Summary of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2
ML103610074
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 01/05/2011
From: Wang A
Plant Licensing Branch IV
To:
Polickoski J, NRR/DORL/LPL4, 415-5430
References
TAC ME5033, TAC ME5034
Download: ML103610074 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 January 5, 2011 LICENSEE: Pacific Gas and Electric Company FACILITY: Diablo Canyon Power Plant, Units 1 and 2

SUBJECT:

SUIVIMARY OF DECEIVIBER 9, 2010, PRE-LICENSING IVIEETING WITH PACIFIC GAS AND ELECTRIC COMPANY ON PLANS TO SUBMIT A LICENSE AMENDMENT TO INCORPORATE MANAGEMENT OF NEW GEOTECHNICAL SEISIVIIC INFORMATION INTO ITS DESIGN AND LICENSING BASIS (TAC NOS. ME5033 AND ME5034)

On December 9,2010, the U. S. Nuclear Regulatory Commission (NRC) staff conducted a Category 1 pre-licensing public meeting with representatives of Pacific Gas and Electric Company, licensee for Diablo Canyon Power Plant, Units 1 and 2, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss the licensee's plans to submit a license amendment to incorporate management of new geotechnical seismic information into its design and licensing basis at its Diablo Canyon Power Plant, Units 1 and 2. A list of attendees is enclosed.

The licensee presented information in a briefing entitled, "Seismic Geotechnical Insights,"

(Agencywide Documents Access and Management System (ADAMS) Accession No. ML103440081). The licensee also discussed its seismic safety licensing history leading to the Long Term Seismic Program (LTSP) and the elements of the LTSP. The licensee reviewed the implementation, seismic analysis results, and licensing basis commitments related to the LTSP and the relationship of LTSP with Generic Issue 199. The licensee discussed its technical evaluation of the Shoreline fault in terms of its LTSP analysis method and the resulting LTSP ground motion levels with the inclusion of initial probabilistic analysis in terms of seismic risk.

Lastly, the licensee reviewed its proposed license amendment changes with a submittal schedule.

The NRC staff questioned how the LTSP was utilized to evaluate the Shoreline fault in terms of the presented graphs and the LTSP's relationship to current design and licensing basis. The NRC staff further questioned how new seismic discoveries will be evaluated via LTSP, the deterministic and/or probabilistic aspects of that evaluation, and the minimum threshold values for seismic safety and their basis. Lastly, the NRC staff discussed questions regarding the content of the proposed license amendment, the submittal schedule, and the potential desire of the licensee to be a pilot plant.

In response to the questions, the licensee p'rovided additionai details of its Shoreline fault analysis The licensee expressed its intention to present further detail regarding the LTSP evaluation method, more specific threshold values with basis, and amendment content and scheduling specifics in a future meeting or in its license amendment request submittal.

-2 Eleven members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to Jim Polickoski at 301-415-5430 or james.polickoski@nrc.gov.

~w Alan B. Wang, p~ager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv

LIST OF ATTENDEES DECEMBER 9,2010, MEETING WITH PACIFIC GAS AND ELECTRIC COMPANY PLANS TO SUBMIT A LICENSE AMENDMENT TO INCORPORATE MANAGEMENT OF NEW GEOTECHNICAL SEISMIC INFORMATION INTO ITS DESIGN AND LICENSING BASIS DOCKET NOS. 50-275 AND 50-323 NRC

Participants:

Headquarters:

Michael Markley, Chief, Plant Licensing Branch IV Kamal Manoly, Senior Level Advisor for Structural Mechanics, Division of Engineering Annie Kammerer, Senior Seismologist/Geophysicist, Structural, Geotechnical & Seismic Engineering Branch Cliff Munson, Senior Technical Advisor for Nuclear Power Plant Sitting, Division of Site &

Environmental Reviews Susan Uttal, Senior Attorney, Office of General Counsel Maxwell Smith, Attorney, Office of General Counsel Jenny Weil, Congressional Affairs Specialist, Office of Congressional Affairs Alan Wang, Project Manager, Plant Licensing Branch IV Nathaniel Ferrer, Project Manager, Relicensing Projects Branch 2 Andrew Stuyvenberg, Project Manager, Relicensing Projects Branch 2 Lauren Gibson, Project Manager, Plant Licensing Branch IV James Polickoski, Project Manager, Plant Licensing Branch IV Region IV:

Tony Vegel, Acting Director, Division of Reactor Safety Rick Deese, Senior Project Engineer, Reactor Projects Branch B

  • Michael Peck, Senior Resident Inspector, Diablo Canyon Power Plant
  • Megan Williams, Reactor Inspector, Plant Support Branch 2
  • Christie Denissen, Reactor Inspector, Engineering Branch 1
  • Pacific Gas and Electric Company

Participants:

Loren Sharp, Senior Director, Engineering Norm Abrahamson, Seismic Engineer, Engineering Rich Klimczak, Manager, Design Engineering Philippe Soenen, Licensing Supervisor, Regulatory Services Jennifer Post, Legal

  • denotes participating via teleconference Enclosure

-2 Members of the Public:

Kimberly A. Keithline, Senior Project Manager, Nuclear Energy Institute Diane Curran, Mothers for Peace Jane Swanson, Spokesperson, Mothers for Peace

  • David Weisman, Alliance for Nuclear Responsibility
  • Jason Kolons, Nuclear Engineer, Southern California Edison
  • David Repka, Winston and Strawn, LLP Tyson R. Smith, Winston and Strawn, LLP
  • Steve McGrath, Harbor Manager, Port San Luis Harbor District
  • Eric Greene, Energy Division, California Public Utilities Commission
  • Barbara Byron, Project Manager, California Energy Commission *
  • denotes participating via teleconference

-2 Eleven members of the public were in attendance. Public Meeting Feedback forms were not received.

Please direct any inquiries to Jim Polickoski at 301-415-5430 or james.polickoski@nrc.gov.

/RN Alan B. Wang, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-275 and 50-323

Enclosure:

List of Attendees cc w/encl: Distribution via Listserv DISTRIBUTION PUBLIC AKammerer, RES/DE/SGSEB LPLIV r/f NFerrer, NRR/DLR/RPB2 RidsAcrsAcnw_MailCTR Resource AStuyvenberg, NRR/DLR/RPB2 RidsNroDser Resource CSteger, NRR RidsNrrDe Resource CMunson, NRO/DSER RidsNrrDlrRpb2 Resource JWeil,OCA RidsNrrDorl Resource MSmith,OGC/GCHEAlAGCOR RidsNrrDorlLpl4 Resource SUUal,OGC/GCHEAlAGCOR RidsNrrLAJ Burkhardt Resource AVegel, RIV RidsNrrPMDiabloCanyon Resource RDeese, RIV RidsResDe Resource MPeck, RIV RidsOcaMailCenter Resource MWilliams, RIV RidsOgcRp Resource CDenissen, RIV RidsOpaMail Resource GMiller, EDO RIV RidsRgn4MailCenter Resource VDricks, OPA RIV KManoly, NRR/DE J. Polickoski, NRR ADAMS Accession No. Meetlng Notlce . ML103270067 Meetlng S ummary ML103610074 OFFICE DORLlLPL4/PM DORLlLPL4/PM DORLlLPL4/LA DORLlLPL4/BC DORLlLPL4/PM NAME JPolickoski AWang JBurkhardt MMarkley AWang DATE 12/23/10 1/3/11 1/3/11 1/5/11 115/11 OFFICIAL RECORD COpy