| ==Dear Sir:== | | ==Dear Sir:== |
|
| |
|
| SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT 93-006-00 This Licensee Event Report is being submitted pursuant to the requirements of the Code of Federal Regulations lOCFR 50.73(a) (2) (i) (A). This report is required to be issued within thirty (30) days of event discovery. | | SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT 93-006-00 This Licensee Event Report is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR 50.73(a) (2) (i) (A). This report is required to be issued within thirty (30) days of event discovery. |
| Sincerely yours, | | Sincerely yours, |
| .ri/ot?o-4-r | | .ri/ot?o-4-r |
Line 117: |
Line 117: |
| * deenergized lF and lG 4KV group buses. The bus design does not result in loss of Unit 2 RCPs since the Unit 2 Auxiliary Power Transformer was in service. | | * deenergized lF and lG 4KV group buses. The bus design does not result in loss of Unit 2 RCPs since the Unit 2 Auxiliary Power Transformer was in service. |
| Per ACTION: of Unit 1 Technical Specification (TS) 3.4 .. 1.1 the unit was shutdown to MODE 3 due to loss of 13 and 14 Reactor Coolant Pumps. With the loss of 2 SPT "ACTION: "a" of Technical Specification (TS) 3.8.1.1 was entered for both units. | | Per ACTION: of Unit 1 Technical Specification (TS) 3.4 .. 1.1 the unit was shutdown to MODE 3 due to loss of 13 and 14 Reactor Coolant Pumps. With the loss of 2 SPT "ACTION: "a" of Technical Specification (TS) 3.8.1.1 was entered for both units. |
| At. 1430 hours (sam~ day) a one-hour notification to the Nuclear Regulatory Commission was made, in accordance with lOCFR 50.72(b) (1) (i) (A), to report the Unit 1 shutdown to MODE 3. | | At. 1430 hours (sam~ day) a one-hour notification to the Nuclear Regulatory Commission was made, in accordance with 10CFR 50.72(b) (1) (i) (A), to report the Unit 1 shutdown to MODE 3. |
| TS 3.4.1.1 and required action states: | | TS 3.4.1.1 and required action states: |
|
| |
|
Line 142: |
Line 142: |
| At approximately 1230 hours on February 21, 1993, the NEO racked-in the Unit 3 generator output breaker, 3TG, ABB Type HK. During breaker rack-in, the SE did not hear the breaker charging springs charge. The NSS observed that the breaker springs were already charged and directed the NEO to rack-out the breaker. This was done to determine why the springs were charged before the breaker was racked-in. The NEO could not rack-out the breaker. The Electrical Maintenance Supervisor (EMS) inspected the breaker ~nd concluded that the breaker charging springs could be discharged to allow rack-out of the breaker by closing the breaker. With .the NSS present, the EMS directed the NEO to close the breaker. At 1332 hours (same day), the NEO closed the breaker initiating the event. | | At approximately 1230 hours on February 21, 1993, the NEO racked-in the Unit 3 generator output breaker, 3TG, ABB Type HK. During breaker rack-in, the SE did not hear the breaker charging springs charge. The NSS observed that the breaker springs were already charged and directed the NEO to rack-out the breaker. This was done to determine why the springs were charged before the breaker was racked-in. The NEO could not rack-out the breaker. The Electrical Maintenance Supervisor (EMS) inspected the breaker ~nd concluded that the breaker charging springs could be discharged to allow rack-out of the breaker by closing the breaker. With .the NSS present, the EMS directed the NEO to close the breaker. At 1332 hours (same day), the NEO closed the breaker initiating the event. |
| ANALYSIS OF OCCURRENCE: | | ANALYSIS OF OCCURRENCE: |
| This event did not affect the health and safety of the public. It is reportable per lOCFR 50.73(a) (2) (i)(A), due to the required shutdown of Unit 1 per TS 3.4.1.1, *following loss of 13 and 14 RCPs. | | This event did not affect the health and safety of the public. It is reportable per 10CFR 50.73(a) (2) (i)(A), due to the required shutdown of Unit 1 per TS 3.4.1.1, *following loss of 13 and 14 RCPs. |
| This event was initiated by closure of the 3TG breaker without the Gas *Turbine Genera.tor running. This caused relays 8 6GBF (breaker failure multi-trip relay), 86GER (generator electric multi-trip relay), and 86Gl (generator regulator multi-trip relay) to actuate. | | This event was initiated by closure of the 3TG breaker without the Gas *Turbine Genera.tor running. This caused relays 8 6GBF (breaker failure multi-trip relay), 86GER (generator electric multi-trip relay), and 86Gl (generator regulator multi-trip relay) to actuate. |
