{{#Wiki_filter:February 2, 2015  
{{#Wiki_filter:UNITED STATES
 
                          NUCLEAR REGULATORY COMMISSION
Mr. Fadi Diya, Senior Vice President   
                                              REGION IV
                                          1600 E. LAMAR BLVD
                                        ARLINGTON, TX 76011-4511
                                          February 2, 2015
Mr. Fadi Diya, Senior Vice President
  and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT:        CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR
                LICENSING EXAMINATION 05000483/2015301
Dear Mr. Diya:
In a telephone conversation on January 28, 2015, between Messrs. Phillip Swan, Examination
Developer, and Stephen Garchow, Nuclear Regulatory Commission (NRC) Chief Examiner,
arrangements were made for the administration of a licensing retake examination consisting of
the Senior Operator portion of the written examination at the Callaway Plant on May 18, 2015.
As agreed during the telephone conversation, the Nuclear Regulatory Commission will provide
written outlines, and your staff will prepare the examinations based on the guidelines in
NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,
Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant
Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff
any changes that might be necessary before the examination is administered.
The draft Senior Operator written examination and supporting reference materials identified in
Attachment 3 to ES-201 will be due by April 6, 2015, and final examination materials will be due
by April 27, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations
(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee, shall approve the
examinations before it is submitted to the NRC for review and approval. All materials shall be
complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or
safeguards information in your response be contained in a separate enclosure and appropriately
marked. Any delay in receiving the required examinations, and reference materials, or the
submittal of inadequate or incomplete materials, may cause the examinations to be
rescheduled.
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in
effect while the examination is being administered.
To permit timely NRC review and evaluation, your staff should submit the preliminary license
application, (Office of Management and Budget (OMB) approval number 3150-0090), medical
certification (OMB approval number 3150-0024), and waiver requests (OMB approval


and Chief Nuclear Officer
F. Diya                                          -2-
number 3150-0090) at least 30 days before the examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at
817-200-1159.
                                                Sincerely,
                                                /RA/
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket: 50-483
License: NPF-30
Distribution to Callaway Plant


Union Electric Company
F. Diya                                            -2-
P.O. Box 620 Fulton, MO  65251 
number 3150-0090) at least 30 days before the examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301   
Signed applications certifying that all training has been completed should be submitted at least
Dear Mr. Diya:
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act
In a telephone conversation on January 28, 2015, between Messrs. Phillip Swan, Examination
of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
available electronically for public inspection in the NRCs Public Document Room or from the
Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room
page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRCs examination
procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at
817-200-1159.
                                                Sincerely,
                                                /RA/
                                                Vincent G. Gaddy, Chief
                                                Operations Branch
                                                Division of Reactor Safety
Docket: 50-483
License: NPF-30
Distribution to Callaway Plant
DISTRIBUTION:
See next page
R:\_REACTORS\_CW\2015\CW 2015301 RFI-smg.docx
ADAMS ACCENSSION NUMBER: ML15033A195
SUNSI Review    ADAMS:              Sensitive            Non-Publicly Available          Keyword
By: SMG            Yes  No          Non-Sensitive        Publicly Available              NRC-002
OFFICE              SOE:OB                                                          C:OB
NAME                SGarchow                                                        VGaddy
SIGNATURE            /RA/                                                            /RA/
DATE                02/02/15                                                        02/02/15
                                        OFFICIAL RECORD COPY


Developer, and Stephen Garchow, Nuclear Regulatory Commission (NRC) Chief Examiner,
Letter to Fadi Diya from Vincent Gaddy, dated February 2, 2015
arrangements were made for the administration of a licensing retake examination consisting of the Senior Operator portion of the written examination at the Callaway Plant on May 18, 2015. 
SUBJECT:       CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR
As agreed during the telephone conversation, the Nuclear Regulatory Commission will provide
                LICENSING EXAMINATION 05000483/2015301
written outlines, and your staff will prepare the examinations based on the guidelines in
Distribution:
NUREG-1021, "Operator Licensing Examination Standar
Regional Administrator (Marc.Dapas@nrc.gov)
ds for Power Reactors," Revision 9, Supplement 1, and NUREG-1122, "Knowledge and Abilities Catalog for Nuclear Power Plant
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
Operators," Revision 2, Supplement 1.  The NRC's regional office will discuss with your staff any changes that might be necessary before the examination is administered. 
DRP Director (Troy.Pruett@nrc.gov)
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)
The draft Senior Operator written examination and supporting reference materials identified in
DRS Director (Anton.Vegel@nrc.gov)
Attachment 3 to ES-201 will be due by April 6, 2015, and final examination materials will be due by April 27, 2015.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee, shall approve the examinations before it is submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use.  We request that any personal, proprietary, sensitive unclassified, or
DRS Deputy Director (Jeff.Clark@nrc.gov)
safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examinations, and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled. 
Senior Resident Inspector (Thomas.Hartman@nrc.gov)
 
