: Clark 197.Y Close Closed EICB RAI TVA Letter dated 223    (G 8/4/2010 Res p onder: Clark 198.Y Closed Closed EICB RAI  224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) 199.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225    (G 8/4/2010 Res p onder: Scansen 200.Y Close Closed EICB RAI TVA Letter dated 226    (C a 8/4/2010 Res ponder: TVA Licensin g 201.Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.
227    (G 8/4/2010 Res p onder: Clark 202.Y Close Closed EICB RAI TVA Letter dated 228    (C a 8/4/2010 Res p onder: Clark 203.Y Closed  Closed EICB RAI TVA Letter dated 229    (C a 8/4/2010 Res p onder: Clark 204.Y Closed Closed EICB RAI TVA Letter dated 230    (C a 8/4/2010 Res p onder: Webb 205.Y Closed Closed EICB RAI TVA Letter dated  231    (G 8/4/2010 Res p onder: Clark 206.Y Closed Closed EICB RAI TVA Letter dated 232    (S i 8/4/2010 Res p onder: Clark 207.Y Closed Closed RAI No. 5 TVA Letter dated 233    (C a 8/4/2010 Res p onder: Clark 208.Y Closed Closed EICB RAI TVA Letter dated 234    (C a 8/4/2010 Res p onder: 209.Y Closed Closed N/A - Du p licate N/A  235    (G 8/4/2010 Res ponder: TVA Licensin g 210.Y Closed Closed N/A N/A  236    (G 8/4/2010 Res p onder: Clark 211.Y Close Closed EICB RAI TVA Letter dated 237    (C a 8/4/2010 Res p onder: Clark 212.Y Closed Closed EICB RAI TVA Letter dated 238    (C a 8/4/2010 Res p onder: Webb/Hilmes 213.Y Closed Closed N/A - Du p licate N/A  239    (C a 8/4/2010 Res p onder: Hilmes 214.Y Closed Closed N/A - Meetin g N/A  240    (G 8/4/2010 Res p onder: Clark 215.Y Close Closed Ml102910008 TVA Letter dated 241    (S i 8/4/2010 Res p onder: Davies 216.Y Closed Closed RAI No. 10 TVA Letter dated 242    (G 8/4/2010 Res p onder: Hilmes 217.Y Close Closed EICB RAI TVA Letter dated 243    (C a 8/3/2010 Res p onder: WEC 218.Y Closed Closed N/A - Closed to N/A  244  EICB (Carte) 8/3/2010  Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.
 
Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202) contains many process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control. 
 
Please explain how the above meets the intent of the approved SPM. Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear
 
Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.
: 23. N Open  Response is provided in letter
 
dated 10/25/10.
 
NNC 11/18/10: SysRS Rev. 2 also contains process
 
requirements that are more
 
appropriately incorporated into process documentation.
Open-TVA/WEC Due 12/22/10 EICB RAI ML102980066 Item No. 14 Response is provided in letter dated 10/25/10. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 245  EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the Responder: WEC Relates to the commitment to provide the test plan and the
: 8. N Open  Response included in letter Open-NRC Review Due 12/22/10 EICB RAI ML102980066 Item
 
No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the
 
information relied upon in the SE must Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
SPM compliance matrix Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.
dated 12/3/10 be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC


As agreed ISG6 does not apply to the Common Q PAMS
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                            radF7C8C.docx                                                                                            Open Items to be Resolved for SER Approval


platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
===Response===
Attachment 1 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 9. N Open Response is provided in letter  
SE      FSAR          NRC No.                                                                          Issue                                                        TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                  Comments Sec.      Sec.          POC                                                                                                                                                    Y/N
(    (
218                                              7/6/2010                                                            Responder: Clark                                              193. Y      Closed                            Closed              EICB RAI              TVA Letter dated 219                                              8/4/2010                                                            Responder: TVA Licensing                                      194. Y      Closed                            Closed              EICB RAI
( ( (  (
220                                              8/4/2010                                                            Responder: Ayala                                              195. Y      Closed                            Closed              EICB RAI              TVA Letter dated 221    7.7.1.2  7.7.1.3                          8/4/2010                                                            Responder: Trelease                                            196. Y      Closed                            Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL
(      (  ( M ( ( M ( ( (
222                                              8/4/2010                                                            Responder: Clark                                              197. Y      Close                            Closed              EICB RAI              TVA Letter dated 223                                              8/4/2010                                                            Responder: Clark                                              198. Y      Closed                            Closed              EICB RAI C C C  C 224    7.5.1.1  7.5.2                            8/4/2010                                                            Responder: Norman (TVA CEG)                                    199. Y      Closed                            Closed              EICB RAI              TVA Letter dated EICB RAI ML102861885 sent to DORL 225                                              8/4/2010                                                            Responder: Scansen                                            200. Y      Close                            Closed              EICB RAI              TVA Letter dated G      G  G a G G a G G G 226                                              8/4/2010                                                            Responder: TVA Licensing                                      201. Y      Closed                            Closed              N/A - Information    TVA Letter dated See also Open Item Nos. 41 & 270.
227                                              8/4/2010                                                            Responder: Clark                                              202. Y      Close                            Closed              EICB RAI              TVA Letter dated a a a  a 228                                              8/4/2010                                                            Responder: Clark                                              203. Y      Closed                            Closed              EICB RAI              TVA Letter dated 229                                              8/4/2010                                                            Responder: Clark                                              204. Y      Closed                            Closed              EICB RAI              TVA Letter dated 230                                              8/4/2010                                                            Responder: Webb                                                205. Y      Closed                            Closed              EICB RAI              TVA Letter dated 231                                              8/4/2010                                                            Responder: Clark                                              206. Y      Closed                            Closed              EICB RAI              TVA Letter dated
( ( (    ( ( (
232                                              8/4/2010                                                            Responder: Clark                                              207. Y      Closed                            Closed              RAI No. 5            TVA Letter dated 233                                              8/4/2010                                                            Responder: Clark                                              208. Y      Closed                            Closed              EICB RAI              TVA Letter dated
(      ( (
234                                              8/4/2010                                                            Responder:                                                    209. Y      Closed                            Closed              N/A - Duplicate      N/A C C C    C C S 235                                              8/4/2010                                                            Responder: TVA Licensing                                      210. Y      Closed                            Closed              N/A                  N/A 236                                              8/4/2010                                                            Responder: Clark                                              211. Y      Close                            Closed              EICB RAI              TVA Letter dated G      G G 237                                              8/4/2010                                                            Responder: Clark                                              212. Y      Closed                            Closed              EICB RAI              TVA Letter dated a a a    a a i 238                                              8/4/2010                                                            Responder: Webb/Hilmes                                        213. Y      Closed                            Closed              N/A - Duplicate      N/A 239                                              8/4/2010                                                            Responder: Hilmes                                              214. Y      Closed                            Closed              N/A - Meeting        N/A 240                                              8/4/2010                                                            Responder: Clark                                              215. Y      Close                            Closed              Ml102910008          TVA Letter dated 241                          (  (              8/4/2010                                                            Responder: Davies                                              216. Y      Closed                            Closed              RAI No. 10            TVA Letter dated
(
242                          C  S              8/4/2010                                                            Responder: Hilmes                                              217. Y      Close                            Closed              EICB RAI              TVA Letter dated G
a  i 243                                              8/3/2010                                                            Responder: WEC                                                218. Y      Closed                            Closed              N/A - Closed to       N/A 244                                              8/3/2010                                                            Responder: WEC                                                23. N        Open                              Open-TVA/WEC        EICB RAI        Response is            LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter      "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that        The process related requirements have been removed from                    Response is provided in letter    Due 12/22/10        No. 14          dated 10/25/10.        information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed    revision 2 of the Software Requirements Specification (SRS).                dated 10/25/10.                                                                                be docketed correspondence."
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS        Attachment 3 of letter dated 10/25/10 contains the                         NNC 11/18/10: SysRS Rev. 2                                                                      LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing  proprietary version of Westinghouse document Nuclear                      also contains process                                                                          analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any    Automation, Watts Bar 2 NSSS Completion Program, I&C                        requirements that are more                                                                      requested should include technical alternatives to the SPM processes or additional project specific    Projects, Software Requirements Specification for the Post                 appropriately incorporated into                                                                information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.        Accident Monitoring System, WNA-SD-00239-WBT,                              process documentation.                                                                          the NRC staff to make an independent Revision 2, Dated September 2010.                                                                                                                                          assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                                                                                                                      of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements,                                                                                                                                                                                  requirements and the protection of for example all seventeen requirements in Section 2.3.2,                                                                                                                                                                                        public health and safety."
                                                  "Configuration Control," address process requirements for configuration control.
Please explain how the above meets the intent of the approved SPM.
245                        EICB                  8/3/2010                                                            Responder: WEC                                                8. N       Open                              Open-NRC Review      EICB RAI                                LIC-101 Rev. 3 Appendix B Section 4, (Carte                                                                                                                                                                                                                        ML102980066 Item                        "Safety Evaluation" states: "the
                                )
Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the                        Response included in letter       Due 12/22/10        No. 119                                  information relied upon in the SE must


dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  radF7C8C.docx                                                                                            Open Items to be Resolved for SER Approval
Open-NRC Review


Due 10/22/10  
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                  Y/N required test documentation for systems developed using the      SPM compliance matrix                                                          dated 12/3/10                                                                                      be docketed correspondence."
Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post                                                                                                                            LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).          Accident Monitoring System Test Plan, WNA-PT-00138-                                                                                                                              analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10                                                                                                                              requested should include technical contains the Westinghouse Application for Withholding for                                                                                                                        information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT-                                                                                                                          the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010.                                                                                                                                      assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246                                  8/3/2010                                                            Responder: WEC                                                9. N      Open                              Open-NRC Review            EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM              As agreed ISG6 does not apply to the Common Q PAMS                        Response is provided in letter    Due 10/22/10               No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be          platform. The information required to address this question                dated 10/25/10                                                                                    be docketed correspondence."
developed. Many other section of the SPM identify that this PQP      concerning the PQP and SPM has been added to                                                                NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the      compliance matrix in revision 1 of the Licensing Technical                NNC 11/18/10: PQP has not        go to WEC Rockville                                              LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,        Report.                                                                    been provided and CQ PAMS        Offices and look at                                              analysis that supports the change please describe the documentation produced and provide the                                                                                      LTR Rev. 1 does not contain      PQP to decide if it must                                        requested should include technical information that the SPM states should be in the PQP.                Attachment 1 of letter dated 10/25/10 contains the                        comparable information.          docketed.                                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                                                                                                                      the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                                                                                        assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                                                                                                                        of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                                                                                                                        requirements and the protection of 2010                                                                                                                                                                        public health and safety."
247                  ( ( (          8/8/2010                                                            Responder: WEC                                                219. Y      Closed                            Closed                    EICB RAI          Response is        LIC-101 Rev. 3 Appendix B Section 4, 248                  C C C          8/8/2010                                                            Responder: WEC                                                220. Y      Closed                            Closed                                        Response is        LIC-101 Rev. 3 Appendix B Section 4, a a a 249                                  8/8/2010                                                            Responder: WEC                                                221. Y      Closed                            Closed                                                          LIC-101 Rev. 3 Appendix B Section 4, 250                                  8/8/2010                                                            Responder: WEC                                                24. N        Open                              Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                        "Safety Evaluation" states: "the The SPM describes the software and documents that will be            Westinghouse develops Software Release Reports/Records                    Response included in letter      Due 12/22/10                                                    information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,      and a Configuration Management Release Report. Describe                    dated 10/25/10.                                                                                    be docketed correspondence."
SPM Section 6, Software Configuration Management Plan)            the documents and when they will be produced. Summarize                                                      10/25/10 is a partial describes the implementation tasks that are to be carried out. The  guidance on how to produce these records, focus on project                                                  response. Still waiting                                          LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the      specific requirements in SPM etc.                                                                            on Software Test Plan                                            analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                        and all other testing                                            requested should include technical Documentation should exist that shows that the configuration                                                                                                                      documentation.                                                  information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                                    the NRC staff to make an independent accomplished. Please provide information that shows that the CM                                                                                                                                                                                    assessment regarding the acceptability tasks have been successfully accomplished for each life cycle                                                                                                                                                                                      of the proposal in terms of regulatory activity group.                                                                                                                                                                                                                                    requirements and the protection of public health and safety."
251                                  8/8/2010                                                            Responder: WEC                                                25. N        Open                              Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                        "Safety Evaluation" states: "the The SPM describes the software testing and documents that will      The software testing performed and documents created are                  Partial response is provided in  Due 12/22/10.                                                    information relied upon in the SE must be created. The SPM also describes the testing tasks that are to    addressed by the SPM Compliance matrix contained in                        letter dated 10/25/10                                                                              be docketed correspondence."
be carried out. The acceptance criterion for software test          Revision 1 of the Licensing Technical Report.                                                                10/25/10 is a partial implementation is that the tasks in the SPM have been carried out                                                                                                                response. Still waiting                                          LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that        Attachment 1 of the letter dated 10/25/10 contains the                                                      on Software Test Plan                                            analysis that supports the change testing been successfully accomplished.                              Proprietary version of Westinghouses document titled:                                                      and all other testing                                            requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                                                          documentation.                                                  information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS),                                                                                                                              the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                                                                                        assessment regarding the acceptability WBT-P, Dated October 2010                                                                                                                                                    of the proposal in terms of regulatory requirements and the protection of public health and safety."


NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                               radF7C8C.docx                                                                                     Open Items to be Resolved for SER Approval
EICB RAI ML102980066 Item
 
No. 15 Response is provided in letter
 
dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the
 
information relied upon in the SE must
 
be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory requirements and the protection of public health and safety." 247    (C a 8/8/2010 Res p onder: WEC 219.Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 248    (C a 8/8/2010 Res p onder: WEC 220.Y Closed Closed  Res p onse is LIC-101 Rev. 3 A ppendix B Section 4
, 249    (C a 8/8/2010 Res p onder: WEC 221.Y Closed  Closed  LIC-101 Rev. 3 A ppendix B Section 4
, 250  EICB (Carte) 8/8/2010  The SPM describes the software and documents that will be
 
created and placed under configuration control. The SCMP (e.g.,
SPM Section 6, "Software Configuration Management Plan") describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records
 
and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
: 24. N Open  Response included in letter
 
dated 10/25/10.
Open-TVA/WEC Due 12/22/10
 
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 251  EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.
Responder: WEC
 
The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in Revision 1 of the Licensing Technical Report.
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled: 
"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS),
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010"
: 25. N Open Partial response is provided in
 
letter dated 10/25/10 Open-TVA/WEC
 
Due 12/22/10.
 
10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the
 
information relied upon in the SE must
 
be docketed correspondence."  LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 252  EICB (Carte) 8/8/2010  The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
Responder: WEC Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.
: 26. N Open  Read ML091560352 Open-TVA/WEC Due 12/10/10
 
Check on this Hilmes  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 253    (C a 8/8/2010 Res p onder: Clark 222.Y Closed Closed  TVA Letter dated Related to O pen Item no. 83.
254    (C a 8/10/2010 Res p onder: WEC 223.Y Closed Closed N/A - Re quest to TVA Letter dated 255    (C a 8/10/2010 Res p onder: WEC 224.Y Closed Closed N/A - Re quest to TVA Letter dated 256    (C a 8/10/2010 Res p onder: WEC 225.Y Closed Closed N/A - Re quest to TVA Letter dated 257    (C a 8/10/2010 Res p onder: WEC 226.Y Closed Closed N/A - Re quest to N/A  258    (C a 8/10/2010 Res p onder: WEC 227.Y Closed Closed N/A - Re quest to N/A  259    (C a 8/10/2010 Res p onder: WEC 228.Y Closed Closed N/A - Re quest to TVA Letter dated 260    (C a 8/10/2010 Res p onder: WEC 229.Y Closed Closed N/A - Re quest to N/A  261    (C a 8/10/2010 Res p onder: WEC 230.Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262    (C a 8/10/2010 Res p onder: WEC 231.Y Closed Closed N/A - Re quest to N/A  263    (C a 8/11/2010 Res p onder: WEC 232.Y Closed Closed ML101650255
, Item  264    (C a 8/11/2010 Res p onder: WEC 233.Y Closed Closed ML101650255
, Item  265    (C a 8/11/2010 Res p onder: WEC 234.Y Closed Closed ML101650255
, Item  266    (C a 8/11/2010 Res p onder: Webb/Webber 235.Y Closed Closed  TVA Letter dated 267    (C a 8/11/2010 Res p onder: WEC 236.Y Closed Closed    268  EICB (Carte) 8/19/2010
 
By letter dated March 12, 2010 (ML101680577), TVA stated that the application specific hardw are and software architecture descriptions are addressed in the WBN2 PAMS System Design
 
Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).


