MONTHYEARNL-22-0365, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R302022-05-31031 May 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R30 NL-21-0905, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R292022-01-26026 January 2022 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 1R29 NL-19-1491, Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2019-12-0909 December 2019 Update to the Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-19-0726, Inservice Inspection Program Owner'S Activity Report for Outage 2R252019-06-17017 June 2019 Inservice Inspection Program Owner'S Activity Report for Outage 2R25 NL-19-0317, Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update2019-04-0202 April 2019 Submittal of Fifth Ten-Year Interval Lnservice Testing Program Update NL-17-1194, Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-242017-07-10010 July 2017 Submittal of Response to Request for Information Fourth Interval Relief Requests RR-13, RR-14, RR-18, RR19, RR-23, and RR-24 NL-17-0951, Inservice Inspection Program, Owner'S Activity Report for Outage 2R242017-05-30030 May 2017 Inservice Inspection Program, Owner'S Activity Report for Outage 2R24 NL-16-2707, Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707)2016-12-27027 December 2016 Units 1 and 2; Fourth 10-year Interval In-service Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements (NL-16-2707) ND-16-1437, Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval2016-08-24024 August 2016 Snubber Program Plan for the Fifth Ten-Year Inservice Testing Interval NL-16-0795, Inservice Inspection Program - Owner'S Activity Report for Outage IR272016-06-0101 June 2016 Inservice Inspection Program - Owner'S Activity Report for Outage IR27 NL-16-0421, Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27)2016-03-17017 March 2016 Full Structural Weld Overlays on Reactor Recirculation and Residual Heat Removal Systems, Nondestructive Examination Results - Spring 2016 Outage (1R27) NL-15-1096, Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-06-18018 June 2015 Provides Follow-up Letter Regarding Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-15-1032, E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R232015-06-12012 June 2015 E. I. Hatch, Unit 2 - Inservice Inspection Program Owner'S Activity Report for Outage 2R23 NL-15-0784, Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval2015-05-0404 May 2015 Submittal of the Inservice Testing Program Relief Requests and Alternatives for Pumps and Valves - Fifth Ten-Year Interval NL-14-1821, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information2014-11-13013 November 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 - Supplemental Information NL-14-1276, Snubber Inspection Plan Submittal in Accordance with ASME OM Code2014-10-31031 October 2014 Snubber Inspection Plan Submittal in Accordance with ASME OM Code NL-14-1250, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.02014-09-19019 September 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 2.0 NL-14-0840, Lnservice Inspection Program Owner'S Activity Report for Outage 1R262014-06-0303 June 2014 Lnservice Inspection Program Owner'S Activity Report for Outage 1R26 NL-14-0231, Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.02014-03-0606 March 2014 Proposed Inservice Inspection Alternative HNP-ISI-ALT-HDPE-01, Version 1.0 NL-12-1266, Inservice Inspection Program, Owner'S Activity Report for Outage 1R252012-06-14014 June 2012 Inservice Inspection Program, Owner'S Activity Report for Outage 1R25 NL-10-0989, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests2010-07-0808 July 2010 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Requests NL-10-1023, Inservice Inspection Program, Owner'S Activity Report for Outage 1R242010-06-11011 June 2010 Inservice Inspection Program, Owner'S Activity Report for Outage 1R24 NL-08-1798, Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-012008-12-19019 December 2008 Fourth 10-Year Interval Lnservice Inspection Program Submittal of Relief Request RR-01 NL-08-0901, Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay2008-06-13013 June 2008 Unit 1, Inservice Inspection Program Owner'S Activity Report for Outage 1R23 and Structural Integrity Design Report for the N9 CRD Nozzle-to-Cap Full Structural Weld Overlay NL-07-0987, Fourth Interval Inspection (ISI) Plan Correction2007-05-0909 May 2007 Fourth Interval Inspection (ISI) Plan Correction NL-07-0802, Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests2007-04-13013 April 2007 Response to Request for Additional Information Regarding the Third 10-Year Interval Inservice Inspection (ISI) Relief Requests ML0704300942006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Examination Plan. ML0704301002006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 3, Revision 1.0, Class 1, 2 and 3 Figures Fourth Ten-Year Inservice Inspection Plan. ML0704300922006-11-20020 November 2006 E. I. Hatch, Unit 2, Volume 1, Revision 2, Introduction Fourth Ten-Year Examination Plan. ML0704301012006-08-10010 August 2006 E. I. Hatch, Unit 2, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-06-1358, Inservice