{{#Wiki_filter:1 Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, September 28, 2011 9:21 AM To: dorts@firstenergycorp.com; cu sterc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource
{{#Wiki_filter:Davis-BesseNPEm Resource From:                               CuadradoDeJesus, Samuel Sent:                               Wednesday, September 28, 2011 9:21 AM To:                                 dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc:                                 Davis-BesseHearingFile Resource


==Subject:==
==Subject:==
Davis Besse Open Items and Confirmatory Items Steve and Cliff,  
Davis Besse Open Items and Confirmatory Items Steve and Cliff, The tables below list the OI and CI by branch for Davis-Besse. The information in the tables include the associated reviewers, whether the issue is a CI or OI and its #, the RAI #, a note summarizing the issue and in some cases the status of the discussion and SER section. Currently, for Davis Besse we have 21 Open Items and 6 Confirmatory Items.
Tomorrow Ill meet with NRCs BCs and technical staff to discuss the status of Davis Besse OI/CI and whether or not well be able to close enough OI/CI to support the schedule. Ill inform you about the result of the meeting. Please review the tables and let me know if you have any question. Cliff, I just talk with Steve about this I called you but I couldnt reach you, Ill call you again-Thanks RASB Title                                Reviewers            CI/OI                                  RAI                                                  Not S&S Methodology                      Brogers              CI                                      RAI 2.1-3                                            aba OI 3.0.3.1.10-                          RAI B.2.22-5 (B.2.22-                                issu 1                        OI            1)                              RAI B.2.22-6        ann 3.0.3.1.10-2                            (B.2.22-2)                              RAI B.2.22-7 cav Masonry Wall Program                  Lehman/Istar          OI 3.0.3.1.10-4                        (B.2.22-4)                                          stee OI 3.0.3.2.15-                          RAI B.2.39-9 (B.2.39-1) 1                            OI              RAI B.2.39-10 (B.2.39-2) 3.0.3.2.15-2                                                        B.2.39-11 (B.2.39-      2/5 OI 3.0.3.2.15- 3)                                RAI B.2.39-12      can 3                            OI        (B.2.39-7)                            RAI B.2.40-    gro 3.0.3.2.15-4                        OI 1(B.2.40-2)                                          inac 3.0.3.2.16-1                                                                                deg Structures Monitoring Program        Naus/Lehman                                                                                                        rela Also has OI 3.0.3.2.15-3                                                                    B.2.
Water Control Structures Inspection  Lehman                and OI 3.0.3.2.16-1                    RAI B.2.40-1(B.2.40-2)                              of t 1


The tables below list the OI and CI by branch for Davis-Besse. The information in the tables include the associated reviewers, whether the issue is a CI or OI and its #, the RAI #, a note summarizing the issue and in some cases the status of the discussion and SER section. Currently, for Davis Besse we have 21 Open Items and 6 Confirmatory Items.  
The fati rem Tele resp Containment Fatigue Analyses, TLAA  ABuford/ASheikh OI 4.6-1                          RAI 4.6-1                          sup OI 3.5.2.12-1 closed OI 3.5.2.12-2                                    The Lehman/Prinaris closed                            RAI 3.5.2.3.12-1 RAI 3.5.2.3.12-4  inpu RARB Title                              Reviewers      CI/OI                              RAI                                Not rega inco MHomiack        OI                                 RAI B1.4-1                        ren app info the incl valv item 3.1.1-80 Reduction of Fracture Toughness                          Trillo/Min/Yee  OI 3.1.2.2-1                      RAI 3.1.2.2-3 (3.1.2.2-2)          and Control Rod Drive Head Penetration Pressure Housings and Primary Side Steam Generator heads, Tube sheets,                                                                                       We and Welds                          SMin            OI                                RAI 3.1.2.2.16-1                  to t Class 1 Fatigue                    Oyee/CNg/Medoff OI 4.3.2.3.2-1                    RAI 4.3.2.3.2-1                    Clas Wa cran app Sep inpu Crane Hoist                        On Yee          CI                                steel crane, fatigue analysis TLAA TLA 2


