{{#Wiki_filter:R.   October 30, 2014  
{{#Wiki_filter:R.                                       UNITED STATES
 
                          NUCLEAR REGULATORY COMMISSION
                                              REGION IV
                                          1600 E LAMAR BLVD
Rafael Flores, Senior Vice President  
                                      ARLINGTON, TX 76011-4511
                                        October 30, 2014
Rafael Flores, Senior Vice President
  and Chief Nuclear Officer
Attention: Regulatory Affairs
Luminant Generation Company LLC
Comanche Peak Nuclear Power Plant
P.O. Box 1002
Glen Rose, TX 76043
SUBJECT:        COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
                EXAMINATION 05000445/2015302; 05000446/2015302
Dear Mr. Flores:
In a telephone conversation on October 29, 2014, between Messrs. G. Struble, Licensing Exam
Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of
licensing examinations at Comanche Peak Nuclear Power Plant during the week of June 1,
2015.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for
Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will
discuss with your staff any changes that might be necessary before the examinations are
administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by March 23, 2015. The written examinations, operating tests, and supporting
reference materials identified in Attachment 3 to ES-201 will be due by April 20, 2015. Pursuant
to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outlines, examinations, and
tests before they are submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations and reference materials, or the


  and Chief Nuclear Officer
R. Flores                                        -2-
Attention:  Regulatory Affairs Luminant Generation Company LLC
submittal of inadequate or incomplete materials, may cause the examinations to be
Comanche Peak Nuclear Power Plant
rescheduled. In addition, your support for on-site validation of the examinations is required
P.O. Box 1002
during the week of May 4, 2015.
Glen Rose, TX  76043
In order to conduct the requested written examinations and operating tests, it will be necessary
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
for your staff to provide adequate space and accommodations in accordance with ES-402 and
EXAMINATION 05000445/2015302; 05000446/2015302 
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
Dear Mr. Flores:
temperatures, and levels) generated during the dynamic operating tests until the examination
In a telephone conversation on October 29, 2014, between Messrs. G. Struble, Licensing Exam Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of
results are final.
licensing examinations at Comanche Peak Nuclear Power Plant during the week of June 1, 2015. As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for  
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
Nuclear Power Plant Operators," Revision 2, Supplement 1. The NRC's regional office will discuss with your staff any changes that might be necessary before the examinations are
effect while the written examinations and operating tests are being administered.
administered.  
To permit timely NRC review and evaluation, your staff should submit preliminary operator and
senior operator license applications (Office of Management and Budget (OMB) approval
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver
requests (if any) (OMB approval number 3150-0090) at least 30 days before the first
examination date. If the applications are not received at least 30 days before the examination
date, a postponement may be necessary. Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for
this collection of information is estimated to average 50 hours per response, including the time
for reviewing instructions, gathering and maintaining the data needed, and completing and
reviewing the collection of information. Send comments regarding this burden estimate or any
other aspect of these information collections, including suggestions for reducing the burden, to
the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Commission, Washington, DC 20555-0001, or by Internet electronic mail to
INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.


R. Flores                                        -3-
To meet the above schedule, it will be necessary for your staff to furnish the examination outlines by March 23, 2015.  The written examinations, operating tests, and supporting
Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and
reference materials identified in Attachment 3 to ES-201 will be due by April 20, 2015.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outlines, examinations, and tests before they are submitted to the NRC for review and approval. All materials shall be complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
safeguards information in your response be contained in a separate enclosure and appropriately marked. Any delay in receiving the required examinations and reference materials, or the
procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E LAMAR BLVD ARLINGTON, TX 76011-4511 
817-200-1159.
R. Flores - 2 -  
                                              Sincerely,
                                              /RA/
submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  In addition, your support for on-site validation of the examinations is required during the week of May 4, 2015.
                                              Vincent G. Gaddy, Chief
                                              Operations Branch
                                              Division of Reactor Safety
Dockets: 50-445; 50-446
Licenses: NPF-87; NPF-89
cc: Electronic Distribution


In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402 and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.


   
  ML14304A383
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
   SUNSI Review            ADAMS              Publicly Available     Non-Sensitive Keyword:
  By: V. Gaddy               Yes No         Non-Publicly Available  Sensitive     RGN-002
To permit timely NRC review and evaluation, your staff should submit preliminary operator and senior operator license applications (Office of Management and Budget (OMB) approval
OFFICE       SOE:OB     OE:OB
number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not
NAME         COsterholtz VGaddy
received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has
SIGNATURE /RA/           /RA/
been completed should be submitted at least 14 days before the first examination date.
DATE         10/30/14   10/30/14
 
                                       
Letter to Rafael Flores from Vincent G. Gaddy, dated October 30, 2014
This letter contains information collections that are subject to the
SUBJECT:       COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
Paperwork Reduction Act of
                NOTIFICATION OF NRC INITIAL OPERATOR LICENSING
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018, which expires on April 30, 2016.  The public reporting burden for
                EXAMINATION 05000445/2015302; 05000446/2015302
this collection of information is estimated to average 50 hours per response, including the time
Electronic distribution by RIV:
for reviewing instructions, gathering and maintaining the data needed, and completing and
Regional Administrator (Marc.Dapas@nrc.gov)
reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Commission, Washington, DC  20555-0001, or by Internet electronic mail to
Acting DRP Director (Troy.Pruett@nrc.gov)
INFOCOLLECTS@NRC.GOV.    
Acting DRP Deputy Director (Jason.Kozal@nrc.gov)
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
Senior Resident Inspector (John.Kramer@nrc.gov)
 