| Actuation of 86GBF relay caused the 3.TG breaker to trip open. Per design, the aforementioned breakers of 13KV bus section 4 and 5DOKV bus section 1 received open trip signais. | | Actuation of 86GBF relay caused the 3.TG breaker to trip open. Per design, the aforementioned breakers of 13KV bus section 4 and 5DOKV bus section 1 received open trip signais. |
Similar Documents at Salem |
---|
Category:LICENSEE EVENT REPORT (SEE ALSO AO
MONTHYEARML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0081998-12-24024 December 1998 LER 97-001-01:on 970215,failure to Perform TS Surveillance of Component Cooling Water Sys Check Valves Occurred.Caused by Inadequate Communication Between EOP Group & IST Reviewers.Procedure Revised.With 981224 Ltr ML18106B0021998-12-17017 December 1998 LER 98-015-01:on 980924,improper Installation of Test Equipment to RPS Occurred.Caused by Inadequate 10CFR50.59 Applicability Reviews During Past Revs.Revised Procedures. with 981217 Ltr ML18106A9551998-11-0303 November 1998 LER 96-013-01:on 960711,concluded That Current Gain & Bias Settings Had Rendered Overtemperature Delta Temp Protection Channels Inoperable.Caused by Scaling Error.Licensee Will Revise Scaling Calculations.With 981105 Ltr ML18106A9451998-10-30030 October 1998 LER 97-004-01:on 970408,failure to Comply with TS Action Statement,Dg Start & Inadequate Surveillance Testing,Was Noted.Caused by Inadequate Tracking of Inoperable Equipment. Discussed Event & Lessons Learned.With 981022 Ltr ML18106A9491998-10-22022 October 1998 LER 98-015-00:on 980924,identified Improper Installation of Test Equipment to Rps.Cause Indeterminate.Procedures for Installation of Test Equipment for Collection of State Point Data Were Placed on Administrative Hold.With 981022 Ltr ML18106A9301998-10-21021 October 1998 LER 98-014-00:on 980725,noted Improper Calibr of Liquid Radwaste Effluent Line Radiation Monitor.Caused by Inattention to Detail by Maint Personnel.Channel Calibr Was Successfully Performed on 1R18 on 980821.With 981019 Ltr ML18106A9071998-10-0101 October 1998 LER 98-014-00:on 980918,discovered That Fire Barrier Matl for HVAC Ducts Does Not Meet Required Level of Fire Resistance.Cause Indeterminate.Established Appropriate Compensatory Actions for Fire Barriers.With 981001 Ltr ML18106A8951998-09-28028 September 1998 LER 98-012-01:on 980725,noted That Afs Was Operated with Less than Required Number of Operable AFW Pumps.Caused by Improper Procedure Implementation.Runout Protection Pressure Device for 22 AFW Pumps Was Returned to Svc.With 980928 Ltr ML18106A8821998-09-21021 September 1998 LER 98-013-00:on 980820,noted Surveillance of Containment Penetration Overcurrent Protection Devices Missed.Caused by Human Error.Satisfactorily Tested Apprpriate Breakers & Disciplined Involved Personnel.With 980921 Ltr ML18106A8791998-09-16016 September 1998 LER 96-006-01:on 960717,determined That non-radioactive Liquid Basin Radwaste Monitor Inoperable During Low Head Conditions.Caused by Inadequate Design Change Package.Design Change 1EC3663-01 Has Been Installed.With 980916 Ltr ML18106A8801998-09-0808 September 1998 LER 98-013-00:on 980806,operation with TS Required Equipment OOS Was Noted.Caused by Human Error.Reviewed Processes & Practices Re Safety Sys Status Control,Procedure Rev & Extra Training.With 980908 Ltr ML18106A8531998-08-27027 August 1998 LER 98-007-00:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Cause of Event Has Not Yet Been Determined.Assembled Root Cause Team & Replaced Affected tubing.W/980827 Ltr ML18106A8521998-08-27027 August 1998 LER 98-011-00:on 980803,ESFA During a 4KV Automatic Transfer Test Was Noted.Caused by Premature Release of Control Console Pushbutton Due to Inadequate Procedural Step.Revised procedure.W/980827 Ltr ML18106A8421998-08-24024 August 1998 LER 98-012-00:on 980725,discovered That Plant Had Operated in Modes 1 & 2 w/twenty-two AFW Pumps Inoperable.Caused by Failure to Restore Pump Runout Protection Pressure Device to Svc.Returned Subject Device to svc.W/980824 Ltr ML18106A8431998-08-24024 August 1998 LER 98-009-00:on 980810,failure