MONTHYEARNL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0905, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R292022-01-26026 January 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R29 NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2019-12-0909 December 2019 Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-19-0726, Inservice Inspection Program Owner'S Activity Report for Outage 2R252019-06-17017 June 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R25 NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update2019-04-0202 April 2019 Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update NL-17-1194, Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-242017-07-10010 July 2017 Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-24 NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R242017-05-30030 May 2017 Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707)2016-12-27027 December 2016 Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2016-08-24024 August 2016 Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-16-0795, Inservice Inspection Program - Owner'S Activity Report for Outage IR272016-06-0101 June 2016 Inservice Inspection Program - Owner'S Activity Report for Outage IR27 NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27)2016-03-17017 March 2016 Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R232015-06-12012 June 2015 E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 NL-15-0784, Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-05-0404 May 2015 Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 NL-14-0840, Lnservice Inspection Program Owner'S Activity Report for Outage 1R262014-06-0303 June 2014 Lnservice Inspection Program Owner'S Activity Report for Outage 1R26 NL-14-0231, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.02014-03-0606 March 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.0 NL-12-1266, Inservice Inspection Program, Owner'S Activity Report for Outage 1R252012-06-14014 June 2012 Inservice Inspection Program, Owner'S Activity Report for Outage 1R25 NL-10-0989, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests2010-07-0808 July 2010 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests NL-10-1023, Inservice Inspection Program, Owner'S Activity Report for Outage 1R242010-06-11011 June 2010 Inservice Inspection Program, Owner'S Activity Report for Outage 1R24 NL-08-1798, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-012008-12-19019 December 2008 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-01 NL-08-0901, Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay2008-06-13013 June 2008 Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction2007-05-0909 May 2007 Fourth Interval Inspection (ISI) Plan Correction NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests ML0704300922006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. ML0704301002006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. ML0704300942006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. ML0704301012006-08-10010 August 2006 E. I. Hatch, Unit 2, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R222006-06-29029 June 2006 Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 ML0704300812006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan. ML0704300832006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Inservice Inspection Plan. ML0704300872006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 3, Revision 1, Class 1, 2 and 3 Figures, Fourth Ten-Year Inservice Inspection Plan. ML0704300962005-08-31031 August 2005 E. I. Hatch, Unit 1, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-05-1190, Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant2005-07-11011 July 2005 Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant ML0516403852005-06-0707 June 2005 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report2004-06-0707 June 2004 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0478, Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-402004-03-29029 March 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-40 NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-182003-07-11011 July 2003 Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 ML0230903562002-11-0101 November 2002 Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 ML0228200262002-10-0404 October 2002 Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) ML0226604362002-09-17017 September 2002 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report 2024-07-09
[Table view] Category:Letter
MONTHYEARIR 05000321/20240102024-11-0606 November 2024 NRC Inspection Report 05000321/2024010 and 05000366/2024010 ML24299A2222024-10-31031 October 2024 Audit Summary for License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0357, Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines2024-10-30030 October 2024 Notification of Deviation from the Inspection Frequency Requirements of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) BWR Jet Pump Assembly Inspection and Flaw Evaluation Guidelines IR 05000321/20240032024-10-30030 October 2024 Edwin I Hatch, Units 1 and 2 - Integrated Inspection Report 05000321/2024003 and 05000366/2024003 ML24292A1602024-10-22022 October 2024 Request for Withholding Information from Public Disclosure License Amendment Request to Revise Technical Specification Surveillance Requirements to Increase Safety/Relief Valve Setpoints ML24290A0792024-10-18018 October 2024 SLR Environmental Preapplication Meeting Summary ML24303A4102024-10-17017 October 2024 Dir Results