ML14223A874: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSC vOC KET NUMBER (2-76) ... NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER TO: FROM:CAROLINA POWER & LIGHT CO DATEOFDOCUMENT MR N C MOSELEY RALEIGH, NC DATE RECEIVED E E UTLEY YLETTER O NOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED XORIGINAL UNCLASSIFIED  
{{#Wiki_filter:NRC FORM 195                                           U.S. NUCLEAR REGULATORY COMMISSC vOC             KET NUMBER (2-76)                                                                                                         ...
'1OOPY 39 e.t 0 es DESCRIPTION ENCLOSURE LTR TRANS THE FOLLOWING  
NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL                                         FILE NUMBER TO:                                             FROM:CAROLINA POWER & LIGHT CO                       DATEOFDOCUMENT MR N C MOSELEY                               RALEIGH, NC DATE RECEIVED E E UTLEY YLETTER                 O NOTORIZED           PROP                           INPUT FORM           NUMBER OF COPIES RECEIVED XORIGINAL             UNCLASSIFIED
.H. B. ROBINSON UNIT NO. 2 STARTUP T'EST REPORT cycle #4. ...DECEMBER 1975....
  '1OOPY                                                                                             39 e.t         0     es DESCRIPTION                                                           ENCLOSURE LTR TRANS THE FOLLOWING             .                             H. B. ROBINSON UNIT NO. 2 STARTUP T'EST REPORT cycle #4. ... DECEMBER 1975....
PLANT NAME: 1 SAFETY FOR ACTION/INFORMATION ENVIRO -Kk ASSIGNED AD *_ASSIGNED AD PROJECT MANAGER: PROJECT MANAGER LIC. ASST. : _ _ _ _ _LIC. ASST. INTERNAL DISTRIBUTION REG FIL Eh SYSTEMS SAFETY PLANT SYSTEMS FNVTRO TFH NRC HEINEMAN TEDESCO ERNST ISCHROEDER BENAROYA BALLARD OELD -LAINAS SPANGLER GOSSICK & STAFF ENGINEERING IPPOLITO aIpC MACCARY SITE TECH CASE KNIGHT OPERATING REACTORS GAMMILL HANAUER SIHWEIL I STELLO STEPP HARLESS PAWLICKI HUILMAN I OPERATINGTECH PROJECT MANAGEMENT REACTOR SAFETY EISENHUT VT SITE ANALYSIS BOYD ROSS SHAO VOLLMER P. COLLINS NOVAK BAER BUNCH HOUSTON ROSZTOCZY SCHWENCER 1 J. COLLINS PETERSON CHECK GRIMES KREGER MELTZ N HELTEMES AT & I SITE SAFETY & ENVIRC SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR____ 194\\% NATL LAB BROOKHAVEN NATL 1AB TIC REG. V-IE ULRIKSON(ORNL)
PLANT NAME:                       1 SAFETY                             FOR ACTION/INFORMATION                         ENVIRO       -Kk ASSIGNED AD *_ASSIGNED                                                               AD PROJECT MANAGER:                                                         PROJECT MANAGER LIC. ASST. :               _     _       _   _     _LIC.                     ASST.
NSIC LA PDR 'ASLB CONSULTANTS NRC FORM 195 (2-761 Carolina Power & Light Company March 15, 1976 g File: NG-3513 (R) Serial: NG-76-377 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Commission DOCKEUD, Region II, Suite 818 230 Peachtree Street, N.W. Atlanta, Georgia 30303  
INTERNAL DISTRIBUTION REG FIL Eh                     SYSTEMS SAFETY                       PLANT SYSTEMS                   FNVTRO TFH NRC                           HEINEMAN                             TEDESCO                         ERNST ISCHROEDER                                                         BENAROYA                       BALLARD OELD                                                         -     LAINAS                         SPANGLER GOSSICK & STAFF               ENGINEERING                           IPPOLITO aIpC                       MACCARY                                                               SITE TECH CASE                         KNIGHT                               OPERATING REACTORS             GAMMILL HANAUER                       SIHWEIL                           I STELLO                           STEPP HARLESS                       PAWLICKI                                                             HUILMAN I OPERATINGTECH PROJECT MANAGEMENT           REACTOR SAFETY                       EISENHUT       VT             SITE ANALYSIS BOYD                         ROSS                                 SHAO                           VOLLMER P. COLLINS                   NOVAK                                 BAER                           BUNCH HOUSTON                       ROSZTOCZY                             SCHWENCER                 1     J. COLLINS PETERSON                     CHECK                                 GRIMES                         KREGER MELTZ                                                     N HELTEMES                     AT &   I                             SITE     SAFETY & ENVIRC SKOVHOLT                     SALTZMAN                             ANALYSIS RUTBERG                               DENTON & MULLER EXTERNAL DISTRIBUTION                                                   CONTROL NUMBER LPDR____   194\\%             NATL LAB                             BROOKHAVEN NATL 1AB TIC                           REG. V-IE                         ULRIKSON(ORNL)
NSIC                         LA PDR
      'ASLB                         CONSULTANTS NRC FORM 195 (2-761
 
Carolina Power & Light Company March 15,     1976                   g File:   NG-3513 (R)                                     Serial:     NG-76-377 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Commission                                               DOCKEUD, Region II, Suite 818 230 Peachtree Street, N.W.
Atlanta, Georgia 30303