to Post Continuous Firewatch as Required by Fire Protection Plan Noted.Caused by Failure to Recognize Concurrent Conditions.Continuous Firewatch Was Posted Immediately & Repaired Smoke detectors.W/980824 Ltr ML18106A8141998-08-13013 August 1998 LER 98-010-00:on 980714,determined That Leakage from Boron Injection Tank Exceeded Max Allowable ECCS Leakage from Sources Outside Containment.Caused by Leaking 2SJ404 Manual Sample valve.2SJ404 Valve repaired.W/980813 Ltr ML18106A8201998-08-13013 August 1998 LER 98-012-00:on 980715,potential to Exceed Rating of Piping Due to Isolation of Overpressure Protection Line Was Noted. Caused by Inadequate Procedural Guidance.Appropriate Operations Dept Procedures Have Been revised.W/980813 Ltr ML18106A6931998-06-29029 June 1998 LER 98-003-00:on 980122,inappropriate Plugging of Tubes R9C60 & R10C60 in Salem Unit 2 Sg,Was Performed.Caused by Failure of Qualification,Verification & Validation Process. Tubes Reviewed to Verify No Others Inappropriately Plugged ML18106A6471998-06-0404 June 1998 LER 98-011-00:on 980505,improper Isolation of Single Cell Battery Charger from 125 Vdc Battery Was Noted.Caused by Inadequate 10CFR50.59 Applicability Review.Placed Procedure SC.MD-CM.ZZ-0024(Q) on Administrative hold.W/980604 Ltr ML18106A6421998-06-0101 June 1998 LER 98-010-00:on 931019,reactor Pressure Vessel Insp Plugs Were Out of Configuration,Was Noted.Caused by Personnel Error.Proper Configuration Was Restored Shortly After Discovery Prior to Entering Mode 2.W/980601 Ltr ML18106A6431998-05-29029 May 1998 LER 98-006-01:on 980227,determined Incorrect Scaling Error of First Stage Pressure Transmitter Existed.Caused by Human Error.Revised Setpoint Calculation SC-MS002-01 & Revised Associated Instrument Calibr Database info.W/980529 Ltr ML18106A6141998-05-18018 May 1998 LER 98-008-00:on 970814,failure to Test 21 & 22 AF 40 Valves in Closed Direction as Required by TS 4.0.5 Was Noted.Caused by Inadequate Design Mod Process.Motor Driven 21/22 AF 40 Valves Were Tested IAW Revised procedure.W/980518 Ltr ML18106A5901998-05-0101 May 1998 LER 98-009-00:on 980405,epoxy Missing from Terminals of H Analyzer Was Noted.Caused by Inadequate Development of Procedure.H Analyzers Were Repaired & Review of Other Safety Related Equipment in Containment Was performed.W/980501 Ltr ML18106A5611998-04-20020 April 1998 LER 98-008-00:on 980323,inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.Caused by less-than-adequate Work Practices During Replacement of Equalizing Valve.Salem Unit 2 Airlocks Were Inspected ML18106A6061998-04-0101 April 1998 Corrected LER 98-004-00:on 980302,failure to Comply W/Tss 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Have Been Taken to Correctly Document Safety Factors.Corrects Prior Similar Occurrences ML18106A4451998-04-0101 April 1998 LER 98-004-00:on 980302,failure to Perform TS 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Were Taken to Correctly Document Safety factors.W/980401 Ltr ML18106A4351998-03-30030 March 1998 LER 98-006-00:on 980227,incorrect Scaling of First Stage Turbine Impulse Pressure Transmitters Noted.Cause Indeterminate.Implemented Procedure Changes & re-scaled Affected Turbine Impulse Pressure transmitters.W/980330 Ltr ML18106A3961998-03-20020 March 1998 LER 98-005-00:on 980219,inoperability of Twelve EDG Fuel Oil Transfer Pump (FOTP) Noted.Caused by Installation of Incorrect Control Switch.Installed Correct off-auto-manual Switch & Verified Operability of Twelve FOTP.W/980320 Ltr ML18106A5781998-03-20020 March 1998 Corrected LER 98-005-00:on 980219,inoperability of 12 Fuel Oil Transfer Pump (Fotp),Noted.Caused by Installation of Incorrect Control Switch.Field Insp Performed to Verify Configuration of Switches for 11,21 & 22 FOTPs ML18106A4021998-03-20020 March 1998 LER 98-007-00:on 980218,failure to Establish Containment Integrity (Closure) Prior to Fuel Movement Was Noted.Caused by Failure to Identify & Include Condensate Pot Vent in Appropriate Valve Lineup.Valves identified.W/980320 Ltr ML18106A4031998-03-20020 March 1998 LER 98-006-00:on 980221,ESF Actuation of 11 & 12 Auxiliary Feedwater Pumps Occurred.Caused by Human Error.Operators Promptly Established Feedwater to All SG & Restored Proper Water levels.W/980320 Ltr 1999-08-26
[Table view] Category:RO)
