| {{#Wiki_filter:Mark J. Ajluni, Southern Nuclear Nuclear Licensing Operating Company. 40 Inverness Center Post Office Box Birmingham. | | {{#Wiki_filter:Mark J. Ajluni, P.E. Southern Nuclear Nuclear Licensing Director Operating Company. Inc. |
| Alabama Tel Fax SOUTHERN'\' | | 40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 SOUTHERN'\' |
| June 14, COMPANY Docket No.: NL-12-1266 U. S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, D. C. 20555-0001 Edwin L Hatch Nuclear Plant -Unit Inservice Inspection Owner's Activity Report for Outage 1 Ladies and Gentlemen: | | June 14, 2012 COMPANY Docket No.: 50-321 NL-12-1266 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin L Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Ladies and Gentlemen: |
| Enclosed is the ASME Section XI Code Case N-532-4 OAR-1 Owner's Activity Report for the 1 R25 Refueling Outage. There are no items to report for Table 1, "Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service." Repair/Replacement activities did occur during Cycle 25 and are addressed in Table 2, "Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service." This report is for the second period of the 4th Interval lSI activities (Interval 4, Period 2, Outage 2). This letter contains no NRC commitments. | | Enclosed is the ASME Section XI Code Case N-532-4 OAR-1 Owner's Activity Report for the 1R25 Refueling Outage. There are no items to report for Table 1, "Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service." Repair/Replacement activities did occur during Cycle 25 and are addressed in Table 2, "Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service." |
| If you have any questions, please contact Jack Stringfellow at (205) 992-7037. | | This report is for the second period of the 4th Interval lSI activities (Interval 4, Period 2, Outage 2). |
| Respectfully submitted, M. J. Ajluni Nuclear Licensing Director MJAlRMJ/lac | | This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037. |
| | Respectfully submitted, M. J. Ajluni Nuclear Licensing Director MJAlRMJ/lac |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. 1 R25 Form OAR-1 Owner's Activity Report 1 R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluations for Continued Service 1 R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service U. S. Nuclear Regulatory Commission NL-12-1266 Page 2 Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President | | : 1. 1 R25 Form OAR-1 Owner's Activity Report |
| & CEO Mr. D. G. Bost, Executive Vice President | | : 2. 1R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluations for Continued Service |
| & Chief Nuclear Officer Mr. D. R. Madison, Vice President | | : 3. 1R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service |
| -Hatch Mr. B. L. Ivey, Vice President | | |
| -Regulatory Affairs Mr. B. J. Adams, Vice President | | U. S. Nuclear Regulatory Commission NL-12-1266 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President - Hatch Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President - Fleet Operations RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager - Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch |
| -Fleet Operations RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager -Hatch Mr. E. D. Morris, Senior Resident Inspector | | |
| -Hatch Edwin I. Hatch Nuclear Plant -Unit Inservice Inspection Owner's Activity Report for Outage Enclosure 1 R25 Form OAR-1 Owner's Activity FORM OAR-1 OWNER'S ACTIVITY Report Number 14-2-2 (UnIt 1, 4 TB Jaten'al, "jfD Period, lND Report) Owner Souther. Nuclear Operadlll CO, (II Blut Cor Geargla Power CompaDY,. | | Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 1 1R25 Form OAR-1 Owner's Activity Report |
| 40 lJIverness Center Parkway, Birmingham, AL 35242 Plant Edwin I. Hatch Nne.ear PlaDt, P. O. Box 2010. Baxley, Georgia 31!13 Unit No. 1 Commercial service date 1ll31nS Re1Ueling outage no. lR25 (if applicable) | | |
| ------Cummt inspection interval Cur,rent inspection period Edition and Addenda of Section XI applicable to the inspection plans lOOI Edltfoa with 2003 Addenda Date and revision of inspection plans YoIuIw 1: 418111 Ver 3.0; JI,hI",. 2: 418111 Ver 3.0; JltIIlIme J: 4/12/11 Ver 3.0; JlDIIIIM 4: 1218111 Ver S.Oj JloJ"". 5: 4/14111 Vcr S.O; Jloillme 6: 418111 Vet 6.0 Edition and Addenda of Section XI applicable to repairheplacement activities. | | FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 14-2-2 (UnIt 1, 4TB Jaten'al, "jfD Period, lND Report) |
| if different than the inspection plans Same Code Cases used: N-46O, N:6e, N-532-4. N-51l-3, 24'76 ..cif applicable) | | Owner Souther. Nuclear Operadlll CO, (II Blut Cor Geargla Power CompaDY,. 40 lJIverness Center Parkway, Birmingham, AL 35242 Plant Edwin I. Hatch Nne.ear PlaDt, P. O. Box 2010. Baxley, Georgia 31!13 Unit No. 1 Commercial service date 1ll31nS Re1Ueling outage no. |
| CERTD1CATE OF CONFORMANCE I certifY that (a) the statements made in this report are com:c:t; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repairlreplacement activities and evaluations supporting the completion of lRl5 conform to the requirements of Section XI. Signed Date CERTD'lCATE OF INSERVICE INSPECTION I. the undersigned. | | (if applicable) ------ lR25 Cummt inspection interval Cur,rent inspection period Edition and Addenda of Section XI applicable to the inspection plans lOOI Edltfoa with 2003 Addenda Date and revision of inspection plans YoIuIw 1: 418111 Ver 3.0; JI,hI",. 2: 418111 Ver 3.0; JltIIlIme J: 4/12/11 Ver 3.0; JlDIIIIM 4: 1218111 Ver S.Oj JloJ"". 5: 4/14111 Vcr S.O; Jloillme 6: 418111 Vet 6.0 Edition and Addenda of Section XI applicable to repairheplacement activities. if different than the inspection plans Same Code Cases used: N-46O, N:6e, N-532-4. N-51l-3, 24'76 |
