ML111720634: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:DRAFT DRAFT DRAFT DRAFT                                            Notes: 1) Or greater than or equal to the approved seismic margin exceptions for certain SSCs discussed in FSARU Section 2.5.6.2.1.1.
{{#Wiki_filter:DRAFT DRAFT
 
DRAFT Notes:
: 1) Or greater than or equal to the approved seismic margin exceptions for certain SSCs discussed in FSARU Section 2.5.6.2.1.1.
: 2) Unless the SSC is one of the approved seismic margin exceptions below 1.0 discussed in FSARU Section 2.5.6.2.1.1.
: 2) Unless the SSC is one of the approved seismic margin exceptions below 1.0 discussed in FSARU Section 2.5.6.2.1.1.
: 3) Or to achieve the minimum approved seismic margin exception discussed in FSARU Section 2.5.6.2.1.1.
: 3) Or to achieve the minimum approved seismic margin exception discussed in FSARU Section 2.5.6.2.1.1.
DRAFT
DRAFT DRAFT}}
DRAFT DRAFT}}

Latest revision as of 19:25, 12 November 2019

Draft Seismic Information Evaluation Flowchart
ML111720634
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 06/20/2011
From:
Pacific Gas & Electric Co
To: Wang A
Plant Licensing Branch IV
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML111720550 List:
References
TAC ME5033, TAC ME5034
Download: ML111720634 (3)


Text

DRAFT DRAFT

DRAFT Notes:

1) Or greater than or equal to the approved seismic margin exceptions for certain SSCs discussed in FSARU Section 2.5.6.2.1.1.
2) Unless the SSC is one of the approved seismic margin exceptions below 1.0 discussed in FSARU Section 2.5.6.2.1.1.
3) Or to achieve the minimum approved seismic margin exception discussed in FSARU Section 2.5.6.2.1.1.

DRAFT

DRAFT DRAFT