MONTHYEARML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0081998-12-24024 December 1998 LER 97-001-01:on 970215,failure to Perform TS Surveillance of Component Cooling Water Sys Check Valves Occurred.Caused by Inadequate Communication Between EOP Group & IST Reviewers.Procedure Revised.With 981224 Ltr ML18106B0021998-12-17017 December 1998 LER 98-015-01:on 980924,improper Installation of Test Equipment to RPS Occurred.Caused by Inadequate 10CFR50.59 Applicability Reviews During Past Revs.Revised Procedures. with 981217 Ltr ML18106A9551998-11-0303 November 1998 LER 96-013-01:on 960711,concluded That Current Gain & Bias Settings Had Rendered Overtemperature Delta Temp Protection Channels Inoperable.Caused by Scaling Error.Licensee Will Revise Scaling Calculations.With 981105 Ltr ML18106A9451998-10-30030 October 1998 LER 97-004-01:on 970408,failure to Comply with TS Action Statement,Dg Start & Inadequate Surveillance Testing,Was Noted.Caused by Inadequate Tracking of Inoperable Equipment. Discussed Event & Lessons Learned.With 981022 Ltr ML18106A9491998-10-22022 October 1998 LER 98-015-00:on 980924,identified Improper Installation of Test Equipment to Rps.Cause Indeterminate.Procedures for Installation of Test Equipment for Collection of State Point Data Were Placed on Administrative Hold.With 981022 Ltr ML18106A9301998-10-21021 October 1998 LER 98-014-00:on 980725,noted Improper Calibr of Liquid Radwaste Effluent Line Radiation Monitor.Caused by Inattention to Detail by Maint Personnel.Channel Calibr Was Successfully Performed on 1R18 on 980821.With 981019 Ltr ML18106A9071998-10-0101 October 1998 LER 98-014-00:on 980918,discovered That Fire Barrier Matl for HVAC Ducts Does Not Meet Required Level of Fire Resistance.Cause Indeterminate.Established Appropriate Compensatory Actions for Fire Barriers.With 981001 Ltr ML18106A8951998-09-28028 September 1998 LER 98-012-01:on 980725,noted That Afs Was Operated with Less than Required Number of Operable AFW Pumps.Caused by Improper Procedure Implementation.Runout Protection Pressure Device for 22 AFW Pumps Was Returned to Svc.With 980928 Ltr ML18106A8821998-09-21021 September 1998 LER 98-013-00:on 980820,noted Surveillance of Containment Penetration Overcurrent Protection Devices Missed.Caused by Human Error.Satisfactorily Tested Apprpriate Breakers & Disciplined Involved Personnel.With 980921 Ltr ML18106A8791998-09-16016 September 1998 LER 96-006-01:on 960717,determined That non-radioactive Liquid Basin Radwaste Monitor Inoperable During Low Head Conditions.Caused by Inadequate Design Change Package.Design Change 1EC3663-01 Has Been Installed.With 980916 Ltr ML18106A8801998-09-0808 September 1998 LER 98-013-00:on 980806,operation with TS Required Equipment OOS Was Noted.Caused by Human Error.Reviewed Processes & Practices Re Safety Sys Status Control,Procedure Rev & Extra Training.With 980908 Ltr ML18106A8531998-08-27027 August 1998 LER 98-007-00:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Cause of Event Has Not Yet Been Determined.Assembled Root Cause Team & Replaced Affected tubing.W/980827 Ltr ML18106A8521998-08-27027 August 1998 LER 98-011-00:on 980803,ESFA During a 4KV Automatic Transfer Test Was Noted.Caused by Premature Release of Control Console Pushbutton Due to Inadequate Procedural Step.Revised procedure.W/980827 Ltr ML18106A8421998-08-24024 August 1998 LER 98-012-00:on 980725,discovered That Plant Had Operated in Modes 1 & 2 w/twenty-two AFW Pumps Inoperable.Caused by Failure to Restore Pump Runout Protection Pressure Device to Svc.Returned Subject Device to svc.W/980824 Ltr ML18106A8431998-08-24024 August 1998 LER 98-009-00:on 980810,failure to Post Continuous Firewatch as Required by Fire Protection Plan Noted.Caused by Failure to Recognize Concurrent Conditions.Continuous Firewatch Was Posted Immediately & Repaired Smoke detectors.W/980824 Ltr ML18106A8141998-08-13013 August 1998 LER 98-010-00:on 980714,determined That Leakage from Boron Injection Tank Exceeded Max Allowable ECCS Leakage from Sources Outside Containment.Caused by Leaking 2SJ404 Manual Sample valve.2SJ404 Valve repaired.W/980813 Ltr ML18106A8201998-08-13013 August 1998 LER 98-012-00:on 980715,potential to Exceed Rating of Piping Due to Isolation of Overpressure Protection Line Was Noted. Caused by Inadequate Procedural Guidance.Appropriate Operations Dept Procedures