| holding a valid conpnission issued by the National Board of Boiler and Pressure Vessel Inspectors the State or Province of and employed by of Hartford. | | ..cif applicable) |
| CT have inspected tho items described in this Activity Report, and state that. to the best of my knowledp and belief; the Owner has performed all activities represented by report in accordance with the requirements of Section By signing this certificate neither the Inspector nOl' his employer makes any warranty, expressed or implied, concerning repairlreplacement activities and evaluation deac:r:ibed. | | CERTD1CATE OF CONFORMANCE I certifY that (a) the statements made in this report are com:c:t; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repairlreplacement activities and evaluations supporting the completion of lRl5 conform to the requirements of Section XI. |
| in this report. Furthermore, neither the Inspector nor his employer shall liable in any manner for any personal iqjury or property damage or a loss of any kind arising from or connected with this | | Signed Date CERTD'lCATE OF INSERVICE INSPECTION I. the undersigned. holding a valid conpnission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of ~ and employed by ~ of Hartford. CT have inspected tho items described in this Owner's Activity Report, and state that. to the best of my knowledp and belief; the Owner has performed all activities represented by this report in accordance with the requirements ofSection Xl By signing this certificate neither the Inspector nOl' his employer makes any warranty, expressed or implied, concerning the repairlreplacement activities and evaluation deac:r:ibed. in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal iqjury or property damage or a loss of any kind arising from or connected with this inspection. |
| ....=-:-______ Commissions Inspector's Signatwe Edwin I. Hatch Nuclear Plant -Unit Inservice Inspection Owner's Activity Report for Outage 1 Enclosure 1 R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws Relevant Conditions that Required Evaluations for Continued Examination Category and Item Item Description Evaluation Description Number OAR-l NONE No evaluation required. | | _--'/<l:.....:::.J:JIlI2<1!11l:/:~,Q;~~~....=-:-_ _ _ _ _ _ Commissions Inspector's Signatwe |
| Thursday, June 07, 2012 Page lof1 Edwin I. Hatch Nuclear Plant -Unit Inservice Inspection Owner's Activity Report for Outage 1 Enclosure 1R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Replacement, or Corrective Measures Required for Continued Code Class Item Description 3 10" Piping 3 10" Piping 3 30" PSW Piping Elbow Description of Work Replaced Section of Unit 1 Div. II PSW piping found to be leaking during G-Scan activities. | | |
| Replaced Section of Unit 1 Div. II PSW piping located in the Valve Box, found to be leaking during tape coat removal of underground piping. Due to the inability to isolate thru-wailleakage in a 30" PSW piping elbow, a temporary non-Code replacement was implemented per Temp Mod 1-10-023 on July 30,2010 (WO 1101202105). | | Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 2 1R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluations for Continued Service |
| The non-Code replacement consisted of leaving the defect (thru wall leakage) in the elbow and welding an assembly of a small section of 6" piping with a flanged connection and drain valve with a threaded pipe cap over the leak location. | | |
| Due to this being a non-Code replacement, HNP-ISI-Al 10 was submitted to the NRC for approval of the proposed replacement which had been prepared in accordance with NRC Gl90-05. Proposed non-Code replacement performed in accordance with B31.1, 2007 Edition. Acceptable per IWA-4224.1(a). | | Examination Category and Item Item Description Evaluation Description Number OAR-l NONE No evaluation required. |
| | Thursday, June 07, 2012 Page lof1 |
| | |
| | Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 3 1R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service |
| | |
| | Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number Replaced Section of Unit 1 Div. II PSW piping found to be leaking during G-Scan 3 10" Piping 3/2/12 WO SNC341062 activities. |
| | Replaced Section of Unit 1 Div. II PSW piping located in the Valve Box, found to be 3 10" Piping 2/26/12 WO SNC361263 leaking during tape coat removal of underground piping. |
| | Due to the inability to isolate thru-wailleakage in a 30" PSW piping elbow, a temporary non-Code replacement was implemented per Temp Mod 1-10-023 on July 30,2010 (WO 1101202105). The non-Code replacement consisted of leaving the defect (thru wall leakage) in the elbow and welding an assembly of a small section of 6" piping with a flanged connection and drain valve with a threaded pipe 3 30" PSW Piping Elbow 3/1/2012 WO SNC105658 cap over the leak location. Due to this being a non-Code replacement, HNP-ISI-AlT 10 was submitted to the NRC for approval of the proposed replacement which had been prepared in accordance with NRC Gl90-05. Proposed non-Code replacement performed in accordance with B31.1, 2007 Edition. Acceptable per IWA-4224.1(a). |
