ML111050100: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:Licensee: Facility: Docket No.Date and Time: Location: Purpose: Attendees:
{{#Wiki_filter:No. 11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18,       2OL!
NRC: Pubtic Participation:
Licensee:            Constellation Energy and Entergy Nuclear Northeast Facility:            Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Docket No.            50-220;50-410; 50-333 Date and Time:        May 4, 2011 at 6:00 p.m.
Meeting Contact: No. 11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OL!Constellation Energy and Entergy Nuclear Northeast Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant 50-220;50-410; 50-333 May 4, 2011 at 6:00 p.m.Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations.
Location:            Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Purpose:              The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations.
D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.
Attendees:
Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141.
NRC:        D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick Pubtic Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.
The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209.
Meeting Contact:      Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov
ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html.
 
2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209. ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
Please confirm the meeting schedule on the NRC website under public meetings.Approved by://^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ 2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209.
Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.
ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
Approved by:
                                                //^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ
 
2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209. ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1,                       and contains information regarding visitors and security.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings.Approved by:/RA/Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
: (see attached)DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review Complete:
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
ACP (Reviewer's Initials)After declaring this document'An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure
Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.
'E" = Copy with attachmenVenclosure "N" = No copy ML111050100)FFICE TVDRP lhp RI/DRP RI/DRP{AME APatel/ACP MGray/MKG 3Dentel/GTD)ATE o4toBt11 04t12t11 04t18 t11 OFFICIAL RECORD COPY 3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes)Discussion of U.S. plant safety operations in light of Japan event ..(10 minutes)NRC to address public questions (as needed)Closing Remarks ....... (5 minutes) 4 Distribution:
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings.
Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OED Director, Office of Nuclear Reactor Regulation, NRR Deputy Director, Office of Nuclear Reactor Regulation NRR Director, Division of lnspection  
Approved by:
& Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Asst. General Counsel Materials Litigation  
                                                            /RA/
& Enforcement' OGC W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard.
Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution : (see attached)
Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc.
DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review       Complete: ACP (Reviewer's Initials)
gov PMNS (RIDSEDOMAILCENTER)(RTDSEDOMAILCENTER)(RTDSNRROD)(RTDSNRROD)(RTDSNRRDIRS)(RTDSNRRDORL)(RIDSOGCMAILCENTER)}}
After declaring this document'An Official Agency Record" it will be released to the Public.
To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure
'E" = Copy with attachmenVenclosure "N" = No copy ML111050100
        )FFICE         TVDRP                     lhp RI/DRP                               RI/DRP
{AME           APatel/ACP                     MGray/MKG                           3Dentel/GTD
        )ATE           o4toBt11                       04t12t11                           04t18 t11 OFFICIAL RECORD COPY
 
3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes)
Discussion of U.S. plant safety operations in light of Japan event         ..(10 minutes)
NRC to address public questions                                               (as needed)
Closing Remarks                                                       ....... (5 minutes)
 
4 Distribution:
Executive Director for Operations, OEDO                       (RIDSEDOMAILCENTER)
Deputy Executive Director for Reactor Programs, OED           (RTDSEDOMAILCENTER)
Director, Office of Nuclear Reactor Regulation, NRR           (RTDSNRROD)
Deputy Director, Office of Nuclear Reactor Regulation NRR     (RTDSNRROD)
Director, Division of lnspection & Regional Support, NRR/DIRS (RTDSNRRDIRS)
Director, Division of Operating Reactor Licensing, NRR/DORL   (RTDSNRRDORL)
Asst. General Counsel Materials Litigation & Enforcement' OGC (RIDSOGCMAILCENTER)
W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard. Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc. gov PMNS}}

Revision as of 00:55, 13 November 2019

and James A. FitzPatrick Nuclear Power Plant Notice of Public Meeting on May 4, 2011
ML111050100
Person / Time
Site: Nine Mile Point, FitzPatrick  Constellation icon.png
Issue date: 04/18/2011
From: Glenn Dentel
Reactor Projects Branch 1
To:
Dentel, G RGN-I/DRP/BR1/610-337-5233
Shared Package
ML110610682, ML110610690 List:
References
11-010
Download: ML111050100 (5)


Text

No.11-010 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OL!

Licensee: Constellation Energy and Entergy Nuclear Northeast Facility: Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Docket No. 50-220;50-410; 50-333 Date and Time: May 4, 2011 at 6:00 p.m.