Tomorrow I'll meet with NRC's BCs and technical staff to discuss the status of Davis Besse OI/CI and whether or not we'll be able to close enough OI/CI to support the schedule. I'll inform you about the result of the meeting. Please review the tables and let me know if you have any question. Cliff, I just talk with Steve about this I called you but I couldn't reach you, I'll call you again-Thanks
ASM 7/1 sup J-in rece Ching/Medoff        CI/OI? 4.1-1          RAI 4.1-2                                        app RAPB Title                                  Reviewers          CI/OI                RAI                                              Not In a In LRA Table 3.2.2-2, the applicant                                                                                                app stated that the stainless steel piping                                                                                            dele components exposed to moist air                                                                                                    pro (internal) are being managed for                                                                                                  Tab cracking by the One-Time Inspection                                                                                                com Program. The AMR items cite generic                                                                                                XXX note H.                                Jklos              CI 3.2.2.2.3.6-2      RAI 3.2.2.2.3.6-2                                Pro NRC agin tan In LRA Table 3.3.2-14, the applicant                                                                                              con stated that the stainless steel heat                                                                                              the exchanger tubes exposed to steam                                                                                                  to d (external) are being managed for                                                                                                  hea reduction in heat transfer by the One-                                                                                            sco Time Inspection Program. The AMR                                                                                                  can items cite generic note G.            Klos/Kichline      OI 3.3.2.14-1        RAI 3.3.2.14-1                                    sco Plea mo In LRA Table 3.2.2-2, the applicant                                                                                                corr stated that the stainless steel piping                                                                                            env components exposed to moist air                                                                                                    plea (internal) are being managed for                                                                                                  item cracking by the One-Time Inspection                                              9/21/2011 e-mail on Supplemental RAI response for 3.2.
Program. The AMR items cite generic                                              3.2.2.2.3.6-2. Teleconference to be scheduled    env note H.                                JKlos              also CI 3.2.2.2.3.6-2 9/29/2011.                                        be c Exp zinc agin app Mkichline/AObodoako OI                   RAI 3.3.2.2.10.4-1                                9/2 letd JGavula            OI                    RAI 2.3.3.18-4(RAI 2.3.3.18-3)                    RAI 3