Resident Inspector (Mike.Langelier@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the examination is being administered. 
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
To permit timely NRC review and evaluation, your staff should submit the preliminary license application, (Office of Management and Budget (OMB) approval number 3150-0090), medical certification (OMB approval number 3150-0024), and waiver requests (OMB approval
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)
  UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 
CW Administrative Assistant (Dawn.Yancey@nrc.gov)
F. Diya - 2 -
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
number 3150-0090) at least 30 days before the examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least
Project Manager (Fred.Lyon@nrc.gov)
14 days before the first examination date. 
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)
 
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
This letter contains information collections that are subject to the
Regional Counsel (Karla.Fuller@nrc.gov)
Paperwork Reduction Act
Technical Support Assistant (Loretta.Williams@nrc.gov)
of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018.  The public reporting burden for this collection of information is estimated to average 50 hours per response, including the time for reviewing instructions,
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
gathering and maintaining the data needed, and completing and reviewing the collection of
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
information.  Send comments regarding this burden estimate or any other aspect of these
RIV/ETA: OEDO (Michael.Waters@nrc.gov)
information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, DC  20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.   
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number. 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.    Thank you for your cooperation in this matter.  Mr. Swan has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 
 
817-200-1159. 
      Sincerely, 
 
      /RA/ 
      Vincent G. Gaddy, Chief 
Operations Branch        Division of Reactor Safety 
 
Docket:  50-483  License:  NPF-30   
Distribution to Callaway Plant 
 
 
F. Diya - 2 -
number 3150-0090) at least 30 days before the examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date. 
This letter contains information collections that are subject to the
Paperwork Reduction Act
of 1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by OMB, under approval number 3150-0018.  The public reporting burden for this collection of information is
estimated to average 50 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information.  Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC  20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.    The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number. 
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS).  ADAMS is accessible from the electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.   
Thank you for your cooperation in this matter.  Mr. Swan has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at 
 
817-200-1159. 
 
      Sincerely, 
        /RA/        Vincent G. Gaddy, Chief 
Operations Branch        Division of Reactor Safety 
Docket:  50-483 
License:  NPF-30   
 
Distribution to Callaway Plant 
DISTRIBUTION
: See next page
R:\_REACTORS\_CW\2015\CW 2015301 RFI-smg.docx  ADAMS ACCENSSION NUMBER:  ML15033A195  SUNSI Review By:  SMG ADAMS:    Yes      No  Sensitive    Non-Sensitive  Non-Publicly Available    Publicly Available Keyword NRC-002 OFFICE SOE:OB  C:OB NAME SGarchow  VGaddy SIGNATURE /RA/  /RA/ DATE 02/02/15  02/02/15 OFFICIAL RECORD COPY
Letter to Fadi Diya from Vincent Gaddy, dated February 2, 2015  
SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000483/2015301  
  Distribution
: Regional Administrator (Marc.Dapas@nrc.gov) Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov)  
Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)  
DRS Director (Anton.Vegel@nrc.gov)  
DRS Deputy Director (Jeff.Clark@nrc.gov) Senior Resident Inspector (Thomas.Hartman@nrc.gov) Resident Inspector (Mike.Langelier@nrc.gov)  
 
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)  
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)  
Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)  
CW Administrative Assistant (Dawn.Yancey@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov)  
Public Affairs Officer (Lara.Uselding@nrc.gov)  
 
Project Manager (Fred.Lyon@nrc.gov)  
Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)  
RITS Coordinator (Marisa.Herrera@nrc.gov)  
ACES (R4Enforcement.Resource@nrc.gov) Regional Counsel (Karla.Fuller@nrc.gov)  
Technical Support Assistant (Loretta.Williams@nrc.gov)  
Congressional Affairs Officer (Jenny.Weil@nrc.gov)  
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov)
}}
}}