Have Been revised.W/980813 Ltr ML18106A6931998-06-29029 June 1998 LER 98-003-00:on 980122,inappropriate Plugging of Tubes R9C60 & R10C60 in Salem Unit 2 Sg,Was Performed.Caused by Failure of Qualification,Verification & Validation Process. Tubes Reviewed to Verify No Others Inappropriately Plugged ML18106A6471998-06-0404 June 1998 LER 98-011-00:on 980505,improper Isolation of Single Cell Battery Charger from 125 Vdc Battery Was Noted.Caused by Inadequate 10CFR50.59 Applicability Review.Placed Procedure SC.MD-CM.ZZ-0024(Q) on Administrative hold.W/980604 Ltr ML18106A6421998-06-0101 June 1998 LER 98-010-00:on 931019,reactor Pressure Vessel Insp Plugs Were Out of Configuration,Was Noted.Caused by Personnel Error.Proper Configuration Was Restored Shortly After Discovery Prior to Entering Mode 2.W/980601 Ltr ML18106A6431998-05-29029 May 1998 LER 98-006-01:on 980227,determined Incorrect Scaling Error of First Stage Pressure Transmitter Existed.Caused by Human Error.Revised Setpoint Calculation SC-MS002-01 & Revised Associated Instrument Calibr Database info.W/980529 Ltr ML18106A6141998-05-18018 May 1998 LER 98-008-00:on 970814,failure to Test 21 & 22 AF 40 Valves in Closed Direction as Required by TS 4.0.5 Was Noted.Caused by Inadequate Design Mod Process.Motor Driven 21/22 AF 40 Valves Were Tested IAW Revised procedure.W/980518 Ltr ML18106A5901998-05-0101 May 1998 LER 98-009-00:on 980405,epoxy Missing from Terminals of H Analyzer Was Noted.Caused by Inadequate Development of Procedure.H Analyzers Were Repaired & Review of Other Safety Related Equipment in Containment Was performed.W/980501 Ltr ML18106A5611998-04-20020 April 1998 LER 98-008-00:on 980323,inadequate Testing of Salem Unit 1 Containment Air Locks Resulted in Entering TS 3.0.3.Caused by less-than-adequate Work Practices During Replacement of Equalizing Valve.Salem Unit 2 Airlocks Were Inspected ML18106A6061998-04-0101 April 1998 Corrected LER 98-004-00:on 980302,failure to Comply W/Tss 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Have Been Taken to Correctly Document Safety Factors.Corrects Prior Similar Occurrences ML18106A4451998-04-0101 April 1998 LER 98-004-00:on 980302,failure to Perform TS 4.11.1.1.2 & 3.3.3.8 Was Noted.Caused by Organizational Deficiency.Steps Were Taken to Correctly Document Safety factors.W/980401 Ltr ML18106A4351998-03-30030 March 1998 LER 98-006-00:on 980227,incorrect Scaling of First Stage Turbine Impulse Pressure Transmitters Noted.Cause Indeterminate.Implemented Procedure Changes & re-scaled Affected Turbine Impulse Pressure transmitters.W/980330 Ltr ML18106A3961998-03-20020 March 1998 LER 98-005-00:on 980219,inoperability of Twelve EDG Fuel Oil Transfer Pump (FOTP) Noted.Caused by Installation of Incorrect Control Switch.Installed Correct off-auto-manual Switch & Verified Operability of Twelve FOTP.W/980320 Ltr ML18106A5781998-03-20020 March 1998 Corrected LER 98-005-00:on 980219,inoperability of 12 Fuel Oil Transfer Pump (Fotp),Noted.Caused by Installation of Incorrect Control Switch.Field Insp Performed to Verify Configuration of Switches for 11,21 & 22 FOTPs ML18106A4021998-03-20020 March 1998 LER 98-007-00:on 980218,failure to Establish Containment Integrity (Closure) Prior to Fuel Movement Was Noted.Caused by Failure to Identify & Include Condensate Pot Vent in Appropriate Valve Lineup.Valves identified.W/980320 Ltr ML18106A4031998-03-20020 March 1998 LER 98-006-00:on 980221,ESF Actuation of 11 & 12 Auxiliary Feedwater Pumps Occurred.Caused by Human Error.Operators Promptly Established Feedwater to All SG & Restored Proper Water levels.W/980320 Ltr 1999-08-26
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
{{#Wiki_filter:.e PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey. 08038 Salem Generating Station March 23, 1993 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir:
SALEM GENERATING STATION LICENSE NO. DPR-70 DOCKET NO. 50-272 UNIT NO. 1 LICENSEE EVENT REPORT 93-006-00 This Licensee Event Report is being submitted pursuant to the requirements of the Code of Federal Regulations 10CFR 50.73(a) (2) (i) (A). This report is required to be issued within thirty (30) days of event discovery.
Sincerely yours,
.ri/ot?o-4-r
~"c. A Vondra -
Salem Operations MJPJ:pc Distribution 260029 9303260150 930323
~DR . ADOCK 05000272 PDR The rc~wcr is in \\!ur hand::;.