RASB Title Reviewers CI/OI RAI No tS&S Methodology Brogers CI RAI 2.1-3 ab aMasonry Wall Program Lehman/Istar OI 3.0.3.1.10-1                                                  OI 3.0.3.1.10-2                                                  OI 3.0.3.1.10-4 RAI B.2.22-5 (B.2.22-1)                                                        RAI B.2.22-6 (B.2.22-2)                                                    RAI B.2.22-7 (B.2.22-4) iss u an n cav ste eStructures Monitoring Program Naus/Lehman OI 3.0.3.2.15-1 OI 3.0.3.2.15
Con 8/2 sup (err Telecon (8/22/11) One Time Inspection Supplement A.1 response 8/17/11. Issues with A.1.30 and July 27 8/2 Klos/Kichline          CI                date(Telecon)                                   Issu Tele upc loss of preload not id as an aging                                           Telecon 8/2/11 on potential follow up on RAI     Res effect                            Klos/RSun/Gavula        OI                3.3.2.3.14-1                                     nee rega req Trea of P incl the Crit incl com rece JKlos                   OI               RAI 3.3.2.2.5-2(3.3.2.2.5-1) (Telecon 8/29/2011) che CVIB (DCI)
-2                                                    OI 3.0.3.2.15-3 OI 3.0.3.2.15
Title                             Reviewers               CI/OI             RAI                                             Not OI 3.0.3.3.6-1 OI 3.0.3.3.6-2 OI PWR Reactor vessel internals      CSydnor                3.0.3.3.6-3      RAIs B.2.32-1, 2 and 3                          issu CSydnor                OI                RAI 3.1.2.2-3 (sent 7/11/2011)                  issu Tab mis 9/0 JPoehler/CSydnor/Ganesh CI                (9/13/2011 Teleconference)                      lett 4
-4                                                OI 3.0.3.2.16-1 RAI B.2.39-9 (B.2.39-1)                                                  RAI B.2.39
-10 (B.2.39
-2)                                                  B.2.39-11 (B.2.39-3)                                                        RAI B.2.39
-12 (B.2.39-7)                                                  RAI B.2.40-1(B.2.40-2)  2/5 cangro ina c de g rel aWater Control Structures Inspection Lehman Also has OI 3.0.3.2.15-3                                and  OI 3.0.3.2.16-1 RAI B.2.40-1(B.2.40-2)  B.2.of t 2Containment Fatigue Analyses, TLAA ABuford/ASheikh OI 4.6-1 RAI 4.6-1 Th e fati re m Tel e res p su p  Lehman/Prinaris OI 3.5.2.12
-1 closed OI 3.5.2.12
-2 closed RAI 3.5.2.3.12
-1  RAI 3.5.2.3.12
-4  Th e inp uRARB Title Reviewers CI/OI RAI No t  MHomiack OI RAI B1.4-1 reg a inc o renitem 3.1.1-80 Reduction of Fracture Toughness Trillo/Min/Yee OI 3.1.2.2-1 RAI 3.1.2.2-3 (3.1.2.2-2) ap p inf o the incl val v      an dControl Rod Drive Head Penetration Pressure Housings and Primary Side Steam Generator heads, Tube sheets, and Welds SMin OI  RAI 3.1.2.2.16-1 We to tClass 1 Fatigue  Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1  Cla sCrane Hoist On Yee CI steel crane, fatigue analysis TLAA Wa cra n ap p Se p inp u TL A 3  Ching/Medoff CI/OI? 4.1-1 RAI 4.1-2 AS M7/1 su pJ-in rec e ap pRAPB Title Reviewers CI/OI RAI No tIn LRA Table 3.2.2-2, the applicant stated that the stai nless steel piping components exposed to moist air (internal) are being managed for cracking by the One-Time Inspection Program. The AMR items cite generic note H. Jklos CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 In a ap p del e pro Ta b co m XX X ProIn LRA Table 3.3.2-14, the applicant stated that the stainless steel heat exchanger tubes exposed to steam (external) are being managed for reduction in heat transfer by the One-Time Inspection Program. The AMR items cite generic note G. Klos/Kichline OI 3.3.2.14-1 RAI 3.3.2.14-1 NR C agi n tan co n the to d he a sco can scoIn LRA Table 3.2.2-2, the applicant stated that the stai nless steel piping components exposed to moist air (internal) are being managed for cracking by the One-Time Inspection Program. The AMR items cite generic note H. JKlos also CI 3.2.2.2.3.6-2 9/21/2011 e-mail on Supplemental RAI response for 3.2.2.2.3.6-2. Teleconference to be scheduled 9/29/2011.
Ple a mo cor r en v ple a ite m3.2.en v be c  Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 Ex p zin c agi n ap p9/2  JGavula OI RAI 2.3.3.18-4(RAI 2.3.3.18-3) let d RAI 4  Klos/Kichline CI Telecon (8/22/11) One Time Inspection Supplement response 8/17/11. Issues with A.1.30 and July 27 date(Telecon)
Co n8/2 su p (er r A.1 8/2 Iss uloss of preload not id as an aging effect Klos/RSun/Gavula OI Telecon 8/2/11 on potential follow up on RAI 3.3.2.3.14-1 Tel e up c Re s ne e  JKlos OI RAI 3.3.2.2.5-2(3.3.2.2.5-1) (Telecon 8/29/2011) reg a req Tre a of Pincl the Cri tincl co m rec e ch e CVIB (DCI) Title Reviewers CI/OI RAI No tPWR Reactor vessel internals CSydnor OI 3.0.3.3.6
-1 OI 3.0.3.3.6
-2                      


OI 3.0.3.3.6-3 RAIs B.2.32
Reactor Vessel Thermal Shock due to                                                         (Tel Borated Water Storage Tank Injection OI 4.7.3-1     RAI 4.7.3-1                             nex High Pressure Injenction/Makeup Nozzle Thermal Sleeves               OI 4.7.4-1     RAI 4.7.4-1                             RAI OI 4.7.5.2-     RAI 4.7.5.2-2                          Syd 2            OI               RAI 4.7.5.2-             nex Inservice Inspection-Fracture        4.7.5.2-3      3                          RAI 4.7.5.2-Mechanics Analyses                  OI 4.7.5.2-4   4 Samuel Cuadrado de Jesús Project Manager Projects Branch1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 5
-1, 2 and 3 iss u  CSydnor OI RAI 3.1.2.2
-3 (sent 7/11/2011) iss u  JPoehler/CSydnor/Ganesh CI (9/13/2011 Teleconference)
Ta b mi s9/0 lett 5Reactor Vessel Thermal Shock due to Borated Water Storage Tank Injection   OI 4.7.3-1 RAI 4.7.3-1 (Te l ne xHigh Pressure Injenction/Makeup Nozzle Thermal Sleeves   OI 4.7.4-1 RAI 4.7.4-1 RAIInservice Inspection-Fracture Mechanics Analyses  OI 4.7.5.2-2                                                      OI 4.7.5.2-3                                                      OI 4.7.5.2-4 RAI 4.7.5.2-2                                                                      RAI 4.7.5.2-3                                                                      RAI 4.7.5.2-4 Syd ne x  Samuel Cuadrado de Jesús Project Manager Projects Branch1 Division of License Renewal U.S. Nuclear Regulatory Commission  


