ML12020A067: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555*0001 January 24, 2012 Mr. Robert J. Duncan II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No.2 3581 West Entrance Road Hartsville, South Carolina 29550 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 January 24, 2012 Mr. Robert J. Duncan II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No.2 3581 West Entrance Road Hartsville, South Carolina 29550 | ||
==SUBJECT:== | ==SUBJECT:== | ||
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 -REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5, DC SOURCES* SHUTDOWN (TAC NO. ME5408) | H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5, DC SOURCES* SHUTDOWN (TAC NO. ME5408) | ||
==Dear Mr. Duncan:== | ==Dear Mr. Duncan:== | ||
By letter to the Nuclear Regulatory Commission (NRC) dated January 20, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110310012), Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air,n and TS Section 3.8.5, "DC Sources -Shutdown", for the H. B. Robinson Steam Electric Plant, Unit No.2. The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on January 19, 2012, it was agreed that you would provide a response 30 days from the date of this letter. The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. | |||
By letter to the Nuclear Regulatory Commission (NRC) dated January 20, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110310012), | |||
Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., | |||
submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air,n and TS Section 3.8.5, "DC Sources - Shutdown", for the H. B. | |||
Robinson Steam Electric Plant, Unit No.2. | |||
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on January 19, 2012, it was agreed that you would provide a response 30 days from the date of this letter. | |||
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources. | |||
Please contact me at requested (301) 415-3302 if you have any questions. | Please contact me at requested (301) 415-3302 if you have any questions. | ||
Sincerely, Cl.M.4t 1. e.t: Araceli Billoch Colon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261 | Sincerely, Cl.M.4t 1. ~ e.t: | ||
Araceli Billoch Colon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261 | |||
==Enclosure:== | ==Enclosure:== | ||
Request for Additional Information cc w/encl: Distribution via ListServ | |||
REQUEST FOR ADDITIONAL INFORMATION REGARDING H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 LICENSE AMENDMENT REQUEST REGARDING TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR. AND SECTION 3.8.S, DC SOURCES - SHUTDOWN DOCKET NO. SO-261 By letter to the Nuclear Regulatory Commission (NRC) dated January 20, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110310012) Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air," and TS Section 3.8.S, "DC Sources - Shutdown," for the H. B. Robinson Steam Electric Plant, Unit No.2. The NRC staff has been reviewing the submittal and has determined that additional information is needed to complete its review. | |||
Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air," and TS Section 3.8.S, "DC Sources -Shutdown," for the H. B. Robinson Steam Electric Plant, Unit No.2. The NRC staff has been reviewing the submittal and has determined that additional information is needed to complete its review. 1. The submittal states: The proposed change to TS 3.8.3 revises the minimum air start receiver pressure as specified in Condition D from 100 psig to 1S0 psig. The current value of 100 pSig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 1S0 psig to ensure a reliable start. Provide an analysis or calculation to justify the Fairbanks Morse recommendation that a minimum air pressure of 1S0 psig in the air start receiver will ensure a reliable start for each Robinson EDG. | : 1. The submittal states: | ||
The proposed change to TS 3.8.3 revises the minimum air start receiver pressure as specified in Condition D from 100 psig to 1S0 psig. The current value of 100 pSig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 1S0 psig to ensure a reliable start. | |||
Provide an analysis or calculation to justify the Fairbanks Morse recommendation that a minimum air pressure of 1S0 psig in the air start receiver will ensure a reliable start for each Robinson EDG. | |||
Enclosure | |||
'.. ML12020A067 OFFICE LPL2-2IPM LPL2-2fLA LPL2*2/BC LPL2*2IPM NAME ABiliochCol6n CSoia DBroaddus ABiliochCol6n DATE 01/20/12 01120112 01/24/12 01/24112}} | |||
Latest revision as of 09:29, 12 November 2019
ML12020A067 | |
Person / Time | |
---|---|
Site: | Robinson |
Issue date: | 01/24/2012 |
From: | Billoch-Colon A Plant Licensing Branch II |
To: | Duncan R Carolina Power & Light Co |
Billoch-Colon A | |
References | |
TAC ME5408 | |
Download: ML12020A067 (3) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 January 24, 2012 Mr. Robert J. Duncan II, Vice President Carolina Power & Light Company H.B. Robinson Steam Electric Plant, Unit No.2 3581 West Entrance Road Hartsville, South Carolina 29550
SUBJECT:
H.B. ROBINSON STEAM ELECTRIC PLANT, UNIT NO.2 - REQUEST FOR ADDITIONAL INFORMATION RELATED TO REQUEST FOR TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR, AND SECTION 3.8.5, DC SOURCES* SHUTDOWN (TAC NO. ME5408)
Dear Mr. Duncan:
By letter to the Nuclear Regulatory Commission (NRC) dated January 20, 2011 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110310012),
Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc.,
submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air,n and TS Section 3.8.5, "DC Sources - Shutdown", for the H. B.
Robinson Steam Electric Plant, Unit No.2.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on January 19, 2012, it was agreed that you would provide a response 30 days from the date of this letter.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC's goal of efficient and effective use of staff resources.
Please contact me at requested (301) 415-3302 if you have any questions.
Sincerely, Cl.M.4t 1. ~ e.t:
Araceli Billoch Colon, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-261
Enclosure:
Request for Additional Information cc w/encl: Distribution via ListServ
REQUEST FOR ADDITIONAL INFORMATION REGARDING H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 LICENSE AMENDMENT REQUEST REGARDING TECHNICAL SPECIFICATIONS CHANGES TO SECTION 3.8.3, DIESEL FUEL OIL AND STARTING AIR. AND SECTION 3.8.S, DC SOURCES - SHUTDOWN DOCKET NO. SO-261 By letter to the Nuclear Regulatory Commission (NRC) dated January 20, 2011, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML110310012) Carolina Power & Light Company, doing business as Progress Energy Carolinas, Inc., submitted a license amendment request to revise Technical Specifications (TS) Section 3.8.3, "Diesel Fuel Oil and Starting Air," and TS Section 3.8.S, "DC Sources - Shutdown," for the H. B. Robinson Steam Electric Plant, Unit No.2. The NRC staff has been reviewing the submittal and has determined that additional information is needed to complete its review.
- 1. The submittal states:
The proposed change to TS 3.8.3 revises the minimum air start receiver pressure as specified in Condition D from 100 psig to 1S0 psig. The current value of 100 pSig is non-conservative with the EDG vendor (Fairbanks Morse) recommendation of a minimum air pressure of 1S0 psig to ensure a reliable start.
Provide an analysis or calculation to justify the Fairbanks Morse recommendation that a minimum air pressure of 1S0 psig in the air start receiver will ensure a reliable start for each Robinson EDG.
Enclosure
'.. ML12020A067 OFFICE LPL2-2IPM LPL2-2fLA LPL2*2/BC LPL2*2IPM NAME ABiliochCol6n CSoia DBroaddus ABiliochCol6n DATE 01/20/12 01120112 01/24/12 01/24112