| A Code Repair was performed during the lR25 outage. | | A Code Repair was performed during the lR25 outage. |
| Repair/Replacement WO WO WO Thursday, June 07,2012 . Page 1 of2 1 Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number %" HPCI Piping Elbow Replaced a W' elbow found leaking during the RPV leakage Test. 3/15/2012 WO SNC377855 Thursday, June 07,2012 Page 2 of2*}}
| | Thursday, June 07,2012 . Page 1 of2 |
| | |
| | Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number 1 %" HPCI Piping Elbow Replaced a W' elbow found leaking during the RPV leakage Test. 3/15/2012 WO SNC377855 Thursday, June 07,2012 Page 2 of2*}} |
Similar Documents at Hatch |
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARNL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0905, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R292022-01-26026 January 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R29 NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2019-12-0909 December 2019 Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-19-0726, Inservice Inspection Program Owner'S Activity Report for Outage 2R252019-06-17017 June 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R25 NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update2019-04-0202 April 2019 Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update NL-17-1194, Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-242017-07-10010 July 2017 Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-24 NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R242017-05-30030 May 2017 Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707)2016-12-27027 December 2016 Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2016-08-24024 August 2016 Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-16-0795, Inservice Inspection Program - Owner'S Activity Report for Outage IR272016-06-0101 June 2016 Inservice Inspection Program - Owner'S Activity Report for Outage IR27 NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27)2016-03-17017 March 2016 Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R232015-06-12012 June 2015 E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 NL-15-0784, Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-05-0404 May 2015 Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 NL-14-0840, Lnservice Inspection Program Owner'S Activity Report for Outage 1R262014-06-0303 June 2014 Lnservice Inspection Program Owner'S Activity Report for Outage 1R26 NL-14-0231, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.02014-03-0606 March 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.0 NL-12-1266, Inservice Inspection Program, Owner'S Activity Report for Outage 1R252012-06-14014 June 2012 Inservice Inspection Program, Owner'S Activity Report for Outage 1R25 NL-10-0989, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests2010-07-0808 July 2010 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests NL-10-1023, Inservice Inspection Program, Owner'S Activity Report for Outage 1R242010-06-11011 June 2010 Inservice Inspection Program, Owner'S Activity Report for Outage 1R24 NL-08-1798, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-012008-12-19019 December 2008 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-01 NL-08-0901, Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay2008-06-13013 June 2008 Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction2007-05-0909 May 2007 Fourth Interval Inspection (ISI) Plan Correction NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests ML0704300942006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. ML0704301002006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. ML0704300922006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. ML0704301012006-08-10010 August 2006 E. I. Hatch, Unit 2, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R222006-06-29029 June 2006 Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 ML0704300812006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan. ML0704300832006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Inservice Inspection Plan. ML0704300872006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 3, Revision 1, Class 1, 2 and 3 Figures, Fourth Ten-Year Inservice Inspection Plan. ML0704300962005-08-31031 August 2005 E. I. Hatch, Unit 1, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-05-1190, Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant2005-07-11011 July 2005 Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant ML0516403852005-06-0707 June 2005 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report2004-06-0707 June 2004 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0478, Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-402004-03-29029 March 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-40 NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-182003-07-11011 July 2003 Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 ML0230903562002-11-0101 November 2002 Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 ML0228200262002-10-0404 October 2002 Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) ML0226604362002-09-17017 September 2002 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report 2022-05-31
