ML18012A900: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 | {{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM I (RIDS) | ||
ACCESSION NBR:9603040267 FACIL:50-409 La Crosse DOC.DATE: ~ :~ | |||
Dairyland Power Cooperative JOHNSEN,M.N. | Boiling Water Reactor, Dairyland NOTARIZED: NO Power Coop DOCKET 05000409 I | ||
Dairyland Power Cooperative BERG,W.L Dairylard Power Cooperative RECIP.NA'Ir'ECIPIENT AFFILIATION | AUTH. NAME AUTHOR AFFILIATION GREENIW.R. Dairyland Power Cooperative JOHNSEN,M.N. Dairyland Power Cooperative BERG,W.L Dairylard Power Cooperative RECIP.NA'Ir'ECIPIENT AFFILIATION | ||
==SUBJECT:== | ==SUBJECT:== | ||
"Annual Rept 1995 of Changes, Tests 6 Experiments." W/ | |||
Conversion App 5/25/72.FCLB/Gaskin,C. | (996022 ) Itt. | ||
icy. | DISTRIBUTION CODE: IE47D COPIES RECEIVED:LTR i TITLE: 50.59 Annual Report of Changes, Tests or ENCL J SIZE: | ||
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT | Experiments Made W ut Approv T | ||
NOTES:License Exp date in accordance with 10CFR2,2.l09(1/28/75). 05000409 Conversion App 5/25/72. FCLB/Gaskin,C. icy. | |||
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL DRPM/PDND 1 0 FAIRTILE,M 1 1 INTERNAL ILE CENTE 1 1 RGN3 FILE 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTES: 1 1 D | |||
N NOTE TO ALL "RIDS" RECIPIENTS: | |||
CONTROL DESK4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT FROM ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED1 TOTAL NUMBER OF COPXES REQUIRED: LTTR 7 ENCL 6 | |||
p 'OAIRYLANO O | |||
COOPERATIVE 3200 EASTAVE. SO. ~ PO. BOX 817 ~ LACROSSE, WISCONSIN54602-0817 (608) 788-4000 FAX NO. (608) 787-1420 WILLIAML. BERG February 20', '996 General Manager In reply, please refer to LAC-13533 DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen: | |||
==SUBJECT:== | ==SUBJECT:== | ||
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)Possession-Only License No.DPR-45 Annual Re ort for 1995-Re ortofChan es Tests and Ex eriments | Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR) | ||
Possession-Only License No. DPR-45 Annual Re ort for 1995-Re ortofChan es Tests and Ex eriments | |||
==REFERENCES:== | ==REFERENCES:== | ||
(1) LACBWR Technical Specification, Section 6.8.1.1 (2) 10 CFR 50.59(b) | |||
In accordance with Reference 1, we are submitting the Annual Report covering the radiological exposure summary. | |||
Also included are brief descriptions of facility changes, including summaries of their safety evaluations, as required by Reference 2. There were no experiments or tests performed during 1995. | |||
Ifthere are any questions concerning this report, please contact us. | |||
Sincerely, DAIRYLANDPOWER COOPERATIVE William L. Berg, General anager WLB:WRG:dh Enclosures cc: Hub Miller, NRC Regional Administrator, Region III Morton Fairtile, NRC Project Manager P | |||
r g'g( I'g r, w~ | |||
gp 9603040267 95i23i PDR ADOCK 0500040'P R PDR | |||
La Crosse Boiling Water Reactor (LACBWR) a~ | |||
C Annual Report - 1995 Prepared by William R. Green and Michael N. Johnsen Technical Support Engineers POSSESSION-ONLY LICENSE NO. DPR-45 Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-0817 FI | |||
N F AN HH TB AND~ERMENT 1995 FACILITYCHANGE The following Facility Changes, which did not require prior NRC approval, were physically completed in 1995. A summary of the safety evaluations performed in accordance with 10 CFR 50.59 type criteria is included. It was determined that there were no unreviewed safety questions for these facility changes, 04-94-04 REMOVALOF WASTE TREATl4KNTBUILDINGULTRASONIC SINK This equipment was no longer used at the I.ACBWR facility and its removal had no effect on safety. | |||
04-95-05 INSTALLATIONOF NEW DRY CLEANER Replaces existing equipment with more modern and environmentally acceptable equipment and has no effect on safety as it relates to a plant in SAFSTOR. | |||
19-95-20 ADD SAFE. Y CAGE TO LADDER Installed for personnel safety. Does not affect the design of plant structures, systems or components related to the safe storage of the fuel. | |||
25-94-06 INSTALLATIONOF COMPUTER COMMUNICATIONSLINE BETWEEN LACBWRPLANT AND ADMINISTRATIONBUILDING Installation of the line allowed LACBWRto interconnect with the Dairyland Power Cooperative computer network. Has no effect on any plant related structures, systems or components associated with SAFSTOR. | |||
37-93-19 REMOVALOF CONTAINMENTBUILDINGMEZZANINELEVEL SAMPLE SINK Samples from Main Steam, Feedwater and Shutdown condensers are no longer required. Removal of the sample sink and associated piping has no efFect on design or function of any structures, systems or components associated with SAFSTOR. | |||
68-95-06 WASTE DISPOSAL BUILDINGHOT WATER HEATER REMOVAL There was no justification for replacement of this water heater when it failed, and its removal has no effect on structure, system or components associated with SAFSTOR. | |||
68-95-07 INSTALLISOLATION VALVEIN WELL WATER SUPPLY TO MULTIZONE AIR CONDITIONER. | |||
This isolation valve was installed to facilitate maintenance on the condenser section of the Multizone Air Conditioner and has no effect on structures, systems or components associated with SAFSTOR. | |||
81-94-04 INSTALLATIONOF NEW TELEPHONE EQUIPMENT Modernization of the phone system, providing enhanced reliability and function of the plant telephone system. | |||
87-95-19 ADDITIONALSECURITY LIGHTINGAROUND PROTECTED AREA Increase light in identified areas for security. Minor load change with no effect on plant electrical system. | |||
DES RIPTION OF CHANGES TESTS AND EXPERIMENTS - (cont'd) | |||
TESTS There were no tests conducted during 1995. | |||
EXPERIMENTS There were no experiments conducted during 1995. | |||
1995 APPENDIX A STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REMBY WORK AND JOB FUNCTION | |||
¹mber ofPersonnel (>100 mrem) Total Man-Rem Station Utility: -: . Contract Station. ,, Utility- Contract; ., | |||
Work 2 Job Function Employees Employees 'Workers and Employees Einployees Workers'and'-'the'rs" Others REACTOR OPERATIONS/SURVEILLANCE Maintenance Personnel 0.304 0.000 0.190 Operating Personnel 1.404 0.000 0.000 Health Physics Personnel 0.729 0.000 0.000 Supervisory Personnel 0.231 0.000 0.000 Engineering Personnel 0.007 0.002 0.000 ROUTINE MAINTENANCE Maintenance Personnel 0.043 0.000 0.000 Operating Personnel 0.000 0.000 0.000 Health Physics Personnel 0.000 0.000 0.000 Supervisory Personnel 0.000 0.000 0.000 Engineering Personnel 0.000 0.000 0.000 INSERVICE INSPECTION Maintenance Personnel 0.000 0.000 0.000 Operating Personnel 0.000 0.000 0.000 Health Physics Personnel 0.000 0.000 0.000 Supervisory Personnel 0.000 0.000 0.000 Engineering Personnel 0.000 0.000 0.000 SPE IALMAINTENANCE Maintenance Personnel 14 0.273 0.000 3.586 Operating Personnel 0 0.410 0.000 0.000 Health Physics Personnel 0 0.076 0.000 0.020 Supervisory Personnel 0 0.140 0.000 0.000 Engineering Personnel 0 0.013 0.078 0.000 | |||
~ ~ | |||
~ | |||
~ 4 I | |||
~ | |||
' | |||
a ~ ~ ~ ~ ~ ~ | |||
~ | ~ ~ 1 | ||
~ ~ | |||
~ | |||
~ . | |||
~ I I I III I III | |||
~ ~ . ~ | |||
'' ~ I I e I III I III | |||
~ | |||
~ I I I III I III | |||
~ ~ I II ' I III I III III I III I III | |||
~ . | |||
~ I I II I III I I II | |||
~ o' ~ | |||
'' ~ I III I III I III I III I III I III | |||
~ ~ I III I III I III I III I III I III I ' | |||
~ s . | |||
'. s i ~ | |||
I I III | |||
~ . | |||
~ I i I I III | |||
~ | |||
' I ll I III | |||
~ ~' ' I ill | |||
~ ~ ~ | |||
I I ~ | |||
~ | |||
~ II ~ ~ | |||
~ 4 ~}} |
Revision as of 04:50, 22 October 2019
ML18012A900 | |
Person / Time | |
---|---|
Site: | La Crosse File:Dairyland Power Cooperative icon.png |
Issue date: | 12/31/1995 |
From: | Berg W, Green W, Johnsen M DAIRYLAND POWER COOPERATIVE |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
LAC-13533, NUDOCS 9603040267 | |
Download: ML18012A900 (8) | |
Text
CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM I (RIDS)
ACCESSION NBR:9603040267 FACIL:50-409 La Crosse DOC.DATE: ~ :~
Boiling Water Reactor, Dairyland NOTARIZED: NO Power Coop DOCKET 05000409 I
AUTH. NAME AUTHOR AFFILIATION GREENIW.R. Dairyland Power Cooperative JOHNSEN,M.N. Dairyland Power Cooperative BERG,W.L Dairylard Power Cooperative RECIP.NA'Ir'ECIPIENT AFFILIATION
SUBJECT:
"Annual Rept 1995 of Changes, Tests 6 Experiments." W/
(996022 ) Itt.
DISTRIBUTION CODE: IE47D COPIES RECEIVED:LTR i TITLE: 50.59 Annual Report of Changes, Tests or ENCL J SIZE:
Experiments Made W ut Approv T
NOTES:License Exp date in accordance with 10CFR2,2.l09(1/28/75). 05000409 Conversion App 5/25/72. FCLB/Gaskin,C. icy.
RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL DRPM/PDND 1 0 FAIRTILE,M 1 1 INTERNAL ILE CENTE 1 1 RGN3 FILE 01 1 1 EXTERNAL: NOAC 1 1 NRC PDR 1 1 NOTES: 1 1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
CONTROL DESK4 PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT FROM ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED1 TOTAL NUMBER OF COPXES REQUIRED: LTTR 7 ENCL 6
p 'OAIRYLANO O
COOPERATIVE 3200 EASTAVE. SO. ~ PO. BOX 817 ~ LACROSSE, WISCONSIN54602-0817 (608) 788-4000 FAX NO. (608) 787-1420 WILLIAML. BERG February 20', '996 General Manager In reply, please refer to LAC-13533 DOCKET NO. 50-409 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen:
SUBJECT:
Dairyland Power Cooperative La Crosse Boiling Water Reactor (LACBWR)
Possession-Only License No. DPR-45 Annual Re ort for 1995-Re ortofChan es Tests and Ex eriments
REFERENCES:
(1) LACBWR Technical Specification, Section 6.8.1.1 (2) 10 CFR 50.59(b)
In accordance with Reference 1, we are submitting the Annual Report covering the radiological exposure summary.
Also included are brief descriptions of facility changes, including summaries of their safety evaluations, as required by Reference 2. There were no experiments or tests performed during 1995.
Ifthere are any questions concerning this report, please contact us.
Sincerely, DAIRYLANDPOWER COOPERATIVE William L. Berg, General anager WLB:WRG:dh Enclosures cc: Hub Miller, NRC Regional Administrator, Region III Morton Fairtile, NRC Project Manager P
r g'g( I'g r, w~
gp 9603040267 95i23i PDR ADOCK 0500040'P R PDR
La Crosse Boiling Water Reactor (LACBWR) a~
C Annual Report - 1995 Prepared by William R. Green and Michael N. Johnsen Technical Support Engineers POSSESSION-ONLY LICENSE NO. DPR-45 Dairyland Power Cooperative 3200 East Avenue South La Crosse, WI 54602-0817 FI
N F AN HH TB AND~ERMENT 1995 FACILITYCHANGE The following Facility Changes, which did not require prior NRC approval, were physically completed in 1995. A summary of the safety evaluations performed in accordance with 10 CFR 50.59 type criteria is included. It was determined that there were no unreviewed safety questions for these facility changes, 04-94-04 REMOVALOF WASTE TREATl4KNTBUILDINGULTRASONIC SINK This equipment was no longer used at the I.ACBWR facility and its removal had no effect on safety.
04-95-05 INSTALLATIONOF NEW DRY CLEANER Replaces existing equipment with more modern and environmentally acceptable equipment and has no effect on safety as it relates to a plant in SAFSTOR.
19-95-20 ADD SAFE. Y CAGE TO LADDER Installed for personnel safety. Does not affect the design of plant structures, systems or components related to the safe storage of the fuel.
25-94-06 INSTALLATIONOF COMPUTER COMMUNICATIONSLINE BETWEEN LACBWRPLANT AND ADMINISTRATIONBUILDING Installation of the line allowed LACBWRto interconnect with the Dairyland Power Cooperative computer network. Has no effect on any plant related structures, systems or components associated with SAFSTOR.
37-93-19 REMOVALOF CONTAINMENTBUILDINGMEZZANINELEVEL SAMPLE SINK Samples from Main Steam, Feedwater and Shutdown condensers are no longer required. Removal of the sample sink and associated piping has no efFect on design or function of any structures, systems or components associated with SAFSTOR.
68-95-06 WASTE DISPOSAL BUILDINGHOT WATER HEATER REMOVAL There was no justification for replacement of this water heater when it failed, and its removal has no effect on structure, system or components associated with SAFSTOR.
68-95-07 INSTALLISOLATION VALVEIN WELL WATER SUPPLY TO MULTIZONE AIR CONDITIONER.
This isolation valve was installed to facilitate maintenance on the condenser section of the Multizone Air Conditioner and has no effect on structures, systems or components associated with SAFSTOR.
81-94-04 INSTALLATIONOF NEW TELEPHONE EQUIPMENT Modernization of the phone system, providing enhanced reliability and function of the plant telephone system.
87-95-19 ADDITIONALSECURITY LIGHTINGAROUND PROTECTED AREA Increase light in identified areas for security. Minor load change with no effect on plant electrical system.
DES RIPTION OF CHANGES TESTS AND EXPERIMENTS - (cont'd)
TESTS There were no tests conducted during 1995.
EXPERIMENTS There were no experiments conducted during 1995.
1995 APPENDIX A STANDARD FORMAT FOR REPORTING NUMBER OF PERSONNEL AND MAN-REMBY WORK AND JOB FUNCTION
¹mber ofPersonnel (>100 mrem) Total Man-Rem Station Utility: -: . Contract Station. ,, Utility- Contract; .,
Work 2 Job Function Employees Employees 'Workers and Employees Einployees Workers'and'-'the'rs" Others REACTOR OPERATIONS/SURVEILLANCE Maintenance Personnel 0.304 0.000 0.190 Operating Personnel 1.404 0.000 0.000 Health Physics Personnel 0.729 0.000 0.000 Supervisory Personnel 0.231 0.000 0.000 Engineering Personnel 0.007 0.002 0.000 ROUTINE MAINTENANCE Maintenance Personnel 0.043 0.000 0.000 Operating Personnel 0.000 0.000 0.000 Health Physics Personnel 0.000 0.000 0.000 Supervisory Personnel 0.000 0.000 0.000 Engineering Personnel 0.000 0.000 0.000 INSERVICE INSPECTION Maintenance Personnel 0.000 0.000 0.000 Operating Personnel 0.000 0.000 0.000 Health Physics Personnel 0.000 0.000 0.000 Supervisory Personnel 0.000 0.000 0.000 Engineering Personnel 0.000 0.000 0.000 SPE IALMAINTENANCE Maintenance Personnel 14 0.273 0.000 3.586 Operating Personnel 0 0.410 0.000 0.000 Health Physics Personnel 0 0.076 0.000 0.020 Supervisory Personnel 0 0.140 0.000 0.000 Engineering Personnel 0 0.013 0.078 0.000
~ ~
~
~ 4 I
~
'
a ~ ~ ~ ~ ~ ~
~ ~ 1
~ ~
~
~ .
~ I I I III I III
~ ~ . ~
~ I I e I III I III
~
~ I I I III I III
~ ~ I II ' I III I III III I III I III
~ .
~ I I II I III I I II
~ o' ~
~ I III I III I III I III I III I III
~ ~ I III I III I III I III I III I III I '
~ s .
'. s i ~
I I III
~ .
~ I i I I III
~
' I ll I III
~ ~' ' I ill
~ ~ ~
I I ~
~
~ II ~ ~
~ 4 ~