Letter to NRC - Hatch - Hurricane Helene IR 05000321/20244012024-10-10010 October 2024 Security Baseline Inspection Report 05000321-2024401 and 05000366-2024401 ML24256A0282024-09-12012 September 2024 2024 Hatch Requal Inspection Corporate Notification Letter NL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc IR 05000321/20240912024-08-27027 August 2024 NRC Investigation Report 2-2023-003 and NOV - NRC Inspection Report 05000321/2024091 and 05000366/2024091 IR 05000321/20240052024-08-26026 August 2024 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 and 2 - Report 05000321/2024005 and 05000366/2024005 NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information IR 05000321/20240022024-08-0808 August 2024 Edwin I Hatch Nuclear Plants, Units 1 and 2 – Integrated Inspection Report 05000321-2024002 and 05000366-2024002 NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 ML24198A1252024-07-16016 July 2024 Edwin I Hatch Nuclear Plant Units 1 - 2 Notification of Conduct of Title 10 of the Code of Federal Regulations 50 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 ML24163A0532024-06-14014 June 2024 Audit Plan - Alternative Seismic Method LAR NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24149A0492024-06-0404 June 2024 SNC Fleet - Regulatory Audit in Support of Review of the License Amendment Request to Revise TS 1.1, Use and Application Definitions, and Add New Technical Specification 5.5.21 and 5.5.17, Online Monitoring Program, NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations IR 05000321/20240902024-05-15015 May 2024 NRC Inspection Report 05000321-2024090 and 05000366-2024090, Investigation Report 2-2023-003; and Apparent Violation NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 05000321/LER-2024-002, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 IR 05000032/20240112024-04-25025 April 2024 Notification of Edwin I. Hatch Nuclear Plant - Comprehensive Engineering Team Inspection (CETI) Baseline Inspection Report 0500032/2024011 and 05000366/2024011 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications IR 05000321/20240012024-04-22022 April 2024 Integrated Inspection Report 05000321/2024001 and 05000366/2024001 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint 05000321/LER-2024-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML24069A0012024-03-0909 March 2024 – Correction of Amendment No. 266 Regarding License Amendment Request Regarding Relocation of Specific Surveillance Frequencies to a Licensee-Controlled Program (TSTF-425, Revision 3) NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission ML24047A0362024-03-0404 March 2024 Response to Hatch and Vogtle FOF Dates Change Request (2025) NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 IR 05000321/20230062024-02-28028 February 2024 Annual Assessment Letter Edwin I. Hatch Nuclear Plant Units 1 and 2 - Nrc Inspection Report 05000321/2023006 and 05000366/2023006 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report 2024-09-09
[Table view] |
Text
Lewis Sumner Southern Nuclear Vice President Operating Company, Inc.
Hatch Project Support 40 Inverness Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7279 Fax 205 992 0341 O SOUTHERNNM COMPANY Energy to Serve Your Wo rld November 1, 2002 Docket Nos. 50-321 HL-6317 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-1 1 Ladies and Gentlemen:
ISI Relief Request RR- 11 was submitted for NRC review in the initial Third 10-Year Interval ISI Program dated October 17, 1995. Subsequently, RR-1 1 was approved in a Safety Evaluation Report (SER) dated June 16, 1997. Relief Request RR-1 1 proposes an alternative to the ASME Section XI certification requirements for personnel performing snubber visual examinations.
Southern Nuclear Operating Company (SNC) proposed that snubber visual examinations be performed by non-ASME XI certified maintenance personnel with specialized snubber training.
Changes within the nuclear industry have resulted in changes to the basis for relief contained in the original relief request. Some vendors previously relied upon to provide personnel training no longer provide such services. Therefore, SNC has been required to develop internal training modules to ensure that the quality of the training program does not diminish. These changes have resulted in more distinction for the training provided to maintenance personnel involved with snubber examinations and functional testing. The previous training program did not distinguish between personnel qualified to examine and those qualified to perform functional testing. The current program provides training for removal, installation, examination, repair, and overhaul of snubbers for selected maintenance personnel involved with the snubber program.
However, only a limited number of these personnel are provided additional training for operation of the snubber functional testing equipment.
The personnel performing visual examinations still receive significantly more training directly related to snubbers than ASME Section XI requires for certification. Therefore, the quality of the examinations performed by trained maintenance personnel is equivalent or better than examinations performed by ASME Section XI certified individuals with only the normal training and experience. Additional training related to operation of the snubber test equipment does not add any additional benefit for personnel performing as-found visual examinations. Therefore, the distinction in training for these maintenance personnel does not affect the quality of the visual examinations.