[Table view] Category:Letter type:NL
MONTHYEARNL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-22-0316, Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-11-30030 November 2022 Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0850, Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-11-18018 November 2022 Supplement to License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0832, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF .2022-10-27027 October 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF . NL-22-0800, Supplement to Authorized Relief Request HNP-ISI-RR-05-022022-10-27027 October 2022 Supplement to Authorized Relief Request HNP-ISI-RR-05-02 NL-22-0801, Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of .2022-10-14014 October 2022 Response to Request for Additional Information Regarding: Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of . NL-22-0757, Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-09-30030 September 2022 Units 1 & 2, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NL-22-0687, Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 22022-08-31031 August 2022 Notice of Intent to Pursue Subsequent License Renewal for Hatch Units 1 & 2 NL-22-0406, Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes2022-08-19019 August 2022 Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes NL-22-0650, Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program2022-08-19019 August 2022 Units 1 and 2 - Response to Request for Confirmation of Information Regarding License Amendment Request to Revise the NFPA 805 Fire Protection Program NL-22-0590, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten2022-08-18018 August 2022 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Exten NL-22-0672, Registration of Spent Fuel Cask Use2022-08-17017 August 2022 Registration of Spent Fuel Cask Use NL-22-0564, and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use2022-07-21021 July 2022 and Vogtle Electric Generating Plant, Registration of Spent Fuel Cask Use NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 NL-22-0499, Registration of Spent Fuel Cask Use2022-06-27027 June 2022 Registration of Spent Fuel Cask Use NL-22-0362, Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update2022-06-0101 June 2022 Southern Nuclear Operating Company, Inc. - Foreign Ownership, Control, or Influence Five-Year Renewal Filing and NRC Facility Clearance Update NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-22-0335, Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And.2022-05-17017 May 2022 Supplement to Application to Revise Technical Specifications to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-208, Revision 0, Extension of Time to Reach Mode 2 in LCO 3.0.3 And. NL-22-0344, Annual Radiological Environmental Operating Reports for 20212022-05-10010 May 2022 Annual Radiological Environmental Operating Reports for 2021 NL-22-0315, Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days2022-05-0404 May 2022 Technical Specification 5.6.6 Post Accident Monitoring Instrumentation Report for Drywell Temperature Indicator Inoperable for Greater than 30 Days NL-22-0325, Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable2022-05-0303 May 2022 Withdrawal of Emergency License Amendment Request for Technical Specification 3.7.2 Regarding One-Time Extension of Completion Time for Plant Service Water (Psw) Pump Inoperable NL-22-0283, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf.2022-04-29029 April 2022 Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. NL-22-0271, Changes to the Physical Security Plan2022-04-19019 April 2022 Changes to the Physical Security Plan NL-22-0240, SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations2022-03-31031 March 2022 SNC Response to Regulatory Issue Summary 2022-01: Preparation and Scheduling of Operator Licensing Examinations NL-21-0918, License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 52022-03-31031 March 2022 License Amendment Request to Revise the NFPA 805 Fire Protection Program. with Attachments 3 to 5 NL-22-0220, Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 20222022-03-28028 March 2022 Units 1 and 2 - Nuclear Property Insurance Coverage as of April 1, 2022 NL-22-0221, Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2022-03-28028 March 2022 Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) 2024-01-30
[Table view] |
Text
Mark J. Ajluni, P.E. Southern Nuclear Nuclear Licensing Director Operating Company. Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7673 Fax 205.992.7885 SOUTHERN'\'
June 14, 2012 COMPANY Docket No.: 50-321 NL-12-1266 U. S. Nuclear Regulatory Commission ATIN: Document Control Desk Washington, D. C. 20555-0001 Edwin L Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Ladies and Gentlemen:
Enclosed is the ASME Section XI Code Case N-532-4 OAR-1 Owner's Activity Report for the 1R25 Refueling Outage. There are no items to report for Table 1, "Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service." Repair/Replacement activities did occur during Cycle 25 and are addressed in Table 2, "Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service."
This report is for the second period of the 4th Interval lSI activities (Interval 4, Period 2, Outage 2).
This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205) 992-7037.
