{{#Wiki_filter:R. | {{#Wiki_filter:R. UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV | |||
1600 E LAMAR BLVD | |||
Rafael Flores, Senior Vice President | ARLINGTON, TX 76011-4511 | ||
October 30, 2014 | |||
Rafael Flores, Senior Vice President | |||
and Chief Nuclear Officer | |||
Attention: Regulatory Affairs | |||
Luminant Generation Company LLC | |||
Comanche Peak Nuclear Power Plant | |||
P.O. Box 1002 | |||
Glen Rose, TX 76043 | |||
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - | |||
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING | |||
EXAMINATION 05000445/2015302; 05000446/2015302 | |||
Dear Mr. Flores: | |||
In a telephone conversation on October 29, 2014, between Messrs. G. Struble, Licensing Exam | |||
Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of | |||
licensing examinations at Comanche Peak Nuclear Power Plant during the week of June 1, | |||
2015. | |||
As agreed during the telephone conversation, your staff will prepare the examinations based on | |||
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power | |||
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for | |||
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will | |||
discuss with your staff any changes that might be necessary before the examinations are | |||
administered. | |||
To meet the above schedule, it will be necessary for your staff to furnish the examination | |||
outlines by March 23, 2015. The written examinations, operating tests, and supporting | |||
reference materials identified in Attachment 3 to ES-201 will be due by April 20, 2015. Pursuant | |||
to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an | |||
authorized representative of the facility licensee shall approve the outlines, examinations, and | |||
tests before they are submitted to the NRC for review and approval. All materials shall be | |||
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or | |||
safeguards information in your response be contained in a separate enclosure and appropriately | |||
marked. Any delay in receiving the required examinations and reference materials, or the | |||
R. Flores -2- | |||
submittal of inadequate or incomplete materials, may cause the examinations to be | |||
rescheduled. In addition, your support for on-site validation of the examinations is required | |||
during the week of May 4, 2015. | |||
In order to conduct the requested written examinations and operating tests, it will be necessary | |||
for your staff to provide adequate space and accommodations in accordance with ES-402 and | |||
to make the simulation facility available on the dates noted above. In accordance with ES-302, | |||
your staff should retain the original simulator performance data (e.g., system pressures, | |||
temperatures, and levels) generated during the dynamic operating tests until the examination | |||
results are final. | |||
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in | |||
Nuclear | effect while the written examinations and operating tests are being administered. | ||
To permit timely NRC review and evaluation, your staff should submit preliminary operator and | |||
senior operator license applications (Office of Management and Budget (OMB) approval | |||
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver | |||
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first | |||
examination date. If the applications are not received at least 30 days before the examination | |||
date, a postponement may be necessary. Signed applications certifying that all training has | |||
been completed should be submitted at least 14 days before the first examination date. | |||
This letter contains information collections that are subject to the Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | |||
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for | |||
this collection of information is estimated to average 50 hours per response, including the time | |||
for reviewing instructions, gathering and maintaining the data needed, and completing and | |||
reviewing the collection of information. Send comments regarding this burden estimate or any | |||
other aspect of these information collections, including suggestions for reducing the burden, to | |||
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory | |||
Commission, Washington, DC 20555-0001, or by Internet electronic mail to | |||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be | |||
available electronically for public inspection in the NRCs Public Document Room or from the | |||
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access | |||
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room | |||
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html. | |||
R. Flores -3- | |||
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and | |||
guidelines referenced in this letter. If you have any questions regarding the NRCs examination | |||
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at | |||
817-200-1159. | |||
Sincerely, | |||
/RA/ | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Dockets: 50-445; 50-446 | |||
Licenses: NPF-87; NPF-89 | |||
cc: Electronic Distribution | |||
ML14304A383 | |||
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword: | |||
By: V. Gaddy Yes No Non-Publicly Available Sensitive RGN-002 | |||
OFFICE SOE:OB OE:OB | |||
NAME COsterholtz VGaddy | |||
SIGNATURE /RA/ /RA/ | |||
DATE 10/30/14 10/30/14 | |||
Letter to Rafael Flores from Vincent G. Gaddy, dated October 30, 2014 | |||
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - | |||
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING | |||
EXAMINATION 05000445/2015302; 05000446/2015302 | |||
Electronic distribution by RIV: | |||
Regional Administrator (Marc.Dapas@nrc.gov) | |||
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) | |||
Acting DRP Director (Troy.Pruett@nrc.gov) | |||
Acting DRP Deputy Director (Jason.Kozal@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) | |||
Senior Resident Inspector (John.Kramer@nrc.gov) | |||
Resident Inspector (Rayomand.Kumana@nrc.gov) | |||
Administrative Assistant (Rhonda.Smith@nrc.gov) | |||
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) | |||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) | |||
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) | |||
Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Stephen.Monarque@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) | |||
Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | |||
RIV/ETA: OEDO (John.Jandovitz@nrc.gov) | |||
EXAMINATION 05000445/2015302; 05000446/2015302 | |||
Electronic distribution by RIV | |||
Acting DRP Deputy Director (Jason.Kozal@nrc.gov) | |||
DRS Director (Anton.Vegel@nrc.gov) | |||
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) Resident Inspector (Rayomand.Kumana@nrc.gov) | |||
Administrative Assistant (Rhonda.Smith@nrc.gov) | |||
Branch Chief, DRP/A (Wayne.Walker@nrc.gov) | |||
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov) | |||
Public Affairs Officer (Lara.Uselding@nrc.gov) | |||
Project Manager (Stephen.Monarque@nrc.gov) | |||
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov) | |||
RITS Coordinator (Marisa.Herrera@nrc.gov) | |||
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov) | |||
Technical Support Assistant (Loretta.Williams@nrc.gov) | |||
Congressional Affairs Officer (Jenny.Weil@nrc.gov) | |||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (John.Jandovitz@nrc.gov) | |||
}} | }} |
Latest revision as of 19:58, 31 October 2019
ML14304A383 | |
Person / Time | |
---|---|
Site: | Comanche Peak |
Issue date: | 10/30/2014 |
From: | Vincent Gaddy Operations Branch IV |
To: | Flores R Luminant Generation Co |
References | |
IR 2015302 IR-2015302 | |
Download: ML14304A383 (5) | |
See also: IR 05000445/2015302
Text
R. UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E LAMAR BLVD
ARLINGTON, TX 76011-4511
October 30, 2014
Rafael Flores, Senior Vice President
and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000445/2015302; 05000446/2015302
Dear Mr. Flores:
In a telephone conversation on October 29, 2014, between Messrs. G. Struble, Licensing Exam
Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of
licensing examinations at Comanche Peak Nuclear Power Plant during the week of June 1,
2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by March 23, 2015. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by April 20, 2015. Pursuant
to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the
R. Flores -2-
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled. In addition, your support for on-site validation of the examinations is required
during the week of May 4, 2015.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402 and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
R. Flores -3-
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at
817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Dockets: 50-445; 50-446
cc: Electronic Distribution
SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:
By: V. Gaddy Yes No Non-Publicly Available Sensitive RGN-002
OFFICE SOE:OB OE:OB
NAME COsterholtz VGaddy
SIGNATURE /RA/ /RA/
DATE 10/30/14 10/30/14
Letter to Rafael Flores from Vincent G. Gaddy, dated October 30, 2014
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
EXAMINATION 05000445/2015302; 05000446/2015302
Electronic distribution by RIV:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Acting DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Jason.Kozal@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Rayomand.Kumana@nrc.gov)
Administrative Assistant (Rhonda.Smith@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Stephen.Monarque@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)