===Response===
SE      FSAR      NRC No.                                                                            Issue                                                        TVA Response(s)                      Acceptable      Status/ Current Actions      Resolution Path      RAI No. & Date      RAI Resp. Date                  Comments Sec.      Sec.      POC                                                                                                                                                      Y/N 252                                                8/8/2010                                                            Responder: WEC                                              26. N        Open                          Open-TVA/WEC                                                  LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                              "Safety Evaluation" states: "the The SPM contain requirements for software requirements              Explain response to AP1000 audit report.                                Read ML091560352              Due 12/10/10                                                  information relied upon in the SE must traceability analysis and associated documentation (see Section      RTM docketed NRC awaiting V&V evaluation of RTM.                                                                                                                      be docketed correspondence."
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability                                                                                                                Check on this Hilmes                                          LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished.                                                                                                                                                                                              analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
( ( ( ( ( ( ( ( ( ( ( ( ( ( (
253                                                8/8/2010                                                            Responder: Clark                                            222. Y      Closed                        Closed                                      TVA Letter dated Related to Open Item no. 83.
254                                                8/10/2010                                                            Responder: WEC                                              223. Y      Closed                        Closed                N/A - Request to    TVA Letter dated 255                                                8/10/2010                                                            Responder: WEC                                              224. Y      Closed                        Closed                N/A - Request to    TVA Letter dated 256                                                8/10/2010                                                            Responder: WEC                                              225. Y      Closed                        Closed                N/A - Request to    TVA Letter dated 257                                                8/10/2010                                                            Responder: WEC                                              226. Y      Closed                        Closed                N/A - Request to    N/A C C C C C C C C C C C C C C C 258                                                8/10/2010                                                            Responder: WEC                                              227. Y      Closed                        Closed                N/A - Request to    N/A 259                                                8/10/2010                                                            Responder: WEC                                              228. Y      Closed                        Closed                N/A - Request to    TVA Letter dated 260                                                8/10/2010                                                            Responder: WEC                                              229. Y      Closed                        Closed                N/A - Request to    N/A 261                                                8/10/2010                                                            Responder: WEC                                              230. Y      Closed                        Closed                N/A - Closed to      TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
262                                                8/10/2010                                                            Responder: WEC                                              231. Y      Closed                        Closed                N/A - Request to    N/A a a a a a a a a a a a a a a a 263                                                8/11/2010                                                            Responder: WEC                                              232. Y      Closed                        Closed                ML101650255, Item 264                                                8/11/2010                                                            Responder: WEC                                              233. Y      Closed                        Closed                ML101650255, Item 265                                                8/11/2010                                                            Responder: WEC                                              234. Y      Closed                        Closed                ML101650255, Item 266                                                8/11/2010                                                            Responder: Webb/Webber                                      235. Y      Closed                        Closed                                      TVA Letter dated 267                                                8/11/2010                                                            Responder: WEC                                              236. Y      Closed                        Closed 268                                                8/19/2010                                                            Responder: WEC                                              10. N        Open                          Open-NRC Review EICB (Carte)
By letter dated March 12, 2010 (ML101680577), TVA stated that        11/18/10 Warren Odess-Gillett took action to discuss with                Response included in letter  Due 12/22/10 the application specific hardware and software architecture          Design Engineering to generate a non-prop figure                        dated 12/3/10 descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482)              Attachment 18 contains the non-proprietary version of the and Software Requirements Specification (ML101050202,                Westinghouse document Watts Bar 2 Common Q PAMS ML102040486, & ML1022040487).                                        Block Diagram.
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
Responder: WEC 11/18/10 Warren Odess-Gillett took action to discuss with Design Engineering to generate a non-prop figure Attachment 18 contains the non-proprietary version of the Westinghouse document "Watts Bar 2 Common Q PAMS Block Diagram."
( ( (
: 10. N Open  Response included in letter dated 12/3/10 Open-NRC Review Due 12/22/10 269   (P o 8/20/2010 Res p onder: NRC 237.Y Closed Closed N/A N/A 270   (C a 8/23/2010 Res p onder: Clark 238.Y Closed Closed   See also O p en Item Nod. 41 & 245.
269                                               8/20/2010                                                           Responder: NRC                                             237. Y       Closed                       Closed                 N/A                 N/A
271   (C a 8/23/2010 Res p onder: WEC 239.Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 240.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 241.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 242.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b   (S i 8/26/2010 Res p onder: Stockton 243.Y Closed Closed RAI No. 6 TVA Letter dated 275    (S i 8/27/2010 Res p onder: Clark 244.Y Closed Closed Not Re q uired  N/A Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 276 7.6 7.6 EICB (Garg) 8/27/2010 In order for the staff to review the effects of multi control systems failure, provide the summary of the analyses documenting the effect on the plant based on the followin g events:
( ( (
(1) loss of power to all control systems powered by a single power supply;  (2) failure of each instrument sensor which provides signal to two or more control systems;  (3)  Break of any sensor impulse line which is used for sensors providing signals to two or more control systems;  and (4)  failure of digital system based on the common cause software failure affecting two or more control systems. For each of these events, confirm that the consequences of these events will not be outside chapter 15 analyses or beyond the capability of operators or safety systems.
270                                               8/23/2010                                                           Responder: Clark                                           238. Y       Closed                       Closed                                                         See also Open Item Nod. 41 & 245.
Responder: Webb The NRC reviewer confirmed this question applies to non-safety systems. 
271                       M M M                    8/23/2010                                                           Responder: WEC                                             239. Y       Closed                       Closed                 N/A - Closed to     NA 272     7.5.2.1   7.5.1         C C P              8/26/2010                                                           Responder: Clark                                           240. Y       Closed                       Closed                 EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a a o 273     7.5.2.1   7.5.1                           8/26/2010                                                           Responder: Clark                                           241. Y       Closed                       Closed                 EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1     7.5.1                           8/26/2010                                                           Responder: Clark                                           242. Y       Closed                       Closed                 EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL
(
274.b                                             8/26/2010                                                           Responder: Stockton                                         243. Y       Closed                       Closed                 RAI No. 6           TVA Letter dated S
i
(
275                                                8/27/2010                                                           Responder: Clark                                           244. Y       Closed                       Closed                 Not Required        N/A S
i


The Distributed Control System (DCS) implemented using Foxboro I/A hardware, replaces most of the non-safety
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radF7C8C.docx                                                                                              Open Items to be Resolved for SER Approval
 
related control systems for WBN Unit 2. The other non-safety-related control systems within the scope of this question are:
: a. Rod Control - Failures of this system are addressed in FSAR Chapter 15.
: b. Main Turbine Electro-Hydraulic Control System 
 
The following provides the requested summaries for the four events listed:
(1) The (DCS) segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) demonstrates that the loss of any single power source does not result in a loss of any DCS function. The other systems within the scope of this question are configured in the same manner as Unit 1, with redundant power sources such that the failure of a single power source does not cause a loss of function.
(2) Signals shared by more than one control function within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.
The impact of a loss of signal to the other systems within the scope of this question is bounded b y the loss of that signal to the individual system and has the same effect as for Unit 1. 
 
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are
 
present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure. 


===Response===
SE    FSAR    NRC No.                                                              Issue                                                        TVA Response(s)                              Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date    Comments Sec. Sec. POC                                                                                                                                                        Y/N 276    7.6    7.6                  8/27/2010                                                              Responder: Webb                                                  1. Y        Open                              Open-TVA/Bechtel            EICB RAI          TVA Letter dated EICB (Garg)
ML102910008      10/21/10 In order for the staff to review the effects of multi control systems                                                                                  Response provided in letter      Due 11/24/10                Item#60          Enclosure 1 Item failure, provide the summary of the analyses documenting the            The NRC reviewer confirmed this question applies to non-                      dated 10/21/10                                                                  No. 13 effect on the plant based on the following events: (1) loss of power    safety systems.                                                                                                  TVA to provide to all control systems powered by a single power supply; (2)                                                                                          Revised response provided in      justification for non-failure of each instrument sensor which provides signal to two or      The Distributed Control System (DCS) implemented using                        letter dated 11/24/10            safety system other more control systems; (3) Break of any sensor impulse line which        Foxboro I/A hardware, replaces most of the non-safety                                                            than DCS.
is used for sensors providing signals to two or more control            related control systems for WBN Unit 2. The other non-                        Response Acceptable. 11/17/10 systems; and (4) failure of digital system based on the common          safety-related control systems within the scope of this                                                          The statement that cause software failure affecting two or more control systems. For      question are:                                                                                                    failure of sense line each of these events, confirm that the consequences of these                                                                                          TVA changed the response in where more than one events will not be outside chapter 15 analyses or beyond the            a. Rod Control - Failures of this system are addressed in                    the latest writeup. The scope of transmitter is connected capability of operators or safety systems.                                  FSAR Chapter 15.                                                          the question applies to all non would be bounded by
: b. Main Turbine Electro-Hydraulic Control System                            safety related control systems the failure of a single and is not limited to just three transmitter does not The following provides the requested summaries for the four                    system listed by the TVA. TVA make sense.
events listed:                                                                could use to envelope other control systems by Unit 1          TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA                          analysis if they applies to Unit 2 statement that all non-letter to NRC dated August 11, 2010, Enclosure 2                          systems also.                      safety control systems (Reference 7) demonstrates that the loss of any single                                                        have been evaluated power source does not result in a loss of any DCS                                                            against these criteria function. The other systems within the scope of this                                                          and have determined question are configured in the same manner as Unit 1,                                                        that their failure does with redundant power sources such that the failure of a                                                      not have consequences single power source does not cause a loss of function.                                                        which will put the plant outside chapter 15 (2) Signals shared by more than one control function                                                              analyses.
within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.
The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems
). The other s y stems 1. Y Open  Response provided in letter dated 10/21/10 Revised response provided in letter dated 11/24/10 Response Acceptable. 11/17/10 TVA changed the response in the latest writeup. The scope of the question applies to all non safety related control systems and is not limited to just three system listed by the TVA. TVA could use to envelope other control systems by Unit 1 analysis if they applies to Unit 2 systems also.
Open-TVA/Bechtel Due 11/24/10


TVA to provide justification for non-safety system other than DCS.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       radF7C8C.docx                                                                                     Open Items to be Resolved for SER Approval
 
The statement that failure of sense line where more than one transmitter is connected would be bounded by the failure of a single transmitter does not make sense.
 
TVA needs to make a statement that all non-
 
safety control systems have been evaluated against these criteria and have determined
 
that their failure does not have consequences which will put the plant outside chapter 15 analyses.
 
EICB RAI ML102910008 Item#60 TVA Letter dated 10/21/10 Enclosure 1 Item No. 13 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments within the scope of this question are analog and therefore this question is not applicable.
All non-safety control systems have been evaluated against
 
these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.


===Response===
SE    FSAR        NRC No.                                                          Issue                                                TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec.        POC                                                                                                                                    Y/N within the scope of this question are analog and therefore this question is not applicable.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
277 7.6 7.6.3 (G 8/27/2010 Res p onder: Clark 245.Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 246.Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 (G 8/27/2010 Res ponder: Mather 247.Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 248.Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8 (G 8/27/2010 Res p onder: Webb 249.Y Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9 (G 8/27/2010 Res ponder: Trelease 250.Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark 251.Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber 252.Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil 253.Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber 254.Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton 255.Y Closed Closed ML102390538
(
, Item Res p onse  288 7.3   (G 9/2/2010 Res p onder: McNeil 256.Y Closed Closed EICB RAI   289   (S i 9/2/2010 Res ponder: Faulkner 257.Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 (C a 9/7/2010 Res p onder: Clark 258.Y Closed Closed N/A N/A This item is a du plicate of item 291.
277   7.6     7.6.3             8/27/2010                                                   Responder: Clark                                                 245. Y       Close                         Closed               EICB RAI           TVA Letter dated 278   7.6     7.6.6             8/27/2010                                                   Responder: Trelease                                             246. Y       Close                         Closed               EICB RAI           TVA Letter dated 279   7.6     7.6.6   D          8/27/2010                                                   Responder: Mather                                               247. Y       Close                         Closed               EICB RAI           TVA Letter dated 280   7.6     7.6.6     ( ( ( ( ( (
291 7.7 (C a 9/7/2010 Res p onder: Clark 259.Y Closed Closed TVA Letter dated 292 7.2.5 7.2 (G 9/7/2010 Res p onder: Crai g 260.Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g 261.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 262.Y Closed Closed ML102390538
8/27/2010                                                   Responder: Trelease                                             248. Y       Closed                       Closed               EICB RAI           TVA Letter dated a
, Item Res p onse  295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 263.Y Closed Closed ML102390538
G G G G G G 281   7.6     7.6.8             8/27/2010                                                   Responder: Webb                                                 249. Y       Closed                       Closed               EICB RAI           TVA Letter dated r
, Item Res p onse  296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 264.Y Closed Closed ML102390538
282   7.6     7.6.9             8/27/2010                                                   Responder: Trelease                                             250. Y       Close                         Closed               EICB RAI           TVA Letter dated 283   7.7.5     XX               8/27/2010                                                   Responder: Clark                                                 251. Y       Closed                       Closed               EICB RAI No.13     TVA Letter dated This item is a follow-up question to item
, Item Res p onse  297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 265.Y Closed Closed ML102390538
(
, Item Res p onse  298 7.3 XX (D a r 9/9/2010 Res p onder: Clark 266.Y Closed Closed ML102390538
284   7.7.3   7.4.1             8/27/2010                                                   Responder: Webber                                               252. Y       Closed                       Closed               EICB RAI No.14     TVA Letter dated This item is a follow-up question to item D
, Item Res p onse  299   (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q 267.Y Closed Closed TVA Letter dated  
a r
(
285   7.3.3     7.3               8/27/2010                                                   Responder: McNeil                                               253. Y       Closed                       Closed               EICB RAI No.15     TVA Letter dated This item is a follow-up question to item D
a r
(
286   7.7.3   9.3.4.2.           8/27/2010                                                   Responder: Webber                                               254. Y       Closed                       Closed               EICB RAI No.16     TVA Letter dated D
a r
(
287   7.3     7.3-1   ( D       8/27/2010                                                   Responder: Elton                                                 255. Y       Closed                       Closed               ML102390538, Item Response G a r
288   7.3                         9/2/2010                                                   Responder: McNeil                                               256. Y       Closed                       Closed               EICB RAI
(
289                               9/2/2010                                                   Responder: Faulkner                                             257. Y       Closed                       Closed               RAI No. 24         TVA Letter dated 290             7.7     (       9/7/2010                                                   Responder: Clark                                                 258. Y       Closed                       Closed               N/A               N/A               This item is a duplicate of item 291.
D    ( ( (
M (
291             7.7               9/7/2010                                                   Responder: Clark                                                 259. Y       Closed                       Closed                                 TVA Letter dated 292   7.2.5     7.2   a    C C S9/7/2010                                                   Responder: Craig                                                260. Y       Closed                       Closed               EICB RAI           TVA Letter dated 293   7.7.4   7.2.2.3. a G      9/8/2010                                                   Responder: Craig                                                261. Y       Closed                       Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL r    a a i 294   7.3     7.3.1.1.           9/9/2010                                                   Responder: Elton                                                 262. Y       Closed                       Closed               ML102390538, Item Response
(
295   7.3     7.3.1.1.           9/9/2010                                                   Responder: Elton                                                 263. Y       Closed                       Closed               ML102390538, Item Response D
a r
(
296   7.3     7.3.1.2.           9/9/2010                                                   Responder: Elton                                                 264. Y       Closed                       Closed               ML102390538, Item Response D
a r
297   7.3     7.3.1.2.   ( (     9/9/2010                                                   Responder: Elton                                                 265. Y       Closed                       Closed               ML102390538, Item Response
( D D 298   7.3       XX     C a a     9/9/2010                                                   Responder: Clark                                                 266. Y       Closed                       Closed               ML102390538, Item Response a r r 299                               Provide Common Q Software Requirements Specification Post   Attachment 41 of the 10/5 letter contains the Common Q           267. Y       Closed                       Closed                                 TVA Letter dated


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 300   EICB (Singh) Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                                   radF7C8C.docx                                                                                             Open Items to be Resolved for SER Approval
Are there any commercially dedicated parts in the RM-1000?  If so, how are they dedicated?
 
Please confirm that digital communication ports available in RM-1000 are not used. Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to letter dated October 31, 2010.
===Response===
(2) Attachment 7 contains the General Atomics detector differences report.
SE   FSAR   NRC No.                                                                             Issue                                                           TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path         RAI No. & Date   RAI Resp. Date     Comments Sec. Sec. POC                                                                                                                                                                      Y/N 300                                             Need Radiation Monitoring System Description/Design Criteria             Responder: Temples/Mather                                        11. Y        Closed                          Closed                    ML102980005, Item TVA letter EICB (Singh) 25                11/24/10, Item 4, Are detectors different from Unit 1. Describe any differences.   (1) The Radiation Monitoring Design Criteria Document,                               Response is included in letter  Due 11/24/10                                and TVA Letter WB-DC-40-24, Revision 21 is contained in Attachment                               dated 10/29/10                                                                dated 10/29/10 Are there any commercially dedicated parts in the RM-1000? If so,    6 to letter dated October 31, 2010.                                                                               TVA to address the                          Enclosure 1 Item how are they dedicated?                                                                                                                                Revised response Included in    following comments:                          No. 20 (2) Attachment 7 contains the General Atomics detector                               letter dated 11/24/10 Please confirm that digital communication ports available in RM-      differences report. The containment high range                                                                     (1) Is it Att. 5 or Att.
The containment high range radiation monitors are loops 271-274.
1000 are not used.                                                    radiation monitors are loops 271-274.                                                                                 6?
(3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.
(2) Pl. confirm that (3) For safety-related applications, General Atomics                                                               HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module                                                           271-274.
(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.
assembly as a Basic Component. This assembly does                                                         (3) TVA to clarify that contain component parts that are Safety-Related                                                               GA has a Commercial Grade Items (SRCGI). Because these                                                                 commercial SRCGI components are assembled into the delivered                                                             dedication Basic Component, they are dedicated to the assembly                                                           program in place by virtue of the acceptance test of the full RM-1000                                                           and that GA is an assembly. Safety-related commercial grade items are                                                           approved dedicated in accordance with General Atomics                                                                   10CFR50, App. B approved 10 CFR 50 Appendix B program.                                                                        supplier.
App B does not (4) The digital communications ports on the safety-related                                                         address RM-1000 radiation monitors are not used.                                                                      commercial grade dedication .
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
General Atomics Electronics Systems, Inc. is an approved 10 CFR 50 Appendix B supplier. They have a commercial grade dedication program.
Revised response General Atomics Electronics Systems, Inc. is an approved                                                           is acceptable.
: 11. Y Closed  Response is included in letter dated 10/29/10 Revised response Included in letter dated 11/24/10 Closed  Due 11/24/10 TVA to address the following comments:
10 CFR 50 Appendix B supplier. They have a commercial                                                               Please submit grade dedication program.                                                                                           response.
(1) Is it Att. 5 or Att.
6? (2) Pl. confirm that HRRMs are loops 271-274. (3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved 10CFR50, App. B supplier.
App B does not address commercial grade dedication .
Revised response is acceptable.
Please submit response.
(4) Response acceptable.
(4) Response acceptable.
ML102980005, Item 25 TVA letter 11/24/10, Item 4, and TVA Letter dated 10/29/10 Enclosure 1 Item No. 20  301   EICB (Singh)EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).
301                                             1.TVA is requested to address the consequences of software               Responder: WEC/Davies/Clark                                      27. N        Open                            Open-TVA/WEC              RAI No. 11        TVA Letter dated common cause failure including all potential resulting failures (i.e.                                                                                                                                               ML102980005        10/29/10 total loss of CERPI, system fail as-is).                                 TVA Partial Response:                                                        Partial response in 10/29 letter. Due 12/22/10              10/26/2010        Enclosure 1 Item No. 21
: 2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281
: 2. In addition, address how the actions stipulated in the plant           For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15,                                                    1)  Please address Technical Specifications will be taken when the CERPI system             no credit is taken for the rod position indication system. For                                                      how fail-as-is is indications are lost. Information notice IN 2010-10 (ML100080281)        all continuous rod withdrawal accidents analyzed in WBN                                                            detected i.e.
) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.
addresses the need to consider software failures and the actions         Unit 2 FSAR, Chapter 15, no credit is taken for any rod                                                            alarms, rod required to assure that the plant will stay within its licensing basis. stop/block.                                                                                                        position deviation EICB (Singh)EICB (Singh) alarms, etc.
: 3. Provide FMEA in support of your response.
: 3. Provide FMEA in support of your response.                        (1) Technical Specification 3.1.8, Rod Position Indication,                                                        2)  Response does not have an action for total loss of indication;                                                                acceptable.
: 4. FSAR Table 7.7-1, Plant Control S ystem Interlocks lists interlock C-11 to block automatic rod withdrawal when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?
: 4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock     therefore, a total loss of CERPI puts the plant into LCO                                                        3)  Response C-11 to block automatic rod withdrawal when 1/1 Control Bank D           3.0.3 which states:                                                                                                  acceptable.
: 5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS? Is this interlock fail safe?  
rod position is above setpoint. This interlock capability would be                                                                                                                       4)  a. Response lost in case of total loss of CERPI. How is the rod block assured       When an LCO is not met and the associated ACTIONS                                                                    acceptable.
for this event?                                                         are not met, an associated ACTION is not provided, or if                                                            b. Pl. address directed by the associated ACTIONS the unit shall be                                                                failure mode on
: 5. How is automatic rod withdrawal affected in case of total loss of     placed in a MODE or other specified condition in which                                                              fail-as-is.
signals from the CERPI to the ICS? Is this interlock fail safe?         the LCO is not applicable. Action shall be initiated within                                                          5) Response 1 hour to place the unit, as applicable, in:                                                                        acceptable.
6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the                                                                                                                          6) Response rod position indicator channel is 5% of span (7.2 inches). The                MODE 3 within 7 hours;                                                                                          acceptable.
CERPI system accuracy specified in the CERPI System                          MODE 4 within 13 hours; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12                  MODE 5 within 37 hours.                                                                                    TVA to address


6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 Responder: WEC/Davies/Clark TVA Partial Response:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                           radF7C8C.docx                                                                        Open Items to be Resolved for SER Approval


For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block. 
===Response===
 
SE   FSAR   NRC No.                                                 Issue                                               TVA Response(s)                       Acceptable Status/ Current Actions     Resolution Path   RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                              Y/N steps or 5.19%. The specified system accuracy seems to be                                                                                                   common cause failure greater than the accuracy assumed in the FSAR Chapter 15.     Exceptions to this Specification are stated in the                                           as stated under Please clarify this anomaly.                                  individual Specifications. Where corrective measures                                         response item 2.
(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:
are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions                                               Please explain how required by LCO 3.0.3 is not required.                                                       various alarms will continue to annunciate (2) CERPI common mode software failure                                                           on software lockup?
When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in: 
Need better Description of the CERPI systems installed at Watts                                         explanation to Bar (Unit 1 & 2):                                                                           understand the rationale behind the Each Programmable Logic Controller (PLC),                                                     response.
 
Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train.
MODE 3 within 7 hours; MODE 4 within 13 hours; and MODE 5 within 37 hours.
Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.
: 27. N Open  Partial response in 10/29 letter.
 
Open-TVA/WEC Due 12/22/10
: 1) Please address how fail-as-is is detected i.e.
alarms, rod position deviation alarms, etc.
: 2) Response acceptable.
: 3) Response acceptable.
: 4) a. Response acceptable.
: b. Pl. address failure mode on fail-as-is.
: 5) Response acceptable.
: 6) Response acceptable.
TVA to address RAI No. 11 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item No. 21 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assum ed in the FSAR Chapter 15. Please clarify this anomaly.
 
Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions  
 
required by LCO 3.0.3 is not required.
(2) CERPI common mode software failure Description of the CERPI systems installed at Watts Bar (Unit 1 & 2):
Each Programmable Logic Controller (PLC),
Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train. Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.
History of CERPI:
History of CERPI:
The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.
The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.
CERPI Software Failure Analysis With regard to the CERPI system software:
CERPI Software Failure Analysis With regard to the CERPI system software:
The software used on PLC-A is identical to that used on PLC-B. The software used on MTP-A is identical to that used on MTP-B   The software used on OM-A is identical to that used on OM-B.
* The software used on PLC-A is identical to that used on PLC-B.
* The software used on MTP-A is identical to that used on MTP-B
* The software used on OM-A is identical to that used on OM-B.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and common cause failure as stated under response item 2.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and
Please explain how various alarms will continue to annunciate on software lockup?
Need better explanation to understand the rationale behind the response.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).
A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an
 
annunciator because of the watchdog alarm circuit associated with the PLC processor module.
A total loss of CERPI indication (e.g., loss of both AC
 
power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications


needed for control.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                     radF7C8C.docx                                                                Open Items to be Resolved for SER Approval
(3) There is no FMEA for the CERPI system. 


===Response===
SE    FSAR  NRC No.                                        Issue                              TVA Response(s)                          Acceptable Status/ Current Actions Resolution Path RAI No. & Date  RAI Resp. Date        Comments Sec. Sec. POC                                                                                                      Y/N site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).
A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.
A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.
(3) There is no FMEA for the CERPI system.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are "active low" requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show "C-11 BANK D AUTO WITHDRAWAL BLOCKED."
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.
Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments consistency of parameter (and units) with the deviation alarm and position indicator uncertaint y , the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For


Amendment 102 to read: 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radF7C8C.docx                                                                                    Open Items to be Resolved for SER Approval
"The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 st eps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required


to take action as required by the Technical Specifications."
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                    TVA Response(s)                            Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date              Comments Sec.      Sec. POC                                                                                                                                                  Y/N consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
The resolution of the rod position indicator channel is +/-
12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 268.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 269.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 270.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 271.Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1 EICB (Garg) FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable.
302   7.5.2.1   7.5.1   ( ( ( (        09/17/2010                                                         Responder: Tindell                                               268. Y       Closed                           Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL 303   7.5.2.1   7.5.1                   09/17/2010                                                         Responder: Tindell                                               269. Y       Closed                           Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M 304   7.5.2.1   7.5.1                   09/17/2010                                                         Responder: Tindell                                               270. Y       Closed                           Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 305   7.5.2.1   7.5.1                   09/17/2010                                                         Responder: Tindell                                               271. Y       Closed                           Closed               EICB RAI         TVA Letter dated EICB RAI ML102861885 sent to DORL 306     7.1       7.1                   FSAR amendment 100, page 7.1-12 provides the definition of         Responder: Hilmes                                                3. Y      Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Allowable value which is not consistent with TSTF-493 as                                                                                                                                               ML102910008      10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is   The FSAR Allowable Value definition will be revised to be                    Response is included in letter  Due 12/17/10        Item#69          Enclosure 1 Item declared inoperable.                                               consistent with the TSTF-493 in FSAR Amendment 102.                          dated 10/29/10                                                          No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9                                                      Pending FSAR that will be included in FSAR Amendment 102 that reflects                                                      Amendment 102 this change.                                                                                                  submittal 307    7.1      7.1                    (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes                                               4.      Y      Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493                                                                                                                                      ML102910008      10/29/10 as AAF is the limit beyond which the instrument channel is          (1) The Acceptable As Found (AAF) definition will be                       Response is included in letter  Due 12/17/10        Item#70          Enclosure 1 Item degraded but may be operable and its operability must be                revised to be consistent with TSTF-493 in FSAR                          dated 10/29/10                                                          No. 27 evaluated. (2) Also it states that AAF is based on measurable            Amendment 102. Attachment 3 contains the revised                                                        Pending FSAR instrument channel uncertainties, such as drift, expected during the    FSAR section 7.1.2.1.9 that will be included in FSAR                                                    Amendment 102 surveillance interval. These wording should be revised to agree          Amendment 102 that reflects this change.                                                                submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided        (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be      in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean            Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue.                                        Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.
Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102.
 
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 3. Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10
Pending FSAR
Amendment 102
submittal EICB RAI ML102910008 Item#69 TVA Letter dated 10/29/10 Enclosure 1 Item No. 26  307 7.1 7.1 EICB (Garg) (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493
as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2) Also it states that AAF is based on measurable instrument channel uncertainties, such as drift, expected durin g the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the issue.
Responder: Hilmes
(1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR
Amendment 102 that reflects this change.
(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology. These sections will be revised to clarify the AAF calculations in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 4. Y Open Response is included in letter
(
 
308     7.1       7.1     G             (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes                                                   5. Y       Open                             Open-TVA/A102       EICB RAI         TVA Letter dated
dated 10/29/10 Open-TVA/A102
 
Due 12/17/10
 
Pending FSAR Amendment 102
 
submittal
 
EICB RAI ML102910008 Item#70 TVA Letter dated 10/29/10  Item
 
No. 27  308 7.1 7.1 (G(1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 5.Y Open Open-TVA/A102 EICB RAI TVA Letter dated Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration. This is very vague and ambiguous.  (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.
(1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) See response to letter item 27 (NRC Matrix Item 307).
Response is included in letter dated 10/29/10 Due 12/17/10 Pending FSAR
 
Amendment 102


submittal ML102910008 Item#71 10/29/10 Enclosure 1 Item No. 28 309 7.1 7.1.2.1.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                     radF7C8C.docx                                                                                  Open Items to be Resolved for SER Approval
9.1 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the -.. This is not acceptable. As algebraic sum is non conservative compared to the SRSS method and will mask the operabilit y of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes


(1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method.
===Response===
(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR  
SE    FSAR      NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date    Comments Sec. Sec.      POC                                                                                                                                                  Y/N Acceptable as left tolerance is not in accordance with TSTF-493 as                                                                                                                                    ML102910008      10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to                        Response is included in letter  Due 12/17/10        Item#71          Enclosure 1 Item This is very vague and ambiguous. (2) Also it states that RPS            determine the Acceptable As Left (AAL) will be deleted                  dated 10/29/10                                                          No. 28 functions use double sided tolerance limits. Since ALF is a band it      in FSAR Amendment 102. Attachment 3 contains the                                                        Pending FSAR will always be double sided and therefore, this clarification does      revised FSAR section 7.1.2.1.9 that will be included in                                                  Amendment 102 not mean anything and clouds the issue.                                  FSAR Amendment 102 that reflects this change.                                                            submittal (2) See response to letter item 27 (NRC Matrix Item 307).
 
309    7.1    7.1.2.1.                (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes                                                    6.      Y      Open                            Open-TVA/A102        EICB RAI          TVA Letter dated 9.1                    methodology, states that AAF is the algebraic sum of the .. This                                                                                                                                      ML102910008      10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint                               Response is included in letter  Due 12/17/10        Item#72          Enclosure 1 Item to the SRSS method and will mask the operability of the instrument        methodology calculations in TI-28 for TSTF-493 will be                 dated 10/29/10                                                          No. 29 channel and therefore, it is not acceptable to the staff. (2) It also    revised to use the Square Root Sum of the Squares                                                       Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into            (SRSS) method.                                                                                         Amendment 102 consideration which is vague and ambiguous.                                                                                                                                      submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
310   7.1   7.1.2.1.                 (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                   Responder: Hilmes                                              7. Y      Open                            Open-TVA/A102        EICB RAI          TVA Letter dated 9.2                    methodology, states that for AAF .and other measurable                                                                                                                                               ML102910008      10/29/10 uncertainties as appropriate (i.e., those present during             TVA Response:                                                              Response is included in letter  Due 12/17/10        Item#73          Enclosure 1 Item calibration.) should be changed to present during normal                                                                                       dated 10/29/10                                                          No. 30 operation (2) Also on page 7.1-15, states that ALT may take       (1) The AAF definition will be revised in FSAR Amendment                                                     Pending FSAR calibration history into consideration which is vague and                102 to read:                                                                                             Amendment 102 ambiguous.                                                                                                                                                                        submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties EICB (Garg) may be included in the AAF if applicable.
: 6. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
 
Due 12/17/10 Pending FSAR
 
Amendment 102
 
submittal EICB RAI ML102910008 Item#72 TVA Letter dated 10/29/10  Item No. 29  310 7.1 7.1.2.1.
9.2 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF -.and other measurable uncertainties as appropriate (i.e., those present during calibration-.) should be changed to present during normal operation--  (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes TVA Response:
(1) The AAF definition will be revised in FSAR Amendment 102 to read:  
"A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be  
 
considered degraded and must be evaluated for  
 
operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the  
 
SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable."
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October  
 
29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
  "A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable."
A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.
 
This revision eliminates the concern regarding
This revision eliminates the concern regarding
: 7. Y Open Response is included in letter
dated 10/29/10 Open-TVA/A102
Due 12/17/10
Pending FSAR Amendment 102
submittal
EICB RAI ML102910008 Item#73 TVA Letter dated 10/29/10  Item
No. 30 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
311 7.1 7.1 EICB (Garg) Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation. Please confirm that single sided calculation has not been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR.
Responder: Hilmes
A statement that single-sided corrections are not used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 8. Y Open Response is included in letter dated 10/29/10 Open-TVA/A102
Due 12/17/10 Pending FSAR
Amendment 102
submittal EICB RAI ML102910008 Item#74 TVA Letter dated 10/29/10  Item No. 31  312  7.0  (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton 272.Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2
) states that Desi g n Res p onder: A y ala 273.Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton 274.Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3  (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) 275.Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5  (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather 276.Y Closed Closed RAI No. 26 317 7.5.2.3 7.5  (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples 277.Y Closed Closed RAI No. 27 TVA Letter dated 318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for  RM-1000 equipment qualification:


(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       radF7C8C.docx                                                                                              Open Items to be Resolved for SER Approval
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.


Supplement 3 was issued one month prior to supplement 2. Please explain the reason for the same. Responder: Temples (i) Applicable to WBN Unit 2.
===Response===
04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                  Y/N calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(ii) Applicable to WBN Unit 2.   (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2  
311    7.1        7.1                    Both Westinghouse and TVA setpoint methodology do not have          Responder: Hilmes                                            8. Y        Open                            Open-TVA/A102              EICB RAI            TVA Letter dated any discussion on single sided calculation. Please confirm that                                                                                                                                            ML102910008        10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with  A statement that single-sided corrections are not used for                  Response is included in letter  Due 12/17/10              Item#74            Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR.        TSTF-493 setpoints will be included in FSAR Amendment                      dated 10/29/10                                                                  No. 31 102. Attachment 3 contains the revised FSAR section                                                          Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that                                                  Amendment 102 reflects this change.                                                                                        submittal
(
312                7.0    D a (              By letter dated September 10,2010, TVA provided the summary        Responder: Stockton                                          272. Y        Close                            Closed                    EICB RAI            TVA Letter dated r G 313    7.7.8    7.7.1.12                  EDCR 52408 (installation of AMSAC in Unit 2) states that Design    Responder: Ayala                                              273. Y        Closed                          Closed                    EICB RAI No.18      TVA Letter dated
(
314    7.3        7.3    ( D              The following 50.59 changes were listed in the March 12 RAI        Responder: Stockton                                          274. Y        Closed                          Closed                    EICB RAI No. 19    TVA Letter dated Related to OI 10 G a r
315    7.5.3      7.5.3                    IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations)                            275. Y        Close                            Closed                    EICB RAI            TVA Letter dated
(
316    7.5.2.3    7.5                    TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather                                          276. Y        Closed                          Closed                    RAI No. 26 S
i
(
317    7.5.2.3    7.5                    TVA has provided a proprietary and a non-proprietary version of    Responder: Temples                                            277. Y        Closed                          Closed                    RAI No. 27          TVA Letter dated S
i 318    7.5.2.3    7.5                    TVA has provided the following documents for RM-1000                Responder: Temples                                           1. N        Open                            Open-TVA/GA                RAI No. 28          TVA Letter dated equipment qualification:                                                                                                                                                                                    ML102980005        10/29/10 (i)   Applicable to WBN Unit 2. 04508905-1QR is                             Note check 04508905-1QR or Due 12/22/10                    10/26/2010          Enclosure 1 Item (i)    Qualification Test Report for RM-1000 Processor Module            applicable only in regards to the RM-1000, with the                   QR. Staff version is QR only.                                                  No. 34 and Current-To-Frequency Converter 04508905-QR                    exception of re-qualification of certain RM-1000                                                     Response update (January 2001)                                                    equipment differences covered in the -1SP report.                     Response is included in letter required. It is clear that (ii)    Qualification Test Report Supplement, RM-1000 Upgrades            The Current-to-Frequency (I-F) converter module                       dated 10/29/10                04508903-2SP and -
04508905-1SP (June 2006)                                          qualifications in the base report and the -1SP report                                               3SP are not applicable.
(iii)  Qualification Test Report Supplement, RM-1000 Upgrades            are not applicable to the RM-1000s, and will be used                                                 The response for 04508905-2SP (June 2008)                                          later as references in the WBN Unit 2 specific                                                       applicability of (iv)    Qualification Test Report Supplement, RM-1000 Upgrades            qualification reports.                                                                               04508905-QR and -
04508905-3SP (May 2008)                                    (ii) Applicable to WBN Unit 2.                                                                           1SP to RM-1000 and IF (iii) Not applicable to WBN Unit 2                                                                         converter is not clear.
Please clarify whether all of these are fully applicable to WBN2 or (iv) Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then                                                                                                                    Check page numbers of please clarify what those are.                                      The 04508905-3SP report was prepared for another TVA                                                        Appendix F plant, as a monitor system-level report, where the system                                                    (missing/duplicate EICB (Singh)
Supplement 3 was issued one month prior to supplement 2.            included equipment mostly based on the base report                                                          pages).
Please explain the reason for the same.                            equipment items. These two -2SP and -3SP supplement                                                          Check applicability of reports were essentially worked concurrently, but the -2SP                                                  Appendix C to RM1000 document review/release process resulted in the release                                                      instead of RM2300?
time difference.                                                                                            See items 336 and 337.
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code


The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                          radF7C8C.docx                                                                                              Open Items to be Resolved for SER Approval
: 1. N Open Note check 04508905-1QR or QR. Staff version is QR only.


Response is included in letter dated 10/29/10 Open-TVA/GA Due 12/22/10  
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                        TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                      Y/N 4, Review not required.
Work may proceed.
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?.
(
319    7.5.2.3    7.5                    TVA provided System Verification Test Results 04507007-1TR          Responder: Temples                                                278. Y        Closed                            Closed                    RAI No. 29        TVA Letter dated S
i E
320                        I              Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY                Responder: Clark                                                  279. Y        Closed                            Closed                    N/A                N/A                Duplicate of item 156 321                        ( E            For the purposes of measuring reactor coolant flow for Reactor      Responder: Clark                                                  280. Y        Closed                            Closed                    N/A                N/A                Duplicate of OI# 157 C I a
322              7.7.1.11                  Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark                                                      281. Y        Closed                            Closed 323                                        WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1                                                  1. Y        Open                              Open-TVA Unit 1                              TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                        10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to                            Response is included in letter   Due: 12/22/10                                Enclosure 1 Item to the NRC by November 15, 2010                                      Revision 2 Change Analysis.                                                    dated 10/29/10                                                                 No. 36 EICB(Garg)
The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 B
324                      (
G
(
M              Per the NRC reviewer, the BISI calculation is not required to be                                                                      282. Y        Closed                            Closed a a 325                                        The Unit 2 loops in service for Unit 1 that are scheduled to be      Responder: TVA Startup Olson                                      283. Y        Closed                            Closed                                                          Closed to open item ?
326                                        TVA uses double-sided methodology for as-found and as-left          Responder: Webb                                                  9. Y        Open October 22, 2010            Open-TVA/A102                                TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR                                                                                                                                                                          10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology    Attachment 3 contains the revised FSAR section 7.1.2.1.9                        Response is included in letter    Due 12/17/10                                  Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects                      dated 10/29/10                                                                  No. 37 this change.                                                                                                      Pending FSAR Amendment 102 submittal 327                                        Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                12. Y                Open                              Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                          Response Included in letter      Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-                          dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
(
328    7.5.2.3    7.5                    Provide the model number for the four containment high range        Responder: Temples                                                284. Y        Closed                            Closed                    RAI No. 30        TVA Letter dated S
i 329    7.6.1      7.6.7                    Section 7.6.7 of the FSAR (Amendment 100) states that, The          Responder: Clark                                                  10. N        Open                              Open-TVA/A102              RAI No. 1          TVA Letter dated EICB (Singh)
DMIMS-DX' audio and visual alarm capability will remain                                                                                                                                                          ML102980005        10/29/10 functional after an Operating Basis Earthquake (OBE). All of the      The title of FSAR Section 3.10 is Seismic Design of                          Response is included in letter                              10/26/2010        Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity            Category I Instrumentation and Electrical Equipment. Since                    dated 10/29/10                    Due 12/17/10                                 No. 39 during a Safe Shutdown Earthquake (SSE) and will not                  the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment.                    system, it is not included in the scope of 3.10. FSAR Section                                                  Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System                                                            Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria                                                  submittal.
system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR.                                Criteria, WB-DC-30-31, Loose Parts Monitoring System. As                                                        TVA to confirm that the


Response update required. It is clear that 04508903-2SP and -
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 radF7C8C.docx                                                                                         Open Items to be Resolved for SER Approval
 
3SP are not applicable.
The response for applicability of 04508905-QR and -
1SP to RM-1000 and IF
 
converter is not clear.
Check pa g e numbers of Appendix F (missing/duplicate pages). Check applicability of
 
Appendix C to RM1000
 
instead of RM2300? See items 336 and 337.
 