Resident Inspector (Rayomand.Kumana@nrc.gov)
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.   
Administrative Assistant (Rhonda.Smith@nrc.gov)
R. Flores - 3 -
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
   
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)
Thank you for your cooperation in this matter.  Mr. Struble has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at 
Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)
 
Public Affairs Officer (Victor.Dricks@nrc.gov)
817-200-1159.
Public Affairs Officer (Lara.Uselding@nrc.gov)
 
Project Manager (Stephen.Monarque@nrc.gov)
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
      Sincerely, 
RITS Coordinator (Marisa.Herrera@nrc.gov)
 
ACES (R4Enforcement.Resource@nrc.gov)
  /RA/ 
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
      Vincent G. Gaddy, Chief
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
Operations Branch      Division of Reactor Safety
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
Dockets:  50-445; 50-446
Licenses: NPF-87; NPF-89
 
  cc:  Electronic Distribution
 
 
ML14304A383
  SUNSI Review By: V. Gaddy  
ADAMS Yes    No Publicly Available  Non-Publicly Available Non-Sensitive Sensitive Keyword: RGN-002 OFFICE SOE:OB OE:OB     NAME COsterholtz VGaddy     SIGNATURE /RA/ /RA/     DATE 10/30/14 10/30/14      
Letter to Rafael Flores from Vincent G. Gaddy, dated October 30, 2014  
 
SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING  
EXAMINATION 05000445/2015302; 05000446/2015302
Electronic distribution by RIV
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) Acting DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Jason.Kozal@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov) Resident Inspector (Rayomand.Kumana@nrc.gov)  
Administrative Assistant (Rhonda.Smith@nrc.gov)  
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)  
Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov) Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Stephen.Monarque@nrc.gov)  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (John.Jandovitz@nrc.gov)
}}
}}

Latest revision as of 19:58, 31 October 2019

Notification of NRC Initial Operator Licensing Examination 05000445/2015302; 05000446/2015302
ML14304A383
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/30/2014
From: Vincent Gaddy
Operations Branch IV
To: Flores R
Luminant Generation Co
References
IR 2015302 IR-2015302
Download: ML14304A383 (5)


See also: IR 05000445/2015302

Text

R. UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E LAMAR BLVD

ARLINGTON, TX 76011-4511

October 30, 2014

Rafael Flores, Senior Vice President

and Chief Nuclear Officer

Attention: Regulatory Affairs

Luminant Generation Company LLC

Comanche Peak Nuclear Power Plant

P.O. Box 1002

Glen Rose, TX 76043

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000445/2015302; 05000446/2015302

Dear Mr. Flores:

In a telephone conversation on October 29, 2014, between Messrs. G. Struble, Licensing Exam

Manager, and C. Osterholtz, Chief Examiner, arrangements were made for the administration of

licensing examinations at Comanche Peak Nuclear Power Plant during the week of June 1,

2015.

As agreed during the telephone conversation, your staff will prepare the examinations based on

the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power

Reactors, Revision 9, Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for

Nuclear Power Plant Operators, Revision 2, Supplement 1. The NRCs regional office will

discuss with your staff any changes that might be necessary before the examinations are

administered.

To meet the above schedule, it will be necessary for your staff to furnish the examination

outlines by March 23, 2015. The written examinations, operating tests, and supporting

reference materials identified in Attachment 3 to ES-201 will be due by April 20, 2015. Pursuant

to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outlines, examinations, and

tests before they are submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations and reference materials, or the

R. Flores -2-

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled. In addition, your support for on-site validation of the examinations is required

during the week of May 4, 2015.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402 and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary operator and

senior operator license applications (Office of Management and Budget (OMB) approval

number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver

requests (if any) (OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on April 30, 2016. The public reporting burden for

this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, and completing and

reviewing the collection of information. Send comments regarding this burden estimate or any

other aspect of these information collections, including suggestions for reducing the burden, to

the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory

Commission, Washington, DC 20555-0001, or by Internet electronic mail to

INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

R. Flores -3-

Thank you for your cooperation in this matter. Mr. Struble has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Osterholtz at 817-200-1269 or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Dockets: 50-445; 50-446

Licenses: NPF-87; NPF-89

cc: Electronic Distribution

ML14304A383

SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: V. Gaddy Yes No Non-Publicly Available Sensitive RGN-002

OFFICE SOE:OB OE:OB

NAME COsterholtz VGaddy

SIGNATURE /RA/ /RA/

DATE 10/30/14 10/30/14

Letter to Rafael Flores from Vincent G. Gaddy, dated October 30, 2014

SUBJECT: COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 -

NOTIFICATION OF NRC INITIAL OPERATOR LICENSING

EXAMINATION 05000445/2015302; 05000446/2015302

Electronic distribution by RIV:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

Acting DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Jason.Kozal@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Rayomand.Kumana@nrc.gov)

Administrative Assistant (Rhonda.Smith@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

Senior Project Engineer, DRP/A (Ryan.Alexander@nrc.gov)

Project Engineer, DRP/A (Thomas.Sullivan@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Stephen.Monarque@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (John.Jandovitz@nrc.gov)