Location: Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Purpose: The U.S. Nuclear Regulatory Commission (NRC)will meet with the public to discuss the NRC's assessment of safety performance at both the Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant for 2010, as described in the annual assessment letters, dated March 4, 2011. The NRC will respond to questions on specific performance issues at the plants and our role in ensuring safe plant operations.

Attendees:

NRC: D. Roberts, Director, Division of Reactor Projects G. Dentel, Chief, Division of Reactor Projects, Branch 1 M. Gray, Chief, Division of Reactor Projects, Branch 2 K. Kolaczyk, Senior Resident Inspector, Nine Mile Point E. Knutson, Senior Resident Inspector, James A. FitzPatrick D. Dempsey, Resident Inspector, Nine Mile Point S. Rutenkroger, Resident Inspector, James A. FitzPatrick Pubtic Participation: This is a Category 3 Meeting. The public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Glenn T. Dentel, Chief, Projects Branch 1 (610) 337-5233 E-mail. olenn.dentel@nrc.gov

2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number M1110620209. ADAMS is accessible from the NRC website at: http:i/wwrrv.nrc.qovireadino rmiadams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc sov/NRRiOVERSIGHT/ASSESS/index.html.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://vrnruw.nrc.gov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 2,2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

Please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

//^{lffi Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects cc: Distribution via ListServ

2 The NRC's annual assessment letter regarding Nine Mile Point Nuclear Station performance during 2010 can be located in ADAMS with Accession Number ML110620141. The NRC's annual assessment letter regarding James A. FitzPatrick Nuclear Power Plant performance during 2010 can be located in ADAMS with Accession Number Ml110620209. ADAMS is accessible from the NRC website at: http://www.nrc.qov/readinq rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety performance of Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant can be found on the NRC's website at: www.nrc.qov/NRR/OVERSIGHT/ASSESS/index.html.

The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/readino-rm/doc-collections/commission/policv/67fr36920.htm1, and contains information regarding visitors and security.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by other NRC personnel at this meeting should be made known by May 2, 2011, via telephone to the NRC meeting contact.

Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances; please confirm the meeting schedule on the NRC website under public meetings.

Approved by:

/RA/

Glenn T. Dentel. Chief Projects Branch 1 Division of Reactor Projects Distribution : (see attached)

DOCUMENT NAME: G:\DRP\BRANCHl\ROP Assessment\2011 ROP EOC\NMP-FITZ AAM Notice.docx SUNSI Review Complete: ACP (Reviewer's Initials)

After declaring this document'An Official Agency Record" it will be released to the Public.

To receive a copy of this document, indicate in the box: 'C" = Copy without attachmenVenclosure

'E" = Copy with attachmenVenclosure "N" = No copy ML111050100

)FFICE TVDRP lhp RI/DRP RI/DRP

{AME APatel/ACP MGray/MKG 3Dentel/GTD

)ATE o4toBt11 04t12t11 04t18 t11 OFFICIAL RECORD COPY

3 Aqenda NRC's Annual Assessment Meeting Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant May 4,2011 6:00 pm Town of Scriba Justice Center 45 Creamery Road Oswego, NY 13126 Formal Meetinq lntroduction Discussion of Nine Mile Point and James A. FitzPatrick performance in 2010 (10 minutes)

Discussion of U.S. plant safety operations in light of Japan event ..(10 minutes)

NRC to address public questions (as needed)

Closing Remarks ....... (5 minutes)

4 Distribution:

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Executive Director for Reactor Programs, OED (RTDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RTDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation NRR (RTDSNRROD)

Director, Division of lnspection & Regional Support, NRR/DIRS (RTDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRR/DORL (RTDSNRRDORL)

Asst. General Counsel Materials Litigation & Enforcement' OGC (RIDSOGCMAILCENTER)

W. Dean, RA D. Lew. DRA D. Roberts, DRP J. Clifford, DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard. Rl OEDO K. Kolaczyk, DRP D. Dempsey, DRP E. Knutson. DRP S. Rutenkroger, DRP K, Kolek, DRP N. Sheehan. PAO D. Screnci, PAO N. McNamara, SLO D. Tift, SLO G. Matakas, ORA C. O'Daniell, ORA K. Heater, DRP L. Pinkham, DRP D. Bearde, DRS T. Haverkamp, DNMS L. Larche, DRM V. Lewis, Rl RecePtionist ROPreportsResource@nrc. gov PMNS