All equipment qualification reports including supplements 2SP and 3SP have
 
been reviewed as
 
vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code RAI No. 28 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 34 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 4, "Review not required.
Work may proceed."
The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review
 
of WBN-2 applicable documents. Was appropriate review guidance used?.
319 7.5.2.3 7.5  (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples 278.Y Closed Closed RAI No. 29 TVA Letter dated 320  E I Per Westin g house letter WBT-D-2340
, TENNESSEE VALLEY Res p onder: Clark 279.Y Closed Closed N/A N/A Du plicate of item 156 321  E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark 280.Y Closed Closed N/A N/A Du plicate of OI# 157 322  7.7.1.11  (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark 281.Y Closed Closed    323  EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted
 
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 2 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
: 1. Y Open Response is included in letter
 
dated 10/29/10 The staff is confused with the response since both units have
 
reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no
 
difference between Unit 1 and 2 Open-TVA Unit 1 
 
Due: 12/22/10
 
TVA Letter dated 10/29/10  Item
 
No. 36  324  (M aPer the NRC reviewer
, the BISI calculation is not re q uired to be 282.Y Closed Closed    325  B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson 283.Y Closed Closed  Closed to o p en item ? 326  EICB(Garg)
TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
: 9. Y Open October 22, 2010 Response is included in letter
 
dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR Amendment 102 submittal  TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 37  327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
Responder: Webber
 
In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
: 12. Y Open Response Included in letter dated 11/24/10 Open-NRC Review 
 
Due 11/24/10    328 7.5.2.3 7.5  (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples 284.Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7 EICB (Singh) Section 7.6.7 of the FSAR (Amendment 100) states that, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment."
 
TVA to clarif y the seismic qualification of the loose parts monitorin g system and include the appropriate information in Table 3.10 (or another suitable section) of the FSAR.
Responder: Clark
 
The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section
 
7.6.7, "Loose Parts Monitoring System (LPMS) System Description," identifies basic system seismic design criteria which are consistent with the requirements of TVA Design Criteria, WB-DC-30-31, Loose Parts Monitoring System. As
: 10. N Open Response is included in letter
 
dated 10/29/10 Open-TVA/A102
 
Due 12/17/10 Pending FSAR
 
Amendment 102 submittal.
TVA to confirm that the RAI No. 1 ML102980005
 
10/26/2010 TVA Letter dated 10/29/10  Item
 
No. 39 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not
 
contain any exception to the Regulatory Guide seismic


===Response===
SE    FSAR    NRC No.                                                                Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                Y/N identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC                                              equipment has been Regulatory Guide Conformance, the system conforms to                                                    seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133                                                required and that TVA identifies the seismic requirements and Note 12 does not                                                reviewed and found the contain any exception to the Regulatory Guide seismic                                                    report acceptable.
requirements.
requirements.
The Westinghouse LPMS seis mic report, EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX TM) for Watts Bar Unit 2, will be added as Reference 7 to FSAR section 7.6 in amendment 102. equipment has been seismically qualified as required and that TVA reviewed and found the
TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT,                                                     list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact                                               document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will                                               acceptance by TVA.
 
be added as Reference 7 to FSAR section 7.6 in amendment                                                 FSAR should reference 102.                                                                                                    the test document as the source document for tracking conformance.
report acceptable. 
(
 
330   7.3     7.3                   Related to Item 298                                               Responder: Hilmes/Faulkner                                   285. Y       Closed                       Closed                     EICB RAI No.20     Item 7, TVA letter D
TVA response does not list the seismic test document and its acceptance by TVA.
a r
FSAR should reference the test document as the source document  
331   7.6.1   7.6.7                 As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                                28. N      Open                          Open-TVA/WEC              RAI No. 8          TVA Letter dated Follow-up of OI-190.
 
of the DMIMS-DX system description to verify the conformance                                                                                                                                           ML102980005        10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response:                                                                                    Due ___________            10/26/2010        Enclosure 1 Item and discrepancies between the FSAR and the proprietary version                                                                                                                                                           No. 40 of the system description for loose parts monitoring system             1) The source of the information is the DMIMS-DXTM                                                  Pending FSAR provided by TVA.                                                           Operations and Maintenance Manual, TS3176, Revision                                              Amendment 102 0, dated August 2010. Attachment 14 contains the                                                submittal
for tracking conformance.
: 1) FSAR, Amendment 100, page 7.6-5 states, During baseline               revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted         DXTM Loose Part Detection System Description,                                                  TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose         Revision 1. The Westinghouse DIMMS-DXTM Loose                                                    DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20         Part Detection System Description, Revision 1 will be                                          Operations Manual in kHz, where background signals from the RCS are acceptable.           added as Reference 9 to section 7.6 in FSAR                                                      the FSAR as the source Spurious alarming from control rod stepping is prevented by a         Amendment 102.                                                                                  document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.         2) The source of the information is the DMIMS-DXTM                                                  TVA to reference the seismic qualification report, Westinghouse report EQ-                                            source document for The online sensitivity of the DMIMS-DX' is such that the              QR-33-WBT, Revision 0, Seismic Evaluation of the                                                item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib       Digital Metal Impact Monitoring System (DMIMS-DXTM)                                              response.
330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner 285.Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7 EICB (Singh)
and impacts with a kinetic energy of 0.5 ft-lb on the inside         for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor.       revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in   Revision 1.
As a follow up of OI 190, Staff has reviewed the proprietar y version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies and discrepancies between the FSAR and the proprietary version of the system description for loose parts monitoring system  
the system description. TVA to provide the source of the information and update the system description as needed.           3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in
 
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g           Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental               Section 7.6.7, Loose Part Monitoring System (LPMS)
provided by TVA.
Conditions. Components of the loose-part detection system             System Description.
: 1) FSAR, Amendment 100, page 7.6-5 states, "During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20  
within containment should be designed and installed to perform their function following all seismic events that do not       Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating       Softline Cable (In Containment)
 
Basis Earthquake (OBE). Recording equipment need not                 Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains           Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate           Change Markups that reflect these changes.
kHz, where back g round si gnals from the RCS are acceptable.
by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity         4) The source of the information is Westinghouse Letter environment.                                                          WBT-D-2580, Tennessee Valley Authority Watts Bar EICB (Singh)
Spurious alarming from control rod stepping is prevented by a  
Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS-                  (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional          DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the                 Description, Revision 1.
 
module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.
The online sensitivity of the DMIMS-DX&#x17d; is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic energy of 0.5 ft-lb on the inside  
 
surface of the RCS pressure boundary within 3 ft of a sensor."
The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, "Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional. The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity environment.
FSAR, Amendment 100, page 7.6-5 states, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the Responder: WEC/Harless/Clark
 
TVA Partial Response:
: 1) The source of the information is the DMIMS-DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1. The Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1 will be added as Reference 9 to section 7.6 in FSAR Amendment 102.
: 2) The source of the information is the DMIMS-DXTM seismic qualification repor t, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM
) for Watts Bar Unit 2. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
: 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in  for draft revision to WBN Unit 2 FSAR
 
Section 7.6.7, "Loose Part Monitoring System (LPMS)
System Description."
Sensors (In Containment)
Softline Cable (In Containment)
Preamplifier (In Containment)
Attachment 3 contains the FSAR Amendment 102 Change Markups that reflect these changes.
: 4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
: 28. N Open Open-TVA/WEC
 
Due ___________
Pending FSAR
 
Amendment 102
 
submittal TVA to reference the DMIMS-DXTM Operations Manual in
 
the FSAR as the source document
 
TVA to reference the
 
source document for item# 4 per the response. RAI No. 8 ML102980005
 
10/26/2010 TVA Letter dated 10/29/10  Item No. 40 Follow-up of OI-190.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment."
Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as needed.
: 3) The system description clearly describes the "In-containment equipment" and "DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information.
Please provide the source of this information and update the system description to reflect the appropriate information.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133.
In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents. To fully respond to this item, a change to
 
the FSAR is required to chan ge the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3
 
contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the
 
sensor. Westinghouse document 1TS3182, Revision 0, Watts Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated Jul y 2010 has been added as reference 8 to FSAR Section 7.6 in amendment 102. Per Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz minimum frequency and provide the basis for the frequency response values in the FSAR. 5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.
332 7.5.2.1 7.5.1 (M a 10/26/2010 286.Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.1 7.5.1 (M a 10/27/2010 287.Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.
Please correct this in a future FSAR amendment. Responder: Stockton 11.
Y Open Figure will be corrected in FSAR Amendment 102.
Open-TVA/A102 
 
Due 12/17/10 Pending FSAR


Amendment 102 submittal. RAI not required. N/A RAI not required because the figure is not part of any SE section.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         radF7C8C.docx                                                                                        Open Items to be Resolved for SER Approval
335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable. Responder: WEC 29.
N Open Open-TVA/WEC Due ___________    336 7.5.2.3 7.5  (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 288.Y Closed Closed    337 7.5.2.3 7.5  (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 289.Y Closed Closed    338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The  RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.


===Response===
SE      FSAR    NRC No.                                                                    Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date      RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                      Y/N DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not                In responding to Item 4, conflicting information was mechanically impact any safety-related equipment.                  found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not            section and various Westinghouse technical consistent with the seismic qualifications described in the          documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information                  the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as          frequency response from 5 Hz to 10 Hz. Attachment 3 needed.                                                              contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the
: 3)  The system description clearly describes the In-containment        sensor.
equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for            Westinghouse document 1TS3182, Revision 0, Watts clarification purposes.                                              Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference
: 4)  The information regarding frequency ranges of the sensors is        8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but              Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information.            revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the        provide the basis for the frequency response values in system description to reflect the appropriate information.          the FSAR.
: 5)  Please provide information as to how the in-containment        5)  In-containment component qualification for vibration as components are qualified for vibration as addressed in              addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133.                              be addressed in a future RAI response letter.
( (
332    7.5.2.1  7.5.1  M M              10/26/2010                                                                                                                          286. Y      Closed                        Closed                ML103000105 Item TBD                    EICB RAI ML103000105 sent to DORL a a 333    7.5.2.1  7.5.1                    10/27/2010                                                                                                                          287. Y      Closed                        Closed                ML103000105 Item TBD                    EICB RAI ML103000105 sent to DORL 334      7        7                        FSAR Figure 7A-3 Mechanical Flow and Control Diagram            Responder: Stockton                                                11. Y        Open                          Open-TVA/A102        RAI not required. N/A              RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves.                                                                                                                                                                            not part of any SE section.
EICB (Darbali)
Please correct this in a future FSAR amendment.                                                                                                  Figure will be corrected in FSAR Due 12/17/10 Amendment 102.
Pending FSAR Amendment 102 submittal.
335    7.6.1    7.6.7                    LPMS: Reference to OI-331, sub item 2.                              Responder: WEC                                                  29. N        Open                          Open-TVA/WEC EICB (Singh)
Provide analysis, test, or combined analysis and test for normal                                                                                                                Due ___________
operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
(
336    7.5.2.3    7.5                      Re: RM-1000 Report 04508905-QR                                      Responder: GA                                                  288. Y      Closed                        Closed S
i
(
337    7.5.2.3    7.5                      Re: RM-1000 Report 04508905-QR                                      Responder: GA                                                  289. Y      Closed                        Closed S
i 338    7.5.2.3    7.5                      In page 3-15 and appendix B of Qualification Test Report          Responder: Civil EQB                                              2. N      Open                          Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown                                                                                          Due: 12/17/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).
Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
Responder: Civil EQB


Get date from Bob Brown
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                    radF7C8C.docx                                                                        Open Items to be Resolved for SER Approval
: 2. N Open Open-TVA/Bechtel


Due: 12/17/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. Responder: Bob Brown 3.
===Response===
N Open Open-TVA/Bechtel Due: 12/17/10   340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA
SE     FSAR   NRC No.                                                             Issue                                                   TVA Response(s)           Acceptable     Status/ Current Actions     Resolution Path   RAI No. & Date   RAI Resp. Date     Comments Sec.      Sec. POC                                                                                                                            Y/N 339   7.5.2.3   7.5             In the Qualification Test Report 04508905-QR, the licensee   Responder: Bob Brown                              3. N        Open                        Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item                                                                                               Due: 12/17/10 (Singh)  (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
: 2. N Open Open-TVA/GA Due:12/22/10}}
340   7.5.2.3   7.5             Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                            2. N        Open                        Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In EICB addition, please provide the standards or the guidance documents                                                                                           Due:12/22/10 (Singh)  used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.}}

Revision as of 05:27, 13 November 2019

2010/12/10 Watts Bar 2 OL - FW: Updated OI List
ML103481282
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 12/10/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103481282 (38)


Text

WBN2Public Resource From: Poole, Justin Sent: Friday, December 10, 2010 11:25 AM To: Crouch, William D Cc: Clark, Mark Steven; Hilmes, Steven A; WBN2HearingFile Resource

Subject:

FW: Updated OI List Attachments: 20101210 Open Item List Master NRC Update 12-10-10.docx See attached Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov


Original Message-----

From: Darbali, Samir Sent: Friday, December 10, 2010 11:17 AM To: Poole, Justin Cc: Garg, Hukam

Subject:

Updated OI List

Justin, Attached is the updated OI list to be sent out to TVA.
Thanks, Samir 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 215 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7A6403732C)

Subject:

FW: Updated OI List Sent Date: 12/10/2010 11:25:08 AM Received Date: 12/10/2010 11:25:12 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"Clark, Mark Steven" <msclark0@tva.gov>

Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 392 12/10/2010 11:25:12 AM 20101210 Open Item List Master NRC Update 12-10-10.docx 410259 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N B (

001 All All A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides 1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

002 All All A Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides 2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains B (

003 All All A Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides 3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains

( B 004 All All Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting 4. Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 005 7.1.3.1 By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb 5. Y Closed Closed EICB RAI TVA Letter dated D

( ( ( (

006 Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 a ( The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 7. Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 008 7.3 G G G G There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 8. Y Closed Closed EICB RAI TVA Letter dated r A 009 7.3.2 5.6, Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 9. Y Closed Closed EICB RAI 3/12/10,

(

010 7.3 7.3 The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 10. Y Closed Closed EICB RAI 3/12/10, D

a r

(

011 7.3.2 5.6, NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 11. Y Closed Closed EICB RAI ML101680598, D

a r

(

012 7.4 7.4 ( D The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 12. Y Closed Closed EICB RAI TVA Letter dated G a r

013 7.1.3.1 Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All ( B Provide the justification for any hardware and software changes Date: 4/27/10 14. Y Closed Closed NRC Meeting TVA Letter dated 015 D ( Verify that the refurbishment of the power range nuclear Date: 4/27/10 15. Y Closed Closed NRC Meeting TVA Letter dated

(

016 a C ( Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 16. Y Closed Closed NRC Meeting TVA Letter dated G

r a A 017 7.3.1 7.3.1, Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 17. Y Closed Closed NRC Meeting TVA Letter dated

(

018 Identify any changes made to any instrumentation and control Date: 4/27/10 18. Y Closed Closed NRC Meeting TVA Letter dated 019 Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 19. Y Closed Closed NRC Meeting TVA Letter dated 020 ( D Provide environmental qualification information pursuant to Section Date: 4/27/10 20. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

021 7.3 ( ( ( ( ( For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 21. Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be C a G G G G G 022 7.3.2 5.6, Verify the auxiliary feedwater control refurbishment results in a Date: 4/27/10 22. Y Closed Closed NRC Meeting TVA Letter dated a r 023 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 23. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

024 Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a 24. Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address

( ( ( ( ( (

025 7.5.2 7.5.1 For the containment radiation high radiation monitor, verify that the Date: 4/27/10 25. Y Closed Closed NRC Meeting ML101230248, 026 Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 26. Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

( ( ( (

027 7.7.1.4 For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 27. Y Closed Closed NRC Meeting TVA Letter dated 028 For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen 28. Y Closed Closed NRC Meeting TVA Letter dated C C C C C S 029 For the rod control system, verify that the refurbishment results in a Date: 4/27/10 29. Y Closed Closed NRC Meeting TVA Letter dated G G G G 030 Regarding the refurbishment of I&C equipment, identify any Responder: Clark 30. Y Closed Closed NRC Meeting TVA Letter dated 031 For the rod position indication system (CERPI), provide information Date: 4/27/10 31. Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

a a a a a i 032 For the process computer, need to consider cyber security issues Date: 4/27/10 32. Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber 033 For the loose parts monitoring system, provide information Date: 4/27/10 33. Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is 034 2/4/2010 Responder: TVA 34. Y Closed Closed N/A TVA Letter dated 034.1 ( Chapter 7.1 - Introduction 35. Y Close Closed N/A N/A

( a 034.2 D Chapter 7.2 - Reactor Trip System 36. Y Close Closed N/A N/A M ( r 034.3 7.3 7.3 a Chapter 7.3 - ESFAS 37. Y Closed Closed N/A N/A a G g r

034.4 7.5.1.1 7.5.2 Chapter 7.5 - Instrumentation Systems Important to Safety 38. Y Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 Chapter 7.6 - All Other Systems Required for Safety 39. Y Closed Closed N/A N/A Closed r

c u

034.6 Chapter 7.7 Control Systems 40. Y Closed Closed N/A N/A n

g h

/

035 ( 2/18/2010 Responder: Clark 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design

( (

M 036 7.5.2 7.5.1 C S February 18, 2010 Date: 5/25/10 42. Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post a

a i 037 7.5.1.1 7.5.2 2/18/2010 Responder: Clark Date: 5/25/10 43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 038 7.5.1.1 7.5.2 ( 2/18/2010 Responder: Clark Date: 5/25/10 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 ( ( M January 13, 2010 Responder: Clark Date: 5/25/10 45. Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the G G a 040 January 13, 2010 Responder: Clark Date: 5/25/10 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the 041 7.5.2 7.5.1 2/19/2010 Responder: WEC 1. N Open Open-NRC Review NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Final Response included in Due: Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. letter dated 12/3/10 (3) 12/3/10 ML093560019, Item TVA Letter dated Specification" (4) 12/10/10 No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing Specification" Technical Report. Due 12/3/10 Partial Response is included in TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" letter dated 10/5/10. information indentified Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a The SysRS and SRS in ISG6.

to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the incorporate requirements from SPM: NRC disapproved WNA-PT-00058-GEN during the original many other documents by (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 reference.

Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance NNC 8/25/10: (3) An earlier Procedure" table in the Licensing Technical Report revision 1 supersede version of this report was that test procedure WNA-TP-00357-GEN.Due 10/22/10 docketed for the Common Q topical report; therefore, there For Item 3, Attachment 19contains the Westinghouse should be no problem to docket document Post-Accident Monitoring System (PAMS) this version. (4) Per Licensing Technical Report, WNA-LI-00058-WBT, Revision ML091560352, the testing 2, dated December 2010. Attachment 20 contains the process document does not Westinghouse Application for Withholding for the Post- address the test plan Accident Monitoring System (PAMS) Licensing Technical requirements of the SPM.