Respectfully submitted, M. J. Ajluni Nuclear Licensing Director MJAlRMJ/lac
Enclosures:
- 1. 1 R25 Form OAR-1 Owner's Activity Report
- 2. 1R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluations for Continued Service
- 3. 1R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service
U. S. Nuclear Regulatory Commission NL-12-1266 Page 2 cc: Southern Nuclear Operating Company Mr. S. E. Kuczynski, Chairman, President & CEO Mr. D. G. Bost, Executive Vice President & Chief Nuclear Officer Mr. D. R. Madison, Vice President - Hatch Mr. B. L. Ivey, Vice President - Regulatory Affairs Mr. B. J. Adams, Vice President - Fleet Operations RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. P. G. Boyle, NRR Senior Project Manager - Hatch Mr. E. D. Morris, Senior Resident Inspector - Hatch
Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 1 1R25 Form OAR-1 Owner's Activity Report
FORM OAR-1 OWNER'S ACTIVITY REPORT Report Number 14-2-2 (UnIt 1, 4TB Jaten'al, "jfD Period, lND Report)
Owner Souther. Nuclear Operadlll CO, (II Blut Cor Geargla Power CompaDY,. 40 lJIverness Center Parkway, Birmingham, AL 35242 Plant Edwin I. Hatch Nne.ear PlaDt, P. O. Box 2010. Baxley, Georgia 31!13 Unit No. 1 Commercial service date 1ll31nS Re1Ueling outage no.
(if applicable) ------ lR25 Cummt inspection interval Cur,rent inspection period Edition and Addenda of Section XI applicable to the inspection plans lOOI Edltfoa with 2003 Addenda Date and revision of inspection plans YoIuIw 1: 418111 Ver 3.0; JI,hI",. 2: 418111 Ver 3.0; JltIIlIme J: 4/12/11 Ver 3.0; JlDIIIIM 4: 1218111 Ver S.Oj JloJ"". 5: 4/14111 Vcr S.O; Jloillme 6: 418111 Vet 6.0 Edition and Addenda of Section XI applicable to repairheplacement activities. if different than the inspection plans Same Code Cases used: N-46O, N:6e, N-532-4. N-51l-3, 24'76
..cif applicable)
CERTD1CATE OF CONFORMANCE I certifY that (a) the statements made in this report are com:c:t; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section Xl; and (c) the repairlreplacement activities and evaluations supporting the completion of lRl5 conform to the requirements of Section XI.
Signed Date CERTD'lCATE OF INSERVICE INSPECTION I. the undersigned. holding a valid conpnission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of ~ and employed by ~ of Hartford. CT have inspected tho items described in this Owner's Activity Report, and state that. to the best of my knowledp and belief; the Owner has performed all activities represented by this report in accordance with the requirements ofSection Xl By signing this certificate neither the Inspector nOl' his employer makes any warranty, expressed or implied, concerning the repairlreplacement activities and evaluation deac:r:ibed. in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal iqjury or property damage or a loss of any kind arising from or connected with this inspection.
_--'/<l:.....:::.J:JIlI2<1!11l:/:~,Q;~~~....=-:-_ _ _ _ _ _ Commissions Inspector's Signatwe
Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 2 1R25 Form OAR-1 Owner's Activity Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluations for Continued Service
Examination Category and Item Item Description Evaluation Description Number OAR-l NONE No evaluation required.
Thursday, June 07, 2012 Page lof1
Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R25 Enclosure 3 1R25 Form OAR-1 Owner's Activity Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service
Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number Replaced Section of Unit 1 Div. II PSW piping found to be leaking during G-Scan 3 10" Piping 3/2/12 WO SNC341062 activities.
Replaced Section of Unit 1 Div. II PSW piping located in the Valve Box, found to be 3 10" Piping 2/26/12 WO SNC361263 leaking during tape coat removal of underground piping.
Due to the inability to isolate thru-wailleakage in a 30" PSW piping elbow, a temporary non-Code replacement was implemented per Temp Mod 1-10-023 on July 30,2010 (WO 1101202105). The non-Code replacement consisted of leaving the defect (thru wall leakage) in the elbow and welding an assembly of a small section of 6" piping with a flanged connection and drain valve with a threaded pipe 3 30" PSW Piping Elbow 3/1/2012 WO SNC105658 cap over the leak location. Due to this being a non-Code replacement, HNP-ISI-AlT 10 was submitted to the NRC for approval of the proposed replacement which had been prepared in accordance with NRC Gl90-05. Proposed non-Code replacement performed in accordance with B31.1, 2007 Edition. Acceptable per IWA-4224.1(a).
A Code Repair was performed during the lR25 outage.
Thursday, June 07,2012 . Page 1 of2
Code Date Repair/Replacement Plan Class Item Description Description of Work Completed Number 1 %" HPCI Piping Elbow Replaced a W' elbow found leaking during the RPV leakage Test. 3/15/2012 WO SNC377855 Thursday, June 07,2012 Page 2 of2*