95-2189 REV 7-92
NRC FORM 366 (6-89) .. U.S. NUCLEAR REGULATORY COMMISSION re APPROVED OMB NO. 3150-0104 EXPIRES: 4/30/92 ESTIMATED BURDEN PER RESPONSE TO COMPLY WTH *THIS INFORMATION COLLECTION REQUEST: .50.0 HRS. FORWARD LICENSEE EVENT REPORT (LERI COMMENTS REGARDING BURDEN ESTIMATE TO THE RECORDS AND REpORTS MANAGEMENT BRANCH (P-530). U.S. NUCLEAR REGULATORY COMMISSION. WASHINGTON. DC-20555. AND TO THE PAPERWORK REDUCTION PROJECT (3150-01041. OFFICE I
OF MANAGEMENT AND BUDGET. WASHINGTON. DC 20503.
FACILITY NAME' 111 DOCKET NUMBER 12) I PAGE 131 Salem Generating Station - Unit 1 o 15 I o Io I o 12 17 I' 21 , OF 0 15
.
TITLE (41 Tech Spec Required Shutdown Due to - Loss of One Off site Transmission Network.
EVENT DATE 151 LER NUMBER 16) REPORT DATE (71 OTHER FACILITIES INVOLVED IBI MONTH DAY YEAR YEAR )\ SEQUENTIAL NUMBER tt REVISION NUMBER MONTH DAY YEAR FACILITY NAMES
***salem Unit 2 DOCKET NUMBERISI 0 1510101013 1111 q2 211 9 3 9 j3
- o I o 16 - o Jo D I3 2 I 3 91 3 0 I 5 IO Io I o I I I THIS REPORT IS SUBMITTED PURSUANT TO THE R~QUIREMENTS OF 10 CFR §:(Check one or more of the following) (11)
OPERATING MODE (9) 2 20.402lbl 20.405(c) 60.73(oll2llivl 73.71(bl 1-- - *- 73.71 (cl POWER LEVEL (101 0 0 18
,___ 20.4051all1Hil 20.405(oi(1i(iil
~
60.38(ci111 50.36lcll21
-
60.731oll21M 50.73(o)(2l(vii)
-
1--
OTHER (S~cify in Abstract bslow and in T~xt, NRC Form
.;.;.;. ~
t:*:-
t:*:*; :-:*:***:*:;.;.;.;.;.
.;.;;.;.
20.406(al(1 II iii) x 50.73(*1 (21,lil
,____ 50.73(o)(2)(viiil(AI 366A)
~
I\ :*:*:*:*:*:*:*:*:::::.; :,::*:* .;.;;.;.
20.405(1111 llivl 50.73(1112l(iil 60.73(1) (21 (viii) (B)
<*:*:*
,.,.,. ({{:\\ .;.:
1-- ,____
,.,.,. .;.;::::,."::::::;:::: .;.; 20.4051*1 ii IM 50.73(11(2)(iij) 50.731111211*1 LICENSEE CONTACT FOR THIS LER (121 NAME TELEPHONE NUMBER AREA CODE M. J. Pastva, Jr. .- LER Coordiantor 6-1019 313191-12111517 COMPLETE ONE LINE FOR EACH COMPONENT FAILURE DESCRIBED IN THIS REPORT (131
.,.;.;.;. .,.,..... :*:* .;.;*,'; :*:-:::':'::: ,:;:::;;:: .;.;;.; ;:;. :*:* :*:*:*:*
*'.-'.*'.-'. :*:*:*:
MANUFAC* REPORTABLE *:-:;*;. *:*:*::::::;: MANUFAC- REPORTABLE*:*:-
CAUSE SYSTEM COMPONENT TUR ER TO NPRDS ) { ::;. ;.;:;:;:; *:*:-'.*'.*'.*'.* CAUSE SYSTEM COMPONENT TUR ER TO NPRDS .;.;. :*:*. *:*:;:;: ;.; . :*:-:*:
.;.;
;.;. :;:::::: *:*:* *:*: :*:-:*:*:
.;.;.,.,. :*:*:*:
;.;..*.
,',','"" ::::
;.;.'"" *: :-:*. /
- :::::::
*:*:*:*
.....;.;:.;.: ;.:**:*: :*:* ::: *:*::::
I I I I I I I I I I I I I I
;.;:-:*:*:*:***** :*:* .*:*: *:*: *:*:*:
I I I I I I I
',','"" .,.,;:::*:*
;.;.:-:*:
.... :.;.;.;.; ::.;
*;.;;.;*
'.*'.*
*;.;;.:**:-:
- .
I
I I I 1. I I
;.; .. ;.;
.*'.*
*:*::*:* :*:*:::: .;.;.;.; *:-::::::::
\?
SUPPLEMENTAL REPORT EXPECTED (141 MONTH DAY YEAR EXPECTED
~NO SUBMISSION I YES (If yes, complete ~XPECTED SUBMISSION DATE!