Inspection Program, Owner'S Activity Report for Outage 1R222006-06-29029 June 2006 Inservice Inspection Program, Owner'S Activity Report for Outage 1R22 ML0704300812006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 1, Revision 1, Introduction Fourth Ten-Year Inservice Inspection Plan. ML0704300832006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 2, Revision 1, Class 1, 2 and 3 Components Fourth Ten-Year Inservice Inspection Plan. ML0704300872006-02-0606 February 2006 E. I. Hatch, Unit 1, Volume 3, Revision 1, Class 1, 2 and 3 Figures, Fourth Ten-Year Inservice Inspection Plan. ML0704300962005-08-31031 August 2005 E. I. Hatch, Unit 1, Version 1.0, Pressure Test Section Fourth Ten-Year Examination Plan. NL-05-1190, Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant2005-07-11011 July 2005 Fourth 10-Year Interval Inservice Testing (Ist)Program Updates Submittal for Edwin I. Hatch Nuclear Plant ML0516403852005-06-0707 June 2005 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0813, Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report2004-06-0707 June 2004 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report NL-04-0478, Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-402004-03-29029 March 2004 Third 10-Year Interval Inservice Inspection Program Submittal of Relief Requests (RR) RR-38, RR-39, and RR-40 NL-03-1380, Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-182003-07-11011 July 2003 Third 10-Year Interval Inservice Testing Program, Submittal of Relief Requests RR-V-18 ML0230903562002-11-0101 November 2002 Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-11 ML0228200262002-10-0404 October 2002 Third 10-Year Interval Inservice Inspection Program, Response to Request for Additional Information (RAI) ML0226604362002-09-17017 September 2002 Third 10-Year Interval Inservice Inspection Program Owner'S Activity Report 2022-05-31
[Table view] Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] |
Text
Lewis Sumner Southern Nuclear Vice President Operating Company, Inc.
Hatch Project Support 40 Inverness Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7279 Fax 205 992 0341 O SOUTHERNNM COMPANY Energy to Serve Your Wo rld November 1, 2002 Docket Nos. 50-321 HL-6317 50-366 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Edwin I. Hatch Nuclear Plant Third 10-Year Interval Inservice Inspection (ISI) Program, Revision of Relief Request RR-1 1 Ladies and Gentlemen:
ISI Relief Request RR- 11 was submitted for NRC review in the initial Third 10-Year Interval ISI Program dated October 17, 1995. Subsequently, RR-1 1 was approved in a Safety Evaluation Report (SER) dated June 16, 1997. Relief Request RR-1 1 proposes an alternative to the ASME Section XI certification requirements for personnel performing snubber visual examinations.
Southern Nuclear Operating Company (SNC) proposed that snubber visual examinations be performed by non-ASME XI certified maintenance personnel with specialized snubber training.
Changes within the nuclear industry have resulted in changes to the basis for relief contained in the original relief request. Some vendors previously relied upon to provide personnel training no longer provide such services. Therefore, SNC has been required to develop internal training modules to ensure that the quality of the training program does not diminish. These changes have resulted in more distinction for the training provided to maintenance personnel involved with snubber examinations and functional testing. The previous training program did not distinguish between personnel qualified to examine and those qualified to perform functional testing. The current program provides training for removal, installation, examination, repair, and overhaul of snubbers for selected maintenance personnel involved with the snubber program.
However, only a limited number of these personnel are provided additional training for operation of the snubber functional testing equipment.
The personnel performing visual examinations still receive significantly more training directly related to snubbers than ASME Section XI requires for certification. Therefore, the quality of the examinations performed by trained maintenance personnel is equivalent or better than examinations performed by ASME Section XI certified individuals with only the normal training and experience. Additional training related to operation of the snubber test equipment does not add any additional benefit for personnel performing as-found visual examinations. Therefore, the distinction in training for these maintenance personnel does not affect the quality of the visual examinations.
U.S. Nuclear Regulatory Commission Page 2 November 1, 2002 The changes incorporated in Relief Request RR-i 1 merely clarify that not all maintenance personnel who perform snubber visual examinations are also trained to operate the functional test equipment. Since the quality of the examinations being performed has not diminished, and the changes to RR-I 1 provide clarification only, SNC will continue with the existing process unless notified otherwise.
