Southern Nuclear Operating Company, Inc.

Tel20S 992.5000 SOUTHERN'\

June 11, 2010 COMPANY Docket No.: 50-321 NL-10-1023 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R24 Ladies and Gentlemen:

Enclosed is the ASME Section XI Code Case N-532-4 OAR-1, Owner's Activity Report for the 1R24 Refueling Outage. There are no items to report for Table 1, "Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service," or for Table 2, "Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service."

This report is for the second period of the 4th Interval lSI activities (Interval 4, Period 2, Outage 1.)

This letter contains no NRC commitments. If you have any questions, please contact Jack Stringfellow at (205)992-7037.

Sincerely, M. J. Ajluni Manager, Nuclear Licensing MJNPAHllac

Enclosures:

1). Form OAR-1 Owners Report 2). OAR-1 1R24 Owner's Report, Table 1, Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service 3). OAR-1 1R24 Owner's Report, Table 2, Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service

U. S. Nuclear Regulatory Commission NL-IO-I023 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Hatch Mr. E.D. Morris, Senior Resident Inspector - Hatch Mr. P.G. Boyle, NRR Project Manager

Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R24 Enclosure 1 FORM OAR-1 Owner's Report

FORM OAR-l O\VNER'S ACTIVITY REPORT Report Number Owner Southern Nuclear Operating Co. (as agent for Georgia Power Company). 40 Inverness Center Parkway. Birmingham. AL 35242 Plant Edwin 1. Hatch Nuclear Plant. P. O. Box 2010. Baxley. Georgia 31513 Unit No. Commercial service date 12/31175 Refueling outage no.

(if applicable)

Current inspection interval Current inspection period Edition and Addenda of Section XI applicable to the inspection plans 200 I Edition with 2003 Addenda Date and revision of inspection plans 2 Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans Same Code Cases used:

CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of I R24 conform to the requirements of Section XI.

(ref~OU!age ;umber)

Sigoa¢T ~ L.. Q i!1I/6"t../fflt.JQ O~t"TtVL Date

(() ) Owner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by HSBCT of Hartford, CT have inspected the items described in this Owner's Activity Report, and state that. to the best of my knowledge and belief. the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

~C2 ~~

--~/~~~==~ln~,~--ct~oc~'s~S~ig~n~a~tLJ=re~~~---------

Commissions GA 850 National Board. State, Province. and Endorsements Date

Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activity Report for Outage 1R24 Enclosure 2 OAR-1 1R24 Owner's Report, Table 1 Items with Flaws or Relevant Conditions that Required Evaluation for Continued Service

Examination Evaluation Category and Description Item Number Item Description OAR-!, Table 1 There arc no items meeting the criteria of Section XI No evaluation required.

Code Case N-532-4 2(a) for evaluation of flaws or relevant conditions that exceeded the acceptance criteria of Division I to determine acceptability for continued service for Plant Hatch Unit I Operating Cycle 24 and Refueling Outage I R24.

Fridaf"'.y 21.2010 Page1Of1

Edwin I. Hatch Nuclear Plant - Unit 1 Inservice Inspection Program Owner's Activitv Report for Outage 1R24 Enclosure 3 OAR-1 1R24 Owner's Report, Table 2 Abstract of Repairs, Replacement, or Corrective Measures Required for Continued Service.

Repairl Code Item Description Date Complete Replacement Class Description of Work Plan Number N/A (JAR*l, Table 2 There are no items meeting the criteria of Section XI Code Case N-532-4 3123/2010 1100000002 2(b) tor repair/replacement activities required that exceeded the acceptance criteria of Division 1 for Plant Hatch Unit I Operating Cycle 24 and Refueling Outage I R24.

~ridaY~.""'y21, 2010 Pa;e'1of1