Report, WNA-LI-00058-WBT, Revision 2, dated December Please provide a test plan that 2010. implements the requirements of the SPM.

For Item 4, Attachment 9 contains the Westinghouse document Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan, WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

B (

042 All All A February 25, 2010: Telecom Date: 5/25/10 47. Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the 043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 2. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to The PAMS ISG6 compliance matrix supplied as Enclosure 1 Revised response included in Due 12/1/10 Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the letter dated 12/22/10. TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed. 5/12/10 expressed issued with all of these compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a By letter dated April 8, 2010 TVA provided the PAMS Response is included in letter TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not Licensing Technical Report provided additional information. dated 10/5/10. 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that Attachment 3 contains the revised Common Q PAMS ISG-6 Revised compliance matrix is TVA Letter dated NNC 11/23/10: WNA-LI-00045-WT-P TVA should identified what they believe was previously reviewed Compliance Matrix, dated June 11, 2010, that addresses unacceptable. 10/5/10 Rev. 1 Section 7 does not include the and approved. these items (Reference 13). RSED documents, and it should. Table NNC 8/12/10: It is not quite 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA enough to provide all of the RSED RTMs.

but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 documents requested. There SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as Compliance Matrix." are two possible routes to being SRP acceptance criteria for PAMS. review that the NRC can

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N It is TVAs understanding that this comment is focused on undertake: (1) follow ISG6, and Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested (2) follow the CQ SPM. The was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the TVA response that was noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS originally pursued was to follow CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from ISG6, but some of the Watts Bar Unit 2. Westinghouse, TVA has agreed to provide those to NRC. compliance items for ISG6 were Westinghouse documents that are not deliverable to TVA will addressed by referencing the NRC then concluded that TVA should go through and provide a be available for audit as SPM. The NRC approved the more complete and thorough compliance matrix. stated above. Requirements Traceability Matrix issues will CQ TR and associated SPM; it be tracked under NRC RAI Matrix Items 142 (Software may be more appropriate to Requirements Specification) and 145 (System Design review the WBN2 PAMS Specification). Commercial Item Dedication issues will be application to for adherence to tracked under NRC RAI Matrix Item 138. This item is the SPM that to ISG6. In either considered closed. path chosen, the applicant should provide documents and a (1) While RSED documents are not specifically mentioned, justification for the acceptability Section 7 has been revised to be applicable to both of any deviation from the path hardware and software. The RSED documents are chosen. For example, it listed in Table 6-3, Westinghouse Watts Bar 2 appears that the Common Q PAMS Documents at Westinghouse Westinghouse's CDIs are Rockville Office. commercial grade dedication (2) Table 6-1 item 15 reference added for WNA-VR-00280- plans, but Westinghouse WBT (RESD) maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

( ( ( ( ( (

044 7.5.2 7.5.1 February 25, 2010 Date: 5/25/10 48. Y Closed Closed EICB RAI TVA Letter dated 045 February 25, 2010 Date: 5/25/10 49. Y Closed Closed EICB RAI TVA Letter dated C C C C C C 046 February 25, 2010 Date: 5/25/10 50. Y Closed Closed N/A - Request for N/A 047 7.5.2 7.5.1 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 51. Y Closed Closed EICB RAI TVA Letter dated a a a a a a 048 7.5.2 7.5.1 April 8, 2010 Date: 5/25/10 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 1. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)

ML102910002 6/18/10 several Reference 8, however, How should the "shall" statements outside of the bracketed These sections are descriptive text and not requirements. Revised response included in Due12/22/10 Item No. 8 Reference 8 has been deleted.

requirements in Common Q requirements documents be The next revision of the Watts Bar Unit 2 PAMS System letter dated 12/22/10. Discuss at 11/22 phone TVA Letter dated interpreted? Requirements Specification will remove shall from the call. 10/29/10 wording in those sections. A date for completing the next Enclosure 1 Item revision of the System Requirements Specification will be TVA response is inconsistent This will be corrected in No. 1 provided no later than August 31, 2010. (e.g., WNA-DS-01667-WBT the Revision 3 Rev. 1 page 1-1, Section 1.3.1 document due to TVA The System Requirements Specification will be revised by implies that "SysRS Section 12/10/10 September 30, 2010 and submitted within two of receipt from ###" has requirements. See Westinghouse. also SDS4.4.2.1-1 on page 4-32).

TVA Revised Response Is there a requirement on the Shall statements within the scope of the System shall referenced above??

Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The Response is provided in letter statements were either relocated to the numbered dated 10/29/10.

requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by TVA Revised Response in TVA submittal of revision 2 of the SysRS and the SysDS Letter dated 10/29/10 Enclosure (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10). 1 Item No. 1 is Acceptable

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N A review of the revision 2 requirements documents NNC 11/18/10: Revised submitted by Westinghouse in response to use of shall Response is not a statement of outside of numbered requirements sections was performed. fact. SysRS Rev. 2 (i.e., WNA-The review found at least one instance of an inappropriate DS-01617-WBT Rev. 2) shall in the documents. As a result Westinghouse contains many shalls that are prepared revision 3 of the impacted requirements documents not within numbered to correct this issue as well as the issue with Reference 8 in requirements sections, for the SysRS. example:

(1) Page 2-1, Section 2.3.1 -

Attachment 1contains WNA-DS-01617-WBT-P, Revision 3, See guidance statement Post Accident Monitoring System- System Requirements (2) Page 2-10, top of page 1 -

Specification, dated December 2010. Attachment 2 See guidance statement contains WNA-DS-01617-WBT-P, Revision 3, Post Accident Monitoring System - System Requirements Specification, dated December 2010. Attachment 3contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01617-WBT-P, Rev. 3.

Attachment 4 contains WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 5 contains WNA-DS-01667-WBT-P, Revision 3, Post Accident Monitoring System - System Design Specification, dated December 2010. Attachment 6contains the Application for Withholding Proprietary Information from Public Disclosure WNA-DS-01667-WBT-P, Rev. 3.

Attachment 7 contains WNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 8 contains WWNA-SD-00239-WBT-P, Revision 3, Software Requirements Specification for the Post Accident Monitoring System, dated December 2010. Attachment 9 contains the Application for Withholding Proprietary Information from Public Disclosure WNA-SD-00239-WBT-P, Rev. 3.

(

051 G April 15, 2010 Date: 5/25/10 54. Y Closed Closed N/A N/A Review addressed by another Open

(

052 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 55. Y Closed Closed RAI No. 12 S

i

(

053 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 56. Y Closed Closed RAI No. 13 S

i

(

054 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 57. Y Closed Closed RAI No. 14 TVA Letter dated S

i

(

055 7.5.2 7.5.1 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 58. Y Closed Closed RAI No. 15 TVA Letter dated S

i

(

056 April 19, 2010 Date: 5/25/10 59. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring S

i

(

057 7.5.2 7.5.1 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 60. Y Closed Closed RAI No. 17 TVA Letter dated S

i

(

058 7.5.0 7.5 April 19, 2010 Date: 5/25/10 61. Y Closed Closed RAI No. 18 TVA Letter dated S

i

( ( ( ( ( ( ( (

059 7.5.2 7.5.1 April 19, 2010 Date: 62. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 63. Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 64. Y Closed Closed N/A N/A Addressed by Open Item No. 48 C C C C C C C S 062 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 65. Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1 April 19, 2010 Date: 5/25/10 66. Y Closed Closed N/A N/A Addressed by Open Item No. 50 a a a a a a a i 064 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 67. Y Closed Closed N/A - No question TVA Letter dated 065 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 68. Y Closed Closed N/A - No question TVA Letter dated 066 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 69. Y Closed Closed N/A - No question TVA Letter dated

(

067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 2. N Open Open-TVA/WEC N/A - No question TVA Letter dated C

a

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N date for the "Commercial Grade Dedication Instructions for AI687, was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

This item is addressed in Rev. 2

a. AI687, AI688 - Scheduled for September 28, 2010 of the Licensing Technical Report
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit Licensing Technical Report, Section 7, Commercial Grade Dedication Process has been revised to describe the general commercial grade dedication process and uses a description of the AI687 dedication process as an example of how the process is applied.

068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 3. N Open Open-TVA/WEC N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q Response included in letter Due 12/3/10 was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to dated 12/22/10. comm8ittment Item 43: made by applicant.

a. AI687, AI688 - Scheduled for September 28, 2010 This item is addressed in Rev. 2 of the Licensing Technical
b. Upgraded PC node box - Per Westinghouse letter WBT- Report D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit WNA-LI-00045-WT-P, Revision 2, Post-Accident Monitoring System (PAMS) Licensing Technical Report was submitted on TVA letter to NRC dated December 3, 2010 (Reference Error! Reference source not found.).

These are the component level EQ/Seismic summary reports for the documents listed above. The documents are available as described below:

(1) AI687, AI688, Available for submittal or placed in the Westinghouse office for audit (2) Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (3) Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference ), this item is available for audit at the Westinghouse Rockville office.

(4) Power supplies - Per Westinghouse letter WBT-D-2035 (Reference ), these items are available for audit at the Westinghouse Rockville office This item is a carry over from the original ISG6 Compliance Matrix. It is TVAs understanding that there is no longer a need to submit the component level qualification documents.

Rather the NRC has requested that the system level EQ report (minus the seismic portion) be submitted. Attachment Error! Reference source not found. contains the __EQ Summary Report_____

069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 4. N Open Open-TVA/WEC N/A - No question N/A EICB date for the "Watts Bar 2 PAMS Specific FAT Report" was October was asked. Item (Carte) 2010. Awaiting for document to be Due 2/18/11 was opened to track docketed by TVA. comm8ittment made by applicant.

070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 3. N Open Open-TVA/WEC N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was was asked. Item 6/18/10 open item does not agree with the due March 31, 2010. Per Westinghouse letter WBT-D-1961, this document is Final Response included in Due 12/17/10 was opened to track dated in Open Item No. 71.

available for audit at the Westinghouse Rockville office. letter dated 12/3/10 comm8ittment TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter Partial Response is included in to the NRC dated August 20, 2010. letter dated 10/5/10. TVA Letter dated 10/5/10 The submitted V&V did not address the Requirements Regulations require that the Traceability Matrix and did not summarize anomalies. At the NRC review be based on September 15th public meeting, Westinghouse agreed to docketed material. Awaiting for include the Concept and Definitions Phase Requirements document to be docketed by Traceability Matrix (RTM) in the next IV&V report along with TVA.

partial Design Phase updates to the RTM.

NNC 8/25/10: Requirements TVA Revised Response: Phase SVVR provided by TVA TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in letter dated 8/20/10.

letter dated August 20, 2010 (Reference 6). NNC 11/23/10: The The next Independent Verification and Validation (IV&V) requirements Phase SVVR report will include the Design provided by TVA on 8/20/10, is Phase Requirements Traceability Matrix. The Design Phase not complete. This report IV&V Report will be submitted should address the RTM, which to NRC by February 11, 2011. it did not. TVA/WEC agreed to address the concept phase RTM Attachment 14contains the Westinghouse document in the next revision.

Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, WNA-VR-00283-WBT, Revision 1, dated November 2010. Attachment 15 contains the Westinghouse Application for Withholding for the WNA-VR-00283-WBT, Revision 1, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System, dated November 8, 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.

071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 4. N Open Open-TVA/WEC N/A - No question N/A NNC 11/23/10: The dues date in this EICB (Carte) date for Revision 2 of the I V&V Report" covering the Design and was asked. Item open item does not agree with the due Implementation phases was July 30, 2010. Attachment 16 contains the Westinghouse document IV&V Response included in letter Due 12/10/10 was opened to track dated in Open Item No. 70.

Summary Report for the Post Accident Monitoring System, dated 12/3/10 commitment made WNA-VR-00283-WBT, Revision 2, dated November 2010. by applicant.

Attachment 17 contains the Westinghouse Application for Awaiting for document to be withholding for the IV&V Summary Report for the Post docketed by TVA.

Accident Monitoring System, WNA-VR-00283-WBT, Revision 2, dated November 2010.

NOTE: Due to document sequencing, this IV&V Phase Summary Report references a previous version of the contract compliance matrix. Refer to the Licensing Technical Report Revision 2 (Attachment 19) for the current contract compliance matrix.

(

072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 70. Y Closed Closed N/A - No question N/A C

a 073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 5. N Open Open-TVA/WEC N/A - No question N/A EICB (Carte) date for Revision 3 of the IV&V Report covering the Integration was asked. Item phase was October 29, 2010. Attachment 10 contains the IV&V Summary Report for the Response included in letter Due 12/22/10 was opened to track Post Accident Monitoring System, WNA-VR-00283-WBT, dated 12/3/10 commitment made Revision 3, dated December 2010. Attachment 11contains by applicant.

the Application For Withholding Proprietary Information Awaiting for document to be From Public Disclosure WNA-VR-00283- WBT, Revision 3, docketed by TVA.

IV &V Summary Report for the Post Accident Monitoring System (Proprietary), dated December 2010.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 6. N Open Open-TVA/WEC N/A - No question N/A EICB date for the Post FAT IV&V Phase Summary Report was was asked. Item (Carte) November 30, 2010. TVA to provide due date. Due 2/21/11 was opened to track commitment made by applicant.

075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 5. N Open Open-NRC Review N/A - No question N/A EICB (Carte) date for the "Watts Bar 2 PAMS Specific FAT Procedure" was was asked. Item September 30, 2010. Attachment 12 contains the Westinghouse document Response included in letter Due 12/3/10 was opened to track Nuclear Automation Watts Bar Unit 2 NSSS Completion dated 12/3/10 commitment made Program I&C Projects, Post Accident Monitoring System by applicant.

Channel Integration Test/Factory Acceptance Test, WNA- Awaiting for document to be TP-02988-WBT, Revision 0, dated November 2010. docketed by TVA.

Attachment 13 contains the Westinghouse Application for Withholding for WNA-TP-02988-WBT, Revision 0,Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test, dated November 2010.

076 7.5.2 7.5.1 ( ( By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 71. Y Closed Closed N/A - No question N/A 077 7.5.2 7.5.1 ( ( By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 72. Y Closed Closed N/A - No question TVA Letter dated C C 078 G G 4/26/2010 Responder: Clark Date: 5/25/10 73. Y Closed Closed EICB RAI TVA Letter dated a a 079 4/26/2010 Responder: Clark Date: 5/25/10 74. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154

(

080 4/26/2010 Responder: WEC 75. Y Closed Closed RAI No. 2 TVA Letter dated S

i 081 7.5.2 7.5.1 CB (C 5/6/2010 Responder: Merten/WEC 7. N Open Open-TVA/WEC EICB RAI TVA Letter dated art ML102910002 6/18/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There Due 12/22/10 Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and Q application (e.g. WBN2 requested information.

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q PAMS):

(2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved (a) Common Q platform (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes components - Common Q TR (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the (b) Application Development (a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. (c) Application Specific - current (a) IEEE 344-1987 vs. -2004 regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. and associated appendices (6) RG 1.168 - September 1997 vs. February 2004 primarily addressed (a) and (b).

(a) IEEE 1012-1986 vs. -1998 The Common Q SER states:

(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 Monitoring Systems, provides endorses 323-1974) the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review," conceptual design approach for states: "Design features and administrative programs that are upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the based on Common Q current staff positions." Please identify all differences between the components (page 58, Section versions referenced and the current staff positions. Please provide 4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these basis of the above review, the differences. staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N system.

Awaiting TVA Response.

082 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 6/18/10 8. N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

EICB (Carte)

ML102910002 7/30/10 41, Item No. 3.

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary Revised response included in Due 12/3/10 Item No. 10 0, Dated April 2010), in Section 2.3, lists hardware/software Qualification Report Of Hardware Testing For Common Q letter dated 12/3/10 changes to the Common Q PAMS previously reviewed by the Applications, 00000-ICE-37764, Rev 3 and Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not TWICE Qualification Status Report, WNAQR-00011-SSP Regulations require that the Dedication to be contain activities that address qualification of all changes Per Westinghouse letter WBT-D-2024, (Reference __) dated NRC review be based on addressed in LTR Rev.

specifically: June 9, 2010, these documents are available for audit at the docketed material. Awaiting for 2, Westinghouse Rockville Office. document to be docketed by TVA.

TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7. NNC 8/9/10: per telephone conversation on 8/5/10, it is not Revision 1 of the Licensing Technical Report provides clear how Westinghouse additional detail on the platform specific to WBN2 and Commercial Grade Dedication references to the evaluation documentation. Plans and Reports for Digital I&C. Westinghouse agree to Please see the response to RAI letter dated 12/22/10, item present to the NRC in a public 3, NRC Request Item 067. meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

083 7.5.2 7.5.1 ( ( May 6, 2010 Date: 6/18/10 76. Y Closed Closed EICB RAI TVA Letter dated C C 084 7.5.2 7.5.1 a a May 6, 2010 Date: 6/18/10 77. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1 5/6/2010 Responder: WEC 9. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102910002 Please provide a detailed description of the PAMS MTP data link Is the WEC ISG4 evaluation inadequate? A response will be provided by Due 12/3/10 Item No. 13 to the plant computer. This description should identify all 10/31/10 equipment (model & version) and describe the functions that each Operation of the MTP as a barrier device. MTP Fails as a Hardware is in Rev. 1 piece of equipment performs. This description should be of barrier device. Describe what prevents a MTP failure from NNC 8/11/10: Design of the Licensing sufficient detail for the NRC to independently evaluate the propagating to the AC160? information should be available Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. now. By letter dated July 30, 10/22.

Node loss on the bus? Bus loss? 2010 (ML102160349) TVA stated that the MTP was NNC 8/25/10:

Revise the ISG4 section of the Licensing Technical Report connected to a Red Hat Linux Disagree with path (Rev. 2) to provide a more detailed description of the MTP as Server (see Enclosure 1, Item forward input by TVA a barrier device. No. 14 part b.). It is presumed above. An explanation

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N that this server is not safety- is about the design is related. IEEE 603-1991 Clause needed.

5.6.3(1) states, "Isolation devices used to affect a safety FAT test procedure to system boundary shall be include data storm classified as part of the safety testing of the MTP system." interface Please describe how the MTP NNC 11/18/10: WEC serves as the isolation device. response states that CQ PAMS LTR Rev. 2 will contain relevant information.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 10. N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102910002 6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI Due 12/22/10 Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the 81.

Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC several regulatory documents, for example: approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185) accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the states: "Design features and administrative programs that are SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the comparison review.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of differences. ISG4

(

087 7.5.2 7.5.1 May 6, 2010 Date: 5/24/10 78. Y Closed Closed RAI No. 20 TVA Letter dated S

i 088 7.5.2 7.5.1 ( May 6, 2010 Date: 5/24/10 79. Y Closed Closed RAI No. 21 TVA Letter dated 089 D ( ( ( 5/6/2010 Responder: Clark 80. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that 090 a C C S 5/6/2010 Responder: Clark Date: 5/25/10 81. Y Closed Closed EICB RAI TVA Letter dated r a a i 091 7.4 7.4 May 20, 2010 Date: 5/25/10 82. Y Closed Closed EICB RAI No.1 TVA Letter dated 092 5/20/2010 Responder: Hilmes 1. Y Open Open-TVA Continuous review as items are added DORL (Poole) TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due: SER Issue are proprietary. document as a communications tool.