==Dear Mr. Moseley:==
==Dear Mr. Moseley:==
Mail Oa1 H. B. ROBINSON UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 CYCLE 4 STARTUP TEST REPORT As required by Paragraph 6.9.1.a of the Technical Specifications for the H. B. Robinson Unit No. 2 plant, the attached summary report of plant startup and power escalation for the beginning of Cycle 4 is submitted.
Mail Oa1 H. B. ROBINSON         UNIT NO. 2 DOCKET NO.     50-261 LICENSE NO.       DPR-23 CYCLE 4 STARTUP         TEST REPORT As required by Paragraph 6.9.1.a of the Technical Specifications for the H. B. Robinson Unit No. 2 plant, the attached summary report of plant startup and power escalation for the beginning of Cycle 4 is submitted.
This report is required due to the installation of fuel supplied by a different vendor (Exxon Nuclear Company, Inc.) than the vendor originally supplying fuel (Westinghouse Electric Corporation).
This report is required due to the installation of fuel supplied by a different vendor (Exxon Nuclear Company, Inc.) than the vendor originally supplying fuel (Westinghouse Electric Corporation). This report is submitted in accordance with the requirements of'Regulatory Guide 10.1 for startup reports.
This report is submitted in accordance with the requirements of'Regulatory Guide 10.1 for startup reports.
Yours ver       truly, E. E. Utley Vice President Bulk Power Supply DBW:jwk Attachment cc:   Messrs. J. G. Davis W. G. McDonald 336 Fayetteville Street
Yours ver truly, E. E. Utley Vice President Bulk Power Supply DBW:jwk Attachment cc: Messrs. J. G. Davis W. G. McDonald 336 Fayetteville Street
* P. 0. Box 1551
* P. 0. Box 1551
* Raleigh, N. C. 27602 2804}}
* Raleigh, N. C. 27602 2804}}

Latest revision as of 02:35, 4 November 2019

Cycle 4 Startup Test Report
ML14223A874
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 12/15/2014
From: Utley E
Carolina Power & Light Co
To: Moseley N
NRC/RGN-II
References
NG-3513 (R), NG-76-377 2804
Download: ML14223A874 (2)


Text

NRC FORM 195 U.S. NUCLEAR REGULATORY COMMISSC vOC KET NUMBER (2-76) ...

NRC DISTRIBUTION FoR PART 50 DOCKET MATERIAL FILE NUMBER TO: FROM:CAROLINA POWER & LIGHT CO DATEOFDOCUMENT MR N C MOSELEY RALEIGH, NC DATE RECEIVED E E UTLEY YLETTER O NOTORIZED PROP INPUT FORM NUMBER OF COPIES RECEIVED XORIGINAL UNCLASSIFIED

'1OOPY 39 e.t 0 es DESCRIPTION ENCLOSURE LTR TRANS THE FOLLOWING . H. B. ROBINSON UNIT NO. 2 STARTUP T'EST REPORT cycle #4. ... DECEMBER 1975....

PLANT NAME: 1 SAFETY FOR ACTION/INFORMATION ENVIRO -Kk ASSIGNED AD *_ASSIGNED AD PROJECT MANAGER: PROJECT MANAGER LIC. ASST. : _ _ _ _ _LIC. ASST.

INTERNAL DISTRIBUTION REG FIL Eh SYSTEMS SAFETY PLANT SYSTEMS FNVTRO TFH NRC HEINEMAN TEDESCO ERNST ISCHROEDER BENAROYA BALLARD OELD - LAINAS SPANGLER GOSSICK & STAFF ENGINEERING IPPOLITO aIpC MACCARY SITE TECH CASE KNIGHT OPERATING REACTORS GAMMILL HANAUER SIHWEIL I STELLO STEPP HARLESS PAWLICKI HUILMAN I OPERATINGTECH PROJECT MANAGEMENT REACTOR SAFETY EISENHUT VT SITE ANALYSIS BOYD ROSS SHAO VOLLMER P. COLLINS NOVAK BAER BUNCH HOUSTON ROSZTOCZY SCHWENCER 1 J. COLLINS PETERSON CHECK GRIMES KREGER MELTZ N HELTEMES AT & I SITE SAFETY & ENVIRC SKOVHOLT SALTZMAN ANALYSIS RUTBERG DENTON & MULLER EXTERNAL DISTRIBUTION CONTROL NUMBER LPDR____ 194\\% NATL LAB BROOKHAVEN NATL 1AB TIC REG. V-IE ULRIKSON(ORNL)

NSIC LA PDR

'ASLB CONSULTANTS NRC FORM 195 (2-761

Carolina Power & Light Company March 15, 1976 g File: NG-3513 (R) Serial: NG-76-377 Mr. Norman C. Moseley, Director U. S. Nuclear Regulatory Commission DOCKEUD, Region II, Suite 818 230 Peachtree Street, N.W.

Atlanta, Georgia 30303

Dear Mr. Moseley:

Mail Oa1 H. B. ROBINSON UNIT NO. 2 DOCKET NO. 50-261 LICENSE NO. DPR-23 CYCLE 4 STARTUP TEST REPORT As required by Paragraph 6.9.1.a of the Technical Specifications for the H. B. Robinson Unit No. 2 plant, the attached summary report of plant startup and power escalation for the beginning of Cycle 4 is submitted.

This report is required due to the installation of fuel supplied by a different vendor (Exxon Nuclear Company, Inc.) than the vendor originally supplying fuel (Westinghouse Electric Corporation). This report is submitted in accordance with the requirements of'Regulatory Guide 10.1 for startup reports.

Yours ver truly, E. E. Utley Vice President Bulk Power Supply DBW:jwk Attachment cc: Messrs. J. G. Davis W. G. McDonald 336 Fayetteville Street

  • P. 0. Box 1551
  • Raleigh, N. C. 27602 2804