Letter Sequence Meeting |
|---|
|
Administration
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
|
MONTHYEARML1032700672010-11-24024 November 2010 Notice of Forthcoming Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request Project stage: Meeting ML1036100742011-01-0505 January 2011 Summary of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1101205642011-01-13013 January 2011 Notice of Forthcoming Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1104201832011-02-23023 February 2011 Summary of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1105602942011-02-25025 February 2011 E-mail, Questions for Future Pre-Licensing Meeting 3 with Pacific Gas and Electric Company to Discuss Long-Term Seismic Program License Amendment Request Project stage: Meeting ML1107601122011-03-18018 March 2011 Notice of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1110203792011-03-31031 March 2011 Transcript of Pre-Licensing Meeting with Representatives of Pacific Gas and Electric Company Project stage: Meeting ML1109101322011-03-31031 March 2011 Licensee Handouts from 3/31/11 Meeting with Pacific Gas and Electric Station Seismic Update Project stage: Meeting ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison Project stage: Meeting ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard Project stage: Meeting ML1113206372011-05-13013 May 2011 Summary of 3/31/11 Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1115401242011-06-0202 June 2011 Email 5/27/11 Teleconference on Proposed Long-term Seismic Program License Amendment Request Project stage: Meeting ML1115908732011-06-0909 June 2011 Notice of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting ML1117205702011-06-20020 June 2011 Licensee Slides from 6/20/11 Pre-Licensing Meeting on Seismic License Amendment Request Project stage: Meeting ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart Project stage: Draft Other ML1119205672011-07-29029 July 2011 6/20/11 - Summary of Meeting with Representatives of Pacific Gas and Electric Company to Discuss Pre-Application for Seismic License Amendment Request for Diablo Canyon Power Plant, Units 1 and 2 Project stage: Meeting 2011-03-18
[Table View] |
Text
From:
Polickoski, James Sent:
Friday, February 25, 2011 9:59 AM To:
Soenen, Philippe R Cc:
Baldwin, Thomas (DCPP); Markley, Michael; Manoly, Kamal; Kammerer, Annie; Smith, Maxwell; Farnholtz, Thomas; Peck, Michael; Denissen, Christie; Braisted, Jonathan; Deese, Rick; Wang, Alan; Miller, Geoffrey; Uselding, Lara; Vegel, Anton; Kennedy, Kriss; Lent, Susan; Burkhardt, Janet
Subject:
Questions for pre-licensing meeting #3 for DCPP proposed LTSP license amendment Signed By:
james.polickoski@nrc.gov
- Philippe, As discussed, the questions the NRC staff would like PG&E to discuss at the third pre-licensing meeting for the Diablo Canyon Power Plant (DCPP) proposed Long Term Seismic program (LTSP) license amendment are:
- 1. What are the entry conditions (criteria) for using the LTSP flowchart? For what will this flowchart be specifically used?
- 2. How will the LTSP analysis flowchart be utilized to qualify new plant equipment, perform plant modifications, perform condition evaluations, and/or evaluate non-conforming/degraded conditions with specific discussion on the LTSP analysis and licensing basis relationship to the existing design and licensing bases of the OBE, SSE, HE, GDC 2, and Part 100?
- 3. How do the results of an LTSP flowchart evaluation (either deterministic, probabilistic, or both) for LTSP evaluated ground motions specifically relate to the three licensed, associated, and existing seismic ground motion equipment performance criteria of the OBE, SSE, HE as well as GDC 2, and Part 100, and how will these LTSP analysis results be used together in conjunction with the OBE, SSE, HE, GDC 2, and Part 100 as licensing basis for future licensing actions?
- 4. When performing future operability determinations, how will the LTSP analysis flowchart be utilized to include specific discussions on the employment of each side of the chart?
- 5. For the Shoreline Fault and for future unevaluated seismic ground motions, how are safety-related SSC code allowables being evaluated for exceedance for the OBE, SSE, and HE where the LTSP ground motion spectra is not immediately bounding and safety-related SSCs are relevant in the applicable parameter range where LTSP is not bounding?
Also, we have selected Thursday, March 24, 2010 from 1-4 pm EST (10-1 PST) as our primary time slot for the public meeting.
Please provide feedback if a call is needed to clarify these questions and whether your staff can accommodate the March 24 date in question by COB, Tuesday, March 1, 2011.
- Thanks, Jim
James T. Polickoski Project Manager - Callaway, Diablo Canyon US NRC/NRR/DORL/LPL4 james.polickoski@nrc.gov 301-415-5430