093 ( May 20, 2010 Date: 5/25/10 83. Y Closed Closed N/A N/A Will be reviewed under item 154 D ( (

094 a 5/20/2010 Responder: Clark Date: 5/25/10 84. Y Closed Closed N/A N/A Information was found in FSAR r G G 095 7.8.1, XX May 20, 2010 Date: 85. Y Closed Closed EICB RAI No. 2 TVA Letter dated

(

096 7.7.5 XX 5/20/2010 Responder: 86. Y Closed Closed EICB RAI No.3 TVA Letter dated D

a r

(

097 7.4.2 7.4 May 20, 2010 Date: 87. Y Closed Closed EICB RAI No.4 TVA Letter dated D

a r

(

098 7.4.2 7.4 May 25, 2010 Date: 88. Y Closed Closed EICB RAI No.5 TVA Letter dated D

a r

099 ( (

B April 12, 2010 Date: 89. Y Closed Closed Closed to Item 129 C a a

100 5/20/2010 Responder: WEC 90. Y Closed Closed N/A - No question N/A 101 4/12/2010 Responder: Slifer 6. Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL (Poole) the 6/30 date, however there is the The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the dated 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

1. V&V Report 04508006A
2. System Description 04508100-1TM

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR

(

102 D ( May 24, 2010 Date: 5/24/10 91. Y Closed Closed N/A TVA Letter dated Request for schedule not information.

a C r a 103 7.4 7.4 5/27/2010 Responder: Ayala Date: 5/27/10 92. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current

(

104 7.4 7.4 ( D 5/27/2010 Responder: Merten Date: 5/27/10 93. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current G a r

105 April 29, 2010 Date: 94. Y Closed Closed N/A N/A Will be reviewed under item 154.

106 May 6, 2010 Date: 5/25/10 95. Y Closed Closed RAI No. 9 TVA Letter dated

(

S i

107 May 6, 2010 Date: 5/28/10 96. Y Closed Closed RAI No. 22 TVA Letter dated

(

108 May 6, 2010 Date: 5/25/10 97. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.b 5/6/2010 Responder: N/A 98. Y Closed Closed N/A N/A Duplicate of another open Item.

( ( D ( (

109.a 7.8 XX 5/6/2010 Responder: N/A 99. Y Closed Closed N/A N/A

( ( ( ( ( (

110 May 6, 2010 Date: 100. Y Closed Closed N/A N/A Information was found.

111 May 6, 2010 Date: 5/28/10 101. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for C C a C S 112 June 1, 2010 Date: 102. Y Closed Closed N/A N/A Information was received G G G G G G 113 6/1/2010 Responder: Clark 103. Y Closed Closed EICB RAI TVA Letter dated a a r a i 114 7.2 7.2 6/1/2010 Responder: WEC 104. Y Close Closed EICB RAI TVA Letter dated 115 2/25/2010 Responder: Clark 105. Y Closed Closed EICB RAI TVA Letter dated 116 6/3/2010 Responder: WEC 106. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting 117 7.1 7.1 6/3/2010 Responder: Hilmes 1. Y Open Open-TVA/A102 EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip Revised response is included in Pending FSAR Item#21 Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7) (RPS) and Engineered Safety Features Actuation System letter dated 10/29/10 Amendment 102 No. 7 (ESFAS)) setpoint values are monitored by periodic submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double- Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR TVA needs to address amendment 100. that trip setpoint and allowable value TVA Revised Response: uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double reduction factor for the sided correction factors. Attachment 3 contains the revised single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR factor. TVA response Amendment 102 that reflects this change. not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint and allowable value and if it is used then provide justifications.

(

118 7.4 7.4 6/8/2010 Responder: Merten 107. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current D

a r

119 ( June 10, 2010 Date: 108. Y Closed Closed RAI No. 23 TVA Letter dated 120 5/6/2010 Responder: Hilmes/Merten/Costley 109. Y Closed Closed EICB RAI TVA Letter dated D ( ( ( (

121 5/6/2010 Responder: Webb/Webber 110. Y Closed Closed EICB RAI TVA Letter dated a C C C S 122 June 14, 2010 Date: 111. Y Closed Closed N/A - Request for N/A r a a a i 123 7.7.3 7.4.1, 6/14/2010 Responder: 112. Y Closed Closed ML101720589, TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

(

124 7.7.5 XX 6/14/2010 Responder: 113. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

(

125 7.7.8 7.7.1.12 6/14/2010 Responder: 114. Y Closed Closed ML101720589, Item TVA Letter dated D

a r

126 7.8 7.8 ( June 14, 2010 Date: 115. Y Closed Closed ML101720589, Item TVA Letter dated

( ( D 127 7.2 7.2 a 6/16/2010 Responder: WEC/Clark 116. Y Closed Closed EICB RAI TVA Letter dated G G r 128 7.2 7.2 6/18/2010 Responder: WEC Drake /TVA Craig 117. Y Closed Closed EICB RAI TVA Letter dated Track through SE open item

(

129 6/12/2010 Responder: WEC 118. Y Closed Closed N/A TVA Letter dated P

o

(

130 6/28/2010 Responder: Clark 119. Y Closed Closed N/A TVA Letter dated P

o

(

131 6/28/2010 Responder: Clark 120. Y Closed Closed N/A TVA Letter dated P

o

(

132 6/28/2010 Responder: Clark 121. Y Closed Closed N/A TVA Letter dated P

o

(

133 6/28/2010 Responder: Clark 122. Y Closed Closed TVA Letter dated P

o 134 ( ( 6/28/2010 Responder: Clark 123. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 ( D D ( 6/30/2010 Responder: Clark 124. Y Closed Closed RAI not necessary TVA Letter dated 136 7.3.2, 7.4, 5.6,C a a P 6/30/2010 Responder: Clark 125. Y Closed Closed RAI not necessary TVA Letter dated a r r o 137 Several WBN2 PAMS documents contain a table titled, Document Responder: WEC 126. Y Closed Closed ML101650255, Item TVA Letter dated 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC 11. N Open Open-TVA/WEC ML101650255, Item EICB (Carte) certain PAMS documentation has been completed. No. 2 This item is used to track all Commercial Grade TVA agreed to include a Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. description of the generic should be provided with an application for a Tier 2 review. Westinghouse hardware To be addressed by commercial grade dedication Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial process in the PAMS licensing Technical Report.

grade dedication plan was included in the Common Q Topical technical report. (see Report Section 11, Commercial Grade Dedication Program. ML102920031 Item No 1)

Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is TVA agreed to include (in the developed for each Common Q hardware or software component PAMS licensing technical report) that requires commercial grade dedication. an evaluation of WBN2 critical characteristics for commercial Please provide the commercial grade dedication plans for each Westinghouse hardware Common Q hardware or software component that has not been components against the generic previously reviewed and approved by the NRC. critical characteristics. (see ML102920031 Item No 2)

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval TVA agreed to include a for a Tier 2 review. description of the generic Westinghouse software (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade commercial grade dedication Dedication Report for the QNX Operating System for Common Q process in the PAMS licensing Applications. technical report. (see ML102920031 Item No 3)

(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications. TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4)

(

139 The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC 127. Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements C

a 140 CB (C The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark 12. N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements art states: The PAMS shall be capable of operation during normal No. 4 10/29/10 Specification

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N and abnormal environments and plant operating modes. The WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post NNC 11/3/10: The origin of the Due 12/3/10 Enclosure 1 Item rational for this requirement is that it is necessary to meet Accident Monitoring System (PAMS) specifies the Reg. requirements in the SysRS are No. 10 TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97. Guide 1.97 variables implemented in the Common Q based not clearly document. Rev. 1 of TVA to docket PAMS Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS the Common Q PAMS Licensing Licensing Technical Completion Program I&C Projects Post What document specifies which RG 1.97 variables are Technical Report contains an Report Rev. 2. Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS? open item that will be addressed Requirements Specification, dated in Rev. 2; this open item is to December 2009.

include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.

(

141 Deleted by DORL Date: 128. Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements C

a 142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC 13. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide No. 6 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - This item is used to track all traceability issues with the TVA/Westinghouse agreed to Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS). include the V&V evaluation of TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is their reusable software element To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear At the September 15 public meeting in Rockville, the development process in the Revision of the RTM, Completion Program I&C Projects Post following actions were agreed to. These items address the V&V design phase summary SRS, SysRS, and Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in traceability concerns with the Software Requirements report. This evaluation would SysDS. Requirements Specification, dated the WBN2 PAMS SysRS. Specification. include an evaluation against December 2009.

the development process

2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the requirements. This evaluation Accident Monitoring Systems Software Requirements Requirements Traceability Matrix(RT), using the issues would also include an evaluation Specification. To clarify, many documents have identified at the 9/15 public meeting as a guide of how the WBN2 specific requirements that are incorporated by reference into the (documented below) and update the RTM as required. requirements were addressed SRS, but what served to direct the author to include those by the reusable software various documents in the SRS or, if the requirement is based 2. The next issue of the IV&V report will include the elements. (see ML102920031 on the System Requirements Specification, what directed the Requirements phase review of the RTM and a partial Item No 5) author to include the requirement there? review for the Design phase.
3. Clarify whether the unnumbered paragraphs in the Post 3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements Requirements Traceability Matrix (RTM) to address Specification, such as in the section headings, or are all such items not in the SRS or SysRS.

sections simply considered to be informative?

4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS? in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program information.

Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS. 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the remove these requirements.

requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems 6. Westinghouse will perform and document an evaluation (reference 5).] of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were at the revisions reviewed by V&V. Have these been verified. addressed? Yes. The next revisions of the SDS and SRS address these issues.

4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements 8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or instead of the System Design Specification (SDS).

by reference, all the requirements that were used in the These will be removed from the SRS and incorporated design phase for the application specific software, or do into the next revision of the SDS.

software design phase activities use requirements found in

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N any other source or document? If so, what are these 9. RTM item R4.2-2 protection class software set to 0.

sources or documents? Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification 10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element. that are performed with the function enable (FE) switch in the ENABLE position.

These references are used in the body of the SRS, for example: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR 12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference documents are used. Describe in 1.1 of the SysRS.

12]).] Need a good write up of how the process works.

They are also included via tables such as found in 13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1 for document submittals and provide it to the NRC no later than 9/30/10

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.] 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include design meets the contract requirements.

requirements not explicitly stated in the SRS? If so what is their origin? 15. Westinghouse to add the Software Design Descriptions to the RTM

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly identified.
18. Westinghouse to resolve the following questions concerning SDDs
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.

Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.

WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

143 CB (C The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 14. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements art PAMS SRS - ML101050202) contains a table (see page iii) titled, No. 7 Specification

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Due 12/22/10 WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document Revision of the RTM, Completion Program I&C Projects Post describes requirements for the major software components SRS, SysRS, and Accident Monitoring System- System SysDS. Requirements Specification, dated (a) Please list and describe each of the major software December 2009.

components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC 15. N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB (Carte)

PAMS SRS) contains a table (see page iii) titled, Document No. 8 10/5/10 Specification Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Response provided in letter Due 12/3/10 SRS was created to support the three documents identified (two of define the process for system level design, software design dated 10/5/10 By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and Responses to items a (ML10101050203), TVA docketed implementation for Common Q safety system development. NRC Review and WEC to and e provided. WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014- This document supplements the Common Q SPM, WCAP- complete response. "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety 16096-NP-A. The scope of NABU-DP-00014-GEN includes NNC 11/18/10: Program I&C Projects, Software Systems). the design and implementation processes for the application b-d to be addressed at public (1) Items b-d closed to Requirements Specification for the Post development. For a fuller description of the design process meeting and audit. Will require other Open Item nos. Accident Monitoring System, dated (b) Please describe the flow of information between these three described in NABU-DP-00014-GEN please refer to the information to be docketed. (2) The point of these February 2010 (ML101050202).

documents. Design Process for AP1000 Common Q Safety Systems, questions was to WCAP-15927 on the AP1000 docket. Since this is a understand how the (c) Does the PAMS SRS implement the requirements in these Westinghouse process document that is not specifically origin of the three documents? referenced in the SRS, it will be removed in the next revision requirements in the of the document. requirements (d) Please describe if and how these three documents are used in specifications were the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the (c) - Closed 142 the requirements would requirements of these three documents have been incorporated be demonstrated in into the WBN2 PAMS SRS. (d) - Closed to Item 142 Rev. 2 of the CQ PAMS LTR.

(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC 16. N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was This item is used to track all traceability issues with the During the September 20-21, Due 12/22/10 created to support the WBN2 PAMS SysRS. System Design Specification (SDS). 2010 audit at Westinghouse, it TVA docketed WNA-DS-01667-WBT was acknowledged that To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware At the September 15 public meeting in Rockville, the TVA/Westinghouse had Revision of the RTM, Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? following actions were agreed to. These items partially previously (in September 15, SRS, SysRS, and Accident Monitoring System- System address the traceability concerns with the System 2010 public meeting) stated: SysDS. Design Specification, dated December (b) Please briefly describe all of the documents that implement the Design Specification. This item will be updated with the 2009.

hardware requirements of the WBN2 PAMS SysRS. results of the September 20 and 21 Commercial Grade TVA would provide the RSED Dedication and SDS RTM audit. RTM. (see ML102920031 Item No 6)

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues TVA would revise and resubmit identified at the 9/15 public meeting as a guide the PAMS RTM to address all (documented below) and update the RTM as required. types of issues identified in the public meeting. (see
2. Some hardware requirements are contained in the SRS ML102920031 Item No 7) instead of the System Design Specification (SDS).

These will be removed from the SRS and incorporated TVA would revise and resubmit into the next revision of the SDS. the Software Verification and Validation phase summary

3. 25 issues identified by V&V where some requirements report for the requirements have not been included in the SDS (14) and SRS (11) phase to document the at the revisions reviewed by V&V. Have these been completion of the requirements addressed? Yes. The next revisions of the SDS and phase review. (see SRS address these issues. ML102920031 Item No 8)
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N review for the Design phase.

6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

( ( (

146 6/17/2010 Responder: 129. Y Closed Closed ML101650255, Item PAMS System Requirements 147 6/17/2010 Responder: 130. Y Closed Closed ML101650255, Item PAMS System Requirements

( ( ( ( (

148 6/17/2010 Responder: 131. Y Closed Closed ML101650255, Item PAMS System Requirements C C C 149 7.2 7.2 FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell 132. Y Close Closed ML101720589, Item TVA Letter dated G G G G G 150 7.2 7.2 Many of the changes were based on the Westinghouse document Responder: Clark 133. Y Close Closed ML101720589, Item TVA Letter dated a a a 151 7.2 7.2 Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark 134. Y Close Closed ML101720589, Item TVA Letter dated 152 7.2 7.2 Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark 135. Y Close Closed ML101720589, Item TVA Letter dated 153 7.2 7.2 FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb 136. Y Close Closed ML101720589, Item TVA Letter dated 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb 2. Y Open Open-TVA/A102 ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the No. 6 and EICB RAI 10/5/10 instrument setpoint methodology which complies with 10 CFR (Q1) Refer to the response to letter item 13, RAI Matrix Item Response is not acceptable. A Due 12/17/10 ML102861885 Item 50.36 requirements. Provide the information on how the WBN2 51. revised response will be No. 8 TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and submitted in the letter dated Pending FSAR 10/29/10 include this discussion in this section. Also, by letter dated May (Q2) EEB-TI-28's single sided methodology conforms with 10/29/10. Amendment 102 Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff WBN's design basis commitment to ensure that 95% of the submittal. No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for that was in affect during WBN Unit 1 licensing. The single all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified sided methodology is not used for any TSTF-493 setpoints allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met. that use TI-28 methodology. 2 is calculated and Therefore, either remove this reduction factor for single sided added to TS, TVA uncertainties or justify how you meet the 95/95 criteria given in RG TVA Revised Response: needs to address the 1.105. latest criteria and that In order to respond to other NRC comments on the setpoint include 95/95 criteria.

methodology discussion in FSAR Amendment 100, TVA Why the last sentence reviewed the previous response to this RAI. This resulted in has been modified by a complete rewrite of the responses to this question as adding TI-28. It was shown below. As a result, the response does not specifically NRCs understanding address the NRC Follow-up Request. However, the overall that all setpoints have responses to all of the NRC RAIs on setpoint methodology to meet TI-28 addresses this item.

(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.

(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.

There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..

(

155 7.2 7.2 G Summary of FSAR change document section 7.2 states that Date: 137. Y Closed Closed ML101720589, Item 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC 17. Y Open Open-TVA/WEC ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The No. 8 10/5/10 Westinghouse review.

value of 121% is changed from 118%. The justification for this Per Westinghouse letter WBT-D-2340, TENNESSEE Revised response included in Due 12/22/10 change states that this was done to bring the text of this section in VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT letter dated 12/22/10.

agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as Correction to RAI Response SNPB 4.3.2-7, (Reference 17) Response is included in letter Submitted 10/29/10.

118%. Justify the change. the 118% value should be 121%. Depending on the use in dated 10/5/10 the FSAR either 118% or 121% are the correct values. As a TVA needs to justify result of the question, Westinghouse reviewed all locations why some places 121%

where either 118% or 121% are used and the context of use is used and other and provided a FSAR markup to reflect the correct value at places 118% is used .

the specific location. These changes will be incorporated in What does 121% or a future FSAR amendment. 118% means.

TVA Response to Follow-up NRC Request:

The following response was provided by Westinghouse letter Westinghouse letter WBT-D-2690 Follow Up -NRC Request on 118% and 121 % FSAR Power Levels, dated December 6, 2010 (Reference 2).

A review of the markups provided by Westinghouse (Reference 5) and the current Unit 2 FSAR shows that in the context of the Power Range High Neutron Flux, High Setting, the value of 118% is correct. In the context of the peak core power during certain transients to confirm the fuel melt criterion, the value of 121% is correct. A detailed discussion of peak core power during transients is contained in FSAR Chapter 4.3.2.2.5, Limiting Power Distributions.