DATE 115)
I I I ABSTRACT (Lifnit to 1400 spaces, i.e., spproximsr8ty fiftetm singfe*spsce typewritten lines) 116)
At 1332 hours on 2/21/93, the 2 .Station Power Transformer (SPT), 12 SPT, and 22 SPT deenergi*zed due to tripping (openJ the Units* common 13KV ring bus section 4 breakers and 500KV section 1 breakers. This resulted from closing the site 13KV gas turbine/generator (Unit 3) output breaker (3TG) onto the energized 13kV ring.bus, while Unit 3 was not running. Unit 1 was in MODE 2 and Unit 2 was at 100% while troubleshooting the breaker during testing,of Unit 3. Unit 1 was shutdown to MODE 3; as per Technical Specification (TS) 3_.4.1.1, due to loss of 13 and 14 Reactor Coolant Pumps. TS 3.8.1.1 wa.s entered for both units due to loss of an
. independent off site AC power source to each unit
- The root cause of this event is personnel error. Due to inadequate communication between personnel involved with troubleshooting a problem with the breaker, it was closed. A contributing factor was insufficient knowledge of the breaker and the associated relay operation. Caution tags were hung on the 3TG breaker and its control switch. The importance of. communications and adhering to proper command and control has been reinforced. Lessons learned were discussed with station management and the involved personnel. The existing Lama co id at the 3TG breaker cubicle will be replaced with a different one to provide better information concerning racking-out the breaker. The 3TG breaker and the protective interlocks affected by operation of the breaker will be assessed for appropriate training and design enhancements.
NRC Form 36.6 (6-89)
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 93-006-00 2 of 5 PLANT AND SYSTEM IDENTIFICATION:
Westinghouse - Pressurized Water Reactor Energy Industry Identification System (EIIS) codes are identified in the text as {xx}
IDENTIFICATION OF OCCURRENCE:
Technical Specifications Required Shutdown Due To Loss Of one Offsite
- Transmission Network Event Date: 2/21/93 Report Date: 3/23/93 This report was initiated by Incident Report No. 93-154.
CONDITIONS PRIOR TO OCCURRENCE:
Unit 1: Mode 2 Reactor Power lE-8 amps Unit Load -o- MWe Unit 2 :. Mode 1 Reactor Power 106% Unit Load 1170 MWe DESCRIPTION OF OCCURRENCE:
At 1332 hours on February 21, 1993, while troubleshooting the 13KV gas turbine/generator (Unit 3) generator output breaker 3TG, during testing of Unit 3, the 2 Station Power Transformer (SPT), 12 SPT, and 22 SPT deenergized. This resulted from tripping (open) the 13KV ring bus section 4 breakers (BS 3-4 and BS 4-5) and 500KV section 1 breakers (BS 1-5, BS 1-8, and BS 1-9), due to closing 3TG onto a live output bus. The loss of 2 SPT caused an automatic transfer of Unit 1 lA and lB 4kV Vital Buses to 11 SPT and Unit 2 2c 4kV Vital Bus to.
21 SPT. Unit 1 13 and 14 Reactor Coolant Pumps (RCPs) and 12B Circulating Water Pump tripped due to loss of 12 SPT, which
- deenergized lF and lG 4KV group buses. The bus design does not result in loss of Unit 2 RCPs since the Unit 2 Auxiliary Power Transformer was in service.
Per ACTION: of Unit 1 Technical Specification (TS) 3.4 .. 1.1 the unit was shutdown to MODE 3 due to loss of 13 and 14 Reactor Coolant Pumps. With the loss of 2 SPT "ACTION: "a" of Technical Specification (TS) 3.8.1.1 was entered for both units.
At. 1430 hours (sam~ day) a one-hour notification to the Nuclear Regulatory Commission was made, in accordance with 10CFR 50.72(b) (1) (i) (A), to report the Unit 1 shutdown to MODE 3.
TS 3.4.1.1 and required action states:
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem* Generating Station DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 93-006-00 3 of 5 DESCRIPTION OF OCCURRENCE: (cont'd)
"All reactor coolant loops shall be in operation.
. APPLICABILITY: MODES 1 AND 2*
ACTION:.
with less than the above required reactor coolant loops in operation, be in at lease.HOT STANDBY within 1 hour."
TS 3.8.1.1 and required action (both units) states:
"As a minimum, the following A.C. electrical power sources shall be OPERABLE:
- a. Two physically independent circuits between the offsite transmission network and the.onsite Class lE distribution system (vital bus system), and"
- b. Three separate and independent diesel generators with:
- 1. Separate day tanks containing a minimum volume of 130 gallons of fuel, and
- 2. A common fuel storage system consisting of two storage tanks, each containing a minimum volume of 20,000 gallons of fuel, and two fuel transfer pumps."
ACTION: a of TS 3.8.1.1 states:
"With either an offsitecircuit or diesel generator of the above required A.C. electrical pqwer sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a2 within one hour and at least once per 8 hours thereafter; restore at least two offsite circuits and three diesel generators to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours."
APPARENT CAUSE OF OCCURRENCE:
The root cause of this event personnel error. Personnel troubleshooting the 3TG breaker did not adequately communicate thereby leading to breaker closure which caused the subsequent event.