Should you have any questions in this regard, please contact this office.
Respectfully submitted, H. L. Sumner, Jr.
IFL/eb
Enclosure:
ISI Relief Request RR- 11 cc: Southern Nuclear Operating Company Mr. P. H. Wells, Nuclear Plant General Manager SNC Document Management (R-Type A02.001)
U.S. Nuclear Regulatory Commission, Washington, D.C.
Mr. Joseph Colaccino, Project Manager - Hatch U.S. Nuclear Regulatory Commission, Region II Mr. L. A. Reyes, Regional Administrator Mr. J. T. Munday, Senior Resident Inspector - Hatch HL-6317
Enclosure Edwin I. Hatch Nuclear Plant Third 10-Year Interval Inservice Inspection Program, ISI Relief Request RR-1 1
SOUTHERN NUCLEAR OPERATING COMPANY PLANT HATCH, UNIT 1 & 2 THIRD 10-YEAR INTERVAL REQUEST FOR RELIEF NO. RR- 11 I. System/Component(s) for Which Relief is Requested: All ASME Class 1, 2, and 3 Snubbers included within the scope of the ISI Program.
II. Code Requirement: Section XI, IWF-5300 (a) and (c) require that visual examinations of snubbers and non-integral attachments (including lugs (non-integral), bolting, pins, and clamps) shall be examined by personnel certified to ASME Section XI VT-3 requirements.
III. Code Requirement from Which Relief is Requested: Relief is requested from using ASME Section XI qualified personnel to perform the Code-required visual examinations of snubbers and their associated non-integral attachments, including lugs, bolting, pins, and clamps.
IV. Basis for Relief: A selective group of Southern Nuclear Operating Company (SNC) Maintenance Department personnel receive special training for examination and/or testing of snubbers. This training includes specialized classes presented by various snubber vendors and contractors as well as internal training. The training includes identification of potential problems and deficient conditions relative to snubber operability. These classes include instructions in snubber repair and complete overhaul and some of these same maintenance personnel have been trained to operate the test equipment and perform snubber functional testing. This training also requires an annual eye examination equivalent to ASME Section XI, paragraph IWA-2321. These maintenance personnel have been far more involved and have accumulated many more hours of experience in activities associated with the removal, installation, examination, repair, overhaul, and testing of snubbers than a typical ASME Section XI VT-3 certified inspector.
The qualification of personnel will be in accordance with the SNC Quality Assurance Program for training and qualification of plant personnel. The subject maintenance personnel will have all such training documented to the training program requirements.
These IWF activities will be documented in the Site Snubber Program. Additionally, the SNC snubber examination procedures require that all examination data sheets be reviewed by the site snubber engineer for concurrence and resolution of any reported conditions.
(This Relief Request does not address the IWB, IWC, or IWD examinations which will be performed in accordance with Sub article IWA-2300, Qualifications of Nondestructive Examination Personnel.)
V. Alternate Examinations: Maintenance personnel who have been trained to recognize potential problems and deficient conditions specifically applicable to snubbers will be utilized to perform the snubber visual examinations required by IWF-5300 (a) and (c) and Table IWF-2500-1 (excluding welded attachments).
RR-1l Page 1 of 2
VI. Justification for the Granting of Relief: Utilization of SNC maintenance personnel who have been specifically trained to inspect, test, repair and overhaul snubber supports and who perform the examinations in conjunction with the Site Snubber Program will:
"* eliminate a redundant inspection by VT-3 certified personnel, thus reducing man-power requirements, costs, and radiation exposure,
"* provide examination by personnel with extensive experience in snubber applications and maintenance, and
"* meet all aspects of IWF, other than the certification of inspection personnel.
These examinations of snubbers and the non-integral attachments will provide reasonable assurance that unallowable inservice flaws have not developed or that they will be detected and repaired prior to return of the reactor vessel to service. Thus an acceptable level of quality and safety will have been achieved and public health and safety will not be endangered by allowing the proposed alternative qualification of inspection personnel.
VII. Implementation Schedule: The subject examinations will be performed during the Third 10-Year Interval.
VIII. Relief Request Status: Relief initially granted in June 16, 1997 SER. SNC has revised and resubmitted RR-1 1 for NRC review.
RR-11 Page 2 of 2