( ( ( ( ( ( (

157 7.2 7.2 FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell 138. Y Close Closed ML101720589, Item TVA Letter dated 158 7.2 7.2 FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell 139. Y Closed Closed ML101720589, Item TVA Letter dated 159 7.2 7.2 FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig 140. Y Close Closed ML101720589, Item TVA Letter dated 160 7.2 7.2 FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell 141. Y Close Closed ML101720589, Item TVA Letter dated G G G G G G G 161 7.2 7.2 FSAR section 7.2.2.3 states that changes to the control function Responder: Clark 142. Y Closed Closed ML101720589, Item TVA Letter dated 162 7.2 7.2 FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell 143. Y Closed Closed ML101720589, Item TVA Letter dated 163 7.2 7.2 Deleted by DORL Date: 144. Y Closed Closed ML101720589, Item 164 7.2 7.2 a FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins 145. Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2 FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark 146. Y Closed Closed ML101720589, Item TVA Letter dated r

166 7.2 7.2 ( ( ( ( Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark 147. Y Closed Closed ML101720589, Item TVA Letter dated g

167 7.2 7.2 G G G G FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark 148. Y Close Closed ML101720589, Item TVA Letter dated l

168 7.2 7.2 FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark 149. Y Close Closed ML101720589, Item TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( (

169 6/18/2010 Responder: Clark 150. Y Closed Closed 170 6/17/2010 Responder: Clark 151. Y Closed Closed

( ( ( (

171 7.2 7.2 6/17/2010 Responder: Craig 152. Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item 172 6/17/2010 Responder: Craig 153. Y Closed Closed EICB RAI M M ( ( ( ( ( ( ( (

173 7.1 7.1 6/17/2010 Responder: Craig/Webb/Powers 154. Y Closed Closed EICB RAI 174 6/28/2010 Responder: Hilmes/Craig 155. Y Closed Closed EICB RAI C C C C 175 June 28, 2010 Responder: 156. Y Closed Closed EICB RAI 176 7.1 7.1 6/28/2010 Responder: Craig/Webb 157. Y Closed Closed EICB RAI a a G G G G G G G G 177 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 158. Y Closed Closed N/A TVA Letter dated RAI not required 178 7.5.2.1 7.5.1 7/15/2010 Responder: Clark 159. Y Closed Closed N/A TVA Letter dated RAI not required a a a a 179 An emphasis is placed on traceability in System Requirements Responder: WEC 160. Y Closed Closed N/A - Closed to NA 180 The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC 161. Y Closed Closed N/A - Closed to NA 181 An emphasis is placed on traceability in System Requirements Responder: WEC 162. Y Closed Closed N/A - Closed to NA 182 Characteristics that the SRP states that a Software Requirements Responder: WEC 163. Y Closed Closed N/A - Closed to NA 183 7/15/2010 Responder: WEC 18. Y Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/21/10 An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Response provided in letter Due 12/3/10 No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements dated 10/21/10 No. 4 and even more so given the modifications to the standard listed in Specification. NNC 11/18/10: The Regulatory Guide 1.172, which breaks with typical NRC use of the point behind this open word should to say Each identifiable requirement in an SRS item was that TVA must must be traceable backwards to the system requirements and the demonstrate that the design bases or regulatory requirements that is satisfies origin of each requirement in the On page 1-2 of the Post Accident Monitoring Systems Software WEC requirements Requirements Specification in the background section, is the specification is known sentence Those sections of the above references that require and documented. TVA modification from the generic PAMS are defined in the document stated that this referring purely to the changes from WNA-DS-01617-WBT Post information would be in Accident Monitoring System-System Requirements Specification CQ PAMS LTR Rev. 2.

or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

(

184 7/15/2010 Responder: WEC 164. Y Closed Closed N/A - Closed to N/A C

a 185 7/15/2010 Responder: WEC 19. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Due (1) 12/3/10 No. 17 Software Requirements Specifications in the SRP, in the (2) _________

unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172, audit. NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say point behind this open Each identifiable requirement in an SRS must be traceable item was that TVA must backwards to the system requirements and the design bases or demonstrate that the regulatory requirements that is satisfies Also the NRC considers origin of each that the SRS is the complete set of requirements used for the requirement in the design of the software, whether it is contained within one WEC requirements document or many. In order to evaluate an SRS against the specification is known guidance in the SRP the staff needs access to all the and documented. TVA requirements. stated that this information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring CQ PAMS LTR Rev. 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Systems Software Requirements Specification are various types (2) TVA also said it of Reusable Software Element. would provide a RTM for the RSED These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

(

186 7.7.8 7.7.1.12 7/15/2010 Responder: Perkins/Clark 165. Y Closed Closed EICB RAI No.6 TVA Letter dated D

a r

187 By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten 20. N Open Open-TVA/WEC ML101970033, Item TVA Letter dated Are these connections already EICB (Carte) requests for information. No. 1 & 2 10/5/10 docketed?

1) Please refer to the revised response to letter dated Partial Response provided in Due 12/22/10
1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115). letter dated 10/5/10 did not identify any connection from the PAMS Operator Modules Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45. NNC 8/25/10: Why did TVA not WBT Rev. 1 - ML101680578) shows a TCP connection from the catch this on the review of the OMs to the plant computer and printer. Please explain. PAMS SysRS or SRS? Does TVA check that the CQ PAMS
2) Please clarify whether any digital safety-related systems or system meets the requirements components have a digital communications path to non-safety- in its purchase specifications?

related systems or with safety related systems in another division.

If so, NRC staff will need these paths identified on the docket.

(

188 By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark 166. Y Closed Closed ML101970033, Item TVA Letter dated C

a

(

189 7.6.7 7/20/2010 Responder: Clark 167. Y Closed Closed RAI No. 3 TVA Letter dated S

i

( ( ( ( (

190 7.9 FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark 168. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

( (

191 7.9 NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins 169. Y Closed Closed ML10197016, Item TVA Letter dated M M M M M 192 7.5.1.1 7.5.2 The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark 170. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to C S 193 7.5.1.1 7.5.2 The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark 171. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a a a a 194 7.5.1.1 7.5.2.1 The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman 172. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to a i 195 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 173. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman 174. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 ( ( Open Item 197 was never issued. 175. Y Closed Closed 198 7.5.1.1 7.5.2.2 M M X SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman 176. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to a a 199 7.5.1.1 7.5.2.3 The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman 177. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Responder: Clark 178. Y Closed Closed EICB RAI TVA Letter dated

(

201 7.7.1.1 7.7.11 7/21/2010 Responder: Webb 179. Y Closed Closed EICB RAI TVA Letter dated C

a 202 7.5.2 7/22/2010 Responder: WEC 21. N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB ML102980066 Item 10/5/10 (Carte) The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide Partial Response provided in Due 12/3/10 No. 4 Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. letter dated 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N stated: "Should our criteria or regulations change so that our Licensing Technical conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the Report R2 Nuclear Power and/or the applicant referencing the topical report applicability of guidance.

will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

( ( ( ( ( (

203 7.5.1.1 7.5.2 7/26/2010 Responder: Clark 180. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 7/26/2010 Responder: Costley/Norman 181. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( (

205 7/26/2010 Responder: Clark 182. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC M M M M ( M M 206 7.5.1.1 7.5.2 7/27/2010 Responder: Clark 183. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL C C 207 July 27, 2010 Date: 184. Y Closed Closed a a a a G a a 208 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 185. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a 209 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 186. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 7/27/2010 Responder: Clark 187. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 7/27/2010 Responder: Clark 188. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

212 7.5.2 7/27/2010 Responder: WEC 22. N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Due 12/22/10 No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the design specification and software requirements specification hardware meets the regulatory requirements. To be addressed by contain information to address the "Design Report on Computer WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

213 7.5.2 7/27/2010 Responder: WEC 7. N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Response is included in letter Due 12/31/10. No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the dated 10/25/10 design specification and software requirements specification Common Q PAMS System Design Specification.

contain information to address the "Theory of Operation NNC to review and revise this Description." The staff has reviewed these documents, and it is Attachment 1 contains the proprietary version of question after LTR R2 is not clear how this is the case. The docketed material does not Westinghouse document Tennessee Valley Authority received.

appear to contain the design basis information that is required to (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

(

214 7/27/2010 Responder: WEC 189. Y Closed Closed EICB RAI TVA Letter dated C

a 215 ( 7/29/2010 Responder: WEC 190. Y Closed Closed

(

( M 216 7.5.1.1 7.5.2 P 7/29/2010 Responder: Clark 191. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL G a o

217 7/6/2010 Responder: Clark 192. Y Close Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

( (

218 7/6/2010 Responder: Clark 193. Y Closed Closed EICB RAI TVA Letter dated 219 8/4/2010 Responder: TVA Licensing 194. Y Closed Closed EICB RAI

( ( ( (

220 8/4/2010 Responder: Ayala 195. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 8/4/2010 Responder: Trelease 196. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

( ( ( M ( ( M ( ( (

222 8/4/2010 Responder: Clark 197. Y Close Closed EICB RAI TVA Letter dated 223 8/4/2010 Responder: Clark 198. Y Closed Closed EICB RAI C C C C 224 7.5.1.1 7.5.2 8/4/2010 Responder: Norman (TVA CEG) 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225 8/4/2010 Responder: Scansen 200. Y Close Closed EICB RAI TVA Letter dated G G G a G G a G G G 226 8/4/2010 Responder: TVA Licensing 201. Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

227 8/4/2010 Responder: Clark 202. Y Close Closed EICB RAI TVA Letter dated a a a a 228 8/4/2010 Responder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated 229 8/4/2010 Responder: Clark 204. Y Closed Closed EICB RAI TVA Letter dated 230 8/4/2010 Responder: Webb 205. Y Closed Closed EICB RAI TVA Letter dated 231 8/4/2010 Responder: Clark 206. Y Closed Closed EICB RAI TVA Letter dated

( ( ( ( ( (

232 8/4/2010 Responder: Clark 207. Y Closed Closed RAI No. 5 TVA Letter dated 233 8/4/2010 Responder: Clark 208. Y Closed Closed EICB RAI TVA Letter dated

( ( (

234 8/4/2010 Responder: 209. Y Closed Closed N/A - Duplicate N/A C C C C C S 235 8/4/2010 Responder: TVA Licensing 210. Y Closed Closed N/A N/A 236 8/4/2010 Responder: Clark 211. Y Close Closed EICB RAI TVA Letter dated G G G 237 8/4/2010 Responder: Clark 212. Y Closed Closed EICB RAI TVA Letter dated a a a a a i 238 8/4/2010 Responder: Webb/Hilmes 213. Y Closed Closed N/A - Duplicate N/A 239 8/4/2010 Responder: Hilmes 214. Y Closed Closed N/A - Meeting N/A 240 8/4/2010 Responder: Clark 215. Y Close Closed Ml102910008 TVA Letter dated 241 ( ( 8/4/2010 Responder: Davies 216. Y Closed Closed RAI No. 10 TVA Letter dated

(

242 C S 8/4/2010 Responder: Hilmes 217. Y Close Closed EICB RAI TVA Letter dated G

a i 243 8/3/2010 Responder: WEC 218. Y Closed Closed N/A - Closed to N/A 244 8/3/2010 Responder: WEC 23. N Open Open-TVA/WEC EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Response is provided in letter Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). dated 10/25/10. be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the NNC 11/18/10: SysRS Rev. 2 LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear also contains process analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C requirements that are more requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post appropriately incorporated into information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, process documentation. the NRC staff to make an independent Revision 2, Dated September 2010. assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, requirements and the protection of for example all seventeen requirements in Section 2.3.2, public health and safety."

"Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

245 EICB 8/3/2010 Responder: WEC 8. N Open Open-NRC Review EICB RAI LIC-101 Rev. 3 Appendix B Section 4, (Carte ML102980066 Item "Safety Evaluation" states: "the

)

Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Response included in letter Due 12/22/10 No. 119 information relied upon in the SE must

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N required test documentation for systems developed using the SPM compliance matrix dated 12/3/10 be docketed correspondence."

Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 Attachment 9 contains the Westinghouse document Post LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). Accident Monitoring System Test Plan, WNA-PT-00138- analysis that supports the change WBT, Revision 0, dated November 2010. Attachment 10 requested should include technical contains the Westinghouse Application for Withholding for information in sufficient detail to enable the Post Accident Monitoring System Test Plan, WNA-PT- the NRC staff to make an independent 00138-WBT, Revision 0, dated November 2010. assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 8/3/2010 Responder: WEC 9. N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Response is provided in letter Due 10/22/10 No. 15 dated 10/25/10 information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question dated 10/25/10 be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical NNC 11/18/10: PQP has not go to WEC Rockville LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. been provided and CQ PAMS Offices and look at analysis that supports the change please describe the documentation produced and provide the LTR Rev. 1 does not contain PQP to decide if it must requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the comparable information. docketed. information in sufficient detail to enable proprietary version of Westinghouse document Tennessee the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October requirements and the protection of 2010 public health and safety."

247 ( ( ( 8/8/2010 Responder: WEC 219. Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, 248 C C C 8/8/2010 Responder: WEC 220. Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, a a a 249 8/8/2010 Responder: WEC 221. Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, 250 8/8/2010 Responder: WEC 24. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Response included in letter Due 12/22/10 information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe dated 10/25/10. be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize 10/25/10 is a partial describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project response. Still waiting LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. on Software Test Plan analysis that supports the change tasks in the SCMP have been carried out in their entirety. and all other testing requested should include technical Documentation should exist that shows that the configuration documentation. information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM assessment regarding the acceptability tasks have been successfully accomplished for each life cycle of the proposal in terms of regulatory activity group. requirements and the protection of public health and safety."

251 8/8/2010 Responder: WEC 25. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software testing and documents that will The software testing performed and documents created are Partial response is provided in Due 12/22/10. information relied upon in the SE must be created. The SPM also describes the testing tasks that are to addressed by the SPM Compliance matrix contained in letter dated 10/25/10 be docketed correspondence."

be carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. 10/25/10 is a partial implementation is that the tasks in the SPM have been carried out response. Still waiting LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the on Software Test Plan analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: and all other testing requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 documentation. information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- assessment regarding the acceptability WBT-P, Dated October 2010 of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 252 8/8/2010 Responder: WEC 26. N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Read ML091560352 Due 12/10/10 information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability Check on this Hilmes LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished. analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

( ( ( ( ( ( ( ( ( ( ( ( ( ( (

253 8/8/2010 Responder: Clark 222. Y Closed Closed TVA Letter dated Related to Open Item no. 83.

254 8/10/2010 Responder: WEC 223. Y Closed Closed N/A - Request to TVA Letter dated 255 8/10/2010 Responder: WEC 224. Y Closed Closed N/A - Request to TVA Letter dated 256 8/10/2010 Responder: WEC 225. Y Closed Closed N/A - Request to TVA Letter dated 257 8/10/2010 Responder: WEC 226. Y Closed Closed N/A - Request to N/A C C C C C C C C C C C C C C C 258 8/10/2010 Responder: WEC 227. Y Closed Closed N/A - Request to N/A 259 8/10/2010 Responder: WEC 228. Y Closed Closed N/A - Request to TVA Letter dated 260 8/10/2010 Responder: WEC 229. Y Closed Closed N/A - Request to N/A 261 8/10/2010 Responder: WEC 230. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262 8/10/2010 Responder: WEC 231. Y Closed Closed N/A - Request to N/A a a a a a a a a a a a a a a a 263 8/11/2010 Responder: WEC 232. Y Closed Closed ML101650255, Item 264 8/11/2010 Responder: WEC 233. Y Closed Closed ML101650255, Item 265 8/11/2010 Responder: WEC 234. Y Closed Closed ML101650255, Item 266 8/11/2010 Responder: Webb/Webber 235. Y Closed Closed TVA Letter dated 267 8/11/2010 Responder: WEC 236. Y Closed Closed 268 8/19/2010 Responder: WEC 10. N Open Open-NRC Review EICB (Carte)

By letter dated March 12, 2010 (ML101680577), TVA stated that 11/18/10 Warren Odess-Gillett took action to discuss with Response included in letter Due 12/22/10 the application specific hardware and software architecture Design Engineering to generate a non-prop figure dated 12/3/10 descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) Attachment 18 contains the non-proprietary version of the and Software Requirements Specification (ML101050202, Westinghouse document Watts Bar 2 Common Q PAMS ML102040486, & ML1022040487). Block Diagram.

Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.

( ( (

269 8/20/2010 Responder: NRC 237. Y Closed Closed N/A N/A

( ( (

270 8/23/2010 Responder: Clark 238. Y Closed Closed See also Open Item Nod. 41 & 245.

271 M M M 8/23/2010 Responder: WEC 239. Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 C C P 8/26/2010 Responder: Clark 240. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a a o 273 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 241. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 8/26/2010 Responder: Clark 242. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL

(

274.b 8/26/2010 Responder: Stockton 243. Y Closed Closed RAI No. 6 TVA Letter dated S

i

(

275 8/27/2010 Responder: Clark 244. Y Closed Closed Not Required N/A S

i

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 276 7.6 7.6 8/27/2010 Responder: Webb 1. Y Open Open-TVA/Bechtel EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/21/10 In order for the staff to review the effects of multi control systems Response provided in letter Due 11/24/10 Item#60 Enclosure 1 Item failure, provide the summary of the analyses documenting the The NRC reviewer confirmed this question applies to non- dated 10/21/10 No. 13 effect on the plant based on the following events: (1) loss of power safety systems. TVA to provide to all control systems powered by a single power supply; (2) Revised response provided in justification for non-failure of each instrument sensor which provides signal to two or The Distributed Control System (DCS) implemented using letter dated 11/24/10 safety system other more control systems; (3) Break of any sensor impulse line which Foxboro I/A hardware, replaces most of the non-safety than DCS.

is used for sensors providing signals to two or more control related control systems for WBN Unit 2. The other non- Response Acceptable. 11/17/10 systems; and (4) failure of digital system based on the common safety-related control systems within the scope of this The statement that cause software failure affecting two or more control systems. For question are: failure of sense line each of these events, confirm that the consequences of these TVA changed the response in where more than one events will not be outside chapter 15 analyses or beyond the a. Rod Control - Failures of this system are addressed in the latest writeup. The scope of transmitter is connected capability of operators or safety systems. FSAR Chapter 15. the question applies to all non would be bounded by

b. Main Turbine Electro-Hydraulic Control System safety related control systems the failure of a single and is not limited to just three transmitter does not The following provides the requested summaries for the four system listed by the TVA. TVA make sense.

events listed: could use to envelope other control systems by Unit 1 TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA analysis if they applies to Unit 2 statement that all non-letter to NRC dated August 11, 2010, Enclosure 2 systems also. safety control systems (Reference 7) demonstrates that the loss of any single have been evaluated power source does not result in a loss of any DCS against these criteria function. The other systems within the scope of this and have determined question are configured in the same manner as Unit 1, that their failure does with redundant power sources such that the failure of a not have consequences single power source does not cause a loss of function. which will put the plant outside chapter 15 (2) Signals shared by more than one control function analyses.

within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.

The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.

(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure.

There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.

(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N within the scope of this question are analog and therefore this question is not applicable.

All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.

TVA Response to Follow-up NRC Request:

All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.

(

277 7.6 7.6.3 8/27/2010 Responder: Clark 245. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 8/27/2010 Responder: Trelease 246. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 D 8/27/2010 Responder: Mather 247. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 ( ( ( ( ( (

8/27/2010 Responder: Trelease 248. Y Closed Closed EICB RAI TVA Letter dated a

G G G G G G 281 7.6 7.6.8 8/27/2010 Responder: Webb 249. Y Closed Closed EICB RAI TVA Letter dated r

282 7.6 7.6.9 8/27/2010 Responder: Trelease 250. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX 8/27/2010 Responder: Clark 251. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item

(

284 7.7.3 7.4.1 8/27/2010 Responder: Webber 252. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item D

a r

(

285 7.3.3 7.3 8/27/2010 Responder: McNeil 253. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item D

a r

(

286 7.7.3 9.3.4.2. 8/27/2010 Responder: Webber 254. Y Closed Closed EICB RAI No.16 TVA Letter dated D

a r

(

287 7.3 7.3-1 ( D 8/27/2010 Responder: Elton 255. Y Closed Closed ML102390538, Item Response G a r

288 7.3 9/2/2010 Responder: McNeil 256. Y Closed Closed EICB RAI

(

289 9/2/2010 Responder: Faulkner 257. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 ( 9/7/2010 Responder: Clark 258. Y Closed Closed N/A N/A This item is a duplicate of item 291.