A contributing factor was insufficient knowledge of the breaker and relay operation on the part of the involved Nuclear Shift Supervisor (NSS), Nuclear Equipment Operator (NEO), Electrical Maintenance
. Supervisor (EMS), and the Unit 3 System Engineer (SE).
LICENSEE EVENT REPORT (LER) TEXT CONTINUATION Salem Generating Station 'DOCKET NUMBER LER NUMBER PAGE Unit 1 5000272 93-006-00 4 of 5 APPARENT CAUSE OF OCCURRENCE: (cont'd)
The following sequence of events lead to the decision to close the breaker:
At approximately 1230 hours on February 21, 1993, the NEO racked-in the Unit 3 generator output breaker, 3TG, ABB Type HK. During breaker rack-in, the SE did not hear the breaker charging springs charge. The NSS observed that the breaker springs were already charged and directed the NEO to rack-out the breaker. This was done to determine why the springs were charged before the breaker was racked-in. The NEO could not rack-out the breaker. The Electrical Maintenance Supervisor (EMS) inspected the breaker ~nd concluded that the breaker charging springs could be discharged to allow rack-out of the breaker by closing the breaker. With .the NSS present, the EMS directed the NEO to close the breaker. At 1332 hours (same day), the NEO closed the breaker initiating the event.
ANALYSIS OF OCCURRENCE:
This event did not affect the health and safety of the public. It is reportable per 10CFR 50.73(a) (2) (i)(A), due to the required shutdown of Unit 1 per TS 3.4.1.1, *following loss of 13 and 14 RCPs.
This event was initiated by closure of the 3TG breaker without the Gas *Turbine Genera.tor running. This caused relays 8 6GBF (breaker failure multi-trip relay), 86GER (generator electric multi-trip relay), and 86Gl (generator regulator multi-trip relay) to actuate.
Actuation of 86GBF relay caused the 3.TG breaker to trip open. Per design, the aforementioned breakers of 13KV bus section 4 and 5DOKV bus section 1 received open trip signais.
Prior to this event Unit 1 was critical (MODE 2), with power level at lE-8 amps. 11 sPr was supplying power to lH and lE 4kV group buses and lC 4kV vital bus. 12 SPT was supplying power to lF and lG 4kV group buses and lA and lB 4kV vital buses. The deenergization of 13kV bus section 4 caused power to be lost to 12 and 22 SPTs. lF and lG group buses, which supply power to 13 and 14 RCPs, respectively, deenergized. This caused the 4kV load breakers to the RCPs as well as to 12 Circulating Water Pump trip open on bus undervoltage. In addition, the Unit 1 lA and lB 4kV vital buses, and the Unit 2 2C 4kV vital buses successfully transferred to their respective alternate SPT.
The reduction in Reactor Coolant System (RCS) flow resulting from the loss *Of power to 13 and 14 RCPs did not challenge safety limits or limiting safety system setpoints. At reactor power levels below 10%
rated thermal power, no protection circuit exists (in accordance with plant design) to open the Reactor Trip Breakers during reduced forced flow conditions. At power levels below 10%, the heat removal capability due to RCS natural circulation is sufficient to ensure adequate margins to Departure from Nucleate Boiling.
LICENSEE EVENT REPORT (LE~) TEXT CONTINUATION Salem Generating Station DOCKET NUMBER LER NUMBER .PAGE Unit 1 5000272 93-006-00 5 of 5 ANALYSIS OF OCCURRENCE: (cont'd)
Loss of the SPT at main generator power levels greater than approximately 25% does not cause' loss of RCPs, since the 4kV buses are then normally supplied from the main generator via the Auxiliary Power Transformer.
During this event, the Unit 2 systems important to safety performed as per design. The associated vital bus instrumentation remained energized and the vital bus undervoltage protection transfer sche.me performed successfully.
CORRECTIVE ACTION:
Four (4) caution tags were hung on the 3TG breaker and its control switch.
a) One tag prohibits operation of the breaker in the TEST position without permission of the Unit 3 SE.*
b) One tag cautions against racking-in the breaker with the breaker charging springs charged.
c) Two tags, one on the breaker and the other on its control switch, prohibit closure of the breaker when the generator is not at normal speed, as it will actuate the breaker failure protection logic.
Appropriate disciplinary action has been taken with the involved personnel.
The importance of communications as set forth in the Work Standards Handbook is being reinforced with applicable station personnel.
Lessons learned from this event were discussed with station management and involved personnel.
The existing Lamacoid located at the 3TG breaker cubicle will be replaced with a new Lamacoid to provide better information to the operator concerning racking-out the breaker.
The 3TG breaker and the protective interlocks affected by operation of the breaker will be assessed for appropriate training and design enhancements.
17/ot?~or tf'cc-eneral Manager -
Salem Operations
.MJPJ:pc SORC Mtg. 93-025}}