Phone:  301-415-2946 Samuel.CuadradoDeJesus@nrc.gov
Hearing Identifier:     Davis_BesseLicenseRenewal_Saf_NonPublic Email Number:           1586 Mail Envelope Properties     (377CB97DD54F0F4FAAC7E9FD88BCA6D0805071ADA7)
 
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1586   Mail Envelope Properties   (377CB97DD54F0F4FAAC7E9FD88BCA6D0805071ADA7)


==Subject:==
==Subject:==
Davis Besse Open Items and Confirmatory Items Sent Date:   9/28/2011 9:20:31 AM Received Date: 9/28/2011 9:20:32 AM From:   CuadradoDeJesus, Samuel Created By:   Samuel.CuadradoDeJesus@nrc.gov Recipients:     "Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com> Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com> Tracking Status: None  
Davis Besse Open Items and Confirmatory Items Sent Date:             9/28/2011 9:20:31 AM Received Date:         9/28/2011 9:20:32 AM From:                   CuadradoDeJesus, Samuel Created By:             Samuel.CuadradoDeJesus@nrc.gov Recipients:
 
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Post Office:   HQCLSTR01.nrc.gov Files     Size     Date & Time MESSAGE   10813     9/28/2011 9:20:32 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>
Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>
Tracking Status: None Post Office:           HQCLSTR01.nrc.gov Files                         Size                     Date & Time MESSAGE                       10813                   9/28/2011 9:20:32 AM Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Revision as of 14:09, 12 November 2019

2011/09/28 Davis-Besse Lr - Davis Besse Open Items and Confirmatory Items
ML11294A023
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/28/2011
From:
Office of Nuclear Reactor Regulation
To:
Division of License Renewal
References
Download: ML11294A023 (6)


Text

Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Wednesday, September 28, 2011 9:21 AM To: dorts@firstenergycorp.com; custerc@firstenergycorp.com Cc: Davis-BesseHearingFile Resource

Subject:

Davis Besse Open Items and Confirmatory Items Steve and Cliff, The tables below list the OI and CI by branch for Davis-Besse. The information in the tables include the associated reviewers, whether the issue is a CI or OI and its #, the RAI #, a note summarizing the issue and in some cases the status of the discussion and SER section. Currently, for Davis Besse we have 21 Open Items and 6 Confirmatory Items.

Tomorrow Ill meet with NRCs BCs and technical staff to discuss the status of Davis Besse OI/CI and whether or not well be able to close enough OI/CI to support the schedule. Ill inform you about the result of the meeting. Please review the tables and let me know if you have any question. Cliff, I just talk with Steve about this I called you but I couldnt reach you, Ill call you again-Thanks RASB Title Reviewers CI/OI RAI Not S&S Methodology Brogers CI RAI 2.1-3 aba OI 3.0.3.1.10- RAI B.2.22-5 (B.2.22- issu 1 OI 1) RAI B.2.22-6 ann 3.0.3.1.10-2 (B.2.22-2) RAI B.2.22-7 cav Masonry Wall Program Lehman/Istar OI 3.0.3.1.10-4 (B.2.22-4) stee OI 3.0.3.2.15- RAI B.2.39-9 (B.2.39-1) 1 OI RAI B.2.39-10 (B.2.39-2) 3.0.3.2.15-2 B.2.39-11 (B.2.39- 2/5 OI 3.0.3.2.15- 3) RAI B.2.39-12 can 3 OI (B.2.39-7) RAI B.2.40- gro 3.0.3.2.15-4 OI 1(B.2.40-2) inac 3.0.3.2.16-1 deg Structures Monitoring Program Naus/Lehman rela Also has OI 3.0.3.2.15-3 B.2.