U.S. Nuclear Regulatory Commission Page 2 November 1, 2002 The changes incorporated in Relief Request RR-i 1 merely clarify that not all maintenance personnel who perform snubber visual examinations are also trained to operate the functional test equipment. Since the quality of the examinations being performed has not diminished, and the changes to RR-I 1 provide clarification only, SNC will continue with the existing process unless notified otherwise.
Should you have any questions in this regard, please contact this office.
Respectfully submitted, H. L. Sumner, Jr.
IFL/eb
Enclosure:
ISI Relief Request RR- 11 cc: Southern Nuclear Operating Company Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)
U.S. Nuclear Regulatory Commission, Washington, D.C.
Mr. Joseph Colaccino, Project Manager - Hatch U.S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident Inspector - Hatch HL-6317
Enclosure Edwin I. Hatch Nuclear Plant Third 10-Year Interval Inservice Inspection Program, ISI Relief Request RR-1 1
SOUTHERN NUCLEAR OPERATING COMPANY PLANT HATCH, UNIT 1 & 2 THIRD 10-YEAR INTERVAL REQUEST FOR RELIEF NO. RR- 11 I. System/Component(s) for Which Relief is Requested: All ASME Class 1, 2, and 3 Snubbers included within the scope of the ISI Program.
II. Code Requirement: Section XI, IWF-5300 (a) and (c) require that visual examinations of snubbers and non-integral attachments (including lugs (non-integral), bolting, pins, and clamps) shall be examined by personnel certified to ASME Section XI VT-3 requirements.
III. Code Requirement from Which Relief is Requested: Relief is requested from using ASME Section XI qualified personnel to perform the Code-required visual examinations of snubbers and their associated non-integral attachments, including lugs, bolting, pins, and clamps.
IV. Basis for Relief: A selective group of Southern Nuclear Operating Company (SNC) Maintenance Department personnel receive special training for examination and/or testing of snubbers. This training includes specialized classes presented by various snubber vendors and contractors as well as internal training. The training includes identification of potential problems and deficient conditions relative to snubber operability. These classes include instructions in snubber repair and complete overhaul and some of these same maintenance personnel have been trained to operate the test equipment and perform snubber functional testing. This training also requires an annual eye examination equivalent to ASME Section XI, paragraph IWA-2321. These maintenance personnel have been far more involved and have accumulated many more hours of experience in activities associated with the removal, installation, examination, repair, overhaul, and testing of snubbers than a typical ASME Section XI VT-3 certified inspector.
The qualification of personnel will be in accordance with the SNC Quality Assurance Program for training and qualification of plant personnel. The subject maintenance personnel will have all such training documented to the training program requirements.
These IWF activities will be documented in the Site Snubber Program. Additionally, the SNC snubber examination procedures require that all examination data sheets be reviewed by the site snubber engineer for concurrence and resolution of any reported conditions.
(This Relief Request does not address the IWB, IWC, or IWD examinations which will be performed in accordance with Sub article IWA-2300, Qualifications of Nondestructive Examination Personnel.)
V. Alternate Examinations: Maintenance personnel who have been trained to recognize potential problems and deficient conditions specifically applicable to snubbers will be utilized to perform the snubber visual examinations required by IWF-5300 (a) and (c) and Table IWF-2500-1 (excluding welded attachments).
RR-1l Page 1 of 2
VI. Justification for the Granting of Relief: Utilization of SNC maintenance personnel who have been specifically trained to inspect, test, repair and overhaul snubber supports and who perform the examinations in conjunction with the Site Snubber Program will:
"* eliminate a redundant inspection by VT-3 certified personnel, thus reducing man-power requirements, costs, and radiation exposure,
"* provide examination by personnel with extensive experience in snubber applications and maintenance, and
"* meet all aspects of IWF, other than the certification of inspection personnel.
These examinations of snubbers and the non-integral attachments will provide reasonable assurance that unallowable inservice flaws have not developed or that they will be detected and repaired prior to return of the reactor vessel to service. Thus an acceptable level of quality and safety will have been achieved and public health and safety will not be endangered by allowing the proposed alternative qualification of inspection personnel.
VII. Implementation Schedule: The subject examinations will be performed during the Third 10-Year Interval.
VIII. Relief Request Status: Relief initially granted in June 16, 1997 SER. SNC has revised and resubmitted RR-1 1 for NRC review.
RR-11 Page 2 of 2