Latest revision as of 17:19, 31 October 2019

Notification of NRC Initial Operator Licensing Examination 05000483/2015301
ML15033A195
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/02/2015
From: Vincent Gaddy
Operations Branch IV
To: Diya F
Union Electric Co
Gaddy V
References
IR 2015001
Download: ML15033A195 (4)


See also: IR 05000483/2015301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD

ARLINGTON, TX 76011-4511

February 2, 2015

Mr. Fadi Diya, Senior Vice President

and Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000483/2015301

Dear Mr. Diya:

In a telephone conversation on January 28, 2015, between Messrs. Phillip Swan, Examination

Developer, and Stephen Garchow, Nuclear Regulatory Commission (NRC) Chief Examiner,

arrangements were made for the administration of a licensing retake examination consisting of

the Senior Operator portion of the written examination at the Callaway Plant on May 18, 2015.

As agreed during the telephone conversation, the Nuclear Regulatory Commission will provide

written outlines, and your staff will prepare the examinations based on the guidelines in

NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 9,

Supplement 1, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power Plant

Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your staff

any changes that might be necessary before the examination is administered.

The draft Senior Operator written examination and supporting reference materials identified in

Attachment 3 to ES-201 will be due by April 6, 2015, and final examination materials will be due

by April 27, 2015. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations

(10 CFR 55.40(b)(3)), an authorized representative of the facility licensee, shall approve the

examinations before it is submitted to the NRC for review and approval. All materials shall be

complete and ready-to-use. We request that any personal, proprietary, sensitive unclassified, or

safeguards information in your response be contained in a separate enclosure and appropriately

marked. Any delay in receiving the required examinations, and reference materials, or the

submittal of inadequate or incomplete materials, may cause the examinations to be

rescheduled.

Appendix E to NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the examination is being administered.

To permit timely NRC review and evaluation, your staff should submit the preliminary license

application, (Office of Management and Budget (OMB) approval number 3150-0090), medical

certification (OMB approval number 3150-0024), and waiver requests (OMB approval

F. Diya -2-

number 3150-0090) at least 30 days before the examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Distribution to Callaway Plant

F. Diya -2-

number 3150-0090) at least 30 days before the examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act

of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018. The public reporting burden for this collection of information is

estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,

gathering and maintaining the data needed, and completing and reviewing the collection of

information. Send comments regarding this burden estimate or any other aspect of these

information collections, including suggestions for reducing the burden, to the Records and

FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,

DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRCs Public Document Room or from the

Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the electronic Reading Room

page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. Mr. Swan has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRCs examination

procedures and guidelines, please contact Mr. Garchow at 817-200-1426, or myself at

817-200-1159.

Sincerely,

/RA/

Vincent G. Gaddy, Chief

Operations Branch

Division of Reactor Safety

Docket: 50-483

License: NPF-30

Distribution to Callaway Plant

DISTRIBUTION:

See next page

R:\_REACTORS\_CW\2015\CW 2015301 RFI-smg.docx

ADAMS ACCENSSION NUMBER: ML15033A195

SUNSI Review ADAMS: Sensitive Non-Publicly Available Keyword

By: SMG Yes No Non-Sensitive Publicly Available NRC-002

OFFICE SOE:OB C:OB

NAME SGarchow VGaddy

SIGNATURE /RA/ /RA/

DATE 02/02/15 02/02/15

OFFICIAL RECORD COPY

Letter to Fadi Diya from Vincent Gaddy, dated February 2, 2015

SUBJECT: CALLAWAY PLANT - NOTIFICATION OF NRC INITIAL OPERATOR

LICENSING EXAMINATION 05000483/2015301

Distribution:

Regional Administrator (Marc.Dapas@nrc.gov)

Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)

DRP Director (Troy.Pruett@nrc.gov)

Acting DRP Deputy Director (Thomas.Farnholtz@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Jeff.Clark@nrc.gov)

Senior Resident Inspector (Thomas.Hartman@nrc.gov)

Resident Inspector (Mike.Langelier@nrc.gov)

Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)

Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)

Project Engineer, DRP/B (Fabian.Thomas@nrc.gov)

CW Administrative Assistant (Dawn.Yancey@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Project Manager (Fred.Lyon@nrc.gov)

Branch Chief, DRS/TSB (Geoffrey.Miller@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

ACES (R4Enforcement.Resource@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Technical Support Assistant (Loretta.Williams@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)

RIV/ETA: OEDO (Michael.Waters@nrc.gov)