D ( ( (

M (

291 7.7 9/7/2010 Responder: Clark 259. Y Closed Closed TVA Letter dated 292 7.2.5 7.2 a C C S9/7/2010 Responder: Craig 260. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3. a G 9/8/2010 Responder: Craig 261. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL r a a i 294 7.3 7.3.1.1. 9/9/2010 Responder: Elton 262. Y Closed Closed ML102390538, Item Response

(

295 7.3 7.3.1.1. 9/9/2010 Responder: Elton 263. Y Closed Closed ML102390538, Item Response D

a r

(

296 7.3 7.3.1.2. 9/9/2010 Responder: Elton 264. Y Closed Closed ML102390538, Item Response D

a r

297 7.3 7.3.1.2. ( ( 9/9/2010 Responder: Elton 265. Y Closed Closed ML102390538, Item Response

( D D 298 7.3 XX C a a 9/9/2010 Responder: Clark 266. Y Closed Closed ML102390538, Item Response a r r 299 Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q 267. Y Closed Closed TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather 11. Y Closed Closed ML102980005, Item TVA letter EICB (Singh) 25 11/24/10, Item 4, Are detectors different from Unit 1. Describe any differences. (1) The Radiation Monitoring Design Criteria Document, Response is included in letter Due 11/24/10 and TVA Letter WB-DC-40-24, Revision 21 is contained in Attachment dated 10/29/10 dated 10/29/10 Are there any commercially dedicated parts in the RM-1000? If so, 6 to letter dated October 31, 2010. TVA to address the Enclosure 1 Item how are they dedicated? Revised response Included in following comments: No. 20 (2) Attachment 7 contains the General Atomics detector letter dated 11/24/10 Please confirm that digital communication ports available in RM- differences report. The containment high range (1) Is it Att. 5 or Att.

1000 are not used. radiation monitors are loops 271-274. 6?

(2) Pl. confirm that (3) For safety-related applications, General Atomics HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module 271-274.

assembly as a Basic Component. This assembly does (3) TVA to clarify that contain component parts that are Safety-Related GA has a Commercial Grade Items (SRCGI). Because these commercial SRCGI components are assembled into the delivered dedication Basic Component, they are dedicated to the assembly program in place by virtue of the acceptance test of the full RM-1000 and that GA is an assembly. Safety-related commercial grade items are approved dedicated in accordance with General Atomics 10CFR50, App. B approved 10 CFR 50 Appendix B program. supplier.

App B does not (4) The digital communications ports on the safety-related address RM-1000 radiation monitors are not used. commercial grade dedication .

TVA Response to Follow-up NRC Request:

Revised response General Atomics Electronics Systems, Inc. is an approved is acceptable.

10 CFR 50 Appendix B supplier. They have a commercial Please submit grade dedication program. response.

(4) Response acceptable.

301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark 27. N Open Open-TVA/WEC RAI No. 11 TVA Letter dated common cause failure including all potential resulting failures (i.e. ML102980005 10/29/10 total loss of CERPI, system fail as-is). TVA Partial Response: Partial response in 10/29 letter. Due 12/22/10 10/26/2010 Enclosure 1 Item No. 21

2. In addition, address how the actions stipulated in the plant For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, 1) Please address Technical Specifications will be taken when the CERPI system no credit is taken for the rod position indication system. For how fail-as-is is indications are lost. Information notice IN 2010-10 (ML100080281) all continuous rod withdrawal accidents analyzed in WBN detected i.e.

addresses the need to consider software failures and the actions Unit 2 FSAR, Chapter 15, no credit is taken for any rod alarms, rod required to assure that the plant will stay within its licensing basis. stop/block. position deviation EICB (Singh)EICB (Singh) alarms, etc.

3. Provide FMEA in support of your response. (1) Technical Specification 3.1.8, Rod Position Indication, 2) Response does not have an action for total loss of indication; acceptable.
4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock therefore, a total loss of CERPI puts the plant into LCO 3) Response C-11 to block automatic rod withdrawal when 1/1 Control Bank D 3.0.3 which states: acceptable.

rod position is above setpoint. This interlock capability would be 4) a. Response lost in case of total loss of CERPI. How is the rod block assured When an LCO is not met and the associated ACTIONS acceptable.

for this event? are not met, an associated ACTION is not provided, or if b. Pl. address directed by the associated ACTIONS the unit shall be failure mode on

5. How is automatic rod withdrawal affected in case of total loss of placed in a MODE or other specified condition in which fail-as-is.

signals from the CERPI to the ICS? Is this interlock fail safe? the LCO is not applicable. Action shall be initiated within 5) Response 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in: acceptable.

6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the 6) Response rod position indicator channel is 5% of span (7.2 inches). The MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; acceptable.

CERPI system accuracy specified in the CERPI System MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. TVA to address

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N steps or 5.19%. The specified system accuracy seems to be common cause failure greater than the accuracy assumed in the FSAR Chapter 15. Exceptions to this Specification are stated in the as stated under Please clarify this anomaly. individual Specifications. Where corrective measures response item 2.

are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions Please explain how required by LCO 3.0.3 is not required. various alarms will continue to annunciate (2) CERPI common mode software failure on software lockup?

Need better Description of the CERPI systems installed at Watts explanation to Bar (Unit 1 & 2): understand the rationale behind the Each Programmable Logic Controller (PLC), response.

Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train.

Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.

History of CERPI:

The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.

CERPI Software Failure Analysis With regard to the CERPI system software:

  • The software used on PLC-A is identical to that used on PLC-B.
  • The software used on MTP-A is identical to that used on MTP-B
  • The software used on OM-A is identical to that used on OM-B.

A common cause failure affecting the software of one CERPI train would affect the other train as well.

Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).

A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.

A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.

(3) There is no FMEA for the CERPI system.

(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:

a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.

Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.

(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.

(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:

The resolution of the rod position indicator channel is +/-

12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.

This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.

302 7.5.2.1 7.5.1 ( ( ( ( 09/17/2010 Responder: Tindell 268. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 269. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL M M M M 304 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 270. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL a a a a 305 7.5.2.1 7.5.1 09/17/2010 Responder: Tindell 271. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes 3. Y Open Open-TVA/A102 EICB RAI TVA Letter dated Allowable value which is not consistent with TSTF-493 as ML102910008 10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is The FSAR Allowable Value definition will be revised to be Response is included in letter Due 12/17/10 Item#69 Enclosure 1 Item declared inoperable. consistent with the TSTF-493 in FSAR Amendment 102. dated 10/29/10 No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9 Pending FSAR that will be included in FSAR Amendment 102 that reflects Amendment 102 this change. submittal 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes 4. Y Open Open-TVA/A102 EICB RAI TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493 ML102910008 10/29/10 as AAF is the limit beyond which the instrument channel is (1) The Acceptable As Found (AAF) definition will be Response is included in letter Due 12/17/10 Item#70 Enclosure 1 Item degraded but may be operable and its operability must be revised to be consistent with TSTF-493 in FSAR dated 10/29/10 No. 27 evaluated. (2) Also it states that AAF is based on measurable Amendment 102. Attachment 3 contains the revised Pending FSAR instrument channel uncertainties, such as drift, expected during the FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 surveillance interval. These wording should be revised to agree Amendment 102 that reflects this change. submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue. Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.

Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(

308 7.1 7.1 G (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes 5. Y Open Open-TVA/A102 EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Acceptable as left tolerance is not in accordance with TSTF-493 as ML102910008 10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to Response is included in letter Due 12/17/10 Item#71 Enclosure 1 Item This is very vague and ambiguous. (2) Also it states that RPS determine the Acceptable As Left (AAL) will be deleted dated 10/29/10 No. 28 functions use double sided tolerance limits. Since ALF is a band it in FSAR Amendment 102. Attachment 3 contains the Pending FSAR will always be double sided and therefore, this clarification does revised FSAR section 7.1.2.1.9 that will be included in Amendment 102 not mean anything and clouds the issue. FSAR Amendment 102 that reflects this change. submittal (2) See response to letter item 27 (NRC Matrix Item 307).

309 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes 6. Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.1 methodology, states that AAF is the algebraic sum of the .. This ML102910008 10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint Response is included in letter Due 12/17/10 Item#72 Enclosure 1 Item to the SRSS method and will mask the operability of the instrument methodology calculations in TI-28 for TSTF-493 will be dated 10/29/10 No. 29 channel and therefore, it is not acceptable to the staff. (2) It also revised to use the Square Root Sum of the Squares Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into (SRSS) method. Amendment 102 consideration which is vague and ambiguous. submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.

310 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes 7. Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.2 methodology, states that for AAF .and other measurable ML102910008 10/29/10 uncertainties as appropriate (i.e., those present during TVA Response: Response is included in letter Due 12/17/10 Item#73 Enclosure 1 Item calibration.) should be changed to present during normal dated 10/29/10 No. 30 operation (2) Also on page 7.1-15, states that ALT may take (1) The AAF definition will be revised in FSAR Amendment Pending FSAR calibration history into consideration which is vague and 102 to read: Amendment 102 ambiguous. submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties EICB (Garg) may be included in the AAF if applicable.

This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) The AAL definition will be revised in FSAR Amendment 102 to read:

A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.

This revision eliminates the concern regarding

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes 8. Y Open Open-TVA/A102 EICB RAI TVA Letter dated any discussion on single sided calculation. Please confirm that ML102910008 10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with A statement that single-sided corrections are not used for Response is included in letter Due 12/17/10 Item#74 Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR. TSTF-493 setpoints will be included in FSAR Amendment dated 10/29/10 No. 31 102. Attachment 3 contains the revised FSAR section Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that Amendment 102 reflects this change. submittal

(

312 7.0 D a ( By letter dated September 10,2010, TVA provided the summary Responder: Stockton 272. Y Close Closed EICB RAI TVA Letter dated r G 313 7.7.8 7.7.1.12 EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala 273. Y Closed Closed EICB RAI No.18 TVA Letter dated

(

314 7.3 7.3 ( D The following 50.59 changes were listed in the March 12 RAI Responder: Stockton 274. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 G a r

315 7.5.3 7.5.3 IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) 275. Y Close Closed EICB RAI TVA Letter dated

(

316 7.5.2.3 7.5 TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather 276. Y Closed Closed RAI No. 26 S

i

(

317 7.5.2.3 7.5 TVA has provided a proprietary and a non-proprietary version of Responder: Temples 277. Y Closed Closed RAI No. 27 TVA Letter dated S

i 318 7.5.2.3 7.5 TVA has provided the following documents for RM-1000 Responder: Temples 1. N Open Open-TVA/GA RAI No. 28 TVA Letter dated equipment qualification: ML102980005 10/29/10 (i) Applicable to WBN Unit 2. 04508905-1QR is Note check 04508905-1QR or Due 12/22/10 10/26/2010 Enclosure 1 Item (i) Qualification Test Report for RM-1000 Processor Module applicable only in regards to the RM-1000, with the QR. Staff version is QR only. No. 34 and Current-To-Frequency Converter 04508905-QR exception of re-qualification of certain RM-1000 Response update (January 2001) equipment differences covered in the -1SP report. Response is included in letter required. It is clear that (ii) Qualification Test Report Supplement, RM-1000 Upgrades The Current-to-Frequency (I-F) converter module dated 10/29/10 04508903-2SP and -

04508905-1SP (June 2006) qualifications in the base report and the -1SP report 3SP are not applicable.

(iii) Qualification Test Report Supplement, RM-1000 Upgrades are not applicable to the RM-1000s, and will be used The response for 04508905-2SP (June 2008) later as references in the WBN Unit 2 specific applicability of (iv) Qualification Test Report Supplement, RM-1000 Upgrades qualification reports. 04508905-QR and -

04508905-3SP (May 2008) (ii) Applicable to WBN Unit 2. 1SP to RM-1000 and IF (iii) Not applicable to WBN Unit 2 converter is not clear.

Please clarify whether all of these are fully applicable to WBN2 or (iv) Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then Check page numbers of please clarify what those are. The 04508905-3SP report was prepared for another TVA Appendix F plant, as a monitor system-level report, where the system (missing/duplicate EICB (Singh)

Supplement 3 was issued one month prior to supplement 2. included equipment mostly based on the base report pages).

Please explain the reason for the same. equipment items. These two -2SP and -3SP supplement Check applicability of reports were essentially worked concurrently, but the -2SP Appendix C to RM1000 document review/release process resulted in the release instead of RM2300?

time difference. See items 336 and 337.

All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 4, Review not required.

Work may proceed.

The applicable reports should have been reviewed prior to dispositioning them.

Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?.

(

319 7.5.2.3 7.5 TVA provided System Verification Test Results 04507007-1TR Responder: Temples 278. Y Closed Closed RAI No. 29 TVA Letter dated S

i E

320 I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark 279. Y Closed Closed N/A N/A Duplicate of item 156 321 ( E For the purposes of measuring reactor coolant flow for Reactor Responder: Clark 280. Y Closed Closed N/A N/A Duplicate of OI# 157 C I a

322 7.7.1.11 Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark 281. Y Closed Closed 323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 1. Y Open Open-TVA Unit 1 TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Response is included in letter Due: 12/22/10 Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. dated 10/29/10 No. 36 EICB(Garg)

The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 B

324 (

G

(

M Per the NRC reviewer, the BISI calculation is not required to be 282. Y Closed Closed a a 325 The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson 283. Y Closed Closed Closed to open item ?

326 TVA uses double-sided methodology for as-found and as-left Responder: Webb 9. Y Open October 22, 2010 Open-TVA/A102 TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR 10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology Attachment 3 contains the revised FSAR section 7.1.2.1.9 Response is included in letter Due 12/17/10 Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects dated 10/29/10 No. 37 this change. Pending FSAR Amendment 102 submittal 327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber 12. Y Open Open-NRC Review SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Response Included in letter Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC- dated 11/24/10 2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

(

328 7.5.2.3 7.5 Provide the model number for the four containment high range Responder: Temples 284. Y Closed Closed RAI No. 30 TVA Letter dated S

i 329 7.6.1 7.6.7 Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark 10. N Open Open-TVA/A102 RAI No. 1 TVA Letter dated EICB (Singh)

DMIMS-DX' audio and visual alarm capability will remain ML102980005 10/29/10 functional after an Operating Basis Earthquake (OBE). All of the The title of FSAR Section 3.10 is Seismic Design of Response is included in letter 10/26/2010 Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity Category I Instrumentation and Electrical Equipment. Since dated 10/29/10 Due 12/17/10 No. 39 during a Safe Shutdown Earthquake (SSE) and will not the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment. system, it is not included in the scope of 3.10. FSAR Section Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria submittal.

system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR. Criteria, WB-DC-30-31, Loose Parts Monitoring System. As TVA to confirm that the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC equipment has been Regulatory Guide Conformance, the system conforms to seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 required and that TVA identifies the seismic requirements and Note 12 does not reviewed and found the contain any exception to the Regulatory Guide seismic report acceptable.

requirements.

TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT, list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will acceptance by TVA.

be added as Reference 7 to FSAR section 7.6 in amendment FSAR should reference 102. the test document as the source document for tracking conformance.

(

330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner 285. Y Closed Closed EICB RAI No.20 Item 7, TVA letter D

a r

331 7.6.1 7.6.7 As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark 28. N Open Open-TVA/WEC RAI No. 8 TVA Letter dated Follow-up of OI-190.

of the DMIMS-DX system description to verify the conformance ML102980005 10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response: Due ___________ 10/26/2010 Enclosure 1 Item and discrepancies between the FSAR and the proprietary version No. 40 of the system description for loose parts monitoring system 1) The source of the information is the DMIMS-DXTM Pending FSAR provided by TVA. Operations and Maintenance Manual, TS3176, Revision Amendment 102 0, dated August 2010. Attachment 14 contains the submittal

1) FSAR, Amendment 100, page 7.6-5 states, During baseline revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted DXTM Loose Part Detection System Description, TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose Revision 1. The Westinghouse DIMMS-DXTM Loose DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20 Part Detection System Description, Revision 1 will be Operations Manual in kHz, where background signals from the RCS are acceptable. added as Reference 9 to section 7.6 in FSAR the FSAR as the source Spurious alarming from control rod stepping is prevented by a Amendment 102. document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping. 2) The source of the information is the DMIMS-DXTM TVA to reference the seismic qualification report, Westinghouse report EQ- source document for The online sensitivity of the DMIMS-DX' is such that the QR-33-WBT, Revision 0, Seismic Evaluation of the item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib Digital Metal Impact Monitoring System (DMIMS-DXTM) response.

and impacts with a kinetic energy of 0.5 ft-lb on the inside for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor. revised system description, Westinghouse DIMMS-DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in Revision 1.

the system description. TVA to provide the source of the information and update the system description as needed. 3) The entries for the following items in FSAR Section 7.6.7 will be modified in Amendment 102 as shown in

2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental Section 7.6.7, Loose Part Monitoring System (LPMS)

Conditions. Components of the loose-part detection system System Description.

within containment should be designed and installed to perform their function following all seismic events that do not Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating Softline Cable (In Containment)

Basis Earthquake (OBE). Recording equipment need not Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate Change Markups that reflect these changes.

by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity 4) The source of the information is Westinghouse Letter environment. WBT-D-2580, Tennessee Valley Authority Watts Bar EICB (Singh)

Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS- (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the Description, Revision 1.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not In responding to Item 4, conflicting information was mechanically impact any safety-related equipment. found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not section and various Westinghouse technical consistent with the seismic qualifications described in the documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as frequency response from 5 Hz to 10 Hz. Attachment 3 needed. contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the

3) The system description clearly describes the In-containment sensor.

equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for Westinghouse document 1TS3182, Revision 0, Watts clarification purposes. Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference

4) The information regarding frequency ranges of the sensors is 8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information. revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the provide the basis for the frequency response values in system description to reflect the appropriate information. the FSAR.
5) Please provide information as to how the in-containment 5) In-containment component qualification for vibration as components are qualified for vibration as addressed in addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133. be addressed in a future RAI response letter.

( (

332 7.5.2.1 7.5.1 M M 10/26/2010 286. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL a a 333 7.5.2.1 7.5.1 10/27/2010 287. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton 11. Y Open Open-TVA/A102 RAI not required. N/A RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves. not part of any SE section.

EICB (Darbali)

Please correct this in a future FSAR amendment. Figure will be corrected in FSAR Due 12/17/10 Amendment 102.

Pending FSAR Amendment 102 submittal.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC 29. N Open Open-TVA/WEC EICB (Singh)

Provide analysis, test, or combined analysis and test for normal Due ___________

operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

(

336 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 288. Y Closed Closed S

i

(

337 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA 289. Y Closed Closed S

i 338 7.5.2.3 7.5 In page 3-15 and appendix B of Qualification Test Report Responder: Civil EQB 2. N Open Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown Due: 12/17/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radF7C8C.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 339 7.5.2.3 7.5 In the Qualification Test Report 04508905-QR, the licensee Responder: Bob Brown 3. N Open Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item Due: 12/17/10 (Singh) (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

340 7.5.2.3 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA 2. N Open Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In EICB addition, please provide the standards or the guidance documents Due:12/22/10 (Singh) used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.