Water Control Structures Inspection Lehman and OI 3.0.3.2.16-1 RAI B.2.40-1(B.2.40-2) of t 1

The fati rem Tele resp Containment Fatigue Analyses, TLAA ABuford/ASheikh OI 4.6-1 RAI 4.6-1 sup OI 3.5.2.12-1 closed OI 3.5.2.12-2 The Lehman/Prinaris closed RAI 3.5.2.3.12-1 RAI 3.5.2.3.12-4 inpu RARB Title Reviewers CI/OI RAI Not rega inco MHomiack OI RAI B1.4-1 ren app info the incl valv item 3.1.1-80 Reduction of Fracture Toughness Trillo/Min/Yee OI 3.1.2.2-1 RAI 3.1.2.2-3 (3.1.2.2-2) and Control Rod Drive Head Penetration Pressure Housings and Primary Side Steam Generator heads, Tube sheets, We and Welds SMin OI RAI 3.1.2.2.16-1 to t Class 1 Fatigue Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1 Clas Wa cran app Sep inpu Crane Hoist On Yee CI steel crane, fatigue analysis TLAA TLA 2

ASM 7/1 sup J-in rece Ching/Medoff CI/OI? 4.1-1 RAI 4.1-2 app RAPB Title Reviewers CI/OI RAI Not In a In LRA Table 3.2.2-2, the applicant app stated that the stainless steel piping dele components exposed to moist air pro (internal) are being managed for Tab cracking by the One-Time Inspection com Program. The AMR items cite generic XXX note H. Jklos CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 Pro NRC agin tan In LRA Table 3.3.2-14, the applicant con stated that the stainless steel heat the exchanger tubes exposed to steam to d (external) are being managed for hea reduction in heat transfer by the One- sco Time Inspection Program. The AMR can items cite generic note G. Klos/Kichline OI 3.3.2.14-1 RAI 3.3.2.14-1 sco Plea mo In LRA Table 3.2.2-2, the applicant corr stated that the stainless steel piping env components exposed to moist air plea (internal) are being managed for item cracking by the One-Time Inspection 9/21/2011 e-mail on Supplemental RAI response for 3.2.

Program. The AMR items cite generic 3.2.2.2.3.6-2. Teleconference to be scheduled env note H. JKlos also CI 3.2.2.2.3.6-2 9/29/2011. be c Exp zinc agin app Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 9/2 letd JGavula OI RAI 2.3.3.18-4(RAI 2.3.3.18-3) RAI 3

Con 8/2 sup (err Telecon (8/22/11) One Time Inspection Supplement A.1 response 8/17/11. Issues with A.1.30 and July 27 8/2 Klos/Kichline CI date(Telecon) Issu Tele upc loss of preload not id as an aging Telecon 8/2/11 on potential follow up on RAI Res effect Klos/RSun/Gavula OI 3.3.2.3.14-1 nee rega req Trea of P incl the Crit incl com rece JKlos OI RAI 3.3.2.2.5-2(3.3.2.2.5-1) (Telecon 8/29/2011) che CVIB (DCI)

Title Reviewers CI/OI RAI Not OI 3.0.3.3.6-1 OI 3.0.3.3.6-2 OI PWR Reactor vessel internals CSydnor 3.0.3.3.6-3 RAIs B.2.32-1, 2 and 3 issu CSydnor OI RAI 3.1.2.2-3 (sent 7/11/2011) issu Tab mis 9/0 JPoehler/CSydnor/Ganesh CI (9/13/2011 Teleconference) lett 4

Reactor Vessel Thermal Shock due to (Tel Borated Water Storage Tank Injection OI 4.7.3-1 RAI 4.7.3-1 nex High Pressure Injenction/Makeup Nozzle Thermal Sleeves OI 4.7.4-1 RAI 4.7.4-1 RAI OI 4.7.5.2- RAI 4.7.5.2-2 Syd 2 OI RAI 4.7.5.2- nex Inservice Inspection-Fracture 4.7.5.2-3 3 RAI 4.7.5.2-Mechanics Analyses OI 4.7.5.2-4 4 Samuel Cuadrado de Jesús Project Manager Projects Branch1 Division of License Renewal U.S. Nuclear Regulatory Commission Phone: 301-415-2946 Samuel.CuadradoDeJesus@nrc.gov 5

Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1586 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0805071ADA7)

Subject:

Davis Besse Open Items and Confirmatory Items Sent Date: 9/28/2011 9:20:31 AM Received Date: 9/28/2011 9:20:32 AM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:

"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>

Tracking Status: None "dorts@firstenergycorp.com" <dorts@firstenergycorp.com>

Tracking Status: None "custerc@firstenergycorp.com" <custerc@firstenergycorp.com>

Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 10813 